Active Building Code Administration Project Inspection Results
BCA Project #: 25-03701- Ringling Circus Museum - Storm Repairs -Roof
Inspection Date | Discipline | Type | Result | Inspector | Comments |
2025/09/04 | Plumbing | Final Plumbing | Cancelled | Paul Nitz | Can this inspection be for 9.4? This inspection should have been for Dirac Starbucks and not Ringling |
2025/09/04 | Electrical | Ceiling Rough-in | Cancelled | Rocky Wilde | Can this inspection be for 9.4? This inspection should have been for Dirac Starbucks and not Ringling |
2025/09/04 | Fire Safety | Fire Water Above Ground | Cancelled | Curtis Rogers | Can this inspection be for 9.4? This inspection should have been for Dirac Starbucks and not Ringling |
BCA Project #: 25-03692- Howser Stadium Upgrade Ph 2
Inspection Date | Discipline | Type | Result | Inspector | Comments |
2025/09/09 | Building/Structural | Re-Inspection | Passed | Paul Nitz | |
2025/09/08 | Building/Structural | Framing | Cancelled | Paul Nitz | |
2025/09/08 | Mechanical | Duct Rough-in | Passed | Paul Nitz | |
2025/09/04 | Building/Structural | Sheetrock | Failed | Paul Nitz | Georgia Pacific installation instructions call for a 6 & 8 screw pattern for structural dens glass panels |
2025/09/04 | Building/Structural | Framing | Failed | Paul Nitz | 1) Studs missing 2) Screws missing 3) Bracing (blocking) missing for dens glass |
2025/08/28 | Electrical | Underground | Passed | Rocky Wilde | |
2025/08/15 | Building/Structural | Framing | Failed | Kody Boswell | Reviewed LG framing for new exterior infill walls. The following needs to be corrected or addressed: 1) It's unclear where bracing and blocking should be installed. Half points of vertical studs? Third points of vertical studs? Contractor to get clarification from EOR. 2) Top and bottom continuous track doesn't have the required fastener spacing per structural drawings. Contractor to install fasteners at 6" OC 3) Double vertical studs are required at new window jamb locations. They were not in place at time of inspection. Contractor to install vertical studs as needed. 4) Additional connections at interior door headers for IT and mech room are to be installed. |
BCA Project #: 24-03685- UCA Add Office Space
Inspection Date | Discipline | Type | Result | Inspector | Comments |
2025/09/10 | Building/Structural | Sheetrock | Conditional | Paul Nitz | Please Call Tony 229-416-6480 1) not complete when inspected, please reschedule another inspection for tomorrow 9/11/2025 so I can pass the inspection with the pics you sent. |
2025/09/10 | Building/Structural | Framing | Passed | Paul Nitz | Please Call Tony 229-416-6480 |
2025/09/05 | Building/Structural | Final Building | Conditional | Paul Nitz | please call josh @ (850)933-2580 invalid permit # for the 1st floor project |
2025/09/05 | Electrical | Wall Rough-in | Passed | Rocky Wilde | Please contact Josh - 850.933.2580 |
2025/09/05 | Building/Structural | Framing | Conditional | Paul Nitz | Please contact Josh - 850.933.2580 1) splicing needs to be addressed before final sheetrock inspection, ok to sheetrock one side and insulate |
2025/09/05 | Fire Safety | Final Fire Safety | NOT READY | Curtis Rogers | Please Contact Josh - 850.933.2580 |
2025/09/05 | Electrical | Final Electrical | Passed | Rocky Wilde | Please Contact Josh - 850.933.2580 |
2025/09/05 | Electrical | Final Electrical | Conditional | Rocky Wilde | please call josh @ (850)933-2580 invalid permit # for the 1st floor project |
BCA Project #: 24-03684-B FSUPD Unit 2 Demo-Lacrosse
Inspection Date | Discipline | Type | Result | Inspector | Comments |
2025/07/09 | Plumbing | Re-Inspection | Passed | Paul Nitz | Cut & Caps are now painted with tar, ready for reinspection |
2025/07/09 | Plumbing | Underground | Passed | Paul Nitz | Cut & Caps are now painted with tar, ready for reinspection |
2025/07/08 | Plumbing | Underground | Failed | Paul Nitz | Shane with English Earthworks is utility contractor onsite. He can be reached at 407-433-3261 1) some of the drains had been covered and could not be inspected 2) The underground caps need to be protected from corrosion |
BCA Project #: 24-03682- Regal Theatre Property Electrical Upgrades
Inspection Date | Discipline | Type | Result | Inspector | Comments |
2025/08/08 | Electrical | Final Electrical | Passed | Rocky Wilde | Please have the inspector call 45 minutes before, Gary is not on site. Gary (850) 247-7418 |
2025/07/31 | Electrical | Final Electrical | Passed | Rocky Wilde | Gary Mansell (850) 247-7418, please have the inspector call when he is 45 minutes out because Gary is not on site. |
BCA Project #: 24-03679- Parking Garage 1 Bookstore Renovation
Inspection Date | Discipline | Type | Result | Inspector | Comments |
2025/09/10 | Plumbing | Underground | Passed | Paul Nitz | |
2025/09/08 | Mechanical | HW Piping & Test | Passed | Paul Nitz |
BCA Project #: 24-03677- BSIR Post Project Revisions
Inspection Date | Discipline | Type | Result | Inspector | Comments |
2025/07/21 | Electrical | Final Electrical | Postponed | Rocky Wilde | ASI 5 electrical revisions. Rooms 0119P and 0119N. |
2025/07/11 | Mechanical | Final Mechanical | Passed | Paul Nitz | Paul and Rocky, This inspection will be in room 0116 that was part of the BSIR Lab permit for the 0119 suite. It's the one we discussed this past Tuesday morning. Thanks, Larry |
2025/07/11 | Electrical | Final Electrical | Passed | Al Smythe | Paul and Rocky, This inspection will be in room 0116 that was part of the BSIR Lab permit for the 0119 suite. It's the one we discussed this past Tuesday morning. Thanks, Larry |
2025/07/11 | Plumbing | Final Plumbing | Passed | Paul Nitz | Paul inspected this on 7/11/25. Room 116 emergency shower and eyewash. |
2025/06/16 | Electrical | Final Electrical | Passed | Rocky Wilde | This final will be for 0119P and 0119Q in the BSIR Lab. It was agreed upon, that the whips in question will actually be a part of the equipment and will connect to the disconnects. Thank you, Larry |
Electrical | Ceiling Rough-in | Passed | Rocky Wilde | This inspection will be in room 0119. Larry |
BCA Project #: 24-03676- Tucker Civic Center Investigate Sewer Piping in Restrooms
Inspection Date | Discipline | Type | Result | Inspector | Comments |
2025/06/02 | Plumbing | Underground | Passed | James Melvin |
BCA Project #: 24-03675- Kuersteiner Opperman Music Hall Replace Lighting Dimmer Racks
Inspection Date | Discipline | Type | Result | Inspector | Comments |
2025/09/03 | Electrical | Final Electrical | Passed | Rocky Wilde | |
2025/09/03 | Fire Safety | Final Egress/Emergency Lights | Passed | Curtis Rogers | |
2025/08/14 | Electrical | Final Electrical | Partial | Rocky Wilde | Opperman Music Hall Westside entry |
BCA Project #: 24-03665- Dirac Starbucks
Inspection Date | Discipline | Type | Result | Inspector | Comments |
2025/09/09 | Electrical | Final Electrical | Failed | Rocky Wilde | MP&E Final inspection. |
2025/09/09 | Plumbing | Final Plumbing | Conditional | Paul Nitz | MP&E Final inspection. 1) Bacteria report required |
2025/09/09 | Mechanical | Final Mechanical | Passed | Paul Nitz | MP&E Final inspection. |
2025/09/05 | Mechanical | Wall & Ceiling | Passed | Paul Nitz | |
2025/09/05 | Electrical | Wall Rough-in | Paul Nitz | plumbing innspection is for insulation and all were performed on 09/04/2025 @ 3:30pm by Rock Wilde and Paul Nitz | |
2025/09/05 | Electrical | Ceiling Rough-in | Paul Nitz | plumbing innspection is for insulation and all were performed on 09/04/2025 @ 3:30pm by Rock Wilde and Paul Nitz | |
2025/09/05 | Plumbing | Rough-in | Paul Nitz | plumbing innspection is for insulation and all were performed on 09/04/2025 @ 3:30pm by Rock Wilde and Paul Nitz | |
2025/09/05 | Mechanical | Duct Rough-in | Paul Nitz | plumbing innspection is for insulation and all were performed on 09/04/2025 @ 3:30pm by Rock Wilde and Paul Nitz | |
2025/09/05 | Mechanical | Insulation | Paul Nitz | plumbing innspection is for insulation and all were performed on 09/04/2025 @ 3:30pm by Rock Wilde and Paul Nitz | |
2025/09/05 | Plumbing | Final Plumbing | Conditional | Paul Nitz | 1) hot and cold-water supply lines need to be labeled before final plumbing inspection. Ok to hang ceiling tile |
2025/09/04 | Mechanical | Duct Rough-in | Conditional | Paul Nitz | these inspections were performed on 09/04/2025 by Paul Nitz and Rocky Wilde, they were accidently loged in for Ringling Circus Musium by Garrison.the plumbing inspection is for plumbing insulation 1) ducting needs to be taped off at boot 2) some ducting needs to be repaired (holes patched) OK TO START HANGING CEILING TILE |
2025/09/04 | Plumbing | Rough-in | Passed | Paul Nitz | these inspections were performed on 09/04/2025 by Paul Nitz and Rocky Wilde, they were accidently loged in for Ringling Circus Musium by Garrison.the plumbing inspection is for plumbing insulation |
2025/09/04 | Electrical | Ceiling Rough-in | Passed | Rocky Wilde | these inspections were performed on 09/04/2025 by Paul Nitz and Rocky Wilde, they were accidently loged in for Ringling Circus Musium by Garrison.the plumbing inspection is for plumbing insulation |
2025/09/04 | Electrical | Wall Rough-in | Passed | Rocky Wilde | these inspections were performed on 09/04/2025 by Paul Nitz and Rocky Wilde, they were accidently loged in for Ringling Circus Musium by Garrison.the plumbing inspection is for plumbing insulation |
2025/09/04 | Mechanical | Insulation | Conditional | Paul Nitz | these inspections were performed on 09/04/2025 by Paul Nitz and Rocky Wilde, they were accidently loged in for Ringling Circus Musium by Garrison.the plumbing inspection is for plumbing insulation |
2025/09/03 | Electrical | Ceiling Rough-in | Cancelled | Rocky Wilde | |
2025/09/03 | Fire Safety | Fire Alarm Rough-In | Passed | Curtis Rogers | Fire Alarm Rough-IN PASSED Side Note: Put it for Fire Water Above Ground *Add hangers to Sprinkler Pipe (1ft from end w/ Fire Pump) *Change (1) 155 degree head to 200 degree head |
2025/09/03 | Mechanical | Final Mechanical | Cancelled | Paul Nitz | |
2025/09/03 | Mechanical | Wall & Ceiling | Cancelled | Paul Nitz | |
2025/09/02 | Electrical | Ceiling Rough-in | NOT READY | Rocky Wilde | |
2025/09/02 | Electrical | Re-Inspection | NOT READY | Rocky Wilde | |
2025/08/29 | Plumbing | Final Plumbing | Failed | Paul Nitz | 1) plumbing insulation has not been inspected. |
2025/08/27 | Electrical | Ceiling Rough-in | Failed | Rocky Wilde | Please call me on your way. Not ready for inspection |
2025/08/01 | Mechanical | Insulation | Partial | Rocky Wilde | hard lid only |
2025/08/01 | Electrical | Ceiling Rough-in | Partial | Rocky Wilde | hard lid only |
2025/07/30 | Electrical | Ceiling Rough-in | Conditional | Rocky Wilde | fire alarm box missing, temporary lighting wires are power out of an open box. |
2025/07/29 | Electrical | Ceiling Rough-in | NOT READY | Rocky Wilde | |
2025/07/29 | Mechanical | Duct Rough-in | Passed | Paul Nitz | This inspection was for the mastic and duct to diffuser connection for the main lobby only. |
2025/07/14 | Electrical | Wall Rough-in | Passed | Rocky Wilde | |
2025/07/14 | Plumbing | Rough-in | Passed | Paul Nitz | |
2025/07/14 | Building/Structural | Wall/Ceiling | Passed | Paul Nitz | |
2025/07/03 | Building/Structural | Framing | Failed | Paul Nitz | In-wall framing inspection 1) MEP need to pass before framing can be inspected |
2025/07/03 | Mechanical | Duct Rough-in | Passed | Paul Nitz | . 1) As Built Plans will be required at final for revisions from approved plans regarding flex and duct locations. Ok To insulate duct |
Fire Safety | Fire Water Above Ground | Rocky Wilde | |||
Electrical | Final Electrical | Rocky Wilde | |||
Fire Safety | Final Fire Safety | Rocky Wilde | |||
Fire Safety | Final Egress/Emergency Lights | Rocky Wilde | |||
Mechanical | Wall & Ceiling | Paul Nitz | |||
Plumbing | Rough-in | Paul Nitz | |||
Electrical | Wall Rough-in | Paul Nitz | |||
Building/Structural | Final Building | Rocky Wilde | |||
Fire Safety | Final Fire Alarm | Rocky Wilde |
BCA Project #: 24-03663- Montgomery Flooring & Lighting Replacement
Inspection Date | Discipline | Type | Result | Inspector | Comments |
2025/08/22 | Electrical | Final Electrical | Passed | Rocky Wilde | On site Tech. Jake 850-264-3320 |
BCA Project #: 24-03661- Chemical Science Lab Remodel Rooms 2400 and 5004
Inspection Date | Discipline | Type | Result | Inspector | Comments |
2025/08/05 | Fire Safety | Final Fire Alarm | Passed | Curtis Rogers | Relocate 2 Speaker Strobes on 5th FL |
2025/07/29 | Electrical | Final Electrical | Conditional | Rocky Wilde | room 5004 only, ok to occupy |
2025/06/26 | Building/Structural | Sheetrock | Passed | Kody Boswell | Sheetrock inspection for rooms 2400 and 5004 |
2025/06/24 | Building/Structural | Insulation | Passed | Kody Boswell | |
2025/06/24 | Building/Structural | Sheetrock | Passed | Kody Boswell | |
2025/06/19 | Building/Structural | Framing | Passed | Kody Boswell | Reviewed LG framing for partition wall between Office 5004A and Office 5004B |
Electrical | Wall Rough-in | Passed | Rocky Wilde | ||
Building/Structural | Framing | Failed | Rocky Wilde |
BCA Project #: 24-03651- UCD Partial Roof Replacement
Inspection Date | Discipline | Type | Result | Inspector | Comments |
2025/08/18 | Building/Structural | Roofing | Passed | Kody Boswell | Substantial/Final Roofing Building Inspection Project can be closed out after receipt of lightning protection certificate and Architect's Substantial Completion punchlist. |
2025/08/18 | Building/Structural | Final Building | Passed | Kody Boswell | Substantial/Final Roofing Building Inspection Project can be closed out after receipt of lightning protection certificate and Architect's Substantial Completion punchlist. |
2025/08/05 | Building/Structural | Final Building | Passed | Kody Boswell | Contractor contacted FSU BCA by phone and requested a final inspection for roof work. Roof work is complete. |
2025/07/08 | Building/Structural | Roofing | Passed | Kody Boswell | In-Progress Inspection for Parapro Coating application |
2025/06/18 | Building/Structural | Roofing | Passed | Kody Boswell | In-Progress Inspection - LWIC Dry-In Plates |
2025/06/11 | Building/Structural | Roofing | Passed | Kody Boswell | In-Progress Inspection / Pull Test |
2025/04/30 | Building/Structural | Roofing | Passed | Kody Boswell | In progress inspection - Tear Off/Dry-In |
Building/Structural | Roofing | Postponed | Kody Boswell | Substantial Completion Contractor contacted FSU BCA to postpone inspection to a later date. | |
Building/Structural | Final Building | Postponed | Kody Boswell | Substantial Completion Contractor contacted FSU BCA to postpone inspection to a later date. |
BCA Project #: 24-03645- CSL 5th Floor Lab Restoration
Inspection Date | Discipline | Type | Result | Inspector | Comments |
2025/08/26 | Mechanical | Duct Rough-in | Passed | Paul Nitz | |
2025/08/26 | Mechanical | Re-Inspection | Passed | Paul Nitz | |
2025/08/15 | Mechanical | Duct Pressure Test | Failed | Paul Nitz | 1) duct was not holding pressure |
2025/07/23 | Mechanical | Duct Rough-in | Passed | Rocky Wilde | |
2025/05/07 | Building/Structural | Insulation | Passed | Kody Boswell | Reviewed insulation and sheathing for new LG framed walls. |
2025/05/07 | Building/Structural | Sheetrock | Passed | Kody Boswell | Reviewed insulation and sheathing for new LG framed walls. |
2025/05/05 | Plumbing | Rough-in | Passed | Paul Nitz | VENT ONLY |
2025/05/05 | Building/Structural | Framing | Passed | Paul Nitz |
BCA Project #: 24-03644- Law School Advocacy Center 2nd Floor Offices
Inspection Date | Discipline | Type | Result | Inspector | Comments |
2025/09/05 | Building/Structural | Final Building | Conditional | Kody Boswell | Final building inspection Result is conditional pending items below being addressed: 1) Ground floor - cover plates need to be installed, paint needs to be touched up in several spots, signage needs to be posted 2) 2nd floor - cover plates need to be installed, signage needs to be posted, data line was a work in progress at time of inspection |
2025/08/13 | Fire Safety | Final Fire Alarm | Passed | Curtis Rogers | Passed- Relocated Speaker Strobes on Ground & 2nd Floors |
2025/08/13 | Fire Safety | Final Fire Sprinkler | Passed | Curtis Rogers | *Intsall missing (2)Escutcheon plates |
2025/07/31 | Electrical | Final Electrical | Conditional | Rocky Wilde | Call when on your way. |
2025/07/31 | Mechanical | Wall & Ceiling | Conditional | Rocky Wilde | Call when on your way. |
2025/07/31 | Fire Safety | Fire Water Above Ground | Passed | Curtis Rogers | Above Ceiling Inspection Visual- 1st & 2nd Floors |
2025/06/11 | Building/Structural | Sheetrock | Passed | Kody Boswell | |
2025/06/11 | Building/Structural | Insulation | Passed | Kody Boswell | |
2025/06/05 | Building/Structural | Framing | Passed | James Melvin | Partial framing inspection |
2025/06/05 | Electrical | Wall Rough-in | Passed | James Melvin | Partial framing inspection |
2025/06/05 | Electrical | Ceiling Rough-in | Passed | James Melvin | Partial framing inspection |
BCA Project #: 24-03639- Love Building Envelope
Inspection Date | Discipline | Type | Result | Inspector | Comments |
2025/08/21 | Building/Structural | Wall/Ceiling | Passed | Paul Nitz | 4th floor, east elevation |
2025/08/15 | Building/Structural | Wall/Ceiling | Passed | Kody Boswell | 1st-4th floors East elevation |
2025/08/08 | Building/Structural | Wall/Ceiling | Passed | Kody Boswell | Interior final for the 2nd, 3rd, and 4th floors on the North and South elevations. |
2025/07/30 | Building/Structural | Wall/Ceiling | Passed | Kody Boswell | Reviewed the following rooms on the 1st floor for substantial completion so furniture could be moved back in: 108B, 108C, 108D, 105, 104A, 104B, 103, 102, 107, 106 |
2025/07/29 | Building/Structural | Wall/Ceiling | Passed | Kody Boswell | Reviewed window installation procedures for the 1st-4th floors West elevation |
2025/07/16 | Building/Structural | Wall/Ceiling | Passed | Kody Boswell | 3rd and 4th floors North and South Elevations. |
2025/06/24 | Building/Structural | Wall/Ceiling | Passed | Kody Boswell | North side 2nd floor, south side basement and 1st floor |
2025/06/13 | Building/Structural | Masonry | Passed | Paul Nitz |
BCA Project #: 24-03631- Biomedical Facility ATS and New Generator
Inspection Date | Discipline | Type | Result | Inspector | Comments |
Building/Structural | Slab | Kody Boswell |
BCA Project #: 24-03625- Sliger Data Center Chiller
Inspection Date | Discipline | Type | Result | Inspector | Comments |
2025/07/02 | Mechanical | CHW Piping & Test | Passed | Paul Nitz |
BCA Project #: 24-03623- Westcott Ruby Diamond OVPR Suite Modifications
Inspection Date | Discipline | Type | Result | Inspector | Comments |
2025/09/03 | Building/Structural | Final Building | Passed | Kody Boswell | Final building inspection. Project can be closed out. |
2025/08/22 | Plumbing | Final Plumbing | Passed | Paul Nitz | |
2025/07/15 | Electrical | Final Electrical | Failed | Rocky Wilde | open boxes, several boxes need to be labeled |
2025/07/11 | Mechanical | Insulation | Passed | Paul Nitz | |
2025/07/11 | Plumbing | Final Plumbing | Failed | Paul Nitz | 1) Plans call for a brass p trap 2) Plans call for a angle valve 3) Water supply line needs supported |
2025/06/30 | Building/Structural | Wall/Ceiling | Passed | Paul Nitz | Cieling grid inspection |
2025/06/30 | Mechanical | Duct Rough-in | Passed | Paul Nitz | |
2025/06/09 | Building/Structural | Sheetrock | Passed | Kody Boswell | Reviewed sheathing attachment for one new partiiton wall and two door infill areas |
2025/06/05 | Electrical | Wall Rough-in | Passed | James Melvin | |
2025/05/30 | Building/Structural | Framing | Conditional | Kody Boswell | Reviewed LG framing for a new partition wall and two door infills. Result is conditional pending addional bracing installation at the top of new partition wall. |
2025/05/21 | Plumbing | Rough-in | Passed | Paul Nitz |
BCA Project #: 24-03619- Fine Arts Waterproofing
Inspection Date | Discipline | Type | Result | Inspector | Comments |
2025/08/13 | Building/Structural | Framing | Passed | Paul Nitz | Inspection on new stairs 1) Gaps in stair wall over 4” wide need to be filled before final CC 2) Feet of stair landing support need to be grouted with non-shrinking grout before final CC |
2025/06/26 | Building/Structural | Slab | Passed | Kody Boswell | Inspection on sidewalk |
2025/06/20 | Building/Structural | Slab | Passed | Kody Boswell | Inspection on Wire for new concrete slab and sidewalk |
2025/06/17 | Building/Structural | Structural | Passed | Kody Boswell | Reviewed reinforcing steel for two site walls. |
2025/06/11 | Building/Structural | Footing | Passed | Kody Boswell | Reviewed reinforcing steel for new footers for walls around Radius classroom area |
2025/06/06 | Building/Structural | Slab | Passed | Kody Boswell | Inspection on Rebar for Pad at Fire egress area in front and steps on West side |
2025/05/30 | Building/Structural | Slab | Passed | Kody Boswell | Reviewed reinforcing steel for sidewalk on the west side of the job site |
2025/05/27 | Building/Structural | Framing | Failed | Paul Nitz | Inspection on added Storm water box re-bar 1) an engineered letter will be required for the construction of the storm water box, FSU BCA has not received the plans for its construction 2) an engineered letter will be required for the deviation of the plans on how the 6" and 8" pipe were ran to the storm box. |
2025/05/27 | Building/Structural | Erosion Control | Passed | Paul Nitz | Inspection on remaining revisions storm water piping 1) this is for the 12" pipe inspectipon only |
2025/05/23 | Building/Structural | Erosion Control | Conditional | Paul Nitz | Inspection on revised itein 1) engineered plans required for the storm box tie in |
2025/05/06 | Plumbing | Underground | Conditional | Paul Nitz | Inspection on final section of new Trench drain piping 1) not a final drainpipe inspection, there is still an incomplete section at the entrance of the buildings south side |
2025/05/06 | Building/Structural | Wall/Ceiling | Passed | Paul Nitz | Inspection on Final section of new Waterproofing |
2025/04/29 | Plumbing | Underground | Passed | Paul Nitz | |
2025/04/29 | Building/Structural | Wall/Ceiling | Passed | Paul Nitz | Inspection on new Waterproofing system |
2025/04/25 | Building/Structural | Structural | Passed | Kody Boswell | In-progress inspection of new Waterproofing system, base bid scope of work. Contractor had one area where underlayment and drainage mat was installed and another area where underlayment installation was in progress. |
BCA Project #: 24-03615- Dittmer Building Envelope Parapet
Inspection Date | Discipline | Type | Result | Inspector | Comments |
2025/09/10 | Building/Structural | Framing | Passed | Kody Boswell | Reviewed LG framing for new roof parapet. The items specified for prior framing inspection were addressed. |
2025/09/10 | Building/Structural | Re-Inspection | Passed | Kody Boswell | Reviewed LG framing for new roof parapet. The items specified for prior framing inspection were addressed. |
2025/09/08 | Building/Structural | Framing | Conditional | Kody Boswell | Reviewed LG framing for the roof parapet. The following was observed: 1) There were a few LG connection screws and a few LG to structural steel connection PAFs. Fasteners were installed as BCA pointed them out. 2) There were a few vertical studs where the connection at the bottom track occurred at the prepunched location. Contractor was in the process of stiffening these locations when BCA left the site. Resolved with inspection on 9/10/2025 Inspection result is conditional pending item (2) above being completed. BCA will revisit the site this afternoon to confirm. |
2025/09/08 | Building/Structural | Structural | Passed | Kody Boswell | Reviewed steel framing for the new roof parapet |
Building/Structural | Framing | Postponed | Kody Boswell | Follow up from 9/8 inspection Contractor contacted FSU BCA prior to site arrival to postpone inspection | |
Building/Structural | Structural | Postponed | Kody Boswell | Follow up from 9/8 inspection Contractor contacted FSU BCA prior to site arrival to postpone inspection |
BCA Project #: 24-03613- Panama City Tech Bldg ECAP Electrical Circuit
Inspection Date | Discipline | Type | Result | Inspector | Comments |
Electrical | Ceiling Rough-in | Passed | James Melvin | ||
Electrical | Wall Rough-in | Passed | James Melvin |
BCA Project #: 24-03612- Haskins Circus Tent Concrete
Inspection Date | Discipline | Type | Result | Inspector | Comments |
2025/07/31 | Building/Structural | Slab | Passed | Kody Boswell | Reviewed reinforcing steel for replacing 3 pads of the sidewalk |
2025/03/19 | Building/Structural | Slab | Passed | Paul Nitz | |
2025/02/17 | Building/Structural | Footing | Passed | Paul Nitz | |
2025/02/13 | Plumbing | Underground | Passed | Paul Nitz | I talked to Travis, he said this was for an underground plumbing inspection done yesterday -Kody |
2025/01/29 | Building/Structural | Slab | Passed | Kody Boswell | Preliminary rebar inspection for the new slab for the new circus tent. Contractor to schedule another inspection prior to concrete placement to verify embed installation and expansion material where new concrete meets old concrete. |
BCA Project #: 24-03607- UCB 4th and 5th Floor Modifications
Inspection Date | Discipline | Type | Result | Inspector | Comments |
2025/04/18 | Electrical | Final Electrical | Passed | Rocky Wilde | All missing electrical covers have been installed and T&B sent |
2025/04/18 | Building/Structural | Final Building | Failed | Rocky Wilde | All missing electrical covers have been installed and T&B sent 1) signage missing |
2025/04/18 | Mechanical | Final Mechanical | Passed | Rocky Wilde | All missing electrical covers have been installed and T&B sent |
2025/04/14 | Fire Safety | Final Fire Safety | Passed | Mary Creason | |
2025/04/14 | Mechanical | Final Mechanical | Conditional | Paul Nitz | 1) Test And Balance report required |
2025/04/14 | Electrical | Final Electrical | Failed | Paul Nitz | 1) outlet covers are still missing, this is the third failure for final electrical for this project |
2025/03/28 | Fire Safety | Final Fire Sprinkler | Passed | Mary Creason | |
2025/03/28 | Mechanical | Final Mechanical | Conditional | Paul Nitz | TAB required |
2025/03/28 | Electrical | Final Electrical | Failed | Rocky Wilde | |
2025/03/28 | Fire Safety | Final Fire Safety | NOT READY | Mary Creason | Contractor not ready for a final - no door hardware, no glass panels on doors to hallways, electrical sockets not covered, tape on fire alarm devices due to painting, etc. |
2025/03/26 | Building/Structural | Final Building | Failed | Paul Nitz | This inspection is for the fourth floor only. Please call 850.252.7910 20-30 minutes before you 1) missing final mechanical, electrical 2) missing windows, carpet, door handles, outlet covers |
2025/03/25 | Building/Structural | Final Building | Failed | Paul Nitz | This inspection is for the fourth floor only. Please call 850.252.7910 20-30 minutes before you 1) glass for offices are missing 2) door knobs are missing 3) carpet is missing 4) outlet covers are missing I called the contractor but have not received a call back |
2025/02/11 | Fire Safety | Final Fire Sprinkler | Passed | Sam Sevor | Please call 30 minutes ahead of time so I will make sure to be there for the walk thru. |
2025/02/10 | Mechanical | Duct Rough-in | Failed | Paul Nitz | Please call 30 minutes ahead of time so I will make sure to be there for the walk thru. 1) ducts need to be sealed |
2025/02/10 | Electrical | Wall Rough-in | Passed | James Melvin | Please call 30 minutes ahead of time so I will make sure to be there for the walk thru. |
2025/02/10 | Building/Structural | Sheetrock | Passed | Paul Nitz | Please call 30 minutes ahead of time so I will make sure to be there for the walk thru. |
2025/02/10 | Building/Structural | Wall/Ceiling | Passed | Paul Nitz | Please call 30 minutes ahead of time so I will make sure to be there for the walk thru. |
2025/02/10 | Electrical | Ceiling Rough-in | Passed | James Melvin | Please call 30 minutes ahead of time so I will make sure to be there for the walk thru. |
2025/01/13 | Building/Structural | Final Building | Conditional | Paul Nitz | This inspection is for the 5th floor kitchen area. Super onsite is Charles Burges, his number is 8506934872. 1) 5th floor is ok for CC, the fourth floor was not ready |
2025/01/13 | Fire Safety | Final Fire Safety | Passed | Sam Sevor | This inspection is for the 5th floor kitchen area. Super onsite is Charles Burges, his number is 8506934872. |
2025/01/13 | Electrical | Final Electrical | Passed | James Melvin | This inspection is for the 5th floor kitchen area. Super onsite is Charles Burges, his number is 8506934872. |
2025/01/06 | Electrical | Ceiling Rough-in | Passed | James Melvin | Call me 30 minutes in advance please. |
2025/01/03 | Mechanical | Insulation | Passed | Paul Nitz | Call me 30 minutes in advance please. |
2025/01/03 | Mechanical | Duct Rough-in | Passed | Paul Nitz | Call me 30 minutes in advance please. |
2025/01/03 | Fire Safety | Fire Water Above Ground | Passed | Curtis Rogers | Moved three heads. Pre Inspected by Kurt on 1/3/2025 and passed. |
2025/01/03 | Mechanical | Final Mechanical | Passed | Paul Nitz | Call me 30 minutes in advance please. |
Electrical | Final Electrical | James Melvin | Call me 30 minutes in advance please. |
BCA Project #: 24-03603- Askew Life Center Room 101 E-Sports Gaming Modifications
Inspection Date | Discipline | Type | Result | Inspector | Comments |
2024/11/25 | Building/Structural | Final Building | Passed | Rocky Wilde | During the electrical final on 11/22/2024. Rock Wilde also looked over everything for the building final. |
2024/11/22 | Electrical | Final Electrical | Passed | Rocky Wilde | |
2024/11/12 | Electrical | Ceiling Rough-in | Passed | Alex Masterton | Requesting an above ceiling rough in inspection. If at all possible being there at 8am would be greatly appreciated since flooring is starting tomorrow. |
2024/10/29 | Building/Structural | Sheetrock | Passed | Paul Nitz | sheetrock screw pattern inspection. |
2024/10/23 | Electrical | Wall Rough-in | Passed | James Melvin | Electrical in wall inspection for Rooms 101A, B, C, and D. Please note, above ceiling will be requested at another day/time. |
BCA Project #: 24-03602- Doak Storm Damage Repairs
Inspection Date | Discipline | Type | Result | Inspector | Comments |
2025/01/17 | Electrical | Final Electrical | Passed | Alex Masterton | Onsite contact is Todd Jones 850-544-4424 |
Electrical | Final Electrical | Cancelled | Al Smythe | Rob Thompson with RT Electric contacted FSU BCA via email to cancel this inspection due to roof work not being completed. | |
Building/Structural | Final Building | Cancelled | Paul Nitz | Rob Thompson with RT Electric contacted FSU BCA via email to cancel this inspection due to roof work not being completed. |
BCA Project #: 24-03600- Mag Lab NHMFL NMR Wing Emegency Circuit Reconfigure
Inspection Date | Discipline | Type | Result | Inspector | Comments |
Electrical | Ceiling Rough-in | Rocky Wilde |
BCA Project #: 24-03593- AME Heating System for Wind Tunnel
Inspection Date | Discipline | Type | Result | Inspector | Comments |
2025/07/18 | Building/Structural | Footing | Passed | Kody Boswell | Reviewed reinorcing steel for a footing for new equipment. |
BCA Project #: 24-03582- Research Foundation Building A Neuromodulation Lab
Inspection Date | Discipline | Type | Result | Inspector | Comments |
Electrical | Final Electrical | James Melvin |
BCA Project #: 24-03581- Williams Building Roof Repairs
Inspection Date | Discipline | Type | Result | Inspector | Comments |
2025/08/05 | Building/Structural | Final Building | Passed | Kody Boswell | Contractor contacted FSU BCA via phone call to request inspection. Roof work is complete. |
2025/07/24 | Building/Structural | Roofing | Postponed | Kody Boswell | |
2025/07/24 | Building/Structural | Final Building | Postponed | Kody Boswell | |
2025/03/25 | Building/Structural | Roofing | Passed | Kody Boswell | In-Progress Inspection - Clay Tile Install |
2025/03/17 | Building/Structural | Roofing | Passed | Kody Boswell | In-Progress Inspection - Tile Tear Off/Dry-In Inspection done virtually via photos provided by th Contractor. Filed in in "Inspections" folder in job file. |
BCA Project #: 24-03579- Maryland Circle Interior Renovation
Inspection Date | Discipline | Type | Result | Inspector | Comments |
2025/08/25 | Electrical | Final Electrical | Passed | Rocky Wilde | |
2025/08/25 | Electrical | Ground | Passed | Rocky Wilde | |
2025/08/25 | Building/Structural | Final Building | Partial | Rocky Wilde | missing ADC door accuator |
2025/08/22 | Fire Safety | Final Fire Safety | Passed | Curtis Rogers | *Need ROC Record of Completion from JCI (Fire Alarm Contractor) |
2025/08/22 | Electrical | Ground | Partial | Rocky Wilde | |
2025/08/22 | Fire Safety | Final Egress/Emergency Lights | Passed | Curtis Rogers | *Passed and Resolved -(4) Exits Lights |
2025/08/22 | Fire Safety | Final Fire Sprinkler | Passed | Curtis Rogers | |
2025/08/22 | Plumbing | Equipment | Passed | Paul Nitz | |
2025/08/22 | Electrical | Final Electrical | Partial | Rocky Wilde | |
2025/08/22 | Building/Structural | Final Building | Failed | Paul Nitz | 1) ADA opening devices need to be operable 2) Door needs to be on the bathroom 3) Bacteria report needs to be submitted |
2025/08/22 | Plumbing | Final Plumbing | Passed | Paul Nitz | |
2025/08/21 | Fire Safety | Final Fire Sprinkler | Passed | Curtis Rogers | |
2025/08/21 | Fire Safety | Final Fire Alarm | Passed | Curtis Rogers | *Tested Pull Stations, Smokes and Speaker Strobes (Notification) |
2025/08/21 | Fire Safety | Final Egress/Emergency Lights | Partial | Curtis Rogers | *Tested EM Lighting- *Need to Install 4 new Exit Signs PASSED*All Extinguishers Up-to-date and in correct locations |
2025/08/20 | Electrical | Panel/Feeder | Partial | Rocky Wilde | |
2025/08/20 | Electrical | Lightning Protection | Partial | Rocky Wilde | |
2025/08/20 | Mechanical | Equipment | Passed | Paul Nitz | |
2025/08/20 | Plumbing | Fixtures | Passed | Paul Nitz | |
2025/08/20 | Electrical | ADA Control Rough-In | Partial | Rocky Wilde | |
2025/07/14 | Electrical | Ceiling Rough-in | Passed | Rocky Wilde | Overhead inspection |
2025/07/03 | Electrical | Ceiling Rough-in | Partial | Rocky Wilde | Partial, breakers for disconnects outdoor |
2025/07/02 | Electrical | Ceiling Rough-in | Partial | Rocky Wilde | Partial |
2025/06/20 | Fire Safety | Hydro-Test | Passed | Curtis Rogers | Curt checked checked pressure 6/20/25 |
2025/06/18 | Fire Safety | Fire Water Above Ground | Passed | Mary Creason | Over head FICW side N Note: informed Chewy that supply air can not be next to sprinkler heads - need to have atleast a tile away so that the air does not block the flow of sprinlker. |
2025/06/17 | Mechanical | Wall & Ceiling | Passed | Paul Nitz | Overhead inspection. |
2025/06/12 | Fire Safety | Fire Alarm Rough-In | Passed | Mary Creason | Partial FA rough in for ceiling - approved |
2025/06/10 | Fire Safety | Fire Water Above Ground | Passed | Mary Creason | Sprinkler heads check Partial sprinkler head check - see plans. |
2025/06/09 | Electrical | Ceiling Rough-in | NOT READY | James Melvin | |
2025/06/09 | Mechanical | Wall & Ceiling | Failed | Paul Nitz | 1) support and bend requirements not met as per SMACNA 3.5 S3.24 3.7 S3.34 3.7 S 3.35 |
2025/05/28 | Electrical | Ceiling Rough-in | Passed | Rocky Wilde | grounding only |
2025/05/12 | Building/Structural | Structural | Passed | Paul Nitz | Lobby, sanitation framing and ladder attachment |
2025/04/28 | Building/Structural | Sheetrock | Passed | Paul Nitz | Screw off |
2025/04/28 | Building/Structural | Sheetrock | Passed | Paul Nitz | Rest of screw inspection |
2025/04/28 | Building/Structural | Sheetrock | Passed | Paul Nitz | Screw off |
2025/04/28 | Electrical | Ceiling Rough-in | Passed | James Melvin | Rest of screw inspection |
2025/04/23 | Building/Structural | Insulation | Passed | Paul Nitz | checking reminding insulation |
2025/04/22 | Mechanical | Equipment | Passed | Paul Nitz | Over head pressure test |
2025/04/21 | Building/Structural | Sheetrock | Passed | Paul Nitz | |
2025/04/21 | Building/Structural | Insulation | Passed | Paul Nitz | |
2025/04/16 | Building/Structural | Sheetrock | Passed | Paul Nitz | |
2025/04/16 | Building/Structural | Insulation | Passed | Paul Nitz | 1) pics required for the back room wall, ok to rock |
2025/04/16 | Building/Structural | Insulation | Passed | Paul Nitz | 2139 Maryland circle, Meet Rick Williams in charge |
2025/04/08 | Building/Structural | Framing | Passed | Paul Nitz | |
2025/04/07 | Building/Structural | Insulation | Passed | Paul Nitz | Partial ( ceilings) |
2025/04/03 | Mechanical | Insulation | Passed | Paul Nitz | 2139 Maryland circle |
2025/04/01 | Plumbing | Stack Piping & Test | Passed | Paul Nitz | Remaining underground checked 3/28 |
2025/03/21 | Plumbing | Water Piping & Test | Passed | Al Smythe | Ale Smythe check missing plumbing items 3/19/25 |
2025/03/20 | Building/Structural | Wall/Ceiling | Passed | Al Smythe | 2139 Maryland circle |
2025/03/20 | Electrical | Wall Rough-in | Passed | Al Smythe | 2139 Maryland circle |
2025/03/19 | Mechanical | Duct Rough-in | Passed | Paul Nitz | 2139 Maryland circle |
2025/03/19 | Plumbing | Water Piping & Test | partial approval | Paul Nitz | 2139 Maryland circle 1) supply clamps were missing and isolation tape will be required in multiple locations, OK to insulate the pipes in the walls only |
2025/03/14 | Building/Structural | Wall/Ceiling | NOT READY | Paul Nitz | 2139 Maryland circ |
2025/03/10 | Building/Structural | Framing | Conditional | Kody Boswell | Reviewed LG framing for ceiling framing for peer rooms, observation rooms, and therapy rooms. Result is conditional pending installation of longer screws for top track connection. |
2025/03/07 | Building/Structural | Framing | NOT READY | Paul Nitz | 2139 Maryland circle |
2025/02/19 | Building/Structural | Slab | Passed | Paul Nitz | Maryland circle 2139 |
2025/02/11 | Plumbing | Underground | Passed | Paul Nitz | |
Electrical | Underground | Passed | James Melvin |
BCA Project #: 23-03567- FAMU-FSU Engineering Building A Building Envelope Improvements
Inspection Date | Discipline | Type | Result | Inspector | Comments |
2025/08/07 | Building/Structural | Wall/Ceiling | Cancelled | Kody Boswell | South Connector Entrance Roof cap This turned into an on-site meeting discussing existing conditions that were encountered during the roof cap removal. The AOR was on site for this discussion. No inspection was performed due to unforseen conditions. |
2025/07/14 | Building/Structural | Wall/Ceiling | Passed | Kody Boswell | South Entrance Curtain Glass Wall panel replacements. |
BCA Project #: 23-03541- Diffenbaugh Steep Slope Roof Repairs
Inspection Date | Discipline | Type | Result | Inspector | Comments |
2025/04/30 | Building/Structural | Roofing | Passed | Kody Boswell | In-progress inspection of standing seam metal roof panels. |
2025/04/04 | Building/Structural | Roofing | Passed | Kody Boswell | In-progress inspection of waterproofing underlayment on steep slope roof areas |
BCA Project #: 23-03540- Howser Baseball Dugout Frame & Door
Inspection Date | Discipline | Type | Result | Inspector | Comments |
Building/Structural | Framing | Kody Boswell |
BCA Project #: 23-03539- NCF Pritzker Marine Building Exterior Improvements
Inspection Date | Discipline | Type | Result | Inspector | Comments |
2025/06/27 | Roofing | In progress | Conditional | Hank Fulmer | dry in for the sloped sections of the roof were inspected. Installation of the peal and stick was installed per manufactures specifications. The original drip edge and flashing is remaining . This is a partial approval. |
2025/06/06 | Roofing | In progress | Conditional | Joan Lima | PARTIAL DRYIN IN PROGRESS SOUTH SIDE |
2025/04/22 | Electrical | Final Electrical | Passed | Hank Fulmer | |
2025/04/22 | Plumbing | Final Plumbing | Passed | Hank Fulmer | |
2024/11/18 | Plumbing | Rough-in | Conditional | Steve Bell | |
2024/11/18 | Electrical | Wall Rough-in | Passed | Hank Fulmer | |
2024/11/18 | Electrical | Wall Rough-in | Conditional | Steve Bell | |
2024/11/18 | Plumbing | Rough-in | Passed | Hank Fulmer | |
2024/11/05 | Building/Structural | Structural | Passed | Joseph Agriesti | |
2024/10/30 | Building/Structural | Slab | Passed | Steve Bell | |
2024/10/28 | Building/Structural | Slab | Failed | Steve Bell | FBC2023 SECTION 107 SUBMITTAL DOCUMENTS No construction documents on site. Please provide approved plans. 1 hr inspection time |
2024/10/25 | Building/Structural | Slab | Failed | Steve Bell | |
2024/10/25 | Electrical | Floor Rough-in | Failed | Steve Bell | |
2024/10/25 | Electrical | Floor Rough-in | Passed | Nicholas Ninos | |
2024/10/25 | Electrical | Wall Rough-in | Failed | Nicholas Ninos | PVC conduit was installed above dirt on plastic sheeting. Installation method is NEC compliant. No discrepancies noted. |
2024/10/25 | Building/Structural | Slab | Passed | Nicholas Ninos | |
2024/10/16 | Building/Structural | Structural | Passed | Hank Fulmer | Partial inspection passed. This is for te south wall, north stairs, and first two column walls. All steel was properly sized and palced. The depths and widths were correctly sized per plans. |
2024/09/20 | Building/Structural | Structural | Passed | Joseph Agriesti | |
2024/09/06 | Building/Structural | Footing | Passed | Joseph Agriesti | |
2024/08/29 | Building/Structural | Structural | Passed | Hank Fulmer | |
2024/08/21 | Plumbing | Gas Piping & Test | Passed | Joseph Agriesti | |
2024/08/21 | Building/Structural | Structural | Passed | Hank Fulmer | |
2024/08/19 | Plumbing | Gas Piping & Test | Passed | Joseph Agriesti | |
2024/08/09 | Building/Structural | Footing | Passed | Hank Fulmer | |
Electrical | Final Electrical | Rocky Wilde |
BCA Project #: 23-03534- Law Research Center-Library AC Install
Inspection Date | Discipline | Type | Result | Inspector | Comments |
2024/05/17 | Electrical | Appliance/Equipment | Passed | Dwayne Mahony | |
2024/05/17 | Mechanical | Equipment | Passed | Dwayne Mahony |
BCA Project #: 23-03524- Mag Lab Kitchen Micro Mart
Inspection Date | Discipline | Type | Result | Inspector | Comments |
2024/08/08 | Electrical | Final Electrical | Passed | Alex Masterton | No comments. |
BCA Project #: 23-03510- Rogers Exterior Envelope Repairs
Inspection Date | Discipline | Type | Result | Inspector | Comments |
2025/01/21 | Building/Structural | Structural | Passed | Kody Boswell | Reviewed window attachment to structure for windows in the stairwells |
2025/01/09 | Building/Structural | Masonry | Passed | Kody Boswell | |
2024/12/23 | Building/Structural | Masonry | Passed | Al Smythe | |
2024/11/13 | Building/Structural | Re-Inspection | Passed | Kody Boswell | Reviewed LG framing for the bracing of the existing exterior CMU walls. Deficencies noted on 11/8/24 framing inspection were corrected. FSU BCA met the threshold inspector on site. During inspection, the threshold inspector noted that window attachment differed from the contract docs. |
2024/11/13 | Building/Structural | Framing | Passed | Kody Boswell | Reviewed LG framing for the bracing of the existing exterior CMU walls. Deficencies noted on 11/8/24 framing inspection were corrected. FSU BCA met the threshold inspector on site. During inspection, the threshold inspector noted that window attachment differed from the contract docs. |
2024/11/08 | Building/Structural | Framing | Failed | Kody Boswell | Reviewed LG framing for exterior wall strengthening. There were several areas where top and bottom track fastener attachment spacing exceeed what was specified in the structural drawings. Also, clips attaching LG studs to existing CMU wall exceeded spacing on structural drawings. It was also discussed with the Contractor that a threshold inspector must also inspect any load bearing elements being repaired/modified. |
Building/Structural | Masonry | Cancelled | Rocky Wilde | Rebar Install stairwell CMU |
BCA Project #: 23-03508-A Tucker Center Chiller Replacement
Inspection Date | Discipline | Type | Result | Inspector | Comments |
2025/01/31 | Electrical | Panel/Feeder | Passed | Rocky Wilde | No visit required. This was already looked at by Rocky Wilde this morning at 10am |
2025/01/31 | Electrical | Appliance/Equipment | Passed | Rocky Wilde | No visit required. This was already looked at by Rocky Wilde this morning at 10am |
2025/01/30 | Mechanical | CHW Piping & Test | Passed | Paul Nitz | Please call me when on the way |
2025/01/30 | Mechanical | Cond. Piping & Test | Passed | Paul Nitz | Please call me when on the way |
Plumbing | Final Plumbing | Paul Nitz | final boiler inspection | ||
Mechanical | Final Mechanical | Postponed | James Melvin | Please complete final inspection for permit closeout. | |
Electrical | Final Electrical | Postponed | James Melvin | Please complete final inspection for permit closeout. | |
Mechanical | Final Mechanical | Paul Nitz | final boiler inspection |
BCA Project #: 23-03503- Rogers Building 5th Remodeling
Inspection Date | Discipline | Type | Result | Inspector | Comments |
2025/09/03 | Building/Structural | Final Building | Failed | Paul Nitz | • Water pressure is currently well below operating level(not enough pressure to flush toilets) • Bathroom door closers need adjustment • Permanent cores not installed • Card readers are offline • WAP not installed |
2025/06/18 | Building/Structural | Final Building | Failed | Paul Nitz | 1) final test and balance required for the hvac 2) closers for the bathroom doors are not installed 3) domestic water shall be sterilized P1.0 |
2025/06/17 | Fire Safety | Final Fire Safety | Passed | Mary Creason | |
2025/06/02 | Plumbing | Final Plumbing | Passed | James Melvin | |
2025/06/02 | Electrical | Re-Inspection | Passed | James Melvin | |
2025/06/02 | Electrical | Final Electrical | Passed | James Melvin | |
2025/05/01 | Mechanical | HW Piping & Test | Passed | Paul Nitz | |
2025/04/30 | Mechanical | HW Piping & Test | Failed | Paul Nitz | 1) Guage was missing 2) pipe support was missing 3) engineered letter required for the expansion joint being in a different location from plans |
2025/04/25 | Fire Safety | Final Egress/Emergency Lights | Passed | Curtis Rogers | |
2025/04/24 | Plumbing | Final Plumbing | NOT READY | Paul Nitz | handrails, signage dispensers are not installed |
2025/04/24 | Fire Safety | Final Fire Sprinkler | Passed | Curtis Rogers | |
2025/04/23 | Fire Safety | Final Fire Alarm | Passed | Curtis Rogers | *Test Flow Switch with Sprinkler Contractor (Phoenix) 04.25.25 @ 10am *Turn Sprinkler Water on for 5th Floor *Robert Nix- Please Put in an Inspection for EM. Lighting (Passed) |
2025/04/21 | Electrical | Final Electrical | Failed | James Melvin | 1) FSU design guidelines 3.3 require Stainless Steel cover plates for all Switches and Receptacles. |
2025/04/09 | Mechanical | Final Mechanical | Passed | Paul Nitz | We will need a Test and Balance. Final pending T and B. |
2025/04/04 | Electrical | Ceiling Rough-in | Passed | Al Smythe | |
2025/03/18 | Building/Structural | Wall/Ceiling | Passed | Paul Nitz | Grid cieling |
2025/02/25 | Fire Safety | Fire Water Above Ground | Passed | Curtis Rogers | Side note: Above Hard Ceiling looks Good |
2025/02/05 | Plumbing | Re-Inspection | Passed | Paul Nitz | Above cieling pipe insulation inspection |
2025/02/05 | Mechanical | Insulation | Passed | Paul Nitz | |
2025/01/28 | Building/Structural | Sheetrock | Passed | Kody Boswell | |
2025/01/28 | Building/Structural | Insulation | Passed | Kody Boswell | |
2025/01/14 | Mechanical | Duct Rough-in | Passed | Paul Nitz | : this was for the penthouse duct |
2025/01/13 | Mechanical | HW Piping & Test | Passed | Paul Nitz | |
2025/01/13 | Mechanical | CHW Piping & Test | Passed | Paul Nitz | |
2025/01/13 | Mechanical | Duct Rough-in | Passed | Paul Nitz | |
2024/12/11 | Plumbing | Stack Piping & Test | Passed | Paul Nitz | |
2024/12/04 | Mechanical | HW Piping & Test | Passed | Paul Nitz | |
2024/11/26 | Building/Structural | Framing | Passed | Rocky Wilde | |
2024/11/26 | Mechanical | Insulation | NOT READY | Rocky Wilde | |
2024/11/19 | Plumbing | Rough-in | Passed | Paul Nitz | |
2024/11/19 | Plumbing | Water Piping & Test | Passed | Paul Nitz | |
2024/11/12 | Mechanical | Duct Rough-in | Conditional | Paul Nitz | 1) waiting for pics of minor corrections |
Electrical | Ceiling Rough-in | NOT READY | Rocky Wilde | ||
Electrical | Wall Rough-in | Passed | Rocky Wilde | ||
Building/Structural | Framing | Postponed | Kody Boswell | FSU BCA arrived on site and was informed by the Contractor the inspection was postponed to a later date | |
Building/Structural | Re-Inspection | Postponed | Kody Boswell | FSU BCA arrived on site and was informed by the Contractor the inspection was postponed to a later date |
BCA Project #: 23-03499- Carothers South Elevation Window Replacement
Inspection Date | Discipline | Type | Result | Inspector | Comments |
2025/08/28 | Building/Structural | Insulation | Passed | Paul Nitz | 4th floor knee wall framing, insulation and electrical roughin |
2025/08/28 | Electrical | Wall Rough-in | Passed | Rocky Wilde | 4th floor knee wall framing, insulation and electrical roughin |
2025/08/28 | Building/Structural | Wall/Ceiling | Passed | Paul Nitz | 4th floor knee wall framing, insulation and electrical roughin |
2025/07/29 | Building/Structural | Framing | Passed | Kody Boswell | Reviewed LG framing and insulation for 4th floor knee walls |
2025/07/29 | Building/Structural | Insulation | Passed | Kody Boswell | Reviwed LG framing and insulation for 4th floor knee walls |
2025/07/24 | Building/Structural | Framing | Passed | Kody Boswell | Reviewed LG framing for 3rd floor knee walls |
2025/07/24 | Building/Structural | Insulation | Passed | Kody Boswell | Reviewed insulation installed in LG framing knee walls on 3rd floor |
2025/07/17 | Building/Structural | Framing | Passed | Kody Boswell | 2nd floor knee walls |
2025/06/25 | Building/Structural | Insulation | Passed | Paul Nitz | Wall insulation Rooms 303,304,305,305A and 309 |
2025/06/23 | Electrical | Wall Rough-in | Passed | Rocky Wilde | Rooms 303, 304,305, 305A and 309. Framing inspection Rooms 304 and 305 electrical rough in. |
2025/06/23 | Building/Structural | Framing | Passed | Paul Nitz | Rooms 303, 304,305, 305A and 309. Framing inspection Rooms 304 and 305 electrical rough in. |
2025/06/12 | Building/Structural | Framing | Passed | Paul Nitz | Window installation inspection 2nd floor |
BCA Project #: 23-03477- New College of Florida New Greenhouse & Shed
Inspection Date | Discipline | Type | Result | Inspector | Comments |
2024/10/01 | Electrical | Ground | Passed | Hank Fulmer | The underground conduit was checked and found to be at the correct depth. Also the panel is installed per code and the correct wire size was used for the 100A main disconnect. I am approving the electrical underground, pnael/feeder, and service release. |
2024/10/01 | Electrical | Panel/Feeder | Passed | Hank Fulmer | The underground conduit was checked and found to be at the correct depth. Also the panel is installed per code and the correct wire size was used for the 100A main disconnect. I am approving the electrical underground, pnael/feeder, and service release. |
2024/10/01 | Electrical | Underground | Passed | Hank Fulmer | The underground conduit was checked and found to be at the correct depth. Also the panel is installed per code and the correct wire size was used for the 100A main disconnect. I am approving the electrical underground, pnael/feeder, and service release. |
2024/10/01 | Electrical | Wall Rough-in | Passed | Hank Fulmer | The underground conduit was checked and found to be at the correct depth. Also the panel is installed per code and the correct wire size was used for the 100A main disconnect. I am approving the electrical underground, pnael/feeder, and service release. |
2024/06/11 | Building/Structural | Footing | Failed | Steve Bell | |
2024/06/11 | Plumbing | Underground | Passed | Steve Bell | |
Steve Bell |
BCA Project #: 23-03474- Turnbull Conference Center Renovations
Inspection Date | Discipline | Type | Result | Inspector | Comments |
2025/09/04 | Building/Structural | Framing | Passed | Rocky Wilde | Rocky inspected the ceiling framing in the foyer area and the electrical disconnect in the dish area on 09/04/2025. Thank you. |
2025/09/04 | Building/Structural | Wall/Ceiling | Passed | Rocky Wilde | Rocky inspected the ceiling framing in the foyer area and the electrical disconnect in the dish area on 09/04/2025. Thank you. |
2025/09/04 | Building/Structural | Sheetrock | Passed | Paul Nitz | Need screws inspected on drywall in the storage room on the first floor. Need duct work inspected on the first floor to be able to hang some drywall, this is also in the storage room. |
2025/09/04 | Electrical | Wall Rough-in | Passed | Rocky Wilde | Rocky inspected the ceiling framing in the foyer area and the electrical disconnect in the dish area on 09/04/2025. Thank you. |
2025/09/04 | Mechanical | Duct Rough-in | Passed | Paul Nitz | Need screws inspected on drywall in the storage room on the first floor. Need duct work inspected on the first floor to be able to hang some drywall, this is also in the storage room. |
2025/08/27 | Electrical | Final Electrical | Passed | Rocky Wilde | Need a above ceiling inspection for the second floor area. Need to reinspect the rough in plumbing in the basement. Need lights inspected on the first floor. |
2025/08/27 | Mechanical | Final Mechanical | Passed | Paul Nitz | Need a above ceiling inspection for the second floor area. Need to reinspect the rough in plumbing in the basement. Need lights inspected on the first floor. 1) labeling was missing for the duct, Ron will send pics when the are on. 2) This mechanical inspection was for the second floor with exception of the mechanical room, it will also need a duct inspection |
2025/08/27 | Fire Safety | Fire Water Above Ground | Partial | Curtis Rogers | 2nd Floor *Above Ceiling Sprinkler Inspection *Add a few hangers in various spots (Over 2 foot arm overs need hangers) |
2025/08/27 | Plumbing | Rough-in | Passed | Paul Nitz | Need the plumbing sanitary and grease piping in the basement area inspected. 1) this was for the sanitary that failed earlier in the week |
2025/08/26 | Building/Structural | Insulation | Passed | Paul Nitz | |
2025/08/26 | Building/Structural | Sheetrock | Passed | Paul Nitz | |
2025/08/26 | Building/Structural | Wall/Ceiling | Passed | Paul Nitz | Need plywood on walls inspected to be able to install FRP. Paul inspected this on 8/26/2025. |
2025/08/25 | Building/Structural | Structural | Passed | Paul Nitz | Re-inspection of the elevator pit floor rebar. |
2025/08/25 | Building/Structural | Re-Inspection | Passed | Paul Nitz | Re-inspection of the elevator pit floor rebar. |
2025/08/25 | Building/Structural | Slab | Passed | Paul Nitz | Re-inspection of the elevator pit floor rebar. |
2025/08/22 | Building/Structural | Slab | Failed | Paul Nitz | Need the rebar inspected in the elevator floor. 1) bars missing |
2025/08/22 | Plumbing | Rough-in | Failed | Paul Nitz | Need the plumbing sanitary and grease piping in the basement area inspected. 1) Sanitary line was leaking |
2025/08/20 | Electrical | Wall Rough-in | Passed | Rocky Wilde | Storage Room Wall - Electrical Rough-In inspection |
2025/08/19 | Building/Structural | Wall/Ceiling | Passed | Kody Boswell | Reviewed LG framing for the storage room wall on level 1 |
2025/08/19 | Building/Structural | Framing | Passed | Kody Boswell | Reviewed LG framing for the storage room wall on level 1 |
2025/08/19 | Building/Structural | Sheetrock | Passed | Kody Boswell | Reviewed sheathing attachment to interior LG framing for several areas on level 1 |
2025/08/15 | Building/Structural | Masonry | Passed | Kody Boswell | Reviewed reinforcing steel for the new elevator walls in the basement. Missing horizontal corner reinforcing bars from previous inspection were installed. |
2025/08/15 | Building/Structural | Wall/Ceiling | Passed | Kody Boswell | Reviewed reinforcing steel for the new elevator walls in the basement. Missing horizontal corner reinforcing bars from previous inspection were installed. |
2025/08/14 | Building/Structural | Structural | Failed | Kody Boswell | Reviewed reinforcing steel for the new elevator walls in the basement. There were horizontal corner bars missing at the corners. Contractor to install horizontal corner bars and call for re-inspection |
2025/08/14 | Building/Structural | Slab | Passed | Kody Boswell | Reviewed reinforcing steel for the elevator equipment room in the basement. |
2025/08/08 | Building/Structural | Framing | Passed | Rocky Wilde | Need framing and electrical inspection for walls on the first floor. Need inspection on roof installed hood fans. |
2025/08/08 | Electrical | Wall Rough-in | Passed | Rocky Wilde | Need framing and electrical inspection for walls on the first floor. Need inspection on roof installed hood fans. |
2025/08/08 | Mechanical | Equipment | Passed | Rocky Wilde | Need framing and electrical inspection for walls on the first floor. Need inspection on roof installed hood fans. |
2025/08/06 | Building/Structural | Framing | Passed | Kody Boswell | Reviewed LG framing for partial storage wall on 1st level |
2025/08/04 | Building/Structural | Structural | Passed | Kody Boswell | Reviewed reinforcing steel for grade beams for the new elevator machine room. |
2025/08/04 | Building/Structural | Footing | Passed | Kody Boswell | Reviewed reinforcing steel for grade beams for the new elevator machine room. |
2025/07/28 | Building/Structural | Structural | Conditional | Kody Boswell | Reviewed reinforcing steel for elevator grade beams. There was missing vertical reinforcing for the two columns. Result is conditional pending installation of missing reinforcing. FSU BCA will accept photos from the Contractor showing missing reinforcing was installed. Also, clarify with the EOR that lap splices for tip grade beam bars is acceptable. Lap Splice for top and bottom bars was measured 38" in the field. Missing reinforcing was installed and EOR confirmed the 38" lap splice was acceptable as of 8/4/2025 |
2025/07/28 | Building/Structural | Framing | Passed | Kody Boswell | Reviewed steel framing for new elevator on second floor and reinforcing steel for the elevator lid |
2025/07/21 | Building/Structural | Structural | Passed | Kody Boswell | Reviewed steel framing that was installed at the elevator area on the mezzanine. |
2025/07/21 | Building/Structural | Framing | Passed | Kody Boswell | Reviewed steel framing that was installed at the elevator area on the mezzanine. |
2025/07/18 | Plumbing | Stack Piping & Test | Passed | Paul Nitz | Need in wall and above ceiling plumbing stack pipes inspected. |
2025/07/18 | Mechanical | Insulation | Passed | Paul Nitz | Need hood exhaust duct insulation inspected to be able to close up framing around it. |
2025/07/18 | Building/Structural | Structural | Conditional | Kody Boswell | Need to get holes inspected before we epoxy the rebar in. Per phone conversaton with the Contractor, FSU BCA is deferring inspection to the threshold inspector. FSU BCA to confirm via receipt of threshod reports. Threshold report received, filed in job folder (#15) |
2025/07/18 | Building/Structural | Footing | Conditional | Kody Boswell | Need to get holes inspected before we epoxy the rebar in. Per phone conversaton with the Contractor, FSU BCA is deferring inspection to the threshold inspector. FSU BCA to confirm via receipt of threshod reports. Threshold report received, filed in job folder (#15) |
2025/07/10 | Building/Structural | Footing | Passed | Kody Boswell | Reviewed helical piles at the elevator equipment room. |
2025/07/10 | Building/Structural | Structural | Passed | Kody Boswell | Reviewed helical piles at the elevator equipment room. |
2025/07/09 | Mechanical | Duct Rough-in | Conditional | Paul Nitz | Paul and Rocky inspected the flue piping for the boiler on 7/8/2025. 1) contractor agent Ron Mears agreed to install CO2 detectors on each floor of the building where the existing Flew pipe had to be reused until the new one comes in, should be about a week from this date 7/9/2025 |
2025/07/08 | Plumbing | Water Piping & Test | Passed | Paul Nitz | Need the water pipes inspected overhead. |
2025/07/07 | Mechanical | Duct Rough-in | Passed | Paul Nitz | Need a light test on the welded hood ducts on the second floor. |
2025/06/25 | Building/Structural | Slab | Passed | Paul Nitz | Please review rebar in overcut section |
2025/06/25 | Building/Structural | Structural | Passed | Paul Nitz | Please review rebar in overcut section |
2025/06/23 | Building/Structural | Structural | Passed | Kody Boswell | Reviewed helical pile installation for the new elevator |
2025/06/23 | Building/Structural | Footing | Passed | Kody Boswell | Reviewed helical pile installation for the new elevator |
2025/06/20 | Plumbing | Stack Piping & Test | Passed | Al Smythe | Need inspection on rebar in slab. Need inspection on stack pipes on the second floor. |
2025/06/19 | Building/Structural | Slab | Failed | Kody Boswell | Reviewed reinforcing steel for slab repair located in the area between grids D-E/13-14 on the first floor. There were 16 mechanical rebar couplers that were not installed per manufacturer's standards. Some couplers had torque bolts not fully torqued and some couplers had torque bolts that did not engage rebar. Contractor to replace incorrectly installed rebar couplers and schedule re-inspection. Also, there was one area where bottom reinforcing did not have the required clear cover. Minimum ¾” clearance required. |
2025/06/19 | Building/Structural | Structural | Failed | Kody Boswell | Reviewed reinforcing steel for slab repair located in the area between grids D-E/13-14 on the first floor. There were 16 mechanical rebar couplers that were not installed per manufacturer's standards. Some couplers had torque bolts not fully torqued and some couplers had torque bolts that did not engage rebar. Contractor to replace incorrectly installed rebar couplers and schedule re-inspection. Also, there was one area where bottom reinforcing did not have the required clear cover. Minimum ¾” clearance required. |
2025/06/09 | Building/Structural | Slab | Passed | Kody Boswell | Reviewed reinforcing steel for loading dock slab replacement at the west end of the building |
2025/05/29 | Building/Structural | Slab | NOT READY | Paul Nitz | Need a slab rebar inspection Need inspection on the new grease interceptors plumbing connections |
2025/05/29 | Plumbing | Equipment | Passed | Paul Nitz | We need a slab rebar inspection. We need the new grease interceptor plumbing inspected |
2025/05/29 | Plumbing | Rough-in | Passed | Paul Nitz | We need a slab rebar inspection. We need the new grease interceptor plumbing inspected |
2025/05/29 | Plumbing | Underground | Passed | Paul Nitz | We need a slab rebar inspection. We need the new grease interceptor plumbing inspected |
2025/05/29 | Building/Structural | Structural | NOT READY | Paul Nitz | We need a slab rebar inspection. We need the new grease interceptor plumbing inspected |
2025/05/29 | Building/Structural | Slab | NOT READY | Paul Nitz | We need a slab rebar inspection. We need the new grease interceptor plumbing inspected |
2025/05/29 | Plumbing | Equipment | NOT READY | Paul Nitz | Need a slab rebar inspection Need inspection on the new grease interceptors plumbing connections |
2025/05/29 | Plumbing | Rough-in | Passed | Paul Nitz | Need a slab rebar inspection Need inspection on the new grease interceptors plumbing connections |
2025/05/29 | Building/Structural | Structural | NOT READY | Paul Nitz | Need a slab rebar inspection Need inspection on the new grease interceptors plumbing connections |
2025/05/27 | Building/Structural | Structural | Conditional | Kody Boswell | Reviewed steel framing for Curtain System in the Dining/Auditorium on the first floor. During inspection, it was noted that the angle braces were welded prior to dead load being applied to framing. Per detail 3 on sheet S304, angle braces are to be welded after the dead load is applied. Result is conditional pending direction from EOR if this condition is acceptable. |
2025/05/09 | Building/Structural | Wall/Ceiling | Passed | Kody Boswell | Reviewed screws for interior sheathing installation and insulation installation for several walls on level 1 and level 2. |
2025/05/09 | Building/Structural | Framing | Conditional | Kody Boswell | Reviewed LG framing for Service Area on level 1 (wall failed at prior inspection). Additional vertical studs have been added at each side of opening. Result is "passed" Reviewed LG framing for walls in the vending area on level 1. Result is "conditional" pending additional brace installation to structural steel beam above. |
2025/05/06 | Building/Structural | Framing | Conditional | Kody Boswell | Reviewed LG framing for several walls located on the first floor. All walls reviewed appeared to be in substantial compliance with the contract documents with exception to the service area (room 125). Service room wall has a large opening. The jamb studs need to be stiffened by adding additonal studs since the opening due to the size of the opening. Contractor may call for re-inspection or have the wall re-reviewed at the next framing inspection. |
2025/05/06 | Building/Structural | Sheetrock | Passed | Kody Boswell | Reviewed sheathing installation for several walls on levels 1 and 2 |
2025/05/06 | Building/Structural | Insulation | Passed | Kody Boswell | Reviewed insulation installation in several LG framed walls, levels 1 and 2 |
2025/05/02 | Plumbing | Rough-in | Passed | Paul Nitz | Paul, this is for the plumbing inspection you performed on Monday, 5/28/2025. Thank you. |
2025/05/02 | Plumbing | Underground | Passed | Paul Nitz | Paul, this is for the plumbing inspection you performed on Monday, 5/28/2025. Thank you. |
2025/05/02 | Building/Structural | Slab | Passed | Kody Boswell | Reviewed reinforcing steel for the rest of the slab on grade infill on level 1 |
2025/04/30 | Building/Structural | Slab | Passed | Paul Nitz | Need to get holes inspected for epoxy and rebar |
2025/04/29 | Building/Structural | Framing | Failed | Rocky Wilde | Need to have a partial electrical and framing inspections done on the first and second floors. 2nd floor only but they are OK to sheet rock one side of the walls and we can check the framing at the insulation inispection 1) door framing not complete 2) notch that electricians made in the framing needs to be corrected |
2025/04/29 | Building/Structural | Framing | Passed | Rocky Wilde | Need to have a partial electrical and framing inspections done on the first and second floors. 1st floor |
2025/04/29 | Electrical | Wall Rough-in | Passed | Rocky Wilde | Need to have a partial electrical and framing inspections done on the first and second floors. |
2025/04/29 | Electrical | Wall Rough-in | Passed | Rocky Wilde | Need to have a partial electrical and framing inspections done on the first and second floors. |
2025/04/28 | Plumbing | Underground | Paul Nitz | ||
2025/04/17 | Building/Structural | Structural | Passed | Kody Boswell | Reviewed reinforcing steel for interior slab on grade infill where existing slab was cut and removed to install underground piping. |
2025/04/17 | Building/Structural | Slab | Passed | Kody Boswell | Reviewed reinforcing steel for interior slab on grade infill where existing slab was cut and removed to install underground piping. |
2025/04/14 | Building/Structural | Slab | Passed | Kody Boswell | hole prep for slab infill at plumbing trenches in slab. |
2025/04/09 | Building/Structural | Slab | Passed | Paul Nitz | Need Housekeeping pad rebar, Steel-I Beams and C-Channel in basement inspected. |
2025/04/09 | Building/Structural | Structural | Passed | Paul Nitz | Need Housekeeping pad rebar, Steel-I Beams and C-Channel in basement inspected. |
2025/03/07 | Building/Structural | Framing | Conditional | Kody Boswell | Reviewed LG framing for vending area walls and ceiling framing in the auditorium (north side) located on level 1. Result is conditional pending additional fasteners added to top track connection for vending area walls and installing missing vertical support stud for ceiling framing. |
2025/03/05 | Building/Structural | Masonry | Passed | Paul Nitz | |
2025/03/05 | Building/Structural | Structural | Passed | Paul Nitz | |
2025/02/25 | Plumbing | Rough-in | Passed | Paul Nitz | |
2025/02/06 | Building/Structural | Wall/Ceiling | Passed | Kody Boswell | Drywall inspection for the third phase of the fire ceiling. |
2025/02/04 | Building/Structural | Structural | Passed | Kody Boswell | Structural Inspection on the Lower Level for temporary opening in masonry wall located along grid A/11-12. The Contractor, FSU BCA, and Threshold inspector (Penonni) were on site. |
2025/02/03 | Building/Structural | Structural | Passed | Kody Boswell | Structural Inspection on the Lower Level for temporary opening in masonry wall located along grid A/11-12. The Contractor, FSU BCA, and Threshold inspector (Penonni) were on site. The reinforcing steel was not yet tied in place. Only dowel holes for new reinforcing were drilled. Penonni checked dowel hole depth and cleanliness. Holes were the corret depth and clean. Contractor to schedule FSU BCA for inspection once reinforcing steel is tied in place, prior to reinforcing being covered up with formwork. |
2025/01/30 | Building/Structural | Structural | Postponed | Kody Boswell | Contractor contacted FSU BCA to inspect masonry reinforcing for a temporary opening in the basement. Upon site arrival it was discovered that the structural drawings were modified for the area requested for inspection. FSU BCA and the Thresold Inspector came to the conclusion that the area could not be inspected prior to the modified structural documents being submitted for review and included in the permit documents. Inspection is postponed until modified structural drawings are submitted for BCA review. |
2025/01/28 | Building/Structural | Framing | NOT READY | Paul Nitz | Need framing inspection to hang some drywall. 1) plans not on site |
2025/01/28 | Building/Structural | Framing | Passed | Paul Nitz | Paul, FSU BCA Inspector, will return today at 1:30 pm to inspect. |
2025/01/15 | Building/Structural | Framing | Passed | Kody Boswell | Reviewed LG framing for fire-rated encasement of a structural steel beam |
Building/Structural | Footing | Postponed | Kody Boswell | Need rebar install inspected on the elevator roof and elevator grade beams. Need some framing inspected on the second floor. Contractor contacted FSU BCA prior to site arrival to postpone inspection to a later date | |
Building/Structural | Structural | Postponed | Kody Boswell | Need rebar install inspected on the elevator roof and elevator grade beams. Need some framing inspected on the second floor. Contractor contacted FSU BCA prior to site arrival to postpone inspection to a later date | |
Building/Structural | Framing | Postponed | Kody Boswell | Need rebar install inspected on the elevator roof and elevator grade beams. Need some framing inspected on the second floor. Contractor contacted FSU BCA prior to site arrival to postpone inspection to a later date | |
Plumbing | Underground | NOT READY | Paul Nitz | Need a slab rebar inspection Need inspection on the new grease interceptors plumbing connections |
BCA Project #: 23-03466- Wm. Johnston - Manikin Chamber Cool Air Upgrade
Inspection Date | Discipline | Type | Result | Inspector | Comments |
2025/08/27 | Electrical | Final Electrical | Failed | Rocky Wilde | 1) electrical panel is not labeled properly |
2025/08/22 | Electrical | Final Electrical | Postponed | Rocky Wilde | |
2025/08/19 | Mechanical | Final Mechanical | Passed | Paul Nitz | Intent is to verify punch list is complete and close project. |
2024/05/14 | Mechanical | Final Mechanical | Failed | Neely Lewis | 1. Need locking caps on regfrigeration access ports FBC-M Sec 1101.10 2. Insulation is to be continuous on refrigeration suction line. FBC-C Section 403.2.10. ( exposed suction pipe will cause condensate to drip and discolor brick on historic building.) 3.Armaflex insulation is to be painted or covered to protect it for degrading from sunlight. FBC-C Sec C403.2.10.1. |
2024/05/14 | Electrical | Final Electrical | NOT READY | Dwayne Mahony | No access to room. |
2024/02/06 | Building/Structural | Footing | Passed | Dwayne Mahony | Addition to mechanical slab is approved. |
2023/12/28 | Building/Structural | Footing | Passed | Dwayne Mahony | Requested inspection is for the concrete pad steel & form and the re-routed storm line per revised drawings. |
2023/12/28 | Building/Structural | Slab | Passed | Dwayne Mahony | Requested inspection is for the concrete pad steel & form and the re-routed storm line per revised drawings. |
2023/12/28 | Plumbing | Underground | Passed | Dwayne Mahony | Requested inspection is for the concrete pad steel & form and the re-routed storm line per revised drawings. |
BCA Project #: 23-03455-A Doak Campbell - East Stands Improvements Phase II
Inspection Date | Discipline | Type | Result | Inspector | Comments |
2025/09/04 | Plumbing | Final Plumbing | Conditional | Paul Nitz | 1) ADA stall doors need to be self closing 2) sink carrier needs to be installed in mens ADA bathroom as per plans 3) door handle needs to be replaced as per plans 4) doors in mens bathroom need to be painted as per plans |
2025/08/29 | Fire Safety | Final Fire Safety | Passed | Curtis Rogers | Elevator Recall A6 & C5 -PASSED American Signal Test - PASSED Emergency Back Up Power Test on 08.22.25 PASSED Sprinkler Tested on 08.27.25 PASSED Final Fire Alarm Test PASSED *GLOBAL Fire Panel has (4) troubles on Panel (2) Troubles from UCA building (existing troubles) *Scoreboard Trouble Monitor - Waitng for Scoreboard Card to be installed *Existing Troubles on Fire Alarm panel will not affect the Fire Alarm from activating properly |
2025/08/29 | Fire Safety | Re-Inspection | Passed | Curtis Rogers | Elevator Recall A#6 Passed |
2025/08/28 | Fire Safety | Final Fire Safety | Partial | Curtis Rogers | Project: 23-03455-A-Doak Campbell - East Stands Improvements Phase II Date: 8/28/2025 By: Curtis Rogers Type: Fire Safety-Final Fire Alarm Results: Partial Notes: Elevator Recall Elevator C#5 PASSED ELEVATOR A#6 NOT READY Elevator A#7 *Out of Scope… Upgrade & Testing Next Year |
2025/08/28 | Electrical | Final Electrical | Passed | Rocky Wilde | |
2025/08/28 | Fire Safety | Final Fire Alarm | Partial | Curtis Rogers | Elevator Recall Elevator C#5 PASSED ELEVATOR A#6 NOT READY Elevator A#7 *Out of Scope… Upgrade & Testing Next Year |
2025/08/28 | Plumbing | Re-Inspection | Conditional | Paul Nitz | Toilet in room 3212 was loose 1) ADA door in men’s bathroom is in the wrong location as per plans and FBC A604.8.1 2) Door handle in men’s room is not per plans 3) Door closer in men’s room has not been changed as per plans 4) ADA doors in women’s restroom do nor shut properly (self close) 5) Women’s restroom is missing placards on two of the doors |
2025/08/27 | Electrical | Final Electrical | Passed | Rocky Wilde | |
2025/08/27 | Plumbing | Final Plumbing | Conditional | Paul Nitz | The jobsite superintendent as well as the plumbing contractor assured BCA that the temporary fix for the toilet height will be addressed the week of 9/1/2025 and will be completed by 9/12/2025 before the second home game. The new ADA toilet in the men’s restroom will be fixed and inspected by BCA before 8/29/2025. The cleanout covers that are missing will not be a problem for temporary CO. If you have any questions, please let me know. 1) ADA toilet is set to high MAX height is 19” FBC A604.4 (The Plumbing Contractor Made A Temporary Fix to this problem because of parts not being available before 8/29/2025) and was approved by the building official to be in compliance. 2) Clean-out covers are missing 3) Toilet in men’s new ADA bathroom is not secure and the supply to it is not plumb 4) The drain for the sink in the new men’s bathroom is PVC and needs to be changed out to chrome. |
2025/08/27 | Plumbing | Re-Inspection | Conditional | Paul Nitz | The jobsite superintendent as well as the plumbing contractor assured BCA that the temporary fix for the toilet height will be addressed the week of 9/1/2025 and will be completed by 9/12/2025 before the second home game. The new ADA toilet in the men’s restroom will be fixed and inspected by BCA before 8/29/2025. The cleanout covers that are missing will not be a problem for temporary CO. If you have any questions, please let me know. 1) ADA toilet is set to high MAX height is 19” FBC A604.4 (The Plumbing Contractor Made A Temporary Fix to this problem because of parts not being available before 8/29/2025) and was approved by the building official to be in compliance. 2) Clean-out covers are missing 3) Toilet in men’s new ADA bathroom is not secure and the supply to it is not plumb 4) The drain for the sink in the new men’s bathroom is PVC and needs to be changed out to chrome. |
2025/08/26 | Fire Safety | Fire Water Above Ground | Passed | Curtis Rogers | Re inspection - Dry System #1 & 2 Upper Concourse Level East Stands *Trip Test - PASSED *Testing Fire Aalrm Components - PASSED |
2025/08/26 | Fire Safety | Final Fire Sprinkler | Conditional | Curtis Rogers | *Need Riser Room Signage on each Riser Room *Add Inspector Test Pipe and Signs at the end of each Dry Sysytem *Add Extra Hanger Bracing for Dry System Riser Upper Concourse Level |
2025/08/26 | Building/Structural | Final Building | Failed | Rocky Wilde | 1) labeling missing 2) ADA doors must be self-closing. FBC A604.8.1.2 |
2025/08/26 | Electrical | Final Electrical | Partial | Rocky Wilde | label electrical covers |
2025/08/26 | Mechanical | Final Mechanical | Passed | Paul Nitz | |
2025/08/26 | Fire Safety | Final Fire Safety | NOT READY | Curtis Rogers | |
2025/08/26 | Fire Safety | Final Fire Alarm | NOT READY | Curtis Rogers | *Need Elevator Up and Running to Complete Fire Alarm Inspections |
2025/08/26 | Plumbing | Final Plumbing | Failed | Paul Nitz | 1) Trap primers are missing in the drains as per plans 2) ADA toilet is set to high MAX height is 19” FBC A604.4 3) Drinking fountain arch needs to be min 4” FBC A602.6 4) Clean-out covers are missing 5) Bathroom stalls need a minimum 15” clearance from partition/ obstacles FBC P405.3.1 6) Toilet in men’s new ADA bathroom is not secure and the supply to it is not plumb 7) The sink in the men’s new ADA bathroom is not hooked up |
2025/08/22 | Fire Safety | Fire Water Above Ground | Passed | Curtis Rogers | Visual AboveGround Sprinkler |
2025/08/22 | Fire Safety | Final Fire Sprinkler | Failed | Curtis Rogers | Passed*Dry System on Phase 1 LLC East FAILED***(2) Dry Sytems on Phase 2 Upper Concourse Levels- Both Clappers(diapragms) not holding pressure |
2025/08/22 | Fire Safety | Final Egress/Emergency Lights | Passed | Curtis Rogers | We are scheduled to shut power down at 6 am to confirm generator switch over Passed *Back Up Power |
2025/08/19 | Fire Safety | Hydro-Test | Passed | Curtis Rogers | PASSED*Hydro-Tested 2 Dry Systems East Stands Upper Concourse Level PASSED* Above Ceiling Inpsection |
2025/08/14 | Electrical | Panel/Feeder | Passed | Rocky Wilde | |
2025/08/11 | Building/Structural | Structural | Conditional | Kody Boswell | Reviewed structural steel, stel deck, and reinforcing steel for the elevated slab infill located on the 4th floor, section 15. Result is conditional pending installation of steel bracing. Contractor is allowed to place concrete prior to brace installation per the EOR. |
2025/08/11 | Building/Structural | Slab | Conditional | Kody Boswell | Reviewed structural steel, stel deck, and reinforcing steel for the elevated slab infill located on the 4th floor, section 15. Result is conditional pending installation of steel bracing. Contractor is allowed to place concrete prior to brace installation per the EOR. |
2025/08/01 | Building/Structural | Structural | Conditional | Kody Boswell | Re inspection for new slab at section 5- 4th floor Reviewed structural steel framing, steel decking, and elevated slab reinforcing for the slab infill area on the upper concourse in section 5. The following deficiences, originally reported on 7/30/2025, were corrected or in the process of being corrected while on site: - Steel framing along grid G didn't match what was shown in detail 1/S615. The W14x22 beam was placed offset from the existing column and some bracing was missing. - Steel framing along grid G didn't match what was shown in detail 2/S615. The W18x48 columns weren't installed. - Wire mesh slab reinforcing was sitting directly on steel deck. Wire mesh should be chaired over beams. Result is conditional pending receipt of photos from Contractor verifying items discussed on site were completed. |
2025/08/01 | Building/Structural | Slab | Conditional | Kody Boswell | Re inspection for new slab at section 5- 4th floor Reviewed structural steel framing, steel decking, and elevated slab reinforcing for the slab infill area on the upper concourse in section 5. The following deficiences, originally reported on 7/30/2025, were corrected or in the process of being corrected while on site: - Steel framing along grid G didn't match what was shown in detail 1/S615. The W14x22 beam was placed offset from the existing column and some bracing was missing. - Steel framing along grid G didn't match what was shown in detail 2/S615. The W18x48 columns weren't installed. - Wire mesh slab reinforcing was sitting directly on steel deck. Wire mesh should be chaired over beams. Result is conditional pending receipt of photos from Contractor verifying items discussed on site were completed. |
2025/07/31 | Plumbing | Water Piping & Test | Passed | Rocky Wilde | Water supply under new bathrooms on 4th floor section 7 and 13 |
2025/07/31 | Fire Safety | Fire Alarm Rough-In | Conditional | Curtis Rogers | Fire alarm device test for the east side *Notification devices (Speaker Strobes) *Gate M - Outside Pump Room- Lower Speaker Strobe to the correct height - 84 inches to center *Gate E - Mens Restroom- Install Speaker Strobes Inside and Outside for proper coverage |
2025/07/30 | Building/Structural | Slab | Failed | Kody Boswell | Reviewed structural steel framing, steel decking, and elevated slab reinforcing for the slab infill area on the upper concourse in section 5. The following deficiences were observed: - Steel framing along grid G didn't match what was shown in detail 1/S615. The W14x22 beam was placed offset from the existing column and some bracing was missing. - Steel framing along grid G didn't match what was shown in detail 2/S615. The W18x48 columns weren't installed. - Wire mesh slab reinforcing was sitting directly on steel deck. Wire mesh should be chaired over beams. |
2025/07/02 | Building/Structural | Slab | Passed | Kody Boswell | Reviewed reinforcing steel and and new steel deck attachment to existing structural steel framing for slab repair on ramp at column line 6n-7n vertical line K-L . North side of gate K |
2025/07/02 | Building/Structural | Structural | Passed | Kody Boswell | Reviewed reinforcing steel and and new steel deck attachment to existing structural steel framing for slab repair on ramp at column line 6n-7n vertical line K-L . North side of gate K |
2025/06/30 | Building/Structural | Sheetrock | Passed | Paul Nitz | Screw inspection new 4th floor bathrooms section 7 and 13 |
2025/06/27 | Building/Structural | Slab | Passed | Kody Boswell | Reviewed reinforcing steel for mid level gate K ramp replacement |
2025/06/27 | Building/Structural | Structural | Passed | Kody Boswell | Reviewed steel framing and steel deck attachmnet for mid level gate K ramp |
2025/06/27 | Building/Structural | Insulation | Passed | Kody Boswell | New bathrooms 4th floor section 7 and 13 ceiling insulation, upper concourse |
2025/06/26 | Building/Structural | Structural | Postponed | Kody Boswell | Mid Level ramp repairs gate K Contractor contacted FSU BCA prior to site arrival to postpone inspection to a later date. |
2025/06/26 | Building/Structural | Masonry | Passed | Paul Nitz | Final lift steel prior to grout 4th floor section 7 and 13. Passing Verified by Paul |
2025/06/26 | Building/Structural | Slab | Postponed | Kody Boswell | Mid Level ramp repairs gate K Contractor contacted FSU BCA prior to site arrival to postpone inspection to a later date. |
2025/06/25 | Building/Structural | Masonry | Failed | Paul Nitz | Final lift rebar prior to grout 4th floor section 7 and 13 1) vertical bars not in contact with the grade beam |
2025/06/24 | Electrical | Ceiling Rough-in | Passed | Rocky Wilde | New 4th floor bathrooms |
2025/06/24 | Building/Structural | Masonry | Passed | Kody Boswell | Reviewed reinforcing steel for 1st lift of CMU walls for new fire suppression rooms attached to new bathrooms 4th floor section 7 and 13 |
2025/06/13 | Building/Structural | Slab | Passed | Rocky Wilde | Re-Inspection for 4th floor slab repair column line 2north- 1 east at top of k gate ramp |
2025/06/13 | Building/Structural | Structural | Passed | Rocky Wilde | Re-Inspection for 4th floor slab repair column line 2north- 1 east at top of k gate ramp |
2025/06/12 | Building/Structural | Slab | Passed | Kody Boswell | 4 areas of slab repair on 4th floor |
2025/06/12 | Building/Structural | Structural | Passed | Kody Boswell | 4 areas of slab repair on 4th floor |
2025/06/12 | Electrical | Ceiling Rough-in | Failed | Al Smythe | New bathrooms 4th floor section 7 and section 13 and miscellaneous 1) Panel not labeled or identified |
2025/05/19 | Building/Structural | Framing | Passed | Kody Boswell | Reviewed roof deck attachment to roof members for new storage room, main concourse, section 9 |
2025/05/09 | Building/Structural | Framing | Passed | Kody Boswell | Reviewed roof framing for 1st floor storage room section 9 |
2025/05/01 | Plumbing | Re-Inspection | Passed | Paul Nitz | Water supply insulation new 4th floor bathrooms |
2025/04/24 | Plumbing | Rough-in | Cancelled | Paul Nitz | Water supply insulation new bathrooms 4th floor section 7 and 13 this inspection was entered twice |
2025/04/22 | Plumbing | Water Piping & Test | Passed | Paul Nitz | New 4th floor bathroom section 13 sanitary and water supply. Also heat trace section 13 and section 7 bathroom |
2025/04/22 | Plumbing | Stack Piping & Test | Passed | Paul Nitz | New 4th floor bathroom section 13 sanitary and water supply. Also heat trace section 13 and section 7 bathroom |
2025/04/21 | Building/Structural | Framing | Passed | Kody Boswell | Reviewed roof framing and roof deck attachment to structure for new bathroom 4th floor section 13 |
2025/04/10 | Building/Structural | Framing | Passed | Paul Nitz | Screw down inspection for decking bathroom section 7 on the 4th floor |
2025/04/03 | Building/Structural | Framing | Passed | Kody Boswell | Reviewed roof framing for the new north bathroom, section 7, upper concourse. Items noted in failed inspection on 4/1/2025 have been corrected and/or addressed. |
2025/04/03 | Plumbing | Rough-in | Passed | Paul Nitz | Re Inspection new bathroom north side 4 th floor section 7 |
2025/04/03 | Plumbing | Stack Piping & Test | Passed | Paul Nitz | Re Inspection new bathroom north side 4 th floor section 7 |
2025/04/03 | Plumbing | Water Piping & Test | Passed | Paul Nitz | Re Inspection new bathroom north side 4 th floor section 7 |
2025/04/02 | Plumbing | Rough-in | Failed | Paul Nitz | North new bathroom 4th floor section 7 1) not holding water |
2025/04/02 | Plumbing | Stack Piping & Test | Failed | Paul Nitz | North new bathroom 4th floor section 7 1) not holding water and vent not supported |
2025/04/02 | Plumbing | Water Piping & Test | Failed | Paul Nitz | North new bathroom 4th floor section 7 1) Vent not supported |
2025/04/01 | Building/Structural | Framing | Failed | Kody Boswell | Reviewed framing new north bathroom 4th floor section 7. The following items need to be addressed/corrected: 1) Simpson clips were not used as shown in detail 5/S7.01. Contractor to verify steel angles area acceptable connections in lieu of Simpson clips with EOR or install Simpson clips. 2) Holes in angle connections along the front wall (detail 6/S7.01) and back wall appeared oversized for the screws being used for connection of angle to LG roof joists. Washers must be installed. 3) Blocking between the end joists and exterior CMU walls was not installed. Blocking must be installed. Items above were discussed with the Contractor prior to FSU BCA leaving the site. Once items are addressed, a re-inspection may be scheduled. Item 1 was addressed by the EOR with acceptance via email. Email filed in Transmittals-correspondence folder. Items 2 and 3 were resolved via re-inspection on 4/2/2025 |
2025/03/27 | Building/Structural | Masonry | Passed | Kody Boswell | Reviewed reinforcing steel for masonry walls for ne bathroom 4th floor section 13, final lift |
2025/03/24 | Building/Structural | Masonry | Passed | Kody Boswell | Reviewed reinnforcing steel for 4th floor section 13 new bathroom rebar prior to grout installation, 2nd lift |
2025/03/17 | Building/Structural | Masonry | Conditional | Kody Boswell | New bathroom section 13 on 4th floor 1st lift grout rebar. FSU BCA arrived on site and the Subcontractor had grouted most of the walls, so FSU BCA was not able to review. Contractor stated the Threshold Inspector (TI) had reviewed and passed the reinforcing. Result is conditional pending verification of the TI's approval. FSU BCA contacted TI via email and is awaiting a response. |
2025/03/13 | Building/Structural | Slab | Passed | Kody Boswell | Reviewed reinforcing steel for the elevated slab infill on 4th level, section 13 |
2025/03/04 | Building/Structural | Masonry | Passed | Kody Boswell | Reviewed reinforcing steel for the top put lift of new bathroom 4th floor section 7 |
2025/02/27 | Building/Structural | Masonry | Passed | Kody Boswell | Re inspection for header rebar for new bathroom section 7 |
2025/02/26 | Building/Structural | Masonry | Conditional | Kody Boswell | Reviewed reinforcing steel for the 2nd lift of the new bathroom walls, 4th floor, section 7. Reinforcing steel was in compliance with the structural drawings except for the east wall. The horizontal reinforcing header for the door opening on the east wall did not have proper bearing over jamb reinforcing. This was discussed with the contractor while on site and must be corrected and called in for re-inspection. Contractor may proceed with grouting the north, south, and west walls. |
2025/01/29 | Plumbing | Final Plumbing | Passed | Paul Nitz | |
2025/01/16 | Plumbing | Storm Piping & Test | Failed | Paul Nitz | Smoke test 1) smoke test was good, missing multiple horizontal and vertical hangers |
2024/11/19 | Plumbing | Storm Piping & Test | Conditional | Paul Nitz | Discuss testing options 1) smoke detection will be allowed for the storm drain only |
2024/11/13 | Plumbing | Storm Piping & Test | Conditional | Paul Nitz | Storm line tie in by gate L 1st floor 1) pressure test required before final inspection |
2024/11/13 | Plumbing | Underground | Conditional | Paul Nitz | Storm line tie in by gate L 1st floor 1) Pressure test required before final inspection |
2024/10/17 | Building/Structural | Slab | Conditional | Kody Boswell | Reviewed reinforcing steel and steel decking for 2 concrete repair areas noted on sheet S2.03B (ASI-09): (1) Between grids K-L/2N-3N (2) Between grids K-L/2S-3S Result is conditional pending the WWR mesh is tied down to epoxied bars prior to concrete placement. Threshold inspector to verify. |
2024/08/30 | Fire Safety | Final Egress/Emergency Lights | Passed | Mary Creason | Conditional certification of occupancy for the 2024 football season - Fire extinguishers to be provided by FSU, and mounts provided by MCJV to be placed in ‘back of house’ areas adjacent to the temp concession stands. - Temporary illuminated Exit Signs to be placed in locations per the design documents. 12’ AFF. To be installed today and tomorrow. - Egress Lighting Completion - We observed the battery-power operation of the high-bay fixtures in the event of a power outage. No issues were observed. A temporary CCO is approved by Fire for the 2024 season Per Sam Sever and Jason Greisel TFD and Todd Pierce State Fire Marshal office |
2024/08/30 | Building/Structural | Final Building | Conditional | Kody Boswell | FSU BCA walked the site to review compliance with the contract documents in order to issue a Conditional Certificate of Occupancy for the upcoming football season. The following need to be addressed prior to the issuance of the Conditional Certificate of Occupancy: 1) Steps at 7 lower vomitories need yellow paint stripes to indicate a change in height. 2) Stair stringer connection to header channel for stairs between grids 11S-12S needs to be corrected. 3) Change in elevation exceeding 1/2" where new field slab and existing field slab at grids A/16S needs to be addressed. Contractor to install flat plate to remedy trip hazard. Per conversation with the Contractor, David Zigler, items stated above would be complete over the weekend prior to the first football game on Monday (9/2/2024) and would provide photos to FSU BCA FSU BCA received pictures addressing the items above on Saturday (8/31) |
2024/08/29 | Fire Safety | Final Egress/Emergency Lights | Passed | Sam Sevor | Generator transfer switch was tested and Emergency lights with State Fire Marshal, Todd --- Test Passed |
2024/08/19 | Building/Structural | Masonry | Passed | Kody Boswell | Reviewed reinforcing steel for the 2nd lift of the bosster storage walls. Reviewed reinforcing steel for the 2nd lift of masonry walls for the booster storage room in the area between grids C-E/3N-5N. Reinforcing over door openings was corrected from prior failed inspection. |
2024/08/19 | Electrical | Ceiling Rough-in | Passed | James Melvin | 1st floor commissary building section 9 |
2024/08/15 | Electrical | Ceiling Rough-in | Passed | James Melvin | Commissary building 1st floor section 10 |
2024/08/15 | Building/Structural | Masonry | Failed | Kody Boswell | Reviewed reinforcing steel for the 2nd lift of masonry walls for the booster storage room in the area between grids C-E/3N-5N. Reinforcing over door openings was not installed per detail 14 on sheet S5.21. This was discussed with the Contractor and threshold inspector. Re-inspection required after reinforcing is installed. |
2024/08/12 | Building/Structural | Masonry | Passed | Kody Boswell | Reviewed reinforcing steel for the first lift of masonry walls for the booster storage room in the area between grids C-E/3N-5N. |
2024/08/08 | Fire Safety | Hydro-Test | Passed | Mary Creason | hydro test for 2 hours Start 9:01am at 222psi and End at 11:21am 224psi Passed Visual on pipe/heads inside vistors locker room/maintenance shop/equipment shop/breakroom |
2024/08/08 | Fire Safety | Fire Water Above Ground | Passed | Mary Creason | hydro test for 2 hours Start 9:01am at 222psi and End at 11:21am 224psi Passed Visual on pipe/heads inside vistors locker room/maintenance shop/equipment shop/breakroom |
2024/07/25 | Building/Structural | Slab | Passed | Kody Boswell | Reviewed structural steel framing for new stairs and reinforcing steel for new landings between column line 8s-18s |
2024/07/24 | Building/Structural | Slab | Postponed | Kody Boswell | Stairs and landings section 12-16. Contractor contacted FSU prior to arrival on site to postpone the inspection to a later date. |
2024/07/24 | Building/Structural | Framing | Postponed | Kody Boswell | Stairs in section 16-12. Contractor contacted FSU prior to arrival on site to postpone the inspection to a later date. |
2024/07/24 | Plumbing | Storm Piping & Test | Passed | Paul Nitz | Section 4 floor drains x 4 |
2024/07/19 | Electrical | Ground | Passed | James Melvin | notes*Building ground inspection by Gate C . Gate D was inspected a week ago *notes* |
2024/07/12 | Building/Structural | Slab | Passed | Kody Boswell | Reviewed reinforcing steel for elevated slabs on the upper concourse between grids 2N-9N |
2024/07/11 | Building/Structural | Slab | Passed | Kody Boswell | Reviewed reinforcing steel for the following areas of elevated slab on the upper concourse: 1) In the area between grids F-J/5S-6S 2) In the area between grids F-J/2S-3S Missing reinforcing from 7/10/2024 inspection was installed and deck was cleaned off. |
2024/07/11 | Building/Structural | Re-Inspection | Passed | Kody Boswell | Reviewed reinforcing steel for the following areas of elevated slab on the upper concourse: 1) In the area between grids F-J/5S-6S 2) In the area between grids F-J/2S-3S Missing reinforcing from 7/10/2024 inspection was installed and deck was cleaned off. |
2024/07/10 | Building/Structural | Slab | Failed | Kody Boswell | Reviewed reinforcing steel for the following areas of elevated slab on the upper concourse: 1) In the area between grids F-J/5S-6S 2) In the area between grids F-J/2S-3S There was some reinforcing that was not installed per detail 7/S6.13 and there was excessive debris in some areas. Contractor to install reinforcing steel and clean off deck. |
2024/07/09 | Building/Structural | Slab | Postponed | Kody Boswell | Contractor contacted FSU prior to arrival on site to cancel inspection and postpone to a later date. |
2024/06/27 | Building/Structural | Slab | Passed | Kody Boswell | Reviewed reinforcing steel for the elevated slab at the upper concourse level located in the area between grids F-G/7S-19S |
2024/06/26 | Building/Structural | Slab | Postponed | Kody Boswell | 4th floor deck columns 7 south- 19s Contractor contacted FSU BCA prior to arriving on site to cancel and postpone inspection. Contractor will reschedule for another date. |
2024/06/26 | Fire Safety | Final Fire Safety | Passed | Mary Creason | Gate K fire line underground = EAST SIDE: Hydro, visual and Flush HYDRO Start at 8:10am 225psi Finished 10:25am 226psi Visual DR18 pipe Flush - passed |
2024/06/26 | Fire Safety | Fire Water Underground | Passed | Mary Creason | Section 11 fire line underground = new fire riser line : flush conducted |
2024/06/26 | Building/Structural | ADA | Passed | Kody Boswell | Reviewed 1st floor ramps for compliance with FBC. Ramp slopes were within standards set by FBC. Connor Ross was present during the walk through. |
2024/06/26 | Fire Safety | Fire Water Underground | Passed | Mary Creason | Gate K fire line underground = Hydro, visual and flush for west side HYDRO Start: 8am at 224psi Finish 10:20am at 225psi Visual DR18 Flush - passed |
2024/06/26 | Fire Safety | Fire Water Underground | Passed | Mary Creason | Gate K, J, L and section 11: completed today - HYDRO, Visual and Flush Paperwork completed |
2024/06/21 | Plumbing | Rough-in | Passed | Dwayne Mahony | |
2024/06/17 | Plumbing | Rough-in | Passed | Paul Nitz | sections 14-13 and 16-15 only |
2024/06/12 | Building/Structural | Slab | Passed | Paul Nitz | N side 4th floor elevated slab |
2024/06/12 | Plumbing | Rough-in | Failed | Paul Nitz | min slope not met on storm drain fbc p1106.2 |
2024/06/10 | Plumbing | Rough-in | NOT READY | Paul Nitz | |
2024/06/05 | Plumbing | Rough-in | Passed | Paul Nitz | |
2024/06/05 | Building/Structural | Masonry | Passed | Kody Boswell | Reviewed reinforcing steel for new masonry walls located B-C/1E-2S |
2024/06/03 | Building/Structural | Slab | Passed | Kody Boswell | Reviewed reinforcing steel for the ramp and stair footer in the area between grids B-E/8S-9S |
2024/05/31 | Building/Structural | Slab | Passed | Kody Boswell | Reviewed reinforcing steel for the slab on grade ramp located between grids A-C/5S-6S |
2024/05/29 | Building/Structural | Slab | Passed | Kody Boswell | Reviewed reinforcing steel for several ramps (slab on grade) |
2024/05/28 | Plumbing | Underground | Passed | Paul Nitz | Section 12/13 |
2024/05/24 | Building/Structural | Slab | Passed | Kody Boswell | Reinforcing steel for ramp slab on grade. Inspection deferred to threshold inspector. See correspondence folder for photos from Contractor. |
2024/05/23 | Building/Structural | Slab | Passed | Kody Boswell | |
2024/05/23 | Plumbing | Rough-in | Passed | Neely Lewis | 1 floor inlet in lower level ramp |
2024/05/22 | Plumbing | Rough-in | Passed | Paul Nitz | |
2024/05/22 | Building/Structural | Framing | Kody Boswell | Meeting held by the Contractor of procedures for weld inspections. FSU BCA met the Contractor, Testing Agency and Threshold Inspector in the field to discuss welding inspections. | |
2024/05/21 | Building/Structural | Slab | Passed | Kody Boswell | Reviewed reinforcing steel for the following slab on grade ramps: 1) Between grids A-C/2N-3N 2) Between grids A-C/8N-9N 3) Between grids A-C/11N-12N |
2024/05/17 | Fire Safety | Fire Water Underground | Passed | Mary Creason | Visual passed, hydro passed and flush passed |
2024/05/17 | Fire Safety | Hydro-Test | Passed | Mary Creason | test started at 7:45am at 215psi and stopped at 10:10am at 215psi. Passed test. |
2024/05/16 | Building/Structural | Slab | Passed | Kody Boswell | Reviewed reinforcing steel and steel deck attachment for a portion of the slab on deck located in the area between grids A-B/7S-16S. |
2024/05/15 | Plumbing | Underground | Passed | Paul Nitz | check slope on ramp 9/10 at next inspection |
2024/05/15 | Plumbing | Rough-in | Passed | Paul Nitz | check slope on ramp 9/10 at next inspection |
2024/05/13 | Plumbing | Underground | NOT READY | Neely Lewis | |
2024/05/13 | Plumbing | Rough-in | NOT READY | Neely Lewis | |
2024/05/13 | Building/Structural | Slab | Passed | Kody Boswell | Reviewed reinforcing steel for the following slab on grade ramps: 1) In the area between grids A-C/5N-6N 2) In the area between grids A-C/8N-9N |
2024/05/09 | Building/Structural | Slab | Passed | Kody Boswell | Reviewed reinforcing steel and steel deck attachment for a portion of the slab on deck located in the area between grids A-B/7N-7S. |
2024/05/06 | Building/Structural | Slab | Passed | Dwayne Mahony | Excess foam plastic is to be removed, T.I. will verify. |
2024/05/03 | Plumbing | Rough-in | Passed | Dwayne Mahony | Approved south end of grandstand lowest level, 7 area drains, and two lower vomitory ramps. |
2024/05/01 | Plumbing | Rough-in | Passed | Neely Lewis | partial only. |
2024/04/30 | Building/Structural | Footing | Passed | Kody Boswell | Reviewed reinforcing steel for a stair footing located in the area between grids B-C/17S-18S |
2024/04/30 | Building/Structural | Slab | Passed | Kody Boswell | Reviewed reinforcing steel for 2 slab on grade areas that were removed to install underground pipe. Reinforcing consisted of steel doweled into existing concrete at 2'-0" spacing along with WWR. |
2024/04/25 | Plumbing | Storm Piping & Test | Passed | Neely Lewis | |
2024/04/10 | Building/Structural | Footing | Passed | Kody Boswell | Reviewed reinforcing steel for a wall footing for the north wall at the visitor's locker room |
2024/04/02 | Building/Structural | Wall/Ceiling | Passed | Kody Boswell | Reviewed reinforcing steel for walls located along grids 14S, 15S and 16S |
2024/03/28 | Building/Structural | Wall/Ceiling | Passed | Kody Boswell | Reviewed reinforcing steel for walls along grids 10S, 11S, 12S and 13S. |
2024/03/26 | Building/Structural | Footing | Passed | Kody Boswell | Reviewed reinforcing steel for the following: - Grade beam along grid 16N - Walls along grids 8S, 9S, 14N and 15N |
2024/03/21 | Building/Structural | Wall/Ceiling | Passed | Kody Boswell | Reviewed reinforcing steel for walls along grids 2S, 3S, 4S, 5S, 6S and 7S |
2024/03/18 | Building/Structural | Wall/Ceiling | Passed | Kody Boswell | Reviewed reinforcing steel for walls along grids 2N and 1E. |
2024/03/15 | Building/Structural | Footing | Passed | Kody Boswell | Reviewed reinforcing steel for the following grade beams (GB) and walls: - GBs along grids 11S, 12S, 13S, 14S, 15S and 16S - Walls along grids 3N, 4N, 5N and 6N |
2024/03/13 | Building/Structural | Footing | Passed | Kody Boswell | Reviewed reinforcing steel for grade beams along grids 2S thru 10S. |
2024/03/11 | Building/Structural | Footing | Passed | Dwayne Mahony | |
2024/03/07 | Building/Structural | Footing | Postponed | Kody Boswell | Contractor contacted FSU to postpone the inspection to a later date. |
2024/03/06 | Building/Structural | Cast in Place Wall | Passed | Kody Boswell | Reviewed reinforcing steel for walls on top of grade beams located along grids 7N, 8N, 9N ,10N, 11N, 12N, 13N, 14N, 15N and the wall in the area between grids A-B/7N-16N. The deficiencies noted on 3/4/24 inspection were corrected. |
2024/03/05 | Building/Structural | Cast in Place Wall | Postponed | Kody Boswell | Contractor contacted FSU to postpone the inspection to a later date due to weather. |
2024/03/04 | Building/Structural | Cast in Place Wall | Failed | Kody Boswell | Reviewed reinforcing steel for walls on top of grade beams located along grids 7N, 8N, 9N ,10N, 11N, 12N, 13N, 14N, 15N and the wall in the area between grids A-B/7N-16N. There were several missing embeds at expansion joint locations and there was insufficient development length for #7 bars at multiple locations. Contractor to reschedule inspection after corrections are made. |
2024/03/01 | Building/Structural | Footing | Passed | Kody Boswell | Reviewed reinforcing steel for grade beams along grids 1E, 2N, 3N, 4N, and 5N. The deficiencies noted on the 2/29/24 inspection were corrected. |
2024/02/29 | Building/Structural | Footing | Failed | Kody Boswell | Reviewed reinforcing steel for grade beams along grids 2N, 3N, 4N, and 5N. Each of these grade beams were stepped and were supposed to be reinforced per detail 4/S5.01. Additional reinforcement called out in the detail going from top steel of top portion of grade beam to bottom steel of bottom portion of grade beam was not placed correctly. Also, the last stirrup located closest to the step did not encase the top steel of the bottom portion of grade beam. |
2024/02/27 | Building/Structural | Footing | Passed | Dwayne Mahony | |
2024/02/27 | Building/Structural | Wall/Ceiling | Passed | Dwayne Mahony | |
2024/02/23 | Building/Structural | Footing | Passed | Dwayne Mahony | |
2024/02/22 | Building/Structural | Footing | Failed | Kody Boswell | Reviewed reinforcing steel for grade beams located along grids 6N, 7N, 8N, 9N and 10N. Reinforcing steel at the field side was not in place per detail 7/S5.01. This was discussed with the Contractor. Contractor to contact EOR for direction due to unforeseen conditions. An RFI will be generated. |
2024/02/15 | Building/Structural | Footing | Postponed | Kody Boswell | Contractor contacted FSU to postpone grade beam reinforcing steel inspection to a later date. (KB) |
2024/02/14 | Building/Structural | Footing | Conditional | Kody Boswell | Reviewed reinforcing steel for grade beams at the lower concourse located between gridlines 15N, 14N, 13N and 12N. Where new grade beams tied to existing concrete columns there was insufficient longitudinal steel length and spacing between existing concrete face and new reinforcing ties. Per the EOR the first new reinforcing tie should be 2" to 3" off of existing concrete. This was not the case for each side of the 4 grade beams reviewed. Contractor to fix reinforcing steel prior to concrete placement. BNI (threshold) to verify reinforcing is corrected prior to concrete placement. (KB) |
2024/02/09 | Building/Structural | Footing | Postponed | Kody Boswell | Contractor contacted FSU to cancel today's inspection and postpone to a later date. Inspection request was for grade beam reincorcing steel. (KB) |
2024/02/08 | Building/Structural | Footing | Postponed | Kody Boswell | Contractor contacted FSU to cancel today's inspection and postpone to a later date. Inspection request was for grade beam reincorcing steel. (KB) |
Building/Structural | Slab | Cancelled | Kody Boswell | Structual slab 4th section 13 column 10s line k. Contactor contacted FSU BCA on 3/7/25 to cancel inspection. | |
Plumbing | Specialty Piping | Postponed | Paul Nitz | Cold water hot tie in for new bathrooms at section 7 and 13 One side to occur at 9 and the other one at 10 | |
Plumbing | Water Piping & Test | Postponed | Paul Nitz | Water supply new bathrooms section 7 and 13 4th floor | |
Building/Structural | Final Building | Kody Boswell | |||
Electrical | Wall Rough-in | Passed | Rocky Wilde | New north bathroom 4th floor 1st lift of grout 4 in wall boxes | |
Building/Structural | Masonry | Passed | Rocky Wilde | New north bathroom 4th floor 1st lift of grout |
BCA Project #: 23-03455- Doak Campbell - East Stands Improvements Phase I
Inspection Date | Discipline | Type | Result | Inspector | Comments |
2025/07/28 | Building/Structural | Insulation | Passed | Kody Boswell | Reviewed insulation for ceilings for elevator machine rooms at gate A and M |
2025/07/28 | Building/Structural | Framing | Passed | Kody Boswell | Reviewed LG framing for new ceilings for elevator machine rooms at gate A and M |
2025/04/24 | Plumbing | Specialty Piping | Failed | Paul Nitz | I would like to reschedule the insulation inspection to 2;30 for the new 4th floor bathrooms 1) plans call for 1'' elastomeric insulation on all supply lines 2) trap primers are bot installed |
2025/03/27 | Building/Structural | Masonry | NOT READY | Paul Nitz | Final lift new s bathroom 4th floor section 13 |
2025/03/11 | Building/Structural | Slab | NOT READY | Kody Boswell | FSU BCA arrived on site and was informed by the Subcontractor that the elevated slab reinforcing steel was not ready for inspection. FSU BCA then left the site. |
2025/01/15 | Plumbing | Storm Piping & Test | Failed | Paul Nitz | Smoke test |
2025/01/07 | Plumbing | Storm Piping & Test | NOT READY | Paul Nitz | Smoke test |
2024/12/16 | Building/Structural | Slab | Passed | Kody Boswell | New Plumbing drains section 5 on the 4th floor rebar |
2024/08/30 | Fire Safety | Final Fire Safety | Passed | Mary Creason | Temporary CCO is approved for the 2024 season by Fire. Sam Sever, Fire Manaager FSU, Jason Griisel TFD, and Todd Perce, State Fire Marshal office conducted a walk thru on 8/27/2024 and conditions were good. |
2024/08/27 | Building/Structural | Other | Conditional | Paul Nitz | Compliance for football game 1) edge protection required on ramps fbc a405.9 2) protruding objects need to be protected fbc a307.0 |
2024/08/27 | Electrical | Ceiling Rough-in | Passed | James Melvin | Visitors locker room |
2024/08/23 | Building/Structural | ADA | Failed | Paul Nitz | Preliminary inspection for compliance in preparation for football game 1) ADA 303.2 vertical change on third floor 2)deburring hand rails 2) ADA 405.9 Edge protection on ground leve |
2024/08/23 | Failed | Paul Nitz | Preliminary inspection for compliance in preparation for football game 1) ADA 303.2 vertical change on third floor 2)deburring hand rails 2) ADA 405.9 Edge protection on ground level | ||
2024/08/22 | Electrical | Ceiling Rough-in | Passed | James Melvin | Commissary building 1st floor section 9 |
2024/08/21 | Building/Structural | Sheetrock | Passed | Paul Nitz | Screw inspection visitors locker room |
2024/08/21 | Building/Structural | Roofing | Passed | Paul Nitz | Commisary building 1st floor section 9 |
2024/08/21 | Building/Structural | Insulation | Passed | Paul Nitz | Commisary building 1st floor section 9 |
2024/08/20 | Building/Structural | Wall/Ceiling | Passed | Paul Nitz | Locker room bulkhead framing |
2024/08/20 | Plumbing | Underground | Passed | Paul Nitz | Storm line tie in by gate J |
2024/08/02 | Plumbing | Rough-in | Passed | Paul Nitz | Plumbing repair at existing ramp at section 4 (column 19n- 16n) 1st floor |
2024/08/02 | Building/Structural | Framing | Passed | Paul Nitz | Drywall framing in visitors locker room section 13/14 |
2024/08/02 | Building/Structural | Slab | Passed | Paul Nitz | Plumbing repair at existing ramp at section 4 (column 19n- 16n) 1st floor |
2024/07/11 | Electrical | Ground | Passed | James Melvin | Ground rods for building steel 1) Al Smythe performed the inspection, it was from gate D to the first elevatoer shaft |
2024/04/29 | Fire Safety | System Flush | Passed | Mary Creason | UG near gate J - flushed - approved |
2024/04/29 | Fire Safety | Fire Water Underground | Passed | Mary Creason | Hydro and visual of piping, tracer line, bulimous paint and restraints on line into sprinkler riser room. Hydro start 810am 220psi and finished at 1020am at 220psi. Passed |
2024/04/25 | Electrical | Panel/Feeder | Passed | Dwayne Mahony | |
2024/04/25 | Fire Safety | Fire Water Underground | Passed | Mary Creason | Visual and hydro on UG piping at gate J. Hydro start at 8:10am at 205psi and end 10:10am at 2:05psi (See shop drawings for exact location) |
2024/04/25 | Fire Safety | Hydro-Test | Passed | Mary Creason | Visual and hydro of pipe passed. Hydro start 8:10am and ended 10:10am 205 psi Pipe is located right next to J gate. (see shop drawings for exact location) |
2024/01/24 | Electrical | Ceiling Rough-in | Conditional | Dwayne Mahony | Panel 94 deadfront piece is missing. Replacement of this piece is mandatory since new load is being added to this panel, per Existing Building code section 808.2. |
2024/01/22 | Electrical | Ceiling Rough-in | Passed | Dwayne Mahony | Inspected new lights and wiring on lower ramps. |
Electrical | Underground | Alex Masterton | Gate D , Small section of 15kva duct bank encasement Revise project to West Stands | ||
Fire Safety | Hydro-Test | Postponed | Curtis Rogers | 4th floor fire suppression |
BCA Project #: 23-03453- Fine Arts Bldg. - Reroof
Inspection Date | Discipline | Type | Result | Inspector | Comments |
2025/05/20 | Building/Structural | Final Building | Conditional | Kody Boswell | Final Inspection Result is conditional pending installation of 3 missing drain baskets and receipt of lightning protection recertification certificate. |
2025/05/20 | Building/Structural | Re-Inspection | Conditional | Kody Boswell | Final Inspection Result is conditional pending installation of 3 missing drain baskets and receipt of lightning protection recertification certificate. |
2023/12/28 | Building/Structural | Roofing | Passed | Dwayne Mahony | In-Progress Inspection |
2023/12/28 | Building/Structural | Roofing | Passed | Dwayne Mahony | In-Progress Inspection |
2023/12/21 | Building/Structural | Roofing | Postponed | Tom Deckert | In-Progress Inspection - Cap Sheet |
2023/12/06 | Building/Structural | Roofing | Passed | Kody Boswell | In-Progress Inspection Reviewed installation of cap sheet on one low roof and the cleaning of existing material where cap sheet was to be installed (KB) |
Building/Structural | Final Building | Postponed | Kody Boswell | Final Roofing/Building Inspection Inspection has been postponed to a later date due to incoming weather | |
Building/Structural | Roofing | Postponed | Kody Boswell | Final Roofing/Building Inspection Inspection has been postponed to a later date due to incoming weather | |
Building/Structural | Roofing | Postponed | Kody Boswell | Final Roofing/Building Inspection - Had to Reschedule due to weather Contractor contacted FSU BCA prior to site arrival to cancel/postpone inspection to a later date. | |
Building/Structural | Final Building | Postponed | Kody Boswell | Final Roofing/Building Inspection - Had to Reschedule due to weather Contractor contacted FSU BCA prior to site arrival to cancel/postpone inspection to a later date. |
BCA Project #: 23-03450- Ringling Ca'D'Zan - Roof Replacement
Inspection Date | Discipline | Type | Result | Inspector | Comments |
2025/09/05 | Building/Structural | Roofing | Passed | Rocky Wilde | inprogress inspection |
2025/06/06 | Roofing | In progress | Conditional | Joan Lima | Partial dry-in in progress south sides. |
Building/Structural | Roofing | Hank Fulmer | roof in progress inspection |
BCA Project #: 23-03433- Soccer Sideline Canopy Improvement
Inspection Date | Discipline | Type | Result | Inspector | Comments |
2024/01/12 | Building/Structural | Roofing | Conditional | Kody Boswell | Reviewed new aluminum supports for new roof panel installation and reviewed new roof panel attachment. Aluminum supports were in substantial compliance with the contract documents. Screw attachment of panels to structure were in substantial compliance with the contract documents and FL Product Approval. Screw attachment at panel sidelaps had not been installed yet. FSU to verify installation during next inspection. (KB) |
BCA Project #: 23-03430- Parking Garages 1-6 CCTV Upgrade
Inspection Date | Discipline | Type | Result | Inspector | Comments |
2023/12/05 | Electrical | Final Electrical | Conditional | Dwayne Mahony | Contact Todd Jones for specific site inspection time. 850-544-4424 Approved garage 5 final inspection in full. |
BCA Project #: 23-03418-B Doak Campbell - West Stands Renovation - (Pkg. 3 & 4)
Inspection Date | Discipline | Type | Result | Inspector | Comments |
2025/08/28 | Mechanical | Final Mechanical | Conditional | Paul Nitz | The mechanical final took place on 08/26/25. 1) fresh air ducts need insulation in the mechanical room |
2025/08/28 | Electrical | Final Electrical | Conditional | Rocky Wilde | Electrical final inspection took place on 08/26/25. ok for TCO |
2025/08/28 | Plumbing | Final Plumbing | Conditional | Paul Nitz | The final plumbing inspection took place on 8/26/25. conditional from the previous inspection notes |
2025/08/25 | Mechanical | Duct Pressure Test | Passed | Paul Nitz | 3.5 inspection of duct work being replaced |
2025/08/12 | Fire Safety | Final Fire Sprinkler | Passed | Curtis Rogers | *Testing of Permenant Air Compressors for (3) Sprinkler Dry Systems Passed - Each Air Compressor pumps up systems within 30 minutes Passed -Test Supervisor Low Air Passed - Checked Breaker Labels |
2025/08/12 | Building/Structural | Slab | Passed | Kody Boswell | Reviewed reinforcing steel for slab on grade outside of gate D |
2025/08/11 | Building/Structural | Final Building | Conditional | Kody Boswell | Final inspection of life safety guardrails and handrails. Result is conditional pending installation of two missing rails in the bowl and installation of intermediate handrail at stair 5. Rails have been installed. No outstanding items to correct for handrails and guardrails |
2025/08/11 | Building/Structural | Final Building | Kody Boswell | ||
2025/08/08 | Mechanical | Final Mechanical | Passed | Rocky Wilde | Check working water and walk areas that have been fixed ready for TCO. |
2025/08/08 | Plumbing | Final Plumbing | Passed | Rocky Wilde | Check working water and walk areas that have been fixed ready for TCO. |
2025/08/08 | Electrical | Final Electrical | Passed | Rocky Wilde | Check working water and walk areas that have been fixed ready for TCO. |
2025/08/07 | Fire Safety | Final Fire Safety | Passed | Curtis Rogers | Main Field club kitchen hood, bloon and trip test for final hood not tested. |
2025/08/06 | Plumbing | Final Plumbing | Partial | Rocky Wilde | Final inspection for 3.5 and 1.5 roofs. |
2025/08/06 | Plumbing | Final Plumbing | Partial | Rocky Wilde | Inspection for the second floor for TCO |
2025/08/06 | Mechanical | Final Mechanical | Partial | Rocky Wilde | Inspection of the second floor for TCO. |
2025/08/06 | Electrical | Final Electrical | Partial | Rocky Wilde | Final inspection for 3.5 and 1.5 roofs. |
2025/08/06 | Mechanical | Final Mechanical | Partial | Rocky Wilde | Final inspection for 3.5 and 1.5 roofs. |
2025/08/06 | Electrical | Final Electrical | Passed | Rocky Wilde | Inspection of the second floor for TCO. |
2025/08/06 | Building/Structural | Structural | Conditional | Kody Boswell | Inspection for more remaining handrails that still need to be inspected. Guardrails and handrails for life safety and ADA have been reviewed in the bowl, lower concourse, founders level, and upper concourse. Result is conditional pending finishwork being completed. Finishwork includes but is not limited to grinding down welds in handrails to provide a smooth surface. Also, the question on whether stair 5 requires an intermediate handrail has yet to be answered. |
2025/08/05 | Electrical | Final Electrical | Partial | Rocky Wilde | First floor final for TCO |
2025/08/05 | Plumbing | Final Plumbing | Partial | Rocky Wilde | First floor final for TCO |
2025/08/05 | Building/Structural | Structural | Conditional | Kody Boswell | Inspection for lower bowl handrails and items fixed from past inspections. Result is conditional pending the installation of a missing bracket for a wall-mounted handrail located near the north ADA ramp, serving the south stepped aisle. |
2025/08/05 | Mechanical | Final Mechanical | Partial | Rocky Wilde | First floor final for TCO |
2025/08/04 | Plumbing | Final Plumbing | Partial | Rocky Wilde | Inspection for the upper concourse, levels 4 and 6 in the south end zone. |
2025/08/04 | Mechanical | Final Mechanical | Partial | Rocky Wilde | Inspection for the upper concourse, levels 4 and 6 in the south end zone. |
2025/08/04 | Electrical | Final Electrical | Partial | Rocky Wilde | Inspection for the upper concourse, levels 4 and 6 in the south end zone. |
2025/08/01 | Plumbing | Final Plumbing | Partial | Rocky Wilde | Upper Concourse restrooms finals for TCO. |
2025/08/01 | Mechanical | Final Mechanical | Partial | Rocky Wilde | Upper Concourse restrooms finals for TCO. Mens and womens restrooms, insulate water lines on sinks, Napkin trashcan needs to be relocate. |
2025/08/01 | Electrical | Appliance/Equipment | NOT READY | Rocky Wilde | Kitchen hood equipment testing. Inspection was also called in with FSU fire. |
2025/08/01 | Mechanical | Equipment | NOT READY | Rocky Wilde | Kitchen hood equipment testing. Inspection was also called in with FSU fire. |
2025/08/01 | Fire Safety | Final Fire Sprinkler | Passed | Curtis Rogers | Kitchen hood equipment testing. Inspection was also called in with FSU fire. Resolved *Kitchen Hood - Field Club L1.05.03 | Fan NOT Working Properly *All the other kitchen hoods passed the Balloon Test and Solenoid Test |
2025/08/01 | Electrical | Final Electrical | Passed | Rocky Wilde | Upper Concourse restrooms finals for TCO. |
2025/07/31 | Electrical | Ceiling Rough-in | Passed | Rocky Wilde | Overhead inspection for upper concourse restrooms. MCJV Sr. management wants to have a conversation after the inspection to align paths to TCO. |
2025/07/31 | Mechanical | Duct Rough-in | Passed | Rocky Wilde | Overhead for upper concourse restrooms. |
2025/07/31 | Fire Safety | Final Fire Alarm | Passed | Curtis Rogers | Verify that the Fire Alarm system will switch to emergency power. *Tested via Transponder Panel on EM Power @West Stands Project 23-03418-B Doak Campbell - West Stands Renovation - (Pkg. 3 & 4) Side Note: Can't test Main Doak FACP on Generator Back up - Connected to the East Side Project -Project: 23-03455-A-Doak Campbell - East Stands Improvements Phase II |
2025/07/30 | Fire Safety | Final Fire Safety | Passed | Curtis Rogers | Extinguisher Inspection Locations And Tags PASSED *Correct Locations & Travel Distances <75 ft ABC Extinguishers PASSED *K Type Extinguishers in all Kitchens PASSED *Correct TAGS on all Extinguishers (ABC & K Type) |
2025/07/30 | Mechanical | Duct Rough-in | Conditional | Paul Nitz | Grease duct inspection. 1) I need product data for the grease duct reservoir 2) slope missing on grease line |
2025/07/30 | Mechanical | Re-Inspection | Conditional | Paul Nitz | Grease duct inspection. 1) I need product data for the grease duct reservoir 2) slope missing on grease line |
2025/07/30 | Fire Safety | Re-Inspection | Passed | Curtis Rogers | Inspection for signage and other outstanding items from past inspections. Fire SPRINKLER Inspection PASSED*All Sprinkler Riser signage and info. signage PASSED*All Sprinkler Hydrauilic Placards are installed on each Riser PASSED*All Sprinkler Escutcheon plates are installed FIRE Alarm Inspection PASSED *All Circuit Breaker Labels are printed on FACP & Transponders PASSED *All room descriptions coincide with Fire Alarm devices *Need to test Fire Alarm with Back Up Power (Generator) |
2025/07/29 | Fire Safety | Fire Water Above Ground | Passed | Curtis Rogers | Heat trace testing. *Tested via Power loss (Trip Breaker) with Fire Alarm Interface at each Heat Trace Module |
2025/07/29 | Fire Safety | Final Fire Safety | Conditional | Curtis Rogers | Final for sprinklers and fire safety inspection. |
2025/07/29 | Fire Safety | Final Egress/Emergency Lights | Passed | Curtis Rogers | Exit sign inspection *All Exit signs were illuminated and installed in the correct positions & locations *Check Egress (Housekeeping) |
2025/07/29 | Fire Safety | Final Fire Alarm | Passed | Curtis Rogers | A/V shutdown with fire alarm. *Activation of Fire Alarm overides Stadium Speakers (White Noise) |
2025/07/29 | Building/Structural | ADA | Failed | Kody Boswell | Reviewed guardrail/handrails and clearances for upper bowl seating (not including Founders lvl seating). The following deficencies were noted: - Incorrect rails were installed at two locations - Handrail extensions were not installed, they were a work in progress. Specifically at handrails that turn the corner at vomitories. - There are 4 seats located at super vomitories that don't have the required clearance between front of chair and rail. These seats will have to be removed. Deficencies noted above were communicated with the Contractor while on site. |
2025/07/29 | Fire Safety | Final Fire Sprinkler | Conditional | Curtis Rogers | Final for sprinklers and fire safety inspection. *Install headboxes in each Riser Room with correct heads and head wrench *Install Riser Room Signage (and info.signage for riser valves) *Hydraulic Placards (Ready to be installed) *A few random escutcheons missing on each level of concourses |
2025/07/29 | Building/Structural | Structural | Failed | Kody Boswell | Reviewed North VIP entrance fix at CMU per RFI 749. Anchors installed through steel channel into CMU weren't installed in cells containing vertical reinforcing. Contractor to verify with the EOR that is acceptable or install channel per RFI 749. |
2025/07/29 | Mechanical | Final Mechanical | Failed | Paul Nitz | Mechanical final for TCO Upper Concourse Restrooms South 1) Hot water requirements for kitchens and janitorial rooms. FBC P607.1 2) ADA sink drain protection. FBC A606.4 3) Signage missing for restrooms. FBC P403.4 4) Duct supports that were moved to hang the lights need to be reconnected 5) Handles need to be installed on the restroom doors 6) Upper Concourse Kitchen 7) Condensation lines need to be supported and insulated. FBC M1107.4 8) Water lines need to be insulated. FBC P607.5 9) Trap seals are not installed in floor drains as per plans 10) Cooler door not installed per manufactures installation,( it doesn’t shut properly) 11) Water was not turned on at this location 12) Upper Concourse Pantry 13) Air handler on the roof is leaking, and the ceiling tiles are sagging and stained. 14) Floor penetration needs to be sealed 15) Chiller lines need to be insulated. FBC M1204.1 16) Speed Of Service Concession 17) The door drags the floor and does not close or fully open. 18) All exposed condensation lines need to protected with a metal jacket. 19) VAV did not have power going to it. 20) Air gap required for the sink drains FBC P802.3.1 21) Women’s Restroom North 22) Cleanout access for the water closet is blocked by rebar 23) The sinks are not operable, the power has not been connected 24) The sink in the handicap restroom is leaking 25) The covers for the cleanouts have not been installed as per manufacture installation, (most have been caulked in place). |
2025/07/29 | Plumbing | Final Plumbing | Conditional | Paul Nitz | Plumbing and gas final. 1)) we only had time to look at the upper concourse |
2025/07/29 | Building/Structural | Roofing | Passed | Kody Boswell | Final roof inspection for main concourse restrooms. |
2025/07/29 | Plumbing | Gas Piping & Test | Conditional | Paul Nitz | Plumbing and gas final. 1) we only had time to look at the upper concourse |
2025/07/29 | Building/Structural | Final Building | NOT READY | Kody Boswell | Handrails and roofing for buildings and bowl. |
2025/07/29 | Building/Structural | Structural | Passed | Kody Boswell | Reviewed North VIP entrance fix at CMU per RFI 749. After prior failed inspection and the direction of the EOR, additional anchors were installed through the steel channel into masonry cells containing vertical reinforcing. |
2025/07/29 | Electrical | Final Electrical | Partial | Rocky Wilde | electrical final. 6 rooms only |
2025/07/29 | Mechanical | Re-Inspection | NOT READY | Paul Nitz | Inspection for grease duct fixes. |
2025/07/29 | Mechanical | Duct Rough-in | NOT READY | Paul Nitz | Inspection for grease duct fixes. |
2025/07/28 | Fire Safety | Final Fire Alarm | Passed | Curtis Rogers | Elevator Recall Inspection Fire Alarm |
2025/07/28 | Building/Structural | ADA | Conditional | Kody Boswell | Reviewed stairs, handrails, and guardrails for stairs 1,2,3,4,5, 6 north, 6 south. Also reviewed guardrails at the service corridor on Founders level. Result is conditional pending some spots at the service corridor guardrail where openings exceed 4" |
2025/07/28 | Building/Structural | Wall/Ceiling | Passed | Kody Boswell | Ceiling framing for the south kitchen office. |
2025/07/28 | Fire Safety | Fire Water Above Ground | Passed | Curtis Rogers | visual inspection for the 3rd floor vestibule and kitchen office. |
2025/07/28 | Electrical | Ceiling Rough-in | Passed | Rocky Wilde | Kitchen office overhead. |
2025/07/28 | Mechanical | Re-Inspection | NOT READY | Paul Nitz | grease duct re-inspection. |
2025/07/28 | Mechanical | Duct Rough-in | NOT READY | Paul Nitz | grease duct re-inspection. |
2025/07/28 | Mechanical | Duct Rough-in | NOT READY | Paul Nitz | mechanical room ductwork. |
2025/07/28 | Fire Safety | Final Egress/Emergency Lights | Passed | Rocky Wilde | Emergency lighting |
2025/07/26 | Electrical | Ceiling Rough-in | Passed | Rocky Wilde | This is for the overhead rough inspection that happened on Saturday in the vestibule in front of elevator 4 on level 3. |
2025/07/26 | Mechanical | Wall & Ceiling | Passed | Rocky Wilde | This is for the overhead rough inspection that happened on Saturday in the vestibule in front of elevator 4 on level 3. |
2025/07/26 | Mechanical | Duct Rough-in | Passed | Rocky Wilde | This is for the overhead rough inspection that happened on Saturday in the vestibule in front of elevator 4 on level 3. |
2025/07/26 | Plumbing | Rough-in | Passed | Rocky Wilde | This is for the overhead rough inspection that happened on Saturday in the vestibule in front of elevator 4 on level 3. |
2025/07/26 | Fire Safety | Fire Water Above Ground | Passed | Curtis Rogers | For record, fire sprinkler trip and flow test for wet and dry systems inspected by Curtis Rogers on Saturday, 7/26/25. |
2025/07/25 | Building/Structural | Structural | Passed | Rocky Wilde | Handrails on stairs 2,3,5. |
2025/07/25 | Mechanical | Duct Rough-in | Passed | Rocky Wilde | Field club women's north restroom and main concourse area B vestibule. |
2025/07/25 | Building/Structural | Wall/Ceiling | Passed | Rocky Wilde | ceiling grid framing for the field club, north women's restroom and main concourse area B vestibule. |
2025/07/25 | Electrical | Ceiling Rough-in | Passed | Rocky Wilde | Field club women's north restroom and main concourse area B vestibule. |
2025/07/25 | Fire Safety | Final Fire Alarm | Partial | Curtis Rogers | Passed - Shutdowns for all RTU/AHU, HVLS fans, Overhead doors, and CO detectors/gas solenoids. *Still need to Test Solenoids for Kitchen Hoods *Add Signage Above Roll up Doors & Riser Rooms Doors *Test Sprinkler Components (Pre-Testing Saturday 07.26.27) |
2025/07/25 | Building/Structural | Framing | Passed | Rocky Wilde | Gate C framing for Rockfon under the ductwork. |
2025/07/25 | Building/Structural | ADA | Passed | Rocky Wilde | Handrails on stairs 2,3,5. |
2025/07/24 | Fire Safety | Final Fire Alarm | Partial | Curtis Rogers | Partial -Fire Alarm for west stands. Testing of all Notification Devices (Speaker Strobes) Founders area, North & South - Upper/Lower Concourse Levels 1-3 *Corrections- Incorrect Room Descriptions Entire Concourse Levels (Room Labels did not match Fire Alarm Panel Description) *Fix Strobe @ Gate A Level 1(Water Damage) *Add Strobe in Nursing Room W1043 *Add F/A Breaker Locks and Breaker Labels For all F/A Transponders |
2025/07/24 | Mechanical | Duct Rough-in | Passed | Rocky Wilde | Partial for third floor. |
2025/07/24 | Building/Structural | Wall/Ceiling | Passed | Rocky Wilde | Framing for field club restrooms and upper concourse single restrooms. |
2025/07/24 | Electrical | Wall Rough-in | Passed | Rocky Wilde | Level four in wall rough for remaining east side. |
2025/07/24 | Mechanical | Duct Rough-in | Passed | Rocky Wilde | Field club restrooms north. |
2025/07/24 | Electrical | Ceiling Rough-in | Passed | Rocky Wilde | Field club restrooms. |
2025/07/24 | Fire Safety | Hydro-Test | Passed | Curtis Rogers | Above Ceiling and Hydro test for all dry systems that are fed out of level two and three systems. |
2025/07/23 | Building/Structural | Wall/Ceiling | Passed | Kody Boswell | Reviewed LG framing for field club north ceilings. |
2025/07/23 | Electrical | Ceiling Rough-in | Passed | Rocky Wilde | Field club specialty ceiling. |
2025/07/23 | Mechanical | Duct Rough-in | Passed | Rocky Wilde | Elevator 2,3 duct work. |
2025/07/23 | Fire Safety | Fire Alarm Rough-In | Passed | Rocky Wilde | For record, all levels rough in preformed during the electrical inspection by Rocky Wilde. |
2025/07/23 | Building/Structural | Wall/Ceiling | Passed | Kody Boswell | For record, ceiling grid framing for field club kitchen staff restroom, and north men's restroom. Inspection was done on 7/23/2025 |
2025/07/22 | Mechanical | Duct Rough-in | Conditional | Paul Nitz | For record, grease duct inspection light test done by Paul Nitz on Tuesday, 07/22/25 at 9 pm. Several leaks found and marked to be sealed. |
2025/07/22 | Electrical | Wall Rough-in | Passed | Rocky Wilde | Founder center loge boxes. |
2025/07/22 | Mechanical | Duct Rough-in | Passed | Paul Nitz | Fire damper inspection. |
2025/07/22 | Electrical | Wall Rough-in | Passed | Rocky Wilde | Level four boxes. |
2025/07/22 | Mechanical | Duct Rough-in | Passed | Paul Nitz | Partial first floor overhead. |
2025/07/22 | Building/Structural | Wall/Ceiling | Passed | Kody Boswell | Partial first floor ceiling framing. |
2025/07/22 | Building/Structural | Framing | Passed | Kody Boswell | Ceiling grid for founders level. |
2025/07/22 | Electrical | Ceiling Rough-in | Passed | Rocky Wilde | Overhead rough in for founders level. |
2025/07/22 | Mechanical | Duct Rough-in | Passed | Paul Nitz | Overhead rough in for founders level. |
2025/07/22 | Electrical | Ceiling Rough-in | Conditional | Rocky Wilde | Partial first floor overhead. |
2025/07/22 | Fire Safety | Fire/Smoke Damper | Passed | Rocky Wilde | Fire damper inspection. |
2025/07/21 | Plumbing | Water Piping & Test | Passed | Paul Nitz | Insulation inspection for plumbing and condenser drain lines in the 2 speed of concessions on the 3rd floor. This was looked at on friday 3/18/2025 at 3 pm. |
2025/07/21 | Mechanical | Insulation | Passed | Paul Nitz | Partial for field club ceiling areas. |
2025/07/21 | Building/Structural | Wall/Ceiling | Passed | Kody Boswell | Reviewed LG framing for field club ceiling areas, partial |
2025/07/21 | Mechanical | Duct Rough-in | NOT READY | Paul Nitz | Test of the fire dampers. |
2025/07/21 | Building/Structural | Framing | Passed | Kody Boswell | Reviewed LG framing for field club ceiling areas, partial |
2025/07/21 | Mechanical | Duct Rough-in | NOT READY | Paul Nitz | Grease duct light test. |
2025/07/21 | Mechanical | HW Piping & Test | Passed | Paul Nitz | This is for the re-inspection pressure test on the VAV in suite 5 that does the north suites. we did this test Friday 7/18/2025 at 3pm. |
2025/07/21 | Fire Safety | Fire Water Above Ground | Passed | Rocky Wilde | Partial visual for field club ceiling areas. |
2025/07/21 | Electrical | Ceiling Rough-in | Passed | Rocky Wilde | Inspection for founders' level private dining. |
2025/07/21 | Mechanical | Duct Rough-in | Passed | Paul Nitz | Inspection for founders' level private di |
2025/07/21 | Fire Safety | Fire/Smoke Damper | NOT READY | Rocky Wilde | Test of the fire dampers in elevator shafts. |
2025/07/21 | Electrical | Ceiling Rough-in | Passed | Rocky Wilde | Partial overhead for field club. |
2025/07/21 | Mechanical | Insulation | Passed | Paul Nitz | Inspection for founders' level private dining. |
2025/07/21 | Building/Structural | Framing | Passed | Kody Boswell | LG framing inspection for founders' level private dining. |
2025/07/21 | Mechanical | Duct Rough-in | Passed | Paul Nitz | Partial for field club ceiling areas. |
2025/07/21 | Mechanical | Duct Rough-in | NOT READY | Paul Nitz | Walk for the grease duct before light test. |
2025/07/18 | Building/Structural | Structural | Passed | Kody Boswell | Bent plate on 19 line south, upper concourse |
2025/07/18 | Plumbing | Rough-in | Passed | Paul Nitz | First floor bars. |
2025/07/18 | Mechanical | Duct Rough-in | NOT READY | Paul Nitz | Fire damper inspection for elevators. Requesting Paul Nitz and Curtis Rogers. |
2025/07/18 | Fire Safety | Fire/Smoke Damper | Cancelled | Mary Creason | Fire damper inspection for elevators. Requesting Paul Nitz and Curtis Rogers. |
2025/07/18 | Plumbing | Water Piping & Test | Failed | Paul Nitz | Heating water for the suites area A gauge. 1) we could not find the gauge to verify the pressure |
2025/07/18 | Mechanical | Duct Pressure Test | Passed | Paul Nitz | 3.5 area B. |
2025/07/18 | Mechanical | Insulation | NOT READY | Paul Nitz | Field club area A club dining and food service prep. |
2025/07/18 | Building/Structural | Wall/Ceiling | Passed | Kody Boswell | Framing for the ceiling outside the field club kitchen. |
2025/07/18 | Mechanical | Duct Rough-in | NOT READY | Paul Nitz | Field club area A club dining and food service prep. |
2025/07/18 | Building/Structural | Framing | Passed | Kody Boswell | Field club area A club dining and food service prep. |
2025/07/18 | Building/Structural | Framing | Postponed | Kody Boswell | First floor bars. Inspection was postponed. |
2025/07/18 | Electrical | Ceiling Rough-in | Passed | Rocky Wilde | Field club area A club dining and food service prep. |
2025/07/18 | Electrical | Wall Rough-in | Conditional | Rocky Wilde | Partial for loge boxes. |
2025/07/18 | Electrical | Wall Rough-in | Passed | Rocky Wilde | First floor bars. |
2025/07/18 | Building/Structural | Re-Inspection | Passed | Kody Boswell | Bent plate on 19 line south, upper concourse |
2025/07/17 | Electrical | Ceiling Rough-in | Passed | Rocky Wilde | Alcoves for main concourse BOH. |
2025/07/17 | Mechanical | Duct Pressure Test | NOT READY | Paul Nitz | Area B 3.5 level. |
2025/07/17 | Building/Structural | Framing | Passed | Kody Boswell | Framing of alcoves main concourse back of house. |
2025/07/17 | Mechanical | Duct Rough-in | Passed | Paul Nitz | Duct rough-in for suite 8. |
2025/07/16 | Building/Structural | Framing | Passed | Rocky Wilde | Electric and framing for founders lounge coves. |
2025/07/16 | Mechanical | Insulation | Passed | Paul Nitz | Mechanical in Suites |
2025/07/16 | Electrical | Wall Rough-in | Passed | Rocky Wilde | Electric and framing for founders lounge coves. |
2025/07/15 | Mechanical | Wall & Ceiling | Passed | Paul Nitz | Partial overhead inspection for duct on main concourse. |
2025/07/15 | Mechanical | Insulation | Passed | Paul Nitz | Partial overhead inspection for duct on main concourse. |
2025/07/15 | Mechanical | Insulation | Passed | Paul Nitz | Partial overhead inspection for duct on founders level. |
2025/07/15 | Mechanical | Wall & Ceiling | Passed | Paul Nitz | Partial overhead inspection for duct on founders level. |
2025/07/15 | Plumbing | Rough-in | Passed | Paul Nitz | Partial insulation for the upper concourse. |
2025/07/15 | Plumbing | Rough-in | Passed | Paul Nitz | Partial insulation for founders level. |
2025/07/15 | Plumbing | Rough-in | Passed | Paul Nitz | Partial insulation inspection for the main concourse. |
2025/07/15 | Electrical | Wall Rough-in | Passed | Rocky Wilde | A partial inspection for in-wall rough level six. |
2025/07/15 | Electrical | Wall Rough-in | Passed | Rocky Wilde | A partial inspection for in-wall rough founders level. |
2025/07/15 | Electrical | Ceiling Rough-in | Conditional | Rocky Wilde | A partial inspection for overhead rough founders level. |
2025/07/15 | Electrical | Ceiling Rough-in | Passed | Rocky Wilde | A partial inspection for overhead rough main concourse. |
2025/07/15 | Building/Structural | Wall/Ceiling | Conditional | Rocky Wilde | Partial ceiling inspection for the upper concourse. |
2025/07/15 | Building/Structural | Wall/Ceiling | Conditional | Rocky Wilde | Partial ceiling inspection for the founders' level. |
2025/07/15 | Mechanical | Insulation | Passed | Paul Nitz | Partial overhead inspection for duct on upper concourse. |
2025/07/15 | Building/Structural | Wall/Ceiling | Passed | Kody Boswell | Partical Ceiling inspection for the main concourse. |
2025/07/15 | Electrical | Ceiling Rough-in | Passed | Rocky Wilde | A partial inspection for overhead rough upper concourse. |
2025/07/15 | Mechanical | Wall & Ceiling | Conditional | Paul Nitz | Partial overhead inspection for duct on upper concourse. |
2025/07/14 | Electrical | Ceiling Rough-in | Cancelled | Rocky Wilde | Upper concourse overhead rough inspection. |
2025/07/14 | Plumbing | Rough-in | Cancelled | Paul Nitz | Plumbing insulation inspection for the founders level. |
2025/07/14 | Electrical | Re-Inspection | Cancelled | Rocky Wilde | Ceiling rough inspection for Rockfon ceilings. |
2025/07/14 | Electrical | Ceiling Rough-in | Cancelled | Rocky Wilde | Ceiling rough inspection for Rockfon ceilings. |
2025/07/14 | Building/Structural | Framing | Passed | Kody Boswell | Framing inspection for the Rockfon ceiling grid on the first floor. |
2025/07/14 | Building/Structural | Framing | Passed | Kody Boswell | Framing for the field club framing restroom |
2025/07/14 | Building/Structural | Framing | Passed | Kody Boswell | Framing for the north loge men's restroom. |
2025/07/14 | Electrical | Wall Rough-in | Cancelled | Rocky Wilde | In-wall rough for the 6th-floor boxes. |
2025/07/14 | Mechanical | Wall & Ceiling | Cancelled | Paul Nitz | Partial for the first floor back of house. |
2025/07/14 | Electrical | Ceiling Rough-in | Cancelled | Rocky Wilde | Partial electrical for main concourse back of house. |
2025/07/14 | Electrical | Wall Rough-in | Cancelled | Rocky Wilde | In wall rough for loge bars and loge boxes. |
2025/07/14 | Electrical | Ceiling Rough-in | Cancelled | Rocky Wilde | Partial for founders' level overhead rough. |
2025/07/11 | Plumbing | Rough-in | NOT READY | Paul Nitz | Main concourse back of house overhead. |
2025/07/11 | Mechanical | Duct Rough-in | Failed | Paul Nitz | Founders' level private dinings. 1) flex duct not connected 2) labeling missing |
2025/07/11 | Electrical | Ceiling Rough-in | Failed | Al Smythe | Private dining on founders level. 1) Open boxes 2) Open conduit |
2025/07/11 | Electrical | Ceiling Rough-in | Failed | Al Smythe | ceiling rough for rockfon ceiling at gate C. 1) grounding wires not on electrical boxes |
2025/07/11 | Building/Structural | Framing | Passed | Kody Boswell | Framing for North Loge mens restroom and both private dining. |
2025/07/11 | Electrical | Wall Rough-in | Failed | Al Smythe | Rough in for bars in loges and suites islands. 1) not ready |
2025/07/11 | Plumbing | Rough-in | NOT READY | Paul Nitz | Plumbing insulation for suite islands. |
2025/07/11 | Mechanical | Duct Rough-in | Conditional | Paul Nitz | Suites duct rough in. 1) flex duct connections need to be secured (taped) |
2025/07/11 | Electrical | Ceiling Rough-in | Failed | Al Smythe | Founders level north loge mens restroom. |
2025/07/11 | Mechanical | Wall & Ceiling | Conditional | Paul Nitz | Overhead inspection for the main concourse back of house. 1) flex duct connections need to be secured (taped) |
2025/07/10 | Fire Safety | Fire Water Above Ground | Passed | Mary Creason | Visual of heat trace on wet system at gate C XL tracer wire used, GT-66 tape, insulation - approved per plans. Must put warning labels on every 10 feet of wire on insulation. |
2025/07/10 | Electrical | Ceiling Rough-in | Passed | Rocky Wilde | Main concourse area B overhead electrical for both concessions. |
2025/07/10 | Plumbing | Rough-in | Passed | Paul Nitz | Main concourse area B concessions overhead visual. |
2025/07/10 | Electrical | Ceiling Rough-in | Passed | Rocky Wilde | ceiling rough-in for the main concourse area B, family bathroom, and mother's room. |
2025/07/09 | Mechanical | Insulation | Conditional | Paul Nitz | Overhead for the upper concourse north and south speed of concessions and south Grab and Go. 1) not ready |
2025/07/09 | Building/Structural | Framing | Passed | Kody Boswell | Framing for the south founders' loge men's restrooms wall and ceiling. |
2025/07/09 | Building/Structural | Framing | Passed | Kody Boswell | North suite restroom ceiling framing. |
2025/07/09 | Electrical | Ceiling Rough-in | Passed | Rocky Wilde | South founders' loge men's restroom. |
2025/07/09 | Plumbing | Water Piping & Test | Passed | Paul Nitz | Pressure test for founders, loge bars north and south. |
2025/07/09 | Mechanical | Duct Rough-in | Conditional | Paul Nitz | Overhead for the upper concourse north and south speed of concessions and south Grab and Go. 1) not ready |
2025/07/09 | Electrical | Ceiling Rough-in | Passed | Rocky Wilde | Overhead for the upper concourse north and south speed of concessions and south Grab and Go. |
2025/07/09 | Mechanical | Duct Rough-in | Passed | Paul Nitz | Duct work in the founders' level added a men's restroom. |
2025/07/09 | Plumbing | Rough-in | Passed | Paul Nitz | Overhead for the upper concourse north and south speed of concessions and south Grab and Go. |
2025/07/09 | Electrical | Ceiling Rough-in | Passed | Rocky Wilde | Founders level north suite restrooms lay-in ceiling. |
2025/07/09 | Plumbing | Stack Piping & Test | Passed | Paul Nitz | South founders' loge mens restroom. |
2025/07/08 | Electrical | Ceiling Rough-in | Passed | Rocky Wilde | Ceiling rough-in for the family restroom in the field club. |
2025/07/08 | Mechanical | Duct Rough-in | Passed | Paul Nitz | Family restroom mechanical in the field club. |
2025/07/08 | Electrical | Ceiling Rough-in | Passed | Rocky Wilde | Field club specialty ceiling outside of the main kitchen. |
2025/07/08 | Building/Structural | Framing | Passed | Kody Boswell | Framing for the field club family restroom ceiling. |
2025/07/07 | Electrical | Wall Rough-in | Passed | Rocky Wilde | In-wall rough-in for field club north bar. |
2025/07/07 | Building/Structural | Framing | Passed | Rocky Wilde | Ceiling grid inspection for founders level north loge. |
2025/07/07 | Electrical | Ceiling Rough-in | Passed | Rocky Wilde | Ceiling rough-in for the field club north restrooms, hard lid ceilings. |
2025/07/07 | Building/Structural | Wall/Ceiling | Passed | Rocky Wilde | Ceiling grid inspection for founders level north loge. |
2025/07/07 | Mechanical | Duct Rough-in | Partial | Paul Nitz | Grease duct inspection for the field club kitchen. 1) a grease duct reservoir needs to be added to any low areas, ok to insulate all areas that were agreed on |
2025/07/07 | Mechanical | Re-Inspection | Partial | Paul Nitz | Grease duct inspection for the field club kitchen. 1) a grease duct reservoir needs to be added to any low areas, ok to insulate all areas that were agreed on |
2025/07/07 | Plumbing | Stack Piping & Test | Failed | Paul Nitz | South loge restrooms on founders' level. 1) there wasn’t any pressure on the line |
2025/07/05 | Building/Structural | Framing | Passed | Rocky Wilde | Founders level added men's restroom, Rocky will conduct the inspection on Saturday, 7/5/25. |
2025/07/05 | Plumbing | Stack Piping & Test | Passed | Rocky Wilde | Founders level added men's restroom, Rocky will be doing the inspection Saturday, 7/5/25. |
2025/07/04 | Fire Safety | Fire Water Above Ground | Cancelled | Rocky Wilde | Visual of the installation of the heat trace for gate C fire line. |
2025/07/04 | Fire Safety | Fire Alarm Rough-In | Postponed | Rocky Wilde | This inspection is to witness the install of the first of 4 heat trace systems. David Schau will contact Mary Creason if the timing needs to be changed due to delay of installation. |
2025/07/03 | Mechanical | Insulation | Passed | Paul Nitz | Inspection for the return duct for the founders' level elevator 1,5. |
2025/07/03 | Building/Structural | Framing | Passed | Paul Nitz | Framing for hard lid ceilings on Founders outside elevator 1,5. |
2025/07/03 | Electrical | Wall Rough-in | Passed | Rocky Wilde | Inspection for founders' level men's restrooms. |
2025/07/03 | Plumbing | Water Piping & Test | Conditional | Paul Nitz | For the record, the field club bars copper pressure test and the south main concourse bar. Paul looked at it on Wednesday, 07/02/2025. 1) verify shut off valve locations |
2025/07/02 | Mechanical | Duct Rough-in | Passed | Paul Nitz | Duct rough in the field club area A restroom hallway. |
2025/07/02 | Building/Structural | Framing | Passed | Kody Boswell | Framing for South Field Club restroom hard lid framing. |
2025/07/02 | Fire Safety | Fire Water Above Ground | Partial | Mary Creason | Fire sprinkler visual on the founders' level for suites and corridors. Sprinkler is required in the closets in the suites. (all suites) |
2025/07/02 | Electrical | Ceiling Rough-in | Passed | Rocky Wilde | South restrooms on the field club hard lid ceilings. |
2025/07/02 | Mechanical | Re-Inspection | Conditional | Paul Nitz | Duct insulation for the field club area A hard lid ceilings. 1)verify duct dampers that are missing |
2025/07/02 | Mechanical | Insulation | Passed | Paul Nitz | Duct insulation for the field club area A hard lid ceilings. |
2025/07/02 | Building/Structural | Framing | Passed | Kody Boswell | Framing for the south restrooms in the field club. |
2025/07/01 | Electrical | Ceiling Rough-in | Passed | Rocky Wilde | Founders' level janitor closets. |
2025/07/01 | Building/Structural | Framing | Passed | Kody Boswell | Framing for North Field Club hard lids. |
2025/07/01 | Mechanical | Re-Inspection | Passed | Paul Nitz | Founders North Suite restrooms corridor. |
2025/07/01 | Mechanical | Duct Rough-in | Passed | Paul Nitz | Founders North Suite restrooms corridor. |
2025/07/01 | Mechanical | Insulation | Failed | Paul Nitz | Duct insulation inspection for the field club area A. 1) insulation was not taped |
2025/07/01 | Building/Structural | Framing | Passed | Kody Boswell | Suite framing for ceilings, suites 2, 5 and 6 |
2025/07/01 | Electrical | Ceiling Rough-in | Passed | Rocky Wilde | Ceiling rough-in for suites side hard lids. |
2025/07/01 | Plumbing | Rough-in | Passed | Paul Nitz | Plumbing insulation inspection for main water at gate C ceiling. |
2025/07/01 | Building/Structural | Framing | Passed | Kody Boswell | Framing for the founders' level north restroom corridor. |
2025/06/30 | Building/Structural | Framing | Conditional | Paul Nitz | Framing for ceiling grid in the south loge on founders level. 1) pics of additional supports will be required |
2025/06/30 | Building/Structural | Wall/Ceiling | Passed | Kody Boswell | Framing inspection for suites 1,3,4 on founders' level. |
2025/06/30 | Electrical | Wall Rough-in | Passed | Rocky Wilde | In-wall for the field club food prep and family restroom. |
2025/06/30 | Building/Structural | Framing | Passed | Paul Nitz | Framing inspection for suites 1,3,4 on founders' level. |
2025/06/30 | Fire Safety | Fire Water Above Ground | Partial | Mary Creason | Visual of sprinkler heads on the founders' level, level 2. Rooms passed - 1, 2 passed however only 1 sprinkler head passed in rooms 3 and 4 Need to install hangers and heads in 3 & 4 |
2025/06/30 | Electrical | Ceiling Rough-in | Passed | Rocky Wilde | Ceiling rough-in for north founders' pantry. |
2025/06/30 | Mechanical | Duct Rough-in | Passed | Paul Nitz | Duct rough for the field club area A hard hid ceilings. |
2025/06/30 | Building/Structural | Re-Inspection | Passed | Paul Nitz | Field club area B hard lid ceiling. |
2025/06/30 | Mechanical | Duct Rough-in | Passed | Paul Nitz | For record, the main field club return duct rough. Paul inspected on 06/27/25. |
2025/06/30 | Electrical | Ceiling Rough-in | Passed | Rocky Wilde | Suite 1,3,4 ceiling rough in. |
2025/06/30 | Building/Structural | Framing | Passed | Paul Nitz | Field club area B hard lid ceiling. |
2025/06/30 | Mechanical | CHW Piping & Test | Passed | Paul Nitz | For record, chilled water pressure test for 3.5 area A. Paul completed on 06/27/25. |
2025/06/30 | Mechanical | CHW Piping & Test | Passed | Paul Nitz | For record, chilled water pressure test for North Field Club IT room piping. Paul completed on 06/27/25. |
2025/06/30 | Mechanical | Duct Rough-in | Failed | Paul Nitz | light test on grease duct. Field Club Kitchen #1 1) Duct construction will not allow the grease to flow back to the hood, an alternative method of removing the grease will have to be installed. FBC M506.3.7 and FBC M506.3.7.1 2) Minimum amount of horizonal grease duct cleanouts was not installed FBC M 506.3.9 (1) Specs on plans call for min 12’ 3) Minimum amount of horizonal grease duct cleanouts at change of direction greater that 45* was not installed FBC M 506.3.9(2) Field Club Kitchen #2 1) Minimum 2% slope not met on grease duct FBC 506.3.7 North Kitchen by gate B 1) A hole in hood connection to duct was found when performing the light test FBC M506.3.2.5 2) Minimum amount of horizonal grease duct cleanouts was not installed FBC M 506.3.9 (1) Specs on plans call for min 12’ 3) Minimum amount of horizonal grease duct cleanouts at change of direction greater that 45* was not installed FBC M 506.3.9(2) 4) Connection from the ducting to the fan have not been made North Kitchen Upper Concourse 1) Kitchen ducts are not connected to the main trunk line ***This inspection was for the kitchen areas only so that the contractor can insulate the duct. No part of the exterior, corridor or ramp areas have been inspected. |
2025/06/27 | Electrical | Ceiling Rough-in | Conditional | Rocky Wilde | founders suites rough in. |
2025/06/27 | Electrical | Ceiling Rough-in | Passed | Rocky Wilde | Founders elevator lobbys. |
2025/06/27 | Electrical | Ceiling Rough-in | Passed | Rocky Wilde | Founders elevator lobbys. |
2025/06/27 | Building/Structural | Framing | Passed | Kody Boswell | Founder's elevator lobbies. |
2025/06/27 | Fire Safety | Fire Water Above Ground | Passed | Rocky Wilde | Visual inspection for founder's level. |
2025/06/27 | Mechanical | Duct Rough-in | Passed | Paul Nitz | duct rough for main concourse 1.5 area B RTU. |
2025/06/27 | Electrical | Wall Rough-in | Passed | Rocky Wilde | Field club area A soffit rough in for TV soffit. |
2025/06/27 | Building/Structural | Framing | Passed | Kody Boswell | Framing for the south womens founders loge restroom ceilings |
2025/06/27 | Mechanical | Duct Rough-in | Passed | Paul Nitz | Suite mechanical for the suites on the founders. |
2025/06/27 | Fire Safety | Hydro-Test | Passed | Rocky Wilde | Hydro test for the field club wet system. |
2025/06/27 | Mechanical | Duct Rough-in | Passed | Paul Nitz | Inspection for the founders area B hard lid ceilings. |
2025/06/27 | Building/Structural | Framing | Passed | Kody Boswell | Framing for the founders' south suite restroom corridor. |
2025/06/27 | Mechanical | Insulation | Passed | Paul Nitz | Inspection for the founders area B hard lid ceilings. |
2025/06/27 | Mechanical | Duct Rough-in | Conditional | Paul Nitz | South womens restrooms in the founders loge. 1) ducts need to be taped |
2025/06/27 | Plumbing | Rough-in | Passed | Paul Nitz | Plumbing insulation field club area B hard lid ceiling. |
2025/06/27 | Building/Structural | Framing | Failed | Kody Boswell | Framing for the field club area B hard lid. Contractor to install additional framing attaching celing framing to structure. Reinspection is required. |
2025/06/27 | Building/Structural | Framing | Conditional | Kody Boswell | Framing for suite 7, hard lid. Result is conditional pending photos from Contractor showing clip angles have been installed where needed. Framing was moved by other trades. |
2025/06/27 | Building/Structural | Slab | Passed | Kody Boswell | Rviewed reinforcing steel for slab on grade near gate A |
2025/06/26 | Building/Structural | Framing | NOT READY | Paul Nitz | Framing inspection for the field club area B hard lid ceilings. |
2025/06/26 | Mechanical | CHW Piping & Test | Failed | Paul Nitz | Upper concourse area A chilled water inspection. 1) minimum pressure not on the lines (min = 100 psi) flbc m1208.1 |
2025/06/26 | Mechanical | Duct Rough-in | Passed | Paul Nitz | duct rough-in for founders' loge women's bathrooms. |
2025/06/26 | Building/Structural | Framing | Passed | Paul Nitz | Framing for founders loge women's restrooms. |
2025/06/26 | Mechanical | Duct Rough-in | Passed | Paul Nitz | Duct rough-in for field club area B hard lid ceilings. |
2025/06/26 | Electrical | Ceiling Rough-in | Passed | Rocky Wilde | Ceiling rough in for field club area B hard lid ceilings. |
2025/06/25 | Building/Structural | Framing | Passed | Paul Nitz | Inspection for gate C soffit with overhead doors. |
2025/06/25 | Electrical | Ceiling Rough-in | Passed | Rocky Wilde | Field club area B hard lid. |
2025/06/25 | Electrical | Ceiling Rough-in | Passed | Rocky Wilde | Electrical ceiling rough-in for founders' level women's loge bathrooms. |
2025/06/25 | Mechanical | Duct Rough-in | Failed | Paul Nitz | Field club area B hard lid duct rough in. 1) ducts and duct insulation missing |
2025/06/25 | Mechanical | Duct Rough-in | Failed | Paul Nitz | duct rough in for founders' loge women's restrooms. 1) ducts were not hooked up |
2025/06/25 | Electrical | Ceiling Rough-in | Passed | Rocky Wilde | Founders Loge area A ceiling rough in. |
2025/06/25 | Building/Structural | Re-Inspection | Passed | Paul Nitz | Inspection for gate C soffit with overhead doors. |
2025/06/25 | Building/Structural | Framing | Passed | Paul Nitz | Framing inspection for the founders' level hard lid ceiling area B. |
2025/06/25 | Mechanical | Duct Rough-in | Passed | Paul Nitz | For the record, Founders level area B suite bathrooms and corridor duct rough in. Inspection done by Paul on 06/23/2025 at 9:30 am. |
2025/06/25 | Fire Safety | Fire Water Above Ground | Passed | Curtis Rogers | Fire sprinkler visual for field club area B hard lid ceilings, and founders level north loge. *Schedule Hydro for these areas! |
2025/06/24 | Plumbing | Gas Piping & Test | Passed | Paul Nitz | High and low presure test for gas lines |
2025/06/23 | Building/Structural | Wall/Ceiling | Passed | Kody Boswell | Ceiling framing for south founders' loge corridors. |
2025/06/23 | Building/Structural | Framing | Conditional | Kody Boswell | Framing for the field club soffits and the janitor's room. Result is conditional pending installation of missing framing for ductwork in janitor room and connection fix for field club south soffit |
2025/06/23 | Fire Safety | Fire Water Above Ground | Passed | Rocky Wilde | Visual on fire sprinklers in Field Club South Side. Also, founders' level North loge and women's loge bathrooms. |
2025/06/23 | Plumbing | Gas Piping & Test | NOT READY | Paul Nitz | Test for gas piping, high and low pressure pipes. |
2025/06/23 | Building/Structural | Framing | Passed | Kody Boswell | Ceiling framing for south founders' loge corridors. |
2025/06/23 | Plumbing | Water Piping & Test | Passed | Paul Nitz | Founders North men's bathroom pressure test. |
2025/06/23 | Electrical | Ceiling Rough-in | Passed | Rocky Wilde | Founders level Loge corridor hard lid ceiling framing. |
2025/06/23 | Electrical | Ceiling Rough-in | Passed | Rocky Wilde | Overhead electrical for the field club area A hard lid ceiling. Also, in walls for TVs in soffits. |
2025/06/23 | Mechanical | Duct Rough-in | Passed | Paul Nitz | Field club visual duct in area A. Duct visual on 1.5 roof. |
2025/06/23 | Building/Structural | Framing | Failed | Kody Boswell | Framing at gate C. There were several connections missing screws. Re-inspection required after missing screws are installed. |
2025/06/23 | Building/Structural | Structural | Passed | Kody Boswell | Reviewed steel framing for stair 2 and 3 |
2025/06/23 | Electrical | Wall Rough-in | Passed | Rocky Wilde | Rough in for the Field club Janitor's room. |
2025/06/21 | Building/Structural | Framing | Passed | Kody Boswell | Ceiling Framing for the south premium entrance. |
2025/06/20 | Electrical | Wall Rough-in | Passed | Rocky Wilde | Field club area A remaining in wall rough. |
2025/06/20 | Building/Structural | Framing | Passed | Kody Boswell | Framing inspection for the south loge corridor. |
2025/06/20 | Fire Safety | Fire Water Above Ground | Cancelled | Curtis Rogers | Visual for the fire sprinkler in South Lodge. *Already has been inspected* |
2025/06/20 | Mechanical | Duct Rough-in | Passed | Rocky Wilde | Duct inspection for the founders level elevator tie-in. |
2025/06/20 | Mechanical | Duct Rough-in | Passed | Rocky Wilde | Duct inspection for the field club area A main duct work. |
2025/06/20 | Electrical | Wall Rough-in | Passed | Rocky Wilde | Gate C soffit rough in. |
2025/06/20 | Building/Structural | Framing | Passed | Kody Boswell | Reviewed LG framing for the field club area A mech room and storage rooms. |
2025/06/20 | Plumbing | Rough-in | NOT READY | Rocky Wilde | Main concourse north premium entrance. |
2025/06/20 | Electrical | Ceiling Rough-in | Failed | Rocky Wilde | Main concourse north premium entrance. |
2025/06/20 | Mechanical | Duct Rough-in | Cancelled | Rocky Wilde | Duct rough in the founders' south loge corridor and south loge duct insulation. |
2025/06/20 | Mechanical | Insulation | NOT READY | Rocky Wilde | Duct rough in the founders' south loge corridor and south loge duct insulation. |
2025/06/20 | Electrical | Ceiling Rough-in | Passed | Rocky Wilde | South founders' loge ceiling rough in. South founders' loge corridor ceiling rough in. |
2025/06/20 | Plumbing | Water Piping & Test | Passed | Rocky Wilde | Founders' loge bathrooms added men's bathroom. |
2025/06/20 | Mechanical | CHW Piping & Test | Passed | Rocky Wilde | For record, 3.5 area B chilled water pressure test. Inspection done by Rocky on Friday, 06/20/25. |
2025/06/20 | Mechanical | Duct Rough-in | NOT READY | Rocky Wilde | Duct inspection for the main concourse north premium entrance. |
2025/06/19 | Building/Structural | Re-Inspection | Passed | Kody Boswell | Framing inspection for the field club bathrooms north. |
2025/06/19 | Building/Structural | Framing | Passed | Kody Boswell | Framing inspection for the field club bathrooms north. |
2025/06/18 | Building/Structural | Framing | NOT READY | Kody Boswell | Framing for the field club north men's and women's restrooms. |
2025/06/18 | Electrical | Ceiling Rough-in | NOT READY | Rocky Wilde | Ceiling rough-in for the South Founders Loge and Hall. |
2025/06/18 | Building/Structural | Re-Inspection | NOT READY | Kody Boswell | Framing for the field club north men's and women's restrooms. |
2025/06/18 | Electrical | Wall Rough-in | Passed | Rocky Wilde | In-wall for re-inspection for the field club north restrooms. |
2025/06/18 | Mechanical | Duct Rough-in | Passed | Paul Nitz | Duct rough-in for the founders' loge south. |
2025/06/18 | Electrical | Re-Inspection | Passed | Rocky Wilde | In-wall for re-inspection for the field club north restrooms. |
2025/06/18 | Building/Structural | Framing | Passed | Kody Boswell | Ceiling framing inspection for the South Founders Loge and Hall. |
2025/06/17 | Building/Structural | Framing | Failed | Rocky Wilde | Framing inspection for the field club north bathrooms. Men's and women's. |
2025/06/17 | Fire Safety | Hydro-Test | Passed | Mary Creason | Hydro test for the upper concourse wet system. 11:21am 220psi end 145pm 22opsi Visual - Partial -passed see approved plans . |
2025/06/17 | Fire Safety | Final Egress/Emergency Lights | Passed | Mary Creason | Request for Mary Creason. Exit Sign Review on Founders and Upper Concourse level. A couple of Exit signs needed - see plans |
2025/06/17 | Electrical | Wall Rough-in | Passed | Rocky Wilde | In-wall inspection for the Field Club North restrooms. Men's and women's. |
2025/06/17 | Electrical | Ceiling Rough-in | Passed | Rocky Wilde | Electrical inspection for the center two bays on the south end zone ceiling lights. |
2025/06/16 | Electrical | Ceiling Rough-in | Passed | Rocky Wilde | Ceiling rough-in inspection for the field club kitchen soffits, north and south. |
2025/06/16 | Building/Structural | Framing | Passed | Kody Boswell | Framing inspection for the south endzone ceiling soffit with added clips. |
2025/06/16 | Fire Safety | Fire Water Above Ground | Cancelled | Mary Creason | Visual inspection of sprinkler heads that were covered by tiles during the hydro test on main concourse back of house. Hunter called to inform me that he would not be ready today. |
2025/06/16 | Building/Structural | Framing | Passed | Rocky Wilde | Framing for the field club kitchen soffits, north and south. |
2025/06/13 | Electrical | Ceiling Rough-in | NOT READY | Rocky Wilde | Light rough-in for the field club south kitchen soffit. |
2025/06/13 | Mechanical | Insulation | Passed | Paul Nitz | Inspection for insulation on the north founders' loge. |
2025/06/13 | Building/Structural | Framing | Passed | Paul Nitz | SEZ west side ceiling framing 4th floor |
2025/06/13 | Building/Structural | Framing | Passed | Paul Nitz | Framing inspection for the knee wall in the club dining in field club. |
2025/06/13 | Building/Structural | Framing | Passed | Paul Nitz | Inspection for the inside portion of the field club columns along field plaza wall. |
2025/06/13 | Electrical | Ceiling Rough-in | NOT READY | Rocky Wilde | Light rough-in for the field club north kitchen soffit. |
2025/06/13 | Building/Structural | Framing | Passed | Rocky Wilde | Framing inspection for the north field club kitchen soffit. |
2025/06/13 | Building/Structural | Framing | Passed | Paul Nitz | Framing inspection for the ceiling in the north founders' loge. |
2025/06/13 | Building/Structural | Wall/Ceiling | Passed | Paul Nitz | Framing inspection for the ceiling in the north founders' loge. |
2025/06/13 | Electrical | Wall Rough-in | NOT READY | Rocky Wilde | Inspection is in the field club food prep room in area A. |
2025/06/13 | Plumbing | Rough-in | Passed | Paul Nitz | plumbing insulation for field club area A food prep room and men's and women bathrooms. |
2025/06/13 | Building/Structural | Framing | Passed | Paul Nitz | Framing inspection for the field club area A food prep room. |
2025/06/13 | Electrical | Ceiling Rough-in | NOT READY | Rocky Wilde | Inspection for light in the exterior soffit in the south endzone, east side. |
2025/06/13 | Building/Structural | Framing | Passed | Paul Nitz | Framing inspection for the south kitchen soffit in field club. |
2025/06/12 | Fire Safety | Hydro-Test | Passed | Mary Creason | Hydro test for main concourse back-of-house areas. Hydro start 7:40am at 225psi and end at 12:59pm at 224psi |
2025/06/12 | Mechanical | Duct Rough-in | Passed | Paul Nitz | north lodge lounge |
2025/06/12 | Building/Structural | Framing | Conditional | Kody Boswell | Framing inspection for Club Dining in the field club area A room 01.15.02. Result is conditional pending additional stiffening of bottom track connection to slab at bar counter |
2025/06/11 | Plumbing | Stack Piping & Test | Passed | Paul Nitz | north club area |
2025/06/11 | Plumbing | Storm Piping & Test | Passed | Paul Nitz | insulation inspection as per pics |
2025/06/11 | Electrical | Re-Inspection | Passed | James Melvin | Final inspection for duct bank near Gate D |
2025/06/11 | Plumbing | Storm Piping & Test | Passed | Paul Nitz | storm drain inspection in columns on 6/10/2025 |
2025/06/11 | Electrical | Wall Rough-in | Passed | James Melvin | The last of the columns in the club area 1st floor |
2025/06/11 | Mechanical | Duct Rough-in | Conditional | Paul Nitz | Founders loge north 1) smacna S3.24 bends will be corrected |
2025/06/10 | Mechanical | Wall & Ceiling | Failed | Paul Nitz | founder's loge and bathroom hallway 1) smacna 3.5 S3.24 bend radius minimum requirements not met 2) " " 3.7 S3.34 support for flex duct requirements not met 3) mechanical attachment was on the outside of the foil duct not around the inner lining |
2025/06/10 | Building/Structural | Slab | Passed | Kody Boswell | Reviewed reinforcing steel for field plaza steps. |
2025/06/10 | Electrical | Wall Rough-in | Passed | Rocky Wilde | North kitchen club area and north stairwell in the club area |
2025/06/10 | Plumbing | Water Piping & Test | Conditional | Paul Nitz | 1st floor club area bathrooms and kitchens 1) missing water arester 2) coopper pipe in contact with metal studs. Min seperation not acheaved |
2025/06/10 | Fire Safety | Opening Protections | Passed | Mary Creason | Fire stopping inspection for the elevator 1,2,3,5 penetrations. NOVA and Daniel inspected. |
2025/06/10 | Electrical | Ceiling Rough-in | Passed | Rocky Wilde | founders loge and bathroom hallway |
2025/06/10 | Plumbing | Stack Piping & Test | NOT READY | Paul Nitz | 1st floor club area bathrooms and kitchens |
2025/06/09 | Plumbing | Water Piping & Test | Cancelled | Paul Nitz | north club kitchens and bathrooms |
2025/06/09 | Plumbing | Stack Piping & Test | NOT READY | Paul Nitz | north club kitchens and bathrooms |
2025/06/09 | Electrical | Wall Rough-in | NOT READY | James Melvin | center north stair well club area |
2025/06/09 | Building/Structural | Framing | Passed | Kody Boswell | LG framing on the last field club column and the wall in front of elevator 5 on the founders. |
2025/06/09 | Mechanical | Duct Rough-in | NOT READY | Paul Nitz | north loge area above ceiling |
2025/06/06 | Electrical | Wall Rough-in | Passed | Rocky Wilde | columns in the club area 1st floor |
2025/06/06 | Building/Structural | Framing | Passed | Kody Boswell | Re-inspection for founder's ceiling fixes. |
2025/06/06 | Building/Structural | Wall/Ceiling | Passed | Kody Boswell | Re-inspection for founder's ceiling fixes. |
2025/06/06 | Building/Structural | Framing | Passed | Kody Boswell | Framing inspection for the Field Club columns. |
2025/06/06 | Building/Structural | Slab | Passed | Kody Boswell | reviewed reinforcing steel for catwalk on level 3.5 from elevator 4 to UCC |
2025/06/06 | Plumbing | Rough-in | Cancelled | Paul Nitz | north club kitchen |
2025/06/06 | Electrical | Ceiling Rough-in | Passed | Rocky Wilde | north founders loge |
2025/06/06 | Mechanical | Wall & Ceiling | Cancelled | Paul Nitz | north founders loge |
2025/06/05 | Electrical | Wall Rough-in | Passed | James Melvin | columns in the club area |
2025/06/05 | Mechanical | Duct Rough-in | Passed | James Melvin | 1st floor club and kitchen area |
2025/06/05 | Building/Structural | Framing | Passed | Kody Boswell | Reviewed LG ceiling framing in the founders suite club area. |
2025/06/05 | Mechanical | Duct Rough-in | Passed | James Melvin | diffusers installation and duct inspection in the founder's lounge |
2025/06/05 | Building/Structural | Sheetrock | Passed | Kody Boswell | screw inspection for founders suites 1-8 done on 06/05/2025 |
2025/06/05 | Building/Structural | Framing | Passed | Kody Boswell | The field club kitchen offices and single bathroom framing inspection. |
2025/06/05 | Building/Structural | Framing | Passed | Kody Boswell | Reviewed LG framing for columns in field club in area B |
2025/06/05 | Building/Structural | Wall/Ceiling | Conditional | Kody Boswell | Ceiling framing in the founders suite club area. Result is conditional pending framing fix at one recessed lighting fixture, area A. |
2025/06/05 | Building/Structural | Sheetrock | Passed | Kody Boswell | East side south end zone drywall screw inspection 4th floor |
2025/06/05 | Building/Structural | Framing | Passed | Kody Boswell | LG framing inspection for Founders suites numbers 1-8, the front knee walls. Done on 06/05/2025. |
2025/06/04 | Mechanical | Duct Rough-in | NOT READY | James Melvin | 1st floor club area and kitchen and suite 8 on founders |
2025/06/04 | Building/Structural | Sheetrock | Passed | Kody Boswell | West side south end zone drywall screw inspection Reviewed interior sheathing attachment to LG wall framing for south endzone, west side, level 4 |
2025/06/04 | Building/Structural | Insulation | Passed | Kody Boswell | Reviewed insulation for sound barrier walls between founders suies 1-8 |
2025/06/04 | Electrical | Wall Rough-in | Passed | James Melvin | founders |
2025/06/03 | Electrical | Ceiling Rough-in | Passed | James Melvin | founders bar area |
2025/06/03 | Fire Safety | Hydro-Test | Passed | Mary Creason | MCJV is requesting a hydro test for the founders' level. Approved -see plans for areas approved. |
2025/06/03 | Building/Structural | Slab | Passed | Kody Boswell | Reviewed reinforcing steel for both stairs 1st floor field club |
2025/06/03 | Building/Structural | Framing | Passed | Kody Boswell | Reviewed exterior LG framing for the founders' level near the elevator shafts, areas A & B |
2025/06/03 | Electrical | Ceiling Rough-in | Passed | James Melvin | south endzone 4th floor |
2025/06/03 | Electrical | Wall Rough-in | Passed | James Melvin | 1st floor club area |
2025/06/03 | Building/Structural | Framing | Passed | Kody Boswell | Reviewed LG framing for field club area A TV wall. |
2025/06/02 | Building/Structural | Sheetrock | Passed | Kody Boswell | South Endzone 4th floor. Screw, framing and drywall inspection. |
2025/06/02 | Building/Structural | Framing | Passed | Kody Boswell | South Endzone 4th floor. Screw, framing and drywall inspection. |
2025/06/02 | Building/Structural | Framing | Passed | Kody Boswell | Reviewed LG framing for women's restrooms seq 1 in the field club. |
2025/05/30 | Plumbing | Rough-in | Passed | James Melvin | insulation inspection on founders' north columns |
2025/05/29 | Fire Safety | Opening Protections | Passed | Mary Creason | MCJV is requesting a fire stopping inspection for cable tray through drywall on founder’s level.\ NOVA and Daniel WT -conducted the fire stopping inspection. -passed |
2025/05/29 | Fire Safety | Fire Alarm Rough-In | Passed | Curtis Rogers | Fourth floor south end zone, exterior, above ceiling, fire alarm. Side Note: 4 Speaker/Strobes demo'd outside of Exterior Wall *Adequate Coverage inside Champions Club |
2025/05/29 | Mechanical | Duct Rough-in | Passed | Paul Nitz | visual inspection suite 8 |
2025/05/29 | Electrical | Wall Rough-in | Passed | Rocky Wilde | partial in wall rough inspection |
2025/05/29 | Electrical | Wall Rough-in | Passed | Rocky Wilde | South endzone 4th floor in wall rough inspection on columns |
2025/05/29 | Building/Structural | Re-Inspection | Failed | Kody Boswell | Re-inspection for framing on the field club bathroom in area B. |
2025/05/29 | Building/Structural | Framing | Failed | Kody Boswell | Re-inspection for framing on the field club bathroom in area B. |
2025/05/29 | Building/Structural | Framing | Passed | Kody Boswell | Reviewed LG framing for South endzone level four exterior columns. |
2025/05/29 | Building/Structural | Framing | Passed | Kody Boswell | Framing for field club columns in area B. |
2025/05/28 | Electrical | Wall Rough-in | Passed | Rocky Wilde | In-wall rough inspection for conduits on 1st floor, club level columns, and founder's columns. |
2025/05/28 | Building/Structural | Framing | Passed | Kody Boswell | Reviewed LG framing for around columns and elevators in the north and south loge on the founder's level. |
2025/05/28 | Mechanical | Duct Rough-in | Passed | Paul Nitz | diffuser rough in on 4th floor south endzone |
2025/05/28 | Building/Structural | Slab | Passed | Kody Boswell | Reviewed reinfocring steel for the field club plaza steps. |
2025/05/28 | Mechanical | Duct Rough-in | Passed | Paul Nitz | inspected on 5/27/2025, was approved, these are for the ducts in suite 8 |
2025/05/28 | Building/Structural | Framing | Passed | Kody Boswell | Reviewed LG framing for one column encasement on main concourse, area B |
2025/05/28 | Building/Structural | Framing | Conditional | Kody Boswell | Reviewed LG framing for the Field Club Area B Bathrooms. Result is conditional pending additional bracing installation. Bracing in place exceeded 4ft spacing. |
2025/05/28 | Building/Structural | Sheetrock | Passed | Kody Boswell | Screw inspection for the field club entrance soffit. |
2025/05/28 | Plumbing | Storm Piping & Test | Passed | Paul Nitz | storm pipe insulation inspection |
2025/05/27 | Mechanical | Duct Rough-in | Passed | Paul Nitz | south end zone |
2025/05/27 | Plumbing | Rough-in | Passed | Paul Nitz | insulation inspection 1st floor club bathroom |
2025/05/27 | Building/Structural | Framing | Conditional | Kody Boswell | Framing inspection for the south endzone level four interior soffit framing, area D. Result is conditional pending installation of 1 clip attaching vertical LG framing to horizontal structural steel tube. |
2025/05/27 | Building/Structural | Framing | Failed | Kody Boswell | Framing inspection for south endzone level four for the soffit ceiling exterior, area D. The detail shown in shop drawings does not reflect jobsite conditions. Contractor to coordinate with delegated engineer. |
2025/05/27 | Building/Structural | Framing | Passed | Kody Boswell | Framing inspection for the south endzone level four exterior columns, area D |
2025/05/27 | Building/Structural | Framing | Conditional | Kody Boswell | Reviewed LG framing for interior walls at the Field Club Kitchen. Area B main concourse. Result is conditional pending the following items are addressed: - Missing screws connecting top track to vertical studs are installed over swing doors (located near restroom 01.04.02 - Approval from the AOR that a portion of one kitchen wall does not have to connecto to structure above. |
2025/05/27 | Building/Structural | Slab | Passed | Kody Boswell | Rebar inspection for Diamonds at the Field Club plaza. |
2025/05/23 | Plumbing | Stack Piping & Test | Passed | Paul Nitz | reinspection of the stack pipe in the first-floor kitchen area |
2025/05/23 | Electrical | Wall Rough-in | Passed | Rocky Wilde | south endzone 4th floor |
2025/05/23 | Electrical | Wall Rough-in | Passed | Rocky Wilde | electrical in-wall rough for 1st floor club area bathrooms, and the 2 PNL's in the 2 different locations in the kitchen for the club area. |
2025/05/23 | Plumbing | Rough-in | Failed | Paul Nitz | Insulation inspection in the kitchens and bathroom on the first floor 1) storm drain was tied into the waist drain FBC P1101.3 |
2025/05/23 | Mechanical | HW Piping & Test | Passed | Paul Nitz | pressure test and visual inspection of chiller pipes on 1.5 north roof |
2025/05/23 | Mechanical | CHW Piping & Test | Passed | Paul Nitz | reinspection on 1.5 south roof |
2025/05/23 | Mechanical | CHW Piping & Test | Passed | Paul Nitz | pressure test and visual inspection of chiller pipes on 1.5 north roof |
2025/05/23 | Electrical | Ceiling Rough-in | Passed | Rocky Wilde | south endzone 4th floor |
2025/05/23 | Building/Structural | Slab | Passed | Kody Boswell | Reviewed reinforcing steel for the field club plaza. |
2025/05/23 | Mechanical | HW Piping & Test | Passed | Paul Nitz | reinspection on 1.5 south roof |
2025/05/22 | Plumbing | Stack Piping & Test | Passed | Paul Nitz | 1st floor club area |
2025/05/22 | Plumbing | Water Piping & Test | Failed | Paul Nitz | 1st floor club area 1) storm drain was tied into the waist drain FBC P1101.3 |
2025/05/22 | Mechanical | Duct Rough-in | Passed | Paul Nitz | visual inspection of ductwork before insulation. throughout founders |
2025/05/22 | Building/Structural | Framing | Passed | Kody Boswell | framing for field club entrance softit. |
2025/05/22 | Building/Structural | Framing | Conditional | Kody Boswell | Framing for founders level north suite bathrooms. Result is conditional pending installation of one brace from top of wall to underside of structure above |
2025/05/22 | Building/Structural | Slab | Passed | Kody Boswell | Reviewed reinforcing steel for a portion of the field club plaza. |
2025/05/22 | Fire Safety | Fire Water Above Ground | Passed | Mary Creason | Visual only inspection for the Field Club entrance soffit. |
2025/05/21 | Plumbing | Water Piping & Test | Passed | Paul Nitz | Chilled water pressure on main concourse area B 1.5. |
2025/05/21 | Electrical | Ceiling Rough-in | Passed | James Melvin | Sofit rough in on the field club entrance. |
2025/05/21 | Fire Safety | Opening Protections | Passed | Mary Creason | Sealing penetrations for founders level. John - NOVA and Daniel - Manhatten/Culpepper - inspected and approved |
2025/05/21 | Plumbing | Rough-in | NOT READY | Paul Nitz | Field Club kitchen area B in wall and pressure test. |
2025/05/21 | Building/Structural | Framing | Passed | Kody Boswell | South end zone sixth floor east side boxes. |
2025/05/21 | Plumbing | Water Piping & Test | NOT READY | Paul Nitz | Field Club kitchen area B in wall and pressure test. |
2025/05/21 | Building/Structural | Structural | Passed | Kody Boswell | South end zone sixth floor east side boxes. |
2025/05/21 | Electrical | Ceiling Rough-in | Passed | James Melvin | Sofit rough in on the field club entrance. |
2025/05/20 | Building/Structural | Re-Inspection | Passed | Kody Boswell | Reviewed reinforcing steel for 2 portions of the field club slab on grade. |
2025/05/20 | Building/Structural | Slab | Passed | Kody Boswell | Reviewed reinforcing steel for 2 portions of the field club slab on grade. |
2025/05/20 | Electrical | Wall Rough-in | Passed | Rocky Wilde | In wall rough in for founders suite north bathrooms. |
2025/05/20 | Electrical | Wall Rough-in | Passed | Rocky Wilde | In wall for field club kitchen and south bathrooms. |
2025/05/20 | Plumbing | Rough-in | Passed | Paul Nitz | Plumbing insulation inspection for founders north suites bathrooms and suites 7&8. |
2025/05/20 | Plumbing | Water Piping & Test | NOT READY | Paul Nitz | Field club kitchen and south bathrooms in wall. |
2025/05/19 | Building/Structural | Re-Inspection | Passed | Kody Boswell | For record, founders level suites 2-5 tracks were seen cleaned out. |
2025/05/19 | Building/Structural | Re-Inspection | Passed | Kody Boswell | Re-inspection for framing on field club. Reviewed LG framingh for wall in field club |
2025/05/19 | Building/Structural | Framing | Passed | Kody Boswell | Curtian wall inspection. Reviewed curtain wall and nanawall frame attachment to structure on founders level and curtain wall installation for the field club on main concourse |
2025/05/19 | Building/Structural | Framing | Passed | Kody Boswell | Re-inspection for framing on field club. Reviewed LG framing for wall in field club |
2025/05/19 | Building/Structural | Structural | Passed | Kody Boswell | Curtian wall inspection. Reviewed curtain wall and nanawall frame attachment to structure on founders level and curtain wall installation for the field club on main concourse |
2025/05/19 | Building/Structural | Framing | Passed | Kody Boswell | For record, founders level suites 2-5 tracks were seen cleaned out. |
2025/05/16 | Mechanical | Duct Rough-in | Conditional | Paul Nitz | Duct inspection for upper concourse. 1) need to see pics of duct mastic application |
2025/05/16 | Electrical | Wall Rough-in | Passed | Rocky Wilde | In-wall for Field Club area B. |
2025/05/16 | Plumbing | Rough-in | Conditional | Paul Nitz | Plumbing insulation inspection for founders suits 1-6 only |
2025/05/16 | Building/Structural | Framing | Conditional | Kody Boswell | Reviewed LG framing for founders' suites 1-6. LG framing appeared to be in substantial compliance with the contract documents. Result is conditional pending bottom tracks and wall cavities between all suites are cleaned out and excessive debris removed. Contractor is allowed to proceed with attaching sheathing to one side of each wall, as long as BCA can verify bottom tracks and wall cavities have been cleaned out. |
2025/05/16 | Building/Structural | Framing | Failed | Kody Boswell | LG framing inspection for field club. Fasteners for top and bottom track connections were not able to be verified due to spray applied fireproofing and sub roof material. Contractor to scrape away fireproofing and other materials so that fasteners can be verified. |
2025/05/15 | Plumbing | Water Piping & Test | Passed | Paul Nitz | founders bar |
2025/05/14 | Plumbing | Water Piping & Test | Passed | Paul Nitz | this is for the water pipe inspection that passed today in the south suites on founders |
2025/05/14 | Plumbing | Stack Piping & Test | Passed | Paul Nitz | this is for the vent pipe on in the founders suite that passed the inspection today 5/14/25 |
2025/05/14 | Plumbing | Water Piping & Test | Failed | Paul Nitz | I need a re-inspect of north founder suites and north bathrooms 1) pressure would not hold 2) hammer arrestor missing 3) pipe separation was missing |
2025/05/13 | Building/Structural | Re-Inspection | Passed | Kody Boswell | Reviewed LG framing for south founders bathroom, area B. Items have been addressed since the prior failed inspection for this area |
2025/05/13 | Building/Structural | Structural | Passed | Kody Boswell | Reviewed steel framing for level six south endzone |
2025/05/12 | Plumbing | Stack Piping & Test | NOT READY | Paul Nitz | founders suits |
2025/05/12 | Plumbing | Water Piping & Test | NOT READY | Paul Nitz | founders area |
2025/05/12 | Plumbing | Storm Piping & Test | Passed | Paul Nitz | 1st floor |
2025/05/12 | Building/Structural | Framing | Failed | Kody Boswell | Reviewed LG framing for founders south suite bathrooms. Framing appeared to be in substantial compliance with the contract documents. Inspection is failed due to excessive debris in wall cavity. Contractor to call for re-inspection after wall cavity has been cleared of excessive debris. |
2025/05/12 | Building/Structural | Re-Inspection | Failed | Kody Boswell | Reviewed LG framing for founders south suite bathrooms. Framing appeared to be in substantial compliance with the contract documents. Inspection is failed due to excessive debris in wall cavity. Contractor to call for re-inspection after wall cavity has been cleared of excessive debris. |
2025/05/12 | Building/Structural | Framing | Passed | Kody Boswell | Reviewed LG framing for upper concourse area A far north family restroom. |
2025/05/12 | Building/Structural | Sheetrock | Passed | Kody Boswell | Reviewed interior sheathing attachment to LG framed walls located on level 4, area C of south endzone |
2025/05/12 | Electrical | Ground | Passed | James Melvin | Visual inspection of 15kv transformer at Gate D , MS1A 1st floor South electrical room and MS1B 1st floor North electrical room. ( 3 ) pieces of equipment. Equipment and cables have already been tested by 3rd party and passed megger test. |
2025/05/09 | Building/Structural | Slab | Passed | Kody Boswell | Reviewed reinforcing steel for several sets of steps at lower bowl, areas A and B |
2025/05/09 | Building/Structural | Framing | Passed | Kody Boswell | Reviewed LG framing for field club interior framing in area B near gate C. |
2025/05/09 | Electrical | Wall Rough-in | Passed | Rocky Wilde | founders suites |
2025/05/09 | Mechanical | Duct Pressure Test | Conditional | Paul Nitz | north 3.5 area 1) clips missing on duct, I will confirm them at next inspection |
2025/05/09 | Mechanical | Duct Rough-in | Passed | Paul Nitz | North 3.5 area visual inspection |
2025/05/08 | Fire Safety | Opening Protections | Passed | Mary Creason | MCJV is requesting a fire stopping inspection for conduit through block and dry wall on upper concourse, founder’s, and main concourse |
2025/05/08 | Building/Structural | Framing | Failed | Paul Nitz | Framing for founders' level area B suite bathroom area. 1) missing framing around water hammers 2) blocking missing for handrails 3) debris between the wall cavity |
2025/05/08 | Plumbing | Rough-in | Passed | Paul Nitz | insulation inspection in the bathrooms on south founders |
2025/05/08 | Building/Structural | Slab | Passed | Kody Boswell | Reviewed reinforcing steel for several sets of steps in the lower bowl, founders level |
2025/05/08 | Building/Structural | Framing | Passed | Kody Boswell | Reviewed LG framing for the family bathroom on upper concourse, area A |
2025/05/08 | Building/Structural | Framing | Passed | Kody Boswell | Reviewed new steel framing for new seating in south endzone, level 6, areas C and D |
2025/05/07 | Electrical | Wall Rough-in | Passed | James Melvin | in wall rough inspection for bathrooms south of the founder's suites. This was looked at on 5/7/2025 at 2pm by James |
2025/05/07 | Mechanical | Duct Pressure Test | NOT READY | Paul Nitz | north 3.5 area |
2025/05/07 | Plumbing | Stack Piping & Test | Passed | Paul Nitz | south founder suite bathrooms |
2025/05/07 | Plumbing | Water Piping & Test | NOT READY | Paul Nitz | South founder's bathrooms next to the south suites, the 2 easternmost bathrooms. Bathrooms were looked at 5/6/2025. |
2025/05/07 | Building/Structural | Slab | Passed | Kody Boswell | MCJV is requesting a reinforcement inspection for founders suite steps, cooler pad in south field club, pads on upper concourse Reviewed reinforcing steel for the following: - Several sets of steps for founders level suites - Mechanical housekeeping pad in mechanical room located on upper concourse, area B - Custodial housekeeping pad in custodial room located on upper concourse, area A |
2025/05/06 | Building/Structural | Framing | Passed | Kody Boswell | Reviewed LG framing for new service corridor and storage room on level 4, south endzone, area C. |
2025/05/06 | Plumbing | Storm Piping & Test | Passed | Paul Nitz | partial inspection |
2025/05/06 | Mechanical | Duct Pressure Test | Failed | Paul Nitz | exhaust duct pressure test on north 3.5 area 1) contractor cannot keep pressure on the ducting |
2025/05/05 | Building/Structural | Slab | Passed | Kody Boswell | Reviewed reinforcing steel for slab on grade on main concourse, area B, located inside gate D |
2025/05/05 | Fire Safety | Opening Protections | Passed | Mary Creason | Fire stopping on the Founders level in the loge and suite areas. John from NOVA was there and conducted in progress inspections. Plumbing through floor penetrations (about 20) passed |
2025/05/02 | Mechanical | Duct Rough-in | Passed | Paul Nitz | visual inspection of duct work on Founders level |
2025/05/01 | Building/Structural | Structural | Passed | Kody Boswell | Level 6 steel inspection for boxes over expansion joints. |
2025/05/01 | Building/Structural | Slab | Passed | Kody Boswell | Reviewed reinforcing steel for steps at loge boxes and founders suites, areas A and B. 8 sets total |
2025/05/01 | Building/Structural | Re-Inspection | Passed | Kody Boswell | Framing inspection for the upper concourse, south pantry, where the studs needed to be changed to 6 in studs. |
2025/05/01 | Mechanical | Duct Rough-in | Passed | Paul Nitz | Founders level duct visual inspection before insulation |
2025/04/30 | Building/Structural | Slab | Passed | Kody Boswell | Reviewed reinforcing steel for north and south seating area |
2025/04/29 | Building/Structural | Framing | Passed | Kody Boswell | Founders framing for North Loge women's bathroom framing. |
2025/04/29 | Building/Structural | Framing | Passed | Kody Boswell | Upper Concourse framing for south pantry and north speed of service concession. |
2025/04/29 | Plumbing | Rough-in | Passed | Paul Nitz | Insulation inspection in the south pantry 3rd floor |
2025/04/29 | Building/Structural | Slab | Passed | Kody Boswell | MCJV is requesting a reinforcement inspection for SEZ 4th floor loge boxes. thanks |
2025/04/28 | Building/Structural | Framing | Failed | Paul Nitz | Framing for the upper concourse area a speed of service concession. 1) Missing the framing for pass through window |
2025/04/28 | Building/Structural | Framing | Passed | Paul Nitz | Framing for the field club exterior framing across from gate C. |
2025/04/28 | Building/Structural | Structural | Passed | Paul Nitz | MCJV is requesting a steel inspection for last 3 loge boxes on west side of 4th floor SEZ. thanks |
2025/04/25 | Building/Structural | Slab | Passed | Kody Boswell | Reviewed reinforcing steel for sidewalk on the east side of the field, to be used by camera carts on football game days |
2025/04/25 | Building/Structural | Framing | Passed | Rocky Wilde | Sub-roof framing for field club area A near north stairs. |
2025/04/25 | Electrical | Ceiling Rough-in | Passed | Rocky Wilde | 1st floor club level electrical rough |
2025/04/25 | Electrical | Wall Rough-in | Passed | Rocky Wilde | 3rd floor south pantry |
2025/04/25 | Plumbing | Water Piping & Test | Passed | Paul Nitz | 3rd floor pantry |
2025/04/25 | Plumbing | Rough-in | Passed | Paul Nitz | 3rd floor pantry |
2025/04/25 | Plumbing | Rough-in | Passed | Paul Nitz | north speed of concessions |
2025/04/25 | Electrical | Wall Rough-in | Passed | Rocky Wilde | center bar on the founders in the Louge area |
2025/04/25 | Plumbing | Rough-in | Passed | Paul Nitz | center bar in founders' area bar area |
2025/04/24 | Building/Structural | Framing | Passed | Kody Boswell | Upper concourse area A grab and go. |
2025/04/24 | Building/Structural | Sheetrock | Passed | Kody Boswell | Screw inspection for field club area A exterior walls. |
2025/04/24 | Building/Structural | Slab | Passed | Kody Boswell | Reviewed reinforcing steel for lower bowel strip to field wall, area A and area B |
2025/04/24 | Building/Structural | Structural | Passed | Kody Boswell | Weld inspections for level 4 and 6 south end zone. |
2025/04/23 | Plumbing | Rough-in | Passed | Paul Nitz | north grab and go inwall insulation inspection |
2025/04/23 | Plumbing | Gas Piping & Test | Passed | Paul Nitz | gate D gas line 65psi pressure test |
2025/04/23 | Plumbing | Water Piping & Test | Failed | Paul Nitz | south pantry plumbing inspection 1) air arrester missing |
2025/04/23 | Fire Safety | Opening Protections | Failed | Mary Creason | Inspecting firestopping for elevators 1 and 2. Top of shaft, only 1. Elevator 1 they are still working on - not ready for inspection 2. Elevator 2 John from Nova conducted a destruction test and it failed. Voids not completely filled |
2025/04/23 | Building/Structural | Framing | Passed | Paul Nitz | Field Club sub-roof framing around south pre-cast stairs. |
2025/04/23 | Electrical | Ceiling Rough-in | Passed | James Melvin | club area 1st floor |
2025/04/22 | Plumbing | Rough-in | Cancelled | Paul Nitz | insulation inspection 3rd floor grab an go |
2025/04/22 | Electrical | Ceiling Rough-in | Passed | Rocky Wilde | Partial overhead rough above subroof in seq 2. |
2025/04/22 | Building/Structural | Framing | Passed | Rocky Wilde | Subroof framing at field club seq 2. |
2025/04/18 | Building/Structural | Framing | Passed | Paul Nitz | Founders exterior framing side A and B near the elevators |
2025/04/18 | Building/Structural | Framing | Passed | Paul Nitz | Field club exterior framing for area A and area B near the entrance. |
2025/04/18 | Electrical | Ceiling Rough-in | Passed | Rocky Wilde | overhead rough 1st floor south field club above sub roof. In-wall rough inspection 3rd floor north grab and go and speed of concessions, |
2025/04/18 | Building/Structural | Framing | partial | Rocky Wilde | Upper concourse area B speed of concession, knee wall, and grab and go. |
2025/04/18 | Building/Structural | Framing | Partial | Rocky Wilde | Framing on upper concourse in area B speed of concession knee wall and grab and go, if MEP inspections pass. Also area A Man 03.16.02. 1) pics required on plumbing insulation |
2025/04/18 | Plumbing | Rough-in | Partial | Paul Nitz | both grab and goes on 3rd floor and the knee wall at the south speed of concessions. 1) insulation required |
2025/04/18 | Building/Structural | Framing | Passed | Paul Nitz | Mcjv is requesting a framing and screw inspection for sheathing for north and south side founders. Thanks |
2025/04/18 | Electrical | Wall Rough-in | Passed | Rocky Wilde | overhead rough 1st floor south field club above sub roof. In-wall rough inspection 3rd floor north grab and go and speed of concessions, |
2025/04/18 | Mechanical | Duct Rough-in | Passed | Paul Nitz | visual inspection of supply duct dusts in both speed of concessions on the 3rd floor |
2025/04/18 | Plumbing | Water Piping & Test | Passed | Paul Nitz | both grab and goes on 3rd floor and the knee wall at the south speed of concessions. |
2025/04/18 | Plumbing | Stack Piping & Test | Passed | Paul Nitz | both grab and goes on 3rd floor and the knee wall at the south speed of concessions. |
2025/04/17 | Building/Structural | Slab | Passed | Kody Boswell | Reviewed reinforcing steel for the following: 1) North wall at expansion joint on existing stadia, area A 2) Topping slabs along the upper bowl in 4 locations, 2 in area A and 2 in area B |
2025/04/17 | Plumbing | Water Piping & Test | Cancelled | Paul Nitz | area B kitchens 3rd floor |
2025/04/17 | Building/Structural | Framing | Passed | Rocky Wilde | Upper concourse area B speed of concession, knee wall, and grab and go. |
2025/04/17 | Building/Structural | Sheetrock | Passed | Kody Boswell | Screw inspection for founders area B exterior framing |
2025/04/17 | Building/Structural | Slab | Passed | Kody Boswell | Reviewed reinforcing steel for the following: 1) North wall at expansion joint on existing stadia, area A 2) Topping slabs along the upper bowl in 4 locations, 2 in area A and 2 in area B |
2025/04/17 | Building/Structural | Framing | Passed | Kody Boswell | Main concourse area A exterior framing for the field club. Also, area B for the field club exterior framing near the entrance. |
2025/04/17 | Electrical | Ceiling Rough-in | Passed | Rocky Wilde | partial overhead rough above sub roof area b |
2025/04/17 | Electrical | Wall Rough-in | Passed | Rocky Wilde | speed of concession area A 3rd floor |
2025/04/17 | Plumbing | Stack Piping & Test | Cancelled | Paul Nitz | area B kitchens 3rd floor |
2025/04/17 | Building/Structural | Wall/Ceiling | Passed | Kody Boswell | Reviewed reinforcing steel for the following: 1) North wall at expansion joint on existing stadia, area A 2) Topping slabs along the upper bowl in 4 locations, 2 in area A and 2 in area B |
2025/04/17 | Building/Structural | Framing | Passed | Kody Boswell | Main concourse area A exterior framing for the field club. Also, area B for the field club exterior framing near the entrance. |
2025/04/17 | Building/Structural | Wall/Ceiling | Passed | Kody Boswell | Reviewed reinforcing steel for the following: 1) North wall at expansion joint on existing stadia, area A 2) Topping slabs along the upper bowl in 4 locations, 2 in area A and 2 in area B |
2025/04/16 | Building/Structural | Framing | Passed | Kody Boswell | Reviewed LG framing for exterior walls on founders level, areas A and B, between grids W7N-W8N and W7S-W8S |
2025/04/16 | Plumbing | Stack Piping & Test | Failed | Paul Nitz | 3rd floor north single bathroom, 3rd floor south grab and go, 3rd floor speed of concession. 1) air admittance valve missing |
2025/04/16 | Plumbing | Water Piping & Test | Failed | Paul Nitz | 3rd floor north single bathroom, 3rd floor south grab and go, 3rd floor speed of concession. 1) pressure required on supply lines |
2025/04/16 | Electrical | Wall Rough-in | Passed | James Melvin | south grab and go 3rd floor in wall electrical inspection |
2025/04/16 | Building/Structural | Re-Inspection | Passed | Paul Nitz | RE-inspection for upper concourse area B speed of concessions back wall access panel opening has been enlarged and framed out. |
2025/04/16 | Building/Structural | Structural | Passed | Kody Boswell | Reviewed steel framing for south end zone boxes, level four |
2025/04/15 | Building/Structural | Structural | Passed | Kody Boswell | Reviewed steel roof joists and roof decking for added restroom and mechanical room on the existing slab on upper concourse, area B |
2025/04/15 | Building/Structural | Structural | Passed | Kody Boswell | Reviewed structural steel framing for several south endzone party decks, levels 4 and 6 |
2025/04/15 | Building/Structural | Structural | Passed | Kody Boswell | Reviewed structural steel for stair 6 north and south. Stairs go from existing ramp up to founders level. |
2025/04/15 | Building/Structural | Wall/Ceiling | Passed | Kody Boswell | Reviewed reinforcing steel for a portion of the north (area A) wall on precast at the expansion joint |
2025/04/15 | Building/Structural | Structural | Passed | Kody Boswell | Reviewed structural steel for stair 1 located in area A from main concourse to founders level. There were 2 missing bolts in a bolted connection at founders level. Contractor installed missing bolts while FSU BCA was on site. |
2025/04/15 | Building/Structural | Sheetrock | Passed | Kody Boswell | Inspection for screws on dens glass for field club stairs and Field club area A sofit |
2025/04/15 | Plumbing | Stack Piping & Test | Passed | Paul Nitz | North women's room 3rd floor overhead |
2025/04/15 | Plumbing | Water Piping & Test | Passed | Paul Nitz | North women's room 3rd floor overhead 1) additional supports and insulation needs to be added at insulation inspection |
2025/04/15 | Electrical | Wall Rough-in | Passed | Rocky Wilde | In-wall rough inspection on 3rd floor for the south grab and go and the speed of concessions area. |
2025/04/14 | Building/Structural | Framing | Failed | Kody Boswell | Reviewed sub roof framing for field club area B, between grids WA-WC/W4S-W11S There were 2 areas where framing was not installed per approved shop drawings. This was discussed with the Contractor on site. |
2025/04/14 | Building/Structural | Framing | Passed | Kody Boswell | Reviewed sub roof framing for field club area B, between grids WA-WC/W4S-W11S, specifically the 2 areas noted in the 8am inspection. |
2025/04/14 | Plumbing | Water Piping & Test | NOT READY | Paul Nitz | north women's restroom, north men's room, and speed of concession on 3rd floor upper concourse. |
2025/04/14 | Plumbing | Stack Piping & Test | NOT READY | Paul Nitz | north women's restroom, north men's room, and speed of concession on 3rd floor upper concourse. |
2025/04/14 | Electrical | Wall Rough-in | NOT READY | James Melvin | south grab and go and speed of concession 3rd floor, upper concourse. |
2025/04/11 | Building/Structural | Slab | Passed | Paul Nitz | MCJV is requesting a reinforcement inspection for remainder of south wall on precast and big overpour on lower bowl of founders precast, we would also like to request an inspection for 6th floor loge boxes before cover-up. thanks |
2025/04/11 | Building/Structural | Structural | Passed | Paul Nitz | Steel inspection for the north bar on main concourse. |
2025/04/11 | Plumbing | Water Piping & Test | NOT READY | Paul Nitz | 3rd floor bathroom, north women's restroom. pressure drain and waist overhead, and domestic water test inspection. |
2025/04/11 | Building/Structural | Framing | Passed | Paul Nitz | Sub roof framing on founders for suites. |
2025/04/11 | Building/Structural | Framing | Passed | Paul Nitz | Field club exterior framing area A and framing around north stairs. |
2025/04/11 | Building/Structural | Framing | Passed | Paul Nitz | Exterior framing on founders area B. |
2025/04/11 | Building/Structural | Wall/Ceiling | Passed | Paul Nitz | MCJV is requesting a reinforcement inspection for remainder of south wall on precast and big overpour on lower bowl of founders precast, we would also like to request an inspection for 6th floor loge boxes before cover-up. thanks |
2025/04/10 | Plumbing | Stack Piping & Test | Cancelled | Paul Nitz | Testing overhead on Area A upper concourse. |
2025/04/10 | Plumbing | Water Piping & Test | Cancelled | Paul Nitz | Testing overhead on Area A upper concourse. |
2025/04/10 | Building/Structural | Framing | Passed | Paul Nitz | Field club exterior framing on areas A and B. Re-inspection from Friday with engineers' detail. |
2025/04/09 | Building/Structural | Framing | partial | Paul Nitz | Framing inspection on upper concourse area B for speed of service concession and concession prep. 1) Front and back wall are not complete |
2025/04/09 | Plumbing | Rough-in | Passed | Paul Nitz | men's room 01.05.01 and women's room 01.04.01 |
2025/04/09 | Plumbing | Water Piping & Test | Passed | Paul Nitz | men's room 01.05.01 and women's room 01.04.01 |
2025/04/09 | Building/Structural | Slab | Passed | Paul Nitz | MCJV is requesting a reinforcement inspection for north founders overpour and south wall on existing structure. thanks |
2025/04/08 | Building/Structural | Wall/Ceiling | Conditional | Kody Boswell | Reviewed reinforcing steel for south wall curb on precast, booster pump pad on south side main concourse. Contractor was finishing installing reinforcing steel at time of inspection. Result is condtional pending receipt of photos from Contractor verifying remaining reinforcing steel is installed. Photos received on 4/9/2025. Filed in job folder. |
2025/04/08 | Building/Structural | Slab | Conditional | Kody Boswell | Reviewed reinforcing steel for south wall curb on precast, booster pump pad on south side main concourse. Contractor was finishing installing reinforcing steel at time of inspection. Result is condtional pending receipt of photos from Contractor verifying remaining reinforcing steel is installed. Photos received on 4/9/2025. Filed in job folder. |
2025/04/08 | Building/Structural | Framing | Postponed | Kody Boswell | Framing for upper concourse area B rooms speed of service concession and the concession prep. Contractor contacted FSU BCA prior to site arrival to cancel/postpone inspection |
2025/04/07 | Electrical | Wall Rough-in | Passed | James Melvin | Partial in-wall rough-in speed of concession on 4th floor and north Founders area. |
2025/04/07 | Electrical | Wall Rough-in | Passed | James Melvin | Partial in-wall rough inspection in the north founders and the south speed of concession area. |
2025/04/07 | Building/Structural | Framing | Passed | Kody Boswell | Reviewed LG framing for founders lvl, area A private dining, kitchen prep, and storage area |
2025/04/04 | Building/Structural | Slab | Passed | Kody Boswell | Reviewed reinforcing steel for topping slabs on founders level, area B |
2025/04/04 | Building/Structural | Framing | Conditional | Kody Boswell | Reviewed LG framing for interior walls for the womens restroom, upper concourse, spltting areas A and B. Result is conditional pending installation of 1 vertical stud, located along the east wall near the south entrance. |
2025/04/04 | Building/Structural | Structural | Passed | Kody Boswell | Reviewed steel framing for south endzone, levels 4 and 6, areas C and D |
2025/04/03 | Electrical | Wall Rough-in | Failed | James Melvin | Partial in-wall rough on Founders area-A. 1) support requirements not met for electrical equipment |
2025/04/02 | Building/Structural | Structural | Postponed | Kody Boswell | South endzone Party decks. FSU BCA was on site for another inspection. During this time the Contractor contacted FSU BCA to cancel/postpone inspection to a later date. |
2025/04/02 | Building/Structural | Framing | Passed | Kody Boswell | Reviewed LG framing for Exterior soffit for main concourse area A north Field Club wall. |
2025/04/02 | Building/Structural | Slab | Conditional | Kody Boswell | Reviewed reinforcing steel for north and south founders level overpour and part of the south wall on precast located at the expansion joint between new and existing construction. Contractor was not finished installing formwork on north founders overpour so clear cover between reinforcing steel and face of concrete was not verified. After discussion with Contractor it is acceptable to FSU BCA for photos to be provided verifying clear cover is per contract documents. Result is condtional pending receipt of photos. |
2025/04/01 | Building/Structural | Masonry | Passed | Kody Boswell | Reviewed reinforcing steel for Upper Concourse area B restroom/mechanical room on existing slab. Walls are topped out. |
2025/04/01 | Building/Structural | Framing | Passed | Kody Boswell | Reviewed LG framing for Upper Concourse area B men's bathroom. |
2025/04/01 | Building/Structural | Wall/Ceiling | Postponed | Kody Boswell | MCJV is requesting a reinforcement inspection for south wall on precast. Inspection was postponed to a later date |
2025/04/01 | Building/Structural | Sheetrock | Passed | Kody Boswell | Reviewed sheathing screw inspection for store front framing, area B |
2025/03/31 | Plumbing | Water Piping & Test | Passed | Paul Nitz | Testing copper supply and pvc drain/vent on upper concourse. Center women’s restroom and southern grab-n-go |
2025/03/31 | Plumbing | Stack Piping & Test | Passed | Paul Nitz | Testing copper supply and pvc drain/vent on upper concourse. Center women’s restroom and southern grab-n-go |
2025/03/28 | Building/Structural | Framing | Passed | Paul Nitz | Framing on main concourse area B store front framing. |
2025/03/28 | Electrical | Wall Rough-in | Passed | Rocky Wilde | founders level area-A partial inwall rough |
2025/03/28 | Building/Structural | Framing | Conditional | Rocky Wilde | Founders area A food service prep and last walls need to be inspected in the area. |
2025/03/28 | Plumbing | Specialty Piping | Passed | Paul Nitz | Checking overhead plumbing insulation on Upper Concourse Area B |
2025/03/28 | Building/Structural | Framing | NOT READY | Paul Nitz | Upper concourse both side grab and go concession framing. Planning on doing founders level first and then go to the upper concourse. |
2025/03/28 | Building/Structural | Slab | Passed | Paul Nitz | MCJV is requesting a reinforcement inspection for north founders upper level slab. Concrete is set for 8. thanks |
2025/03/27 | Building/Structural | Roofing | Passed | Kody Boswell | Upper concourse area A roofing progress inspection. Insulation, cover board, and cap sheet |
2025/03/27 | Building/Structural | Sheetrock | Passed | Kody Boswell | Screw Inspection for main concourse area B south wall |
2025/03/27 | Building/Structural | Slab | Passed | Kody Boswell | Reviewed reinforcing steel for south side founders level slab |
2025/03/26 | Building/Structural | Masonry | Passed | Kody Boswell | Reviewed reinforcing steel for upper concourse area B south restroom and mechanical room, 1st lift |
2025/03/26 | Building/Structural | Masonry | Passed | Kody Boswell | Inspection for elevator 5, top out lift |
2025/03/26 | Building/Structural | Slab | Passed | Kody Boswell | Reviewed reinforcing steel for the north party porch on founders level. |
2025/03/26 | Building/Structural | Structural | Passed | Kody Boswell | South endzone level 4 and level 6 party decks. |
2025/03/25 | Building/Structural | Masonry | Passed | Kody Boswell | Reviewed reinforcing steel for elevator 5, 7th lift, area B |
2025/03/25 | Building/Structural | Framing | Passed | Kody Boswell | Exterior framing in area a. Soffit framing also. |
2025/03/25 | Building/Structural | Framing | Passed | Kody Boswell | In wall blocking founders level, area A |
2025/03/25 | Building/Structural | Wall/Ceiling | Passed | Kody Boswell | Reviewed reinforcing steel for a curb on founders level, area A |
2025/03/24 | Building/Structural | Sheetrock | Passed | Kody Boswell | Screw inspection for sheathing on main concourse field club wall, area B |
2025/03/21 | Building/Structural | Structural | Passed | Kody Boswell | Reviewed steel roof decking at south electrical room on main concourse, area A |
2025/03/21 | Building/Structural | Slab | Passed | Kody Boswell | Reviewed reinforcing steel for elevated slab on deck on founders level, area A and area B |
2025/03/21 | Building/Structural | Framing | Passed | Kody Boswell | Reviewed LG exterior framing on founders level area a. |
2025/03/20 | Plumbing | Specialty Piping | Passed | Paul Nitz | Inspecting copper insulation for in-wall close up |
2025/03/20 | Building/Structural | Structural | Passed | Kody Boswell | Reviewed steel joist and bridging for the south electrical room, main concourse, area B |
2025/03/19 | Building/Structural | Masonry | Passed | Kody Boswell | Reviewed reinforcing steel for the 1st lift of field club walls on main concourse, area B, along grid WB/W6S-W8S |
2025/03/19 | Building/Structural | Framing | Conditional | Kody Boswell | Reviewed exterior LG framing for kitchen area in area B, main concourse, between grids W5S-W8S. Result is conditional pending clarification on 2 framed louver openings (4' and 6' openings). With exception to louver openings, LG wall framing appeared to be in substantial compliance with the contract documents. |
2025/03/19 | Building/Structural | Structural | Passed | Kody Boswell | Inspecting party porches at south endzone. Reviewed structural steel framing for several areas in the south endzone where stadia is being modified, 4th and 6th levels, areas C and D |
2025/03/18 | Building/Structural | Masonry | Passed | Kody Boswell | Reviewed reinforcing steel for elevator 5, 6th lift, area B |
2025/03/18 | Building/Structural | Roofing | Passed | Kody Boswell | Detailing around penetrations in progress inspection for main concourse. This was an in-progress inspection of roofing installation around roof penetrations. |
2025/03/18 | Building/Structural | Slab | Conditional | Kody Boswell | Reviewed reinforcing steel for SOG for area A, sequence 3. Result is conditional pending the following items being addressed and verified by the Threshold Inspector prior to concrete placement: 1) Smooth dowel installation along previously placed concrete and along preceast elements. 2) At thickened slab edges in various locations, there are several bottom cover issues. 3) Diamond slip dowel installation along construction joint at the north end. FSU BCA got a verbal approval from the Threshold Inspector that the items above were addressed prior to concrete placement. |
2025/03/17 | Building/Structural | Masonry | Passed | Kody Boswell | Reviewed reinforcing steel for the 5th lift of elevator 5 masonry walls, area B |
2025/03/14 | Building/Structural | Masonry | NOT READY | Paul Nitz | Interior cmu inspection for area a upper concourse. |
2025/03/14 | Building/Structural | Masonry | NOT READY | Paul Nitz | Elevator 5 cmu inspection. |
2025/03/14 | Building/Structural | Structural | Passed | Paul Nitz | Stair 1 inspection. |
2025/03/14 | Building/Structural | Framing | Passed | Paul Nitz | Subroof framing on founders level. |
2025/03/14 | Electrical | Ground | Passed | Rocky Wilde | 15kv switch grounding at Gate D |
2025/03/14 | Building/Structural | Structural | Passed | Paul Nitz | Party porch decking on level 4. |
2025/03/14 | Fire Safety | Opening Protections | Passed | Mary Creason | Looking at fire wall labeling for cover up in area a main concourse. |
2025/03/13 | Building/Structural | Re-Inspection | Passed | Kody Boswell | Reviewed reinforcing steel for portions of the elevated slab on deck and topping slab over foam for the founders level party porch, area B. Corrections were made to address comments on failed slab inspection earlier today. Contractor installed the correct size rebar for the topping slab over foam and corrected the spacing for the Z-bars for the composite slab. |
2025/03/13 | Building/Structural | Slab | Failed | Kody Boswell | Reviewed reinforcing steel for portions of the elevated slab on deck and topping slab over foam for the founders level party porch, area B. Reinforcing steel for topping slab over foam was not the correct size rebar. Contract drawings show #5@8in OC, contractor had #4@8in OC tied in place. Reinforcing steel (Z-bars) for elevated slab on deck was the incorrect spacing. Contract drawings show #5@6in OC, contractor had #5@12in OC. Contractor to correct incorrectly sized and incorrectly spaced reinforcing |
2025/03/13 | Building/Structural | Masonry | Passed | Kody Boswell | Reviewed reinforcing steel for the 1st lift of several interior cmu walls on upper concourse, area a. |
2025/03/12 | Building/Structural | Slab | Conditional | Kody Boswell | Reviewed reinforcing steel for curbs for south restroom on existing elevated slab on upper concourse, area B. Result is conditional pending side cover for reinforcing being addressed. |
2025/03/12 | Building/Structural | Slab | NOT READY | Kody Boswell | FSU BCA arrived on siteto review reinforcing steel for party porch at founders level, area B. Contractor was not ready for inspection. |
2025/03/12 | Building/Structural | Masonry | Passed | Kody Boswell | Reviewed reinforcing steel for elevator 5 in area B, 3rd lift |
2025/03/11 | Mechanical | Duct Rough-in | Passed | Paul Nitz | Rough in duct work branches on main concourse corridor |
2025/03/11 | Building/Structural | Footing | Failed | Paul Nitz | Last section of conduit in the Duct bank at Gate D behind bus stop by sidewalk . 1) red die not installed per plans nor installation instructions, contractor is going to ask the electrical engineer if they will allow a alternative method in leu of the red die. Contractor is ok to cover the trench so that other trades can continue their work but is aware that he may have to uncover to address not following the plans. |
2025/03/11 | Plumbing | Underground | Passed | Paul Nitz | Testing underground sanitary line at Gate B. |
2025/03/07 | Building/Structural | Structural | Passed | Kody Boswell | Reviewed joist framing, bridging, and RTU frame at north custodial room on upper concourse. |
2025/03/07 | Plumbing | Underground | Passed | Paul Nitz | Inspecting the remaining grease and sanitary lines underground at L4 |
2025/03/07 | Building/Structural | Footing | Failed | Paul Nitz | Concrete inspection for the duct bank at Gate D by the ramp . This is for the electrical duct bank for west stands 1) minimum coverage not met as per plans, 3” min and they have less than an 1 inch in many locations. 2) red concrete die was not installed per manufacture installation instructions. Contractor said that he had 10 cans of die and my calculations said it would require around 41 of the cans that they were using |
2025/03/07 | Fire Safety | Opening Protections | Passed | Mary Creason | Nova will be onsite through out the day for fire stopping on founders level. Shannon Burgess from NOVA was on site to do inspections. |
2025/03/07 | Building/Structural | Masonry | Passed | Kody Boswell | Reviewed reinforcing steel for several interior cmu walls, area a, upper concourse, 2nd lift |
2025/03/07 | Building/Structural | Slab | Passed | Kody Boswell | Reviewed reinforcing steel for SOG reinforcement for north bathroom, area A. |
2025/03/07 | Plumbing | Specialty Piping | Failed | Paul Nitz | Copper insulation inspection of upper con women’s bathroom Area A 1) insulation and clamps are missing |
2025/03/06 | Building/Structural | Structural | Conditional | Kody Boswell | Reviewed steel framing for level 4 party deck, area D, 2 east most bays. Result is conditional pending engineer approval for cantilever condition for horizontal framing occuring at existing steel columns. 3 locations. This condition occurs in each bay. |
2025/03/06 | Building/Structural | Slab | NOT READY | Kody Boswell | Reviewed reinforcing steel for SOG for north bathroom, area A. Contractor was not finished installed reinforcing. |
2025/03/06 | Building/Structural | Structural | Failed | Kody Boswell | Reviewed decking at the south bar roof, area B. Fasteners were not at the correct spacing at deck side laps (12" OC per structural drawings). This was discussed with the contractor prior to FSU BCA leaving the site. |
2025/03/06 | Building/Structural | Masonry | Passed | Kody Boswell | Reviewed reinforcing steel for elevator 1 in area A, 6th lift. |
2025/03/06 | Electrical | Underground | Failed | James Melvin | 40' of duct bank at Gate D . Exiting building by ramp . 1) red die not installed per plans nor installation instructions, contractor is going to ask the electrical engineer if they will allow a alternative method in leu of the red die. Contractor is ok to cover the trench so that other trades can continue their work but is aware that he may have to uncover to address not following the plans. |
2025/03/06 | Plumbing | Specialty Piping | Failed | Paul Nitz | Checking copper insulation on founders level in prep for drywall. 1) water arresters are missing |
2025/03/06 | Building/Structural | Masonry | Passed | Kody Boswell | Reviewed reinforcing steel for elevator 5, area A, 1st lift |
2025/03/05 | Fire Safety | Fire Water Above Ground | Passed | Curtis Rogers | Visual inspection for rough in at entry portal soffit gate c area. *Dry Concealed Pendants (Sprinkler) |
2025/03/05 | Fire Safety | Opening Protections | Passed | Sam Sevor | Nova will be onsite through out the day doing in progress inspections for fire stopping on founders level. *Observed Concealed dry pendants in Soffit area |
2025/03/05 | Building/Structural | Framing | Passed | Kody Boswell | Reviewed LG interior framing on founders level, areas A and B. Framing locations reviewed can be seen on "LG Framing Markups", filed in Inspections folder. Green highlighted walls on markup sheets have a passing result. |
2025/03/05 | Building/Structural | Masonry | Passed | Kody Boswell | Reviewed reinforcing steel for several interior masonry walls on upper concourse, area A, 2nd lift |
2025/03/04 | Plumbing | Water Piping & Test | Passed | Paul Nitz | -Testing Main Con L4 underground storm. -Pressure testing Upper Con women’s restroom copper and drain/vent |
2025/03/04 | Building/Structural | Masonry | Passed | Kody Boswell | Reviewed reinforcing steel for the 5th lift of elevator 1 masonry walls |
2025/03/04 | Building/Structural | Masonry | Passed | Kody Boswell | Reviewed reinforcing steel for the 1st lift of several interior walls on upper concourse, area a. |
2025/03/04 | Building/Structural | Structural | Passed | Kody Boswell | Reviewed roof decking on the upper concourse seq 2 |
2025/03/04 | Plumbing | Stack Piping & Test | Failed | Paul Nitz | -Testing Main Con L4 underground storm. -Pressure testing Upper Con women’s restroom copper and drain/vent 1)missing clamps 2) missing water hammer 3) add support |
2025/03/04 | Plumbing | Underground | Passed | Paul Nitz | -Testing Main Con L4 underground storm. -Pressure testing Upper Con women’s restroom copper and drain/vent |
2025/03/04 | Building/Structural | Framing | Passed | Kody Boswell | Reviewed LG framing on level 2 (Founders lvl) for the exterior corridor wall, between grids W1-W8S (area B) |
2025/03/03 | Building/Structural | Slab | Conditional | Kody Boswell | Reviewed reinforcing steel for a portion of the main concourse slab on grade, located in the approximate area between grids WB-WD/W4N-W8S. There were several issues, see below: - Reinforcing for isolation pads between grids W6S-W8S was not installed. Contractor was still installing vapor barrier on grade at time of inspection. - Reinforcing for slab turndown and curbs between grids W4N-W2N and W2S-W5S was not installed. Contractor had not excavated slab turndown. Vapor barrier and WWR was in place. Vapor barrier and WWR must be removed and reinstalled after slab turndown is excavated. - Construction joints were not installed along grid WB/W4N-W4S and along grid W4N/WB-WD. Contractor was not actively working on installing formwork at time of inspection. After discussion with the Bo Anthony and Kaleb Phillips, FSU BCA agreed to grant a conditonal passing result for this inspection with the understanding that the items stated above would be corrected/addressed prior to concrete placement in those areas specified. FSU BCA to rereview areas affected by above comments. Contractor is not to place concrete in those areas until FSU BCA approval. FSU BCA confirmed items above were addressed prior to concrete placement. |
2025/03/03 | Building/Structural | Masonry | Passed | Kody Boswell | Reviewed reinforcing steel for the 4th lift of masonry walls for elevator 1, area A |
2025/03/03 | Building/Structural | Framing | Failed | Kody Boswell | Reviewed LG framing on level 2 (Founders lvl) for the exterior corridor wall, between grids W1-W8S (area B) |
2025/02/28 | Building/Structural | Structural | Passed | Kody Boswell | Seq 2 upper concourse joist, bridging, and frame inspection. |
2025/02/28 | Fire Safety | Fire Wall | Passed | Mary Creason | Fire wall in a chase main concourse area b restroom. Stencils placement on a 2hr fire wall. |
2025/02/28 | Building/Structural | Masonry | Passed | Kody Boswell | Reviewed reinforcing steel for the 3rd lift for elevator 1, area A |
2025/02/28 | Electrical | Wall Rough-in | Passed | James Melvin | in-wall rough inspection on founders' level 2. |
2025/02/27 | Mechanical | Duct Pressure Test | Passed | Paul Nitz | Testing overhead exhaust ductwork on main concourse near Gate C |
2025/02/27 | Plumbing | Stack Piping & Test | NOT READY | Paul Nitz | Testing underground grease lines in L4 of phase 2 |
2025/02/27 | Plumbing | Specialty Piping | Passed | Paul Nitz | Inspecting copper insulation in Upper Concourse Area A men’s restroom. |
2025/02/27 | Building/Structural | Slab | Passed | Kody Boswell | Reviewed reinforcing steel for level 2 elevated slab located in the area between grids WC.1-WD/W4N-W4S |
2025/02/27 | Building/Structural | Footing | Failed | Paul Nitz | Duct Bank - manhole to sidewalk by Gate D behind bus stop . 1) failure to use approved materials for concrete die. 2) (IRWIN STRAIGHT-LINE) was used as a concrete die |
2025/02/27 | Plumbing | Water Piping & Test | Passed | Paul Nitz | Testing small underground sections of continued storm and remaining section of sanitary on Main Concourse Phase 2 L4. Testing copper water lines as one unit before sleeving and setting underground. Looked at on 2/27 and passed. |
2025/02/27 | Electrical | Wall Rough-in | Passed | Al Smythe | inwall inspection for north market concessions |
2025/02/27 | Plumbing | Underground | Passed | Paul Nitz | Testing small underground sections of continued storm and remaining section of sanitary on Main Concourse Phase 2 L4. Testing copper water lines as one unit before sleeving and setting underground. Looked at on 2/27 and passed. |
2025/02/27 | Mechanical | Duct Rough-in | Passed | Paul Nitz | Inspecting small section of RA ductwork on Founders level. Also high overhead ductwork at Gate B. Looked at and passed on 2/24. Calling in for record. |
2025/02/26 | Building/Structural | Wall/Ceiling | Passed | Kody Boswell | Reviewed reinforcing steel for stair walls at field club, area A. |
2025/02/26 | Building/Structural | Slab | Passed | Kody Boswell | Reviewed reinforcing steel for a pour strip at founders level along grid WC.1/W5N-W5S |
2025/02/26 | Building/Structural | Masonry | Failed | Kody Boswell | Reviewed reinforcing steel for the 2nd lift of masonry walls for elevator 1, area A. Structural drawings call for fully grouted walls. Cells not containing vertical reinforcing appeared to be filled with mortar 4 courses down from the top of the 2nd lift, obstructing view down to the top of the 1st lift (previously grouted). Due to obstructed view, FSU BCA was not able to verify that grout would be able to fill all voids in masonry. |
2025/02/26 | Plumbing | Storm Piping & Test | Passed | Paul Nitz | Re-test of storm piping with minimum 5’ head pressure at highest point. |
2025/02/26 | Mechanical | Duct Pressure Test | NOT READY | Paul Nitz | Testing exhaust ductwork on main concourse. |
2025/02/25 | Building/Structural | Structural | Passed | Kody Boswell | Reviewed south endzone steel tube framing for curtainwall. |
2025/02/25 | Plumbing | Water Piping & Test | Passed | Paul Nitz | Upper con Area A Men’s restroom. Copper and drain/vents |
2025/02/25 | Plumbing | Stack Piping & Test | Passed | Paul Nitz | Upper con Area A Men’s restroom. Copper and drain/vents |
2025/02/25 | Plumbing | Underground | Failed | Paul Nitz | Testing underground storm in phase 2 north (L4) 1) min head pressure not met |
2025/02/25 | Building/Structural | Wall/Ceiling | Passed | Kody Boswell | Reviewed reinforcing steel for south field club stair walls |
2025/02/24 | Fire Safety | Fire Water Above Ground | Passed | Curtis Rogers | Inspecting rough in for soffits in area a main concourse. |
2025/02/24 | Electrical | Wall Rough-in | Passed | James Melvin | inwall inspection for the first-floor area-a |
2025/02/24 | Building/Structural | Masonry | Conditional | Kody Boswell | Reviewed reinforcing steel for the 1st lift of elevator 6 masonry walls. Result is conditional pending photos of missing reinforcing being installed. |
2025/02/23 | Building/Structural | Footing | Passed | Paul Nitz | Unable to schedule weekend inspections. Correct date and time of inspection is Sunday the 23rd at 2:00am. Inspection is of conduits exiting manhole by Gate D at bus stop . 1) electrical bank for Doak West Stand |
2025/02/21 | Building/Structural | Framing | Conditional | Kody Boswell | Interior framing for area a main concourse restrooms and concessions. The result is conditional pending a passed electrical in-wall inspection |
2025/02/21 | Fire Safety | Opening Protections | Cancelled | Sam Sevor | Inspecting chase wall and fire wall labeling. Area b main concourse. |
2025/02/21 | Building/Structural | Slab | Conditional | Kody Boswell | Reviewed reinforcing steel for slab on grade in the area between grids WA-WD/W8S-W11S. Result is conditional pending minor coerrections to be made, including cover issues, missing reinforcing, missing dowels tying new to existing concrete. |
2025/02/21 | Building/Structural | Structural | Passed | Kody Boswell | Inspecting rtu frames, joist, and bridging in seq 1 (partial) upper concourse. |
2025/02/21 | Plumbing | Specialty Piping | Passed | Paul Nitz | Main con Area A overhead copper insulation. |
2025/02/19 | Building/Structural | Structural | Conditional | Kody Boswell | Inspecting decking in seq 2 on upper concourse. There was one area missing a weld at the continuous steel edge angle. This was discussed with the contractor prior to FSU BCA leaving the site. Result is conditional pending weld. |
2025/02/18 | Mechanical | Duct Rough-in | Passed | Rocky Wilde | Checking SA/RA (market concession) and exhaust duct (bathrooms) in Area A. Looked at on 2/18/25, passed. Called in for record on 2/19/25. |
2025/02/18 | Building/Structural | Roofing | Conditional | Kody Boswell | In progress roof inspection for area a main concourse. There is one RTU that requires a cricket installed due to the width of RTU. This was discussed with the Contractor while on site. Result is conditional pending cricket installation. |
2025/02/17 | Building/Structural | Re-Inspection | Passed | Paul Nitz | Reinspection for field walls. Already reinfected the reinforcement on 2/17 |
2025/02/17 | Building/Structural | Wall/Ceiling | Failed | Paul Nitz | MCJV is requesting a reinforcement inspection for field wall on north side. Thanks Not ready |
2025/02/17 | Plumbing | Underground | Failed | Paul Nitz | Testing underground of newly added in south bar area. 1) need approved plans |
2025/02/14 | Building/Structural | Wall/Ceiling | Passed | Kody Boswell | reinforcement inspection for field wall on north side |
2025/02/14 | Plumbing | Stack Piping & Test | Passed | Paul Nitz | Testing copper supply and PVC drain/vent lines on Upper Con Area A women’s restroom 03.11.01 |
2025/02/14 | Plumbing | Water Piping & Test | Passed | Paul Nitz | Testing copper supply and PVC drain/vent lines on Upper Con Area A women’s restroom 03.11.01 |
2025/02/13 | Plumbing | Stack Piping & Test | Passed | Paul Nitz | Testing DW/CW/HW and drain/vent pipes on Main Con Area A building. |
2025/02/13 | Plumbing | Water Piping & Test | Passed | Paul Nitz | Testing DW/CW/HW and drain/vent pipes on Main Con Area A building. |
2025/02/13 | Plumbing | Stack Piping & Test | Passed | Paul Nitz | Testing DW/CW/HW and drain/vent pipes on Main Con Area A building. |
2025/02/13 | Plumbing | Water Piping & Test | Passed | Paul Nitz | Testing DW/CW/HW and drain/vent pipes on Main Con Area A building. |
2025/02/12 | Building/Structural | Sheetrock | Passed | Kody Boswell | Screw inspection for fire rated wall in chase on main concourse. Electrical room 01.04.07 |
2025/02/12 | Building/Structural | Masonry | Passed | Kody Boswell | Interior cmu walls on upper concourse area b. Note: FSU BCA initially failed the inspection due to lack of clean outs for high lift grouting. In order to keep work going, FSU BCA returned to the site in the late afternoon after clean outs were cut in. |
2025/02/12 | Building/Structural | Wall/Ceiling | Postponed | Kody Boswell | Contractor contacted FSU BCA prior to site arrival to cancel/postpone field wall reinforcing inspection to a later date. |
2025/02/11 | Mechanical | Duct Rough-in | Passed | Paul Nitz | Checking main con overhead ductwork in concession areas Area A |
2025/02/11 | Building/Structural | Masonry | Postponed | Kody Boswell | Contractor contacted FSU BCA prior to site arrival to cancel/postpone masonry inspection to a later date |
2025/02/11 | Electrical | Underground | Passed | James Melvin | Reinspection of duct bank under sidewalk at Gate D to manhole |
2025/02/11 | Building/Structural | Roofing | Passed | Kody Boswell | PVC roofing in progress inspection for area b main concourse. |
2025/02/11 | Building/Structural | Sheetrock | Passed | Kody Boswell | Screw inspection for main concourse concession stand and restrooms |
2025/02/11 | Building/Structural | Structural | Conditional | Kody Boswell | Reviewed steel framing connections for new HSS beams welded to existing steel columns. Result is conditional pending EOR approval of connection. |
2025/02/11 | Building/Structural | Wall/Ceiling | Passed | Kody Boswell | Reviewed reinforcing steel for secondary field wall, area A |
2025/02/10 | Building/Structural | Wall/Ceiling | NOT READY | Paul Nitz | MCJV is requesting an inspection for secondary field wall reinforcement. thanks |
2025/02/07 | Mechanical | Insulation | Passed | Paul Nitz | Checking insulation on main con area B concession areas |
2025/02/07 | Building/Structural | Roofing | Passed | Rocky Wilde | Cover board inspection on area a main concourse roof. |
2025/02/07 | Electrical | Ceiling Rough-in | Passed | Rocky Wilde | Soffit electrical rough in at concession stands in area b. |
2025/02/07 | Fire Safety | Fire Water Above Ground | Passed | Sam Sevor | Visual fire sprinkler rough in for soffits at main concourse area b concession stands. |
2025/02/07 | Building/Structural | Structural | Passed | Rocky Wilde | Joist, bridging, and RTU framing on upper concourse area a. |
2025/02/07 | Building/Structural | Wall/Ceiling | Passed | Rocky Wilde | MCJV is requesting a reinforcement inspection for primary field wall for 12. thanks |
2025/02/07 | Building/Structural | Framing | Passed | Paul Nitz | Framing inspection for soffits on main concourse area b soffits in the concession stands. |
2025/02/06 | Building/Structural | Framing | Passed | Kody Boswell | 6th floor sez box framing inspection. |
2025/02/06 | Building/Structural | Structural | Passed | Kody Boswell | 6th floor sez box framing inspection. |
2025/02/06 | Building/Structural | Structural | Passed | Kody Boswell | Precast weld inspection lower bowl Deferred to BNI (threshold inspector) and NOVA (3rd party testing agency) |
2025/02/05 | Mechanical | Duct Rough-in | Passed | Paul Nitz | Ductwork rough in Area B northern grab-n-go. |
2025/02/05 | Plumbing | Stack Piping & Test | Passed | Paul Nitz | Inspected on 2/4/25. Checking DW/CW/HW and PVC drain/vent lines on upper con Concession Prep 03.06.01 & 03.06.02. Passed with condition regarding water fountain copper supply and PVC drain line protection when coming through block wall. |
2025/02/05 | Building/Structural | Wall/Ceiling | Passed | Paul Nitz | MCJV is requesting an inspection for field wall reinforcement. thanks |
2025/02/05 | Plumbing | Water Piping & Test | Passed | Paul Nitz | Inspected on 2/4/25. Checking DW/CW/HW and PVC drain/vent lines on upper con Concession Prep 03.06.01 & 03.06.02. Passed with condition regarding water fountain copper supply and PVC drain line protection when coming through block wall. |
2025/02/04 | Mechanical | Insulation | Passed | Paul Nitz | Inspections copper insulation on upper con men’s restroom |
2025/02/04 | Building/Structural | Wall/Ceiling | NOT READY | Kody Boswell | MCJV is requesting an inspection for field wall reinforcement for 12. FSU BCA arrived on site and there was no reinforcing ready to be reviewed. |
2025/02/04 | Mechanical | Duct Rough-in | Passed | Paul Nitz | Ductwork inspection main con Market Concession. In-wall/overhead before close up. |
2025/02/04 | Building/Structural | Masonry | Passed | Kody Boswell | Reviewed reinforcing steel for some interior masonry walls on upper concourse area b. |
2025/02/04 | Building/Structural | Structural | Conditional | Kody Boswell | Reviewed joist framing on the upper concourse, sequence 1. Joist framing appeared to be in substantial compliance with the contract documents with the exception of a few joists located at enabling steel locations. Result is conditional pending installation of remaining joists. Note: There are some wide flange steel beams that are still a work in progress. Contractor submitted an RFI for an alternate connection due to bolted connections not fitting correctly. This will require a separate inspection. |
2025/02/03 | Building/Structural | Wall/Ceiling | Passed | Kody Boswell | MCJV is putting in a request for field wall reinforcement inspection that is being looked at on 2/3 |
2025/02/03 | Building/Structural | Structural | Postponed | Kody Boswell | Joist inspection for upper concourse. Contractor contacted FSU BCA prior to site arrival to cancel/postpone inspection to a later date. |
2025/02/03 | Building/Structural | Roofing | Passed | Kody Boswell | In progress inspection of the north bathroom/concession group on the main concourse. Contractor was in the process of laying down insulation board and fastneing coverboard to the steel roof deck. |
2025/01/31 | Plumbing | Stack Piping & Test | Passed | Paul Nitz | Testing remaining DW/HW/CW in upper con men’s restroom. Along with scattered copper and drain/vents in same area. Side note: visual inspection of copper insulation in previously tested/passed. |
2025/01/31 | Building/Structural | Framing | Conditional | Kody Boswell | Reviewed LG framing for the south restroom group and concessions. All rooms were reviewed with excpetion to the "Mother's" room. There were a few screws missing in some vertical members. Contrctor to verify these screws get installed. |
2025/01/31 | Plumbing | Water Piping & Test | Passed | Paul Nitz | Testing remaining DW/HW/CW in upper con men’s restroom. Along with scattered copper and drain/vents in same area. Side note: visual inspection of copper insulation in previously tested/passed. |
2025/01/31 | Building/Structural | Wall/Ceiling | Passed | Kody Boswell | Reviewed reinforcing steel for a portion of the field wall in area A |
2025/01/31 | Building/Structural | Framing | Passed | Kody Boswell | Reviewed LG framing for the subroof for the south grab-n-go concession and the south pantry. |
2025/01/30 | Building/Structural | Structural | Passed | Kody Boswell | Precast weld inspection. FSU BCA has deferred precast weld inspections to BNI (Threshold inspector) and NOVA (3rd party testing agency) |
2025/01/30 | Building/Structural | Masonry | Passed | Kody Boswell | Interior CMU on upper concourse in area b. |
2025/01/30 | Building/Structural | Wall/Ceiling | Passed | Kody Boswell | concrete wall rebar inspection. |
2025/01/29 | Building/Structural | Masonry | Passed | Kody Boswell | Top section of walls at electrical rooms in upper concourse. |
2025/01/29 | Building/Structural | Roofing | Passed | Kody Boswell | North grab and go sub roof framing at upper concourse. |
2025/01/29 | Plumbing | Water Piping & Test | Passed | Paul Nitz | Testing upper con partial men’s south restroom and sink wall in women’s. DW/HW/CW and drains. |
2025/01/29 | Plumbing | Stack Piping & Test | Passed | Paul Nitz | Testing upper con partial men’s south restroom and sink wall in women’s. DW/HW/CW and drains. |
2025/01/28 | Building/Structural | Framing | NOT READY | Paul Nitz | Framing inspection for area b main concourse. |
2025/01/17 | Plumbing | Stack Piping & Test | Passed | Paul Nitz | Continuation of inspection on 1/16 Upper con restroom drains. |
2025/01/17 | Plumbing | Water Piping & Test | Passed | Paul Nitz | Continuation of copper inspection from 1/16 Upper con |
2025/01/17 | Building/Structural | Structural | Passed | Kody Boswell | Reviewed steel angle installation for new seating in the SE endzone, located section 327, level 6. Only a few top rows were complete. At some of the vertical support angles, there was only about 4-5" of weld when structural drawings call for 6" (detail 10/S5-6-3). This was discussed with the Contractor prior to FSU BCA leaving the site. |
2025/01/16 | Building/Structural | Wall/Ceiling | Passed | Kody Boswell | MCJV is requesting an inspection for wall reinforcment for field wall. thanks |
2025/01/16 | Plumbing | Water Piping & Test | Failed | Paul Nitz | Testing DW/CW/HW on Upper Con Area B women’s bathroom. Supply and drain 1)drain was not full and supply was not ready |
2025/01/16 | Plumbing | Stack Piping & Test | Failed | Paul Nitz | Testing drain/vent lines on Upper Con Area B Women’s restroom. 1)drain was not full and supply was not ready |
2025/01/15 | Building/Structural | Wall/Ceiling | Passed | Kody Boswell | Reviewed reinforcing steel for a portion of the field wall located east of grid WA between grids W9S-W11S. Contractor was still installing formwork. Note: Wall footer WF3 between grids W9S-W10S was placed in the wrong location so the Contractor doweled into the incorrectly located footer to get the footer in the right location. Reinforcing steel was not reviewed by BCA or BNI prior to concrete placement. After discussion, FSU and the Contractor agreed that photo documentation of reinforcing would suffice. Contractor emailed photo documentation. Filed in the job folder. |
2025/01/09 | Building/Structural | Footing | Passed | Kody Boswell | Reviewed reinforcing steel for the column footing located at grids WB/W11N |
2025/01/03 | Building/Structural | Structural | Passed | Kody Boswell | Reviewed roof decking attachment to structure for the north bathroom group on the lower concourse |
2025/01/03 | Building/Structural | Slab | Passed | Kody Boswell | Reviewed reinforcing steel for walk in cooler slab on the upper concourse and several column pour backs |
2024/12/30 | Plumbing | Stack Piping & Test | Passed | Paul Nitz | Testing drain lines in Area B men’s restroom. Block demoed to observe pipes. |
2024/12/27 | Building/Structural | Masonry | Passed | Rocky Wilde | MCJV is requesting a masonry reinforcement inspection for elevator 4 top out. thanks |
2024/12/19 | Building/Structural | Structural | Passed | Kody Boswell | Reviewed RTU framing in area a2 main concourse. |
2024/12/19 | Plumbing | Water Piping & Test | Failed | Paul Nitz | Testing DW on Founders level 1) water hammers missing on lavs and ice machine |
2024/12/12 | Building/Structural | Slab | Passed | Kody Boswell | Reviewed reinforcing steel for 3 isolation pads for walk-in coolers on the lower concourse level. Reinforcing steel was in substantial compliance with the contract documents. Waterproofing was replaced since the AM inspection. |
2024/12/11 | Building/Structural | Masonry | Passed | Kody Boswell | Reviewed masonry reinforcement for area A interior bathroom walls, lower concourse |
2024/12/10 | Building/Structural | Masonry | Passed | Kody Boswell | Reviewed reinforcing steel for several interior restroom walls on lower concourse, north bathroom group. |
2024/11/22 | Plumbing | Stack Piping & Test | Passed | Paul Nitz | Testing the last remaining stacks in Area A bathroom perimeter. Stacks chase to level 2 and level 3 |
2024/11/21 | Building/Structural | Masonry | Passed | Kody Boswell | Reviewed reinforcing steel for interior walls in the womens RR |
2024/11/21 | Building/Structural | Masonry | Passed | Kody Boswell | Reviewed reinforcing steel for interior walls in the mens RR |
2024/11/21 | Building/Structural | Slab | Conditional | Kody Boswell | Sequence 2 rebar inspection topping slab Result is conditional pending photos from Contractor showing the following work is complete, prior to concrete placement: 1) Finish installing slip dowels at construction joint. 2) Finish installing form work 3) Finish installing one area of steel reinforcing Photos received by Contractor on 11-25-2024. Filed in job folder. |
2024/11/21 | Building/Structural | Framing | Passed | Kody Boswell | framing inspection for North and South electrical rooms, Founders level |
2024/11/21 | Fire Safety | Opening Protections | Passed | Mary Creason | framing inspection for North and South electrical rooms, Founders level Courtesy walk thru for fire penetrations inspections expectations with contractor |
2024/11/20 | Plumbing | Stack Piping & Test | Passed | Paul Nitz | Checking single remaining drain cluster in Area A ADA restroom. |
2024/11/20 | Building/Structural | Masonry | Passed | Kody Boswell | Reviewed reinforcing steel for interior walls in the womens RR |
2024/11/20 | Mechanical | Duct Rough-in | Failed | Paul Nitz | Checking Founders level ductwork 1) plans call for turning veins on all 90* duct 2) expansion joint ducting missing |
2024/11/19 | Building/Structural | Masonry | Passed | Kody Boswell | Reviewed reinforcing steel for interior walls for the south womens RR on the main concourse |
2024/11/19 | Plumbing | Water Piping & Test | Passed | Paul Nitz | Checking 2 remaining ADA toilet/sink clusters in Area A men’s room |
2024/11/18 | Plumbing | Stack Piping & Test | Passed | Paul Nitz | Waste drain testing in Area A men’s and women’s bathroom groups. Note: one cluster in the women’s will be left out due to underground electrical fix. Will inspect at a later date. |
2024/11/18 | Building/Structural | Framing | NOT READY | Kody Boswell | FSU BCA arrived on site to review sheathing attachment to LG soffit framing at gate C. Upon arrival, the Contractor stated they were not ready for inspection. |
2024/11/18 | Building/Structural | Masonry | Passed | Kody Boswell | Reviewed reinforcing steel for two interior womens RR walls on the main concourse, 1st and 2nd lifts |
2024/11/18 | Plumbing | Water Piping & Test | Passed | Paul Nitz | Domestic water pressure test Area A men’s and women’s bathroom groups. Note: copper insulation may have started on the straight pipe. All joints will be left visible for leak checks and joint observation. |
2024/11/15 | Building/Structural | Masonry | Passed | Rocky Wilde | MCJV is requesting an inspection for first lift walls interior in women’s bathroom main concourse. Thanks |
2024/11/14 | Plumbing | Gas Piping & Test | Passed | Paul Nitz | Natural gas 60PSI pressure test, this will include all piping installed overhead in the building. We potentially will be ready tomorrow on the 13th but will let you know at time of inspection. |
2024/11/14 | Building/Structural | Masonry | Passed | Kody Boswell | Reviewed reinforcing steel for interior walls in the womens restroom, main concourse. |
2024/11/14 | Building/Structural | Masonry | Passed | Kody Boswell | Reviewed reinforcing steel for interior walls in the womens restroom, main concourse. |
2024/11/14 | Plumbing | Water Piping & Test | Passed | Paul Nitz | Checking Area B men’s restroom sink cluster drainage pipe. |
2024/11/13 | Building/Structural | Masonry | Passed | Kody Boswell | Reviewed reinforcing steel for some interior walls at womens bathroom in area B main concourse, 2nd lift |
2024/11/13 | Building/Structural | Masonry | Passed | Kody Boswell | Reviewed reinforcing steel for some interior walls at womens bathroom in area B main concourse, 1st lift |
2024/11/13 | Plumbing | Gas Piping & Test | NOT READY | Paul Nitz | Pressure testing overhead natural gas line. |
2024/11/13 | Building/Structural | Framing | Conditional | Kody Boswell | Reviewed LG framing for two soffits located along grids W3S and W3N. There were 4 studs for the W3N soffit that had been overnotched to mimss structural steel framing. FSU BCA directed the contractor that these 4 studs be replaced with minimal notching and photos sent after work is complete. Photos received by Scottie Stuart with PSI on 11/13/24. Photos filed in the job folder. |
2024/11/13 | Plumbing | Stack Piping & Test | Conditional | Paul Nitz | Testing in-wall drain waste and vent retest for women’s restroom area. 1) a visual inspection must be completed on the repairs where the test balls were placed |
2024/11/13 | Mechanical | Duct Pressure Test | Passed | Paul Nitz | Testing the high area insulated ductwork on south and north ends. As well as the ductwork on founders. 1) this was the supply and return duct over the mens and womens bathrooms that were already insulated |
2024/11/13 | Building/Structural | Slab | Conditional | Kody Boswell | Pour 3 sequence 1 topping slab rebar, corridor. Some dowel plates at construction joints were not installed at time of inspection. Contractor is to provide photos of plate dowel installation prior to concrete placement. |
2024/11/12 | Building/Structural | Masonry | Passed | Kody Boswell | Reviewed reinforcing steel for several interior restroom walls for mens RR and womens RR located in area B on main concourse |
2024/11/12 | Building/Structural | Slab | Conditional | Kody Boswell | Reviewed reinforcing steel for the upper concourse topping slab for the womens RR, mens RR and concessions area in area B. Contractor to provide photos showing the following work is complete prior to concrete placement: 1) Finish installing expansion material along walls and curbs 2) Finish installing block outs around steel columns 3) Finish installing reinforcing at chases Photos received via email by Curry with MCJV, filed in job folder. |
2024/11/12 | Plumbing | Rough-in | NOT READY | Paul Nitz | Testing bathroom drain lines in south women’s bathroom group. |
2024/11/12 | Building/Structural | Masonry | Passed | Kody Boswell | Reviewed reinforcing steel for a few interior masonry wallsa for the south mens RR, lower concourse |
2024/11/11 | Building/Structural | Masonry | Passed | Kody Boswell | Reviewed reinforcing steel or several interior restroom walls for the south mens restroom, main concourse |
2024/11/08 | Building/Structural | Masonry | Passed | Kody Boswell | Upper Concourse SEQ3 rebar inspection |
2024/11/08 | Building/Structural | Slab | Passed | Kody Boswell | Upper Concourse SEQ1/Pour 1 topping slab |
2024/11/08 | Plumbing | Rough-in | Failed | Paul Nitz | Julius didn't select an option. I'm assuming mens RR plumbing inspection. -Kody 1) waist drains are covered and can not be inspected due to a CMU wall that was installed prior to inspection |
2024/11/08 | Building/Structural | Masonry | Passed | Kody Boswell | area b mens and womens bathroom interior walls |
2024/11/08 | Building/Structural | Sheetrock | Passed | Kody Boswell | Reviewed exterior sheathing attachment to portions of the service corridor wall located on the founders level |
2024/11/07 | Building/Structural | Masonry | Conditional | Kody Boswell | Reviewed reinorcing steel for the following CMU walls: 1) Upper concourse: north grab n go concession, top out lift 2) Founders level: elevator 2, top out lift 3) Lower concourse: south mens restrooms interior walls, 1st lift Wall (2) note: Vertical reinforcing for 3 of the 4 elevator walls had insufficient lap splice length for rebar. This was discussed with the Contractor on site. FSU BCA left the site and returned around 1pm for re-inspection |
2024/11/04 | Building/Structural | Masonry | Passed | Kody Boswell | Reviewed reinforcing steel for the 2nd lift of the north grab-n-go concessions on the upper concourse. |
2024/11/04 | Plumbing | Specialty Piping | Passed | Paul Nitz | |
2024/11/01 | Plumbing | Other | Passed | Paul Nitz | Copper pipe insulation |
2024/10/31 | Building/Structural | Masonry | Failed | Kody Boswell | Reviewed reinforcing steel for the 2nd lift of the north grab-n-go concessions on the upper concourse. Vertical reinforcing did not have 27" lap length per structural drawings. Re-inspection is required prior to grout placement. |
2024/10/30 | Building/Structural | Masonry | Passed | Kody Boswell | Mcjv is requesting a masonry reinforcement inspection for upper concourse area A and south main con area B. Thanks Reviewed reinforcing steel for south restroom partition wall (1st lift) on lower concourse and for north custodian room (2nd lift) on the upper concourse. |
2024/10/30 | Building/Structural | Masonry | Passed | Kody Boswell | Inspecting masonry on upper concourse sequence 3 at the custodian room. |
2024/10/29 | Plumbing | Water Piping & Test | Passed | Paul Nitz | this inspection was completed on 10-29-2024 |
2024/10/28 | Mechanical | Duct Pressure Test | Cancelled | Paul Nitz | |
2024/10/28 | Building/Structural | Masonry | Passed | Kody Boswell | Reviewed reinforcing steel for the 2nd lift of north bathroom walls, upper concourse. |
2024/10/24 | Building/Structural | Masonry | Passed | Kody Boswell | Reviewed reinforcing steel for a south bathroom wall on the lower concourse, 1st lift |
2024/10/24 | Building/Structural | Framing | NOT READY | Kody Boswell | Reviewed soffit LG framing located over the main concourse walkway, approximately along grid W3S/WC-WE. LG framing was not completely installated at time of inspection. |
2024/10/24 | Building/Structural | Masonry | Passed | Kody Boswell | Reviewed reinforcing steel for concession stand walls on the upper concourse, 2nd lift. |
2024/10/23 | Building/Structural | Masonry | Passed | Kody Boswell | Reviewed reinforcing steel for concession stand walls on the upper concourse, 2nd lift. |
2024/10/23 | Mechanical | Duct Rough-in | Failed | Paul Nitz | 1) pressure and smoke test will be required 2) manufacture installation instructions required for the duct connections |
2024/10/22 | Mechanical | Duct Rough-in | Passed | Rocky Wilde | |
2024/10/22 | Building/Structural | Masonry | Passed | Kody Boswell | Reviewed reinforcing steel for several grab-n-go concession walls on the upper concourse, 1st lift. |
2024/10/22 | Plumbing | Water Piping & Test | Passed | Rocky Wilde | |
2024/10/21 | Building/Structural | Masonry | Passed | Kody Boswell | Reviewed reinforcing steel for the following walls: (1) Founders level, elevator 2 top out course (2) Founders level, elevator 3 top out course (3) Ground floor, south electrical room walls top out course |
2024/10/17 | Building/Structural | Masonry | Passed | Kody Boswell | Reviewed reinforcing steel for masonry walls for the concession stand on the upper concourse, 1st lift |
2024/10/16 | Building/Structural | Masonry | Passed | Kody Boswell | Reviewed reinforcing steel for upper concourse concession stand walls, second and first lifts |
2024/10/15 | Building/Structural | Masonry | Conditional | Paul Nitz | Masonry rebar inspection upper level elevator 1) not accessible |
2024/10/15 | Building/Structural | Masonry | Passed | Paul Nitz | MCJV is requesting an inspection for elevator 2 on founders level. thanks |
2024/10/14 | Building/Structural | Masonry | Passed | Kody Boswell | Masonry rebar inspection sequence 2 concession (10/12) |
2024/10/14 | Building/Structural | Masonry | Passed | Kody Boswell | Reviewed reinforcing steel for the 3rd lift of elevator 4 |
2024/10/11 | Building/Structural | Masonry | Passed | Kody Boswell | Reviewed the 2nd lift of concession stand walls on the upper concourse |
2024/10/11 | Building/Structural | Masonry | Passed | Kody Boswell | Reviewed reinforcing steel for the 2nd lift of CMU walls for the concession stand on the upper concourse. |
2024/10/11 | Plumbing | Storm Piping & Test | Passed | Paul Nitz | |
2024/10/10 | Plumbing | Stack Piping & Test | NOT READY | Paul Nitz | pipes were covered by plastic, inspection could not be completed |
2024/10/10 | Building/Structural | Masonry | Passed | Kody Boswell | Reviewed reinforcing steel for the 2nd lift of a masonry wall located near elevator 4 on the lower concourse. |
2024/10/10 | Building/Structural | Masonry | Passed | Kody Boswell | Reviewed reinforcing steel for the 2nd lift of the concession stand (upper concourse) and top out lift of elevator 4 (lower concourse). |
2024/10/09 | Building/Structural | Masonry | Passed | Kody Boswell | Reviewed reinforcing steel the 2nd lift of masonry walls on the upper concourse. |
2024/10/09 | Building/Structural | Wall/Ceiling | Passed | Kody Boswell | Reviewed reinforcing steel for a curb on the upper concourse, north concession stand. |
2024/10/07 | Building/Structural | Masonry | Conditional | Kody Boswell | Reviewed reinforcing steel for the 1st and 2nd lifts of concession stand walls on the upper concourse. Result is conditional pending missing vertical bars are added at door jambs and vertical bars at sills are cut down in order to get sufficient top clear cover during grouting. |
2024/10/02 | Building/Structural | Masonry | Passed | Kody Boswell | Reviewed reinforcing steel for the 5th lift of elevator walls for elevators 3 and 4. |
2024/10/01 | Building/Structural | Masonry | Passed | Kody Boswell | Reviewed reinforcing steel via photos for a small section of masonry curb on the upper concourse. Photos are filed in the job folder under photos, dated 2024-10-01. |
2024/09/30 | Building/Structural | Masonry | Postponed | Kody Boswell | Contractor contacted FSU BCA prior to site arrival to cancel/postpone inspection to a later date |
2024/09/25 | Building/Structural | Masonry | Conditional | Paul Nitz | Inspection for elevators 3 and 4 clean outs for masonry grout. Was looked at 9/23 |
2024/09/25 | Building/Structural | Masonry | Passed | Kody Boswell | Reviewed reinforcing steel for the 2nd lift of masonry walls for elevator 2. |
2024/09/23 | Building/Structural | Masonry | Passed | Paul Nitz | Inspection for masonry reinforcement upper concourse |
2024/09/19 | Building/Structural | Masonry | Postponed | Kody Boswell | Contractor contacted FSU BCA prior to site arrival to cancel/postpone masonry inspection. |
2024/09/19 | Building/Structural | Masonry | Failed | Kody Boswell | Reviewed reinforcing steel for the 3rd lift of masonry for elevators 3 and 4 on the lower concourse. Masonry lifts were 10 feet in height with no cleanouts were provided. Contractor to provide cleanouts for high lift grouting. |
2024/09/18 | Building/Structural | Masonry | Passed | Kody Boswell | Reviewed reinforcing steel for several masonry walls for the north restrooms (2nd lift) and north elevator (1st lift) |
2024/09/17 | Building/Structural | Structural | Conditional | Kody Boswell | Reviewed reinforcing steel for several curbs on the upper concourse in sequence 3. Some curbs needed to have the top two continuous bars raised. Some spots the bars were over 4" from top of concrete when the total curb height is 8"-10". Threshold inspector to verify proper placement prior to concrete placement. |
2024/09/12 | Building/Structural | Masonry | Passed | Kody Boswell | Reviewed reinforcing steel for the top out course of several north bathroom walls on the lower concourse |
2024/09/12 | Building/Structural | Structural | Passed | Kody Boswell | FSU BCA was contacted by the contractor to cancel and postpone reinforcing steel inspection for curbs on the upper concourse. |
2024/09/11 | Building/Structural | Masonry | Passed | Kody Boswell | Reviewed reinforcing steel for the top out lift of exterior walls for the north side bathrooms |
2024/09/11 | Building/Structural | Structural | Passed | Kody Boswell | Reviewed reinforcing steel for several curbs on the upper concourse towards the north ramp |
2024/09/10 | Building/Structural | Masonry | Postponed | Kody Boswell | Masonry inspection was postponed to 9/11/2024 by Contractor to get more work done prior to inspection and grout. |
2024/09/10 | Building/Structural | Final Building | Conditional | Kody Boswell | Final inspection of the temporary bleachers installed by Inproduction for the additional 240 seats that were installed after Game 1 on 9/2/2024. Conditional upon receipt of completed punch list documentation or on site walk through. FSU BCA received the completed punch list with documentation on 9/11/2024 from Matt Noone with Nations Group annd received the threshold report for the stands structure on 9/11/2024 from Eric Kelly with Clark reder Engineering. |
2024/09/09 | Building/Structural | Masonry | Passed | Paul Nitz | |
2024/09/09 | Building/Structural | Structural | Passed | Kody Boswell | Reviewed reinforcing steel for several curbs on the upper concourse |
2024/09/06 | Building/Structural | Masonry | Passed | Kody Boswell | Reviewed reinforcing steel for the north bathroom, 2nd lift |
2024/09/06 | Building/Structural | Structural | Postponed | Kody Boswell | Contractor contacted FSU BCA prior to site arrival to cancel/postpone inspection |
2024/09/05 | Building/Structural | Masonry | Passed | Kody Boswell | Reviewed reinforcing steel for several walls on the main concourse, 1st lift and 2nd lift |
2024/09/04 | Building/Structural | Slab | Passed | Kody Boswell | Reviewed reinforcing steel for upper concourse curbs, main concourse diamonds, and main electrical room pads. |
2024/09/03 | Building/Structural | Slab | Postponed | Kody Boswell | South electrical room pads. Contractor contacted FSU BCA prior to site arrival to postpone the inspection to a later date. |
2024/08/30 | Fire Safety | Final Fire Safety | Passed | Mary Creason | Inspection set up with Sam Sevor to have Mary Creason to review the egress lighting and exit sign placements. A prior walk-through was completed at 6:00 a.m. on Tuesday, August 27 that confirmed footcandles for the public concourse spaces. Conducted a final for the Temporary CCO and per Sam SeverFSU Fire Manager, Todd Peirce, SFM and Jason Grisel, TFD, all conditions were adequate. FIRE has approved the Temporary CCO. |
2024/08/30 | Building/Structural | Final Building | Passed | Kody Boswell | FSU BCA walked with Matt Noone from Nations Group to verify that outstanding punch list items for the temporary bleachers structure from a previous walk through were addressed. FSU BCA is content with the addressing of these items and can move forward with a temporary Certificate of Occupancy for the upcoming season. |
2024/08/27 | Building/Structural | Masonry | Passed | Paul Nitz | Masonry rebar inspection for area b. |
2024/08/26 | Building/Structural | Slab | Conditional | Paul Nitz | Rebar inspection for slab on grade at gate b. \\ 1) not ready, B&I are on site util completion |
2024/08/19 | Building/Structural | Structural | Passed | Kody Boswell | Contractor contacted FSU BCA prior to site arrival to cancel/postpone reinforcing steel inspection for curbs on the upper concourse |
2024/08/16 | Building/Structural | Structural | Postponed | Kody Boswell | FSU BCA was on site doing a slab inspection when the Contractor contacted FSU BCA to cancel/postpone inspection for upper oncourse curbs. |
2024/08/16 | Building/Structural | Slab | Passed | Kody Boswell | Reviewed reinforcing steel for slab on grade at gate d. |
2024/08/15 | Building/Structural | Structural | Passed | Kody Boswell | FSU BCA defferred this inspection to the threshold inspector due to scheduling conflicts. Threshold inspector verbally informed FSU BCA reinforcing steel for curbs on the upper concourse was in substantial compliance with the contract documents. |
2024/08/15 | Building/Structural | Other | Cancelled | Kody Boswell | Initial inspection for fireproofing of steel. FSU BCA discussed with the contractor that the third party testing agency will handle the fireproofing inspections. |
2024/08/15 | Building/Structural | Masonry | Conditional | Kody Boswell | Reviewed reinforcing steel for masonry walls for the south restrooms and concession stands, 2nd lift, located in the approximate area between grids M-WF/8S-16S. During inspection it was observed that the precast lintel over the wide doorway (between grids 10S-12S) had moderate damage, exposing reinforcing. Result is conditional pending replacement of precast lintel or an approved repair procedure from the EOR. Contractor may grout over doorway if precast lintel is properly shored. |
2024/08/14 | Building/Structural | Masonry | Postponed | Kody Boswell | Contractor contacted FSU BCA prior to site arrival to cancel/postpone the masonry inspection for south restrooms/concession stands |
2024/08/13 | Building/Structural | Slab | Passed | Kody Boswell | Reviewed reinforcing steel for curbs on upper concourse, sequence 1 |
2024/08/13 | Building/Structural | Slab | Passed | Kody Boswell | Reviewed reinforcing steel for the elevated slab on the founders level, sequence 3 |
2024/08/12 | Building/Structural | Masonry | Passed | Kody Boswell | Reviewed reinforcing steel for the 1st lift of the main concourse south restroom. Part of the area reviewed consisted of the failed inspection dated 8/9/2024. |
2024/08/12 | Building/Structural | Masonry | Passed | Kody Boswell | Reviewed reinforcing steel for the 3rd lift of the masonry wall running along University Center C |
2024/08/12 | Building/Structural | Structural | Passed | Kody Boswell | Reviewed reinforcing steel for several curbs on the upper concourse in sequence 1 |
2024/08/12 | Building/Structural | Slab | Passed | Kody Boswell | Reviewed reinforcing steel for the SOG for the north restroom on the main concourse. |
2024/08/09 | Building/Structural | Structural | Postponed | Kody Boswell | Contractor contacted FSU prior to site arrival to cancel and postpone inspection for reinforcing steel for curbs on the upper concourse |
2024/08/09 | Building/Structural | Masonry | Failed | Kody Boswell | Reviewed reinforcing steel for the 1st lift of restroom walls on the main concourse. There were several spots where reinforcing was not installed per contract drawings. |
2024/08/08 | Building/Structural | Masonry | Passed | Kody Boswell | Rebar inspection masonry on upper concourse sequence 3 and main concourse sequence 1. |
2024/08/08 | Building/Structural | Slab | Passed | Kody Boswell | Inspecting rebar for curbs on upper concourse sequence 1. |
2024/08/07 | Building/Structural | Masonry | Passed | Kody Boswell | Reviewed reinforcing steel for masonry walls on upper concourse sequence 3 and on main concourse south restrooms/concession stands. |
2024/08/07 | Building/Structural | Slab | Passed | Kody Boswell | Reviewed reinforcing steel for the north portion of the main concourse slab on grade |
2024/08/07 | Building/Structural | Structural | Passed | Kody Boswell | Reviewed reinforcing steel for several curbs on upper concourse sequence 1. |
2024/08/07 | Building/Structural | Structural | Passed | Kody Boswell | Reviewed reinforcing steel for several curbs on upper concourse sequence 1. |
2024/08/06 | Building/Structural | Masonry | Passed | Kody Boswell | Reviewed reinforcing steel for masonry walls on upper concourse in sequence 3. Inspected curbs on upper concourse at sequence 1. |
2024/08/02 | Building/Structural | Masonry | Passed | Kody Boswell | Reviewed reinforcing steel for masonry walls on the upper concourse |
2024/08/02 | Electrical | Ground | Passed | James Melvin | Building ground at Gate "C " |
2024/08/02 | Building/Structural | Slab | Passed | Kody Boswell | Reviewed reinforcing steel for the SOG at gate C area labeled as pour area 6. |
2024/08/01 | Building/Structural | Slab | Passed | Kody Boswell | Reviewed reinforcing steel for curbs on the upper concourse |
2024/08/01 | Building/Structural | Masonry | Passed | Kody Boswell | Reviewed reinforcing steel for masonry walls on upper concourse (sequence 3) 2nd lift |
2024/07/31 | Plumbing | Underground | Passed | Paul Nitz | Inspections for 10” water main. Pushed from 7/30 due to weather delay on site. |
2024/07/31 | Building/Structural | Masonry | Passed | Kody Boswell | Reviewed reinforcing steel for the 3rd lift of CMU walls on the upper concourse. |
2024/07/31 | Building/Structural | Slab | Passed | Kody Boswell | Contractor verbally discussed with FSU while on site that there was no curb reinforcing inspection required. FSU was on site for a masonry inspection at the same time. |
2024/07/30 | Building/Structural | Masonry | Passed | Kody Boswell | Reviewed reinforcing steel for the 2nd lift. upper concourse sequence 2. |
2024/07/30 | Building/Structural | Slab | Postponed | Kody Boswell | Contracted contacted FSU prior to site arrival to postpone the inspection to a later date. |
2024/07/30 | Plumbing | Underground | NOT READY | Paul Nitz | 10” water main at Gate D |
2024/07/29 | Fire Safety | Fire Water Underground | Passed | Mary Creason | Inspecting thrust block for the fire riser and Flush system Flush passed today. Thrust block observed by Sam Sever 7/23/2024 and passed |
2024/07/29 | Building/Structural | Slab | Passed | Kody Boswell | Reviewed reinforcing steel for several curbs on upper concourse in sequence 1 |
2024/07/29 | Building/Structural | Masonry | Passed | Kody Boswell | Reviewed reinforcing steel for the 2nd lift of cmu walls on the upper course, sequence 3. |
2024/07/26 | Building/Structural | Masonry | Passed | Kody Boswell | |
2024/07/26 | Building/Structural | Slab | Passed | Kody Boswell | Reviewed reinforcing steel for curbs on the upper concourse. |
2024/07/26 | Building/Structural | Slab | Conditional | Kody Boswell | Reviewed reinforcing steel for SOG South Restrooms/Concession stands. The following items are to be address by the contractor and verifed by threshold inspector prior to concrete placement: 1) Missing vertical dowels for the elevator shaft. 2) Missing reinforcing around slab turndowns for 2 isolation joints. 3) Several missing re-entrant corner bars. |
2024/07/25 | Plumbing | Underground | Passed | Paul Nitz | Storm line inspection |
2024/07/25 | Plumbing | Underground | Passed | Paul Nitz | Grease inspection on north side. Looked at 7/24 at 10am |
2024/07/25 | Building/Structural | Masonry | Passed | Kody Boswell | Reviewed reinforcing steel for the first lift of 12" CMU walls located at the north restrooms |
2024/07/24 | Fire Safety | Fire Water Underground | Passed | Sam Sevor | Inspection for tying the fire riser into the existing underground fire line. Inspected underground fire line for: corrosion coating on bolts hydro to working pressure with fire pump. 150psi Will re-turn for seprate inspection on Monday 7/29 at 9:00am for flush. |
2024/07/23 | Plumbing | Underground | Passed | Paul Nitz | storm and sanitary |
2024/07/22 | Building/Structural | Masonry | Passed | Paul Nitz | Upper concourse reinforcing for masonry on the third floor first lift to the first colm and reinforcing for north bathroom group on lower concourse |
2024/07/22 | Building/Structural | Masonry | Passed | Kody Boswell | Upper concourse reinforcing for masonry and reinforcing for north bathroom group on lower concourse |
2024/07/22 | Building/Structural | Slab | Postponed | Kody Boswell | Contractor contacted FSU prior to site arrival to postpone slab on grade inspection to a later date |
2024/07/19 | Plumbing | Underground | NOT READY | Paul Nitz | |
2024/07/19 | Building/Structural | Masonry | Passed | Kody Boswell | upper and lower concourse. |
2024/07/19 | Plumbing | Underground | Passed | Paul Nitz | |
2024/07/18 | Building/Structural | Masonry | Postponed | Kody Boswell | Contractor contacted FSU prior to site arrival to postpone masonry inspection to a later date. |
2024/07/18 | Building/Structural | Slab | Postponed | Kody Boswell | Contractor contacted FSU prior to site arrival to postpone slab on grade inspection to a later date. |
2024/07/18 | Building/Structural | Masonry | Passed | Kody Boswell | Reviewed reinforcing steel for a portion of the 1st level north bathroom walls, 1st lift |
2024/07/17 | Building/Structural | Masonry | Passed | Kody Boswell | Upper concourse rebar for masonry |
2024/07/17 | Building/Structural | Slab | Conditional | Kody Boswell | Reviewed reinforcing steel for the slab on grade on ground level in the area between grids WD-WE/W5S-W8S. Result is conditional because Contractor had not finished tying reinforcing, but work was almost complete. Threshold inspector to verify reinforcing is fully installed prior to concrete placement. |
2024/07/16 | Building/Structural | Masonry | Passed | Paul Nitz | Rebar for walls 1,2,and three tiered section on the top floor, was inspectedn 7-16-2024 by Paul Nitz, |
2024/07/15 | Building/Structural | Masonry | Passed | Kody Boswell | Masonry rebar on upper concourse area b at restrooms and pantry. |
2024/07/15 | Plumbing | Underground | Passed | Paul Nitz | sanitary |
2024/07/15 | Plumbing | Underground | Passed | Paul Nitz | greese |
2024/07/12 | Building/Structural | Masonry | Cancelled | Kody Boswell | Contractor contacted FSU BCA prior to inspection to cancel. |
2024/07/12 | Building/Structural | Masonry | Passed | Kody Boswell | Reviewed reinforcing steel for the following masonry walls on level 3: 1) 2nd lift in the area between grids WD-WE/W10S-W11S 2) 2nd lift along grid M/W8S-W10S 3) 1st lift along grid M/W6S-W8S |
2024/07/11 | Building/Structural | Slab | Conditional | Kody Boswell | Reviewed reinforcing steel for the level 3 elevated slab in the area between grids WD-M/W8N-W11N. There were several masonry dowels and curb dowels not yet installed. FSU BCA to verify with threshold inspetor that dowels are installed prior to concrete placement. |
2024/07/11 | Building/Structural | Masonry | Passed | Kody Boswell | Reviewed reinforcing steel for the first lift of masonry walls along grid M/W8S-W9S |
2024/07/10 | Building/Structural | Masonry | Passed | Kody Boswell | Reviewed reinforcing steel for the first lift for the following walls on level 3: 1) In the area between grids WD-WE/W10S-W11S 2) Along grid M between grids W8S-W10S |
2024/07/10 | Plumbing | Underground | Passed | Paul Nitz | |
2024/07/10 | Building/Structural | Structural | Passed | Kody Boswell | Reviewed precast welded connections for vomitory walls on level 3 between grids W2N-W3N, W2S-W3S and W4S-W5S. |
2024/07/10 | Building/Structural | Masonry | Cancelled | Kody Boswell | Contractor and FSU discussed only goinng to the 2pm masonry inspection, as 2 masonry inspections in the same day was not needed. |
2024/07/10 | Building/Structural | Slab | Postponed | Kody Boswell | Contractor contacted FSU BCA prior to arrival on site to cancel/postpone a level 3 elevated slab inspection to a later date. |
2024/07/09 | Building/Structural | Slab | Conditional | Kody Boswell | Reviewed reinforcing steel for the level 3 elevated slab in the area between grids WD-M/W4N-W7.9N. Several dowels for curbs supporting precast walls and dowels for load-bearing masonry walls were not in place. FSU BCA remained on site until enough work was complete to comfortably defer to the threshold inspector. Threshold inspector to verify remaining dowels in place prior to concrete placement. FSU BCA to follow up. |
2024/07/05 | Plumbing | Underground | Passed | James Melvin | I place of inspection on 7/5. |
2024/07/04 | Plumbing | Underground | Passed | Paul Nitz | Storm trunk line |
2024/07/04 | Plumbing | Underground | Passed | James Melvin | In place of inspection on 7/4. |
2024/07/03 | Building/Structural | Masonry | Passed | Kody Boswell | Reviewed reinforcing steel for the 1st lift of 12" cmu walls in the area between grids WF-M/W2S-W3S. Main concourse level. |
2024/07/03 | Building/Structural | Structural | Passed | Kody Boswell | Reviewed reinforcing steel for curbs on level 3 in the area between grids WD-WE/W10S-W11S and between grids WF-M/W8S-W10S. Contractor was still installing formwork at time of inspection. FSU to defer to threshold inspector to verify formwork is in place prior to concrete placement. |
2024/07/02 | Building/Structural | Structural | Cancelled | Kody Boswell | precast inspection Contractor contacted FSU BCA to cancel and postpone inspection prior to arrival on site |
2024/07/02 | Plumbing | Underground | Passed | Paul Nitz | |
2024/07/02 | Plumbing | Underground | Passed | Paul Nitz | Small section of grease replaced once storm piping was set below it. |
2024/07/02 | Building/Structural | Masonry | Passed | Kody Boswell | Masonry inspection for the remaining block in area b. 1st lift of reinforcing steel was reviewed. |
2024/07/02 | Building/Structural | Slab | NOT READY | Kody Boswell | FSU arrived on site to review reinforcing steel for curbs on level 3 in the area between grids WD-WE/W10S-W11S. Contractor was not done tying reinforcing steel in place |
2024/06/28 | Building/Structural | Masonry | Passed | Kody Boswell | Reviewed reinforcing steel for the 1st lift of masonry located in the approximate area between grids WE-WF/3-4. |
2024/06/28 | Building/Structural | Slab | Passed | Kody Boswell | Reviewed reinforcing steel for the following structural elements: 1) 3rd level (Upper concourse) curbs for precast in the area between grids WD-WE/W6S-W7S and grids WD-WE/W4S-W5S 2) 2nd level (Founders level) elevated slab on deck in the area between grids WD-WF/ W3.9N-W3.9S |
2024/06/27 | Plumbing | Storm Piping & Test | Passed | Paul Nitz | Storm and sanitary |
2024/06/27 | Building/Structural | Masonry | Passed | Kody Boswell | Reviewed reinforcing steel for the 1st lift of masonry located approximately in the area between grids WF-M/W3S-W4S. |
2024/06/26 | Building/Structural | Masonry | Passed | Kody Boswell | Reviewed reinforcing steel for bond beams below grade located at the intersection of gridines WE/W8S and WE/W9S |
2024/06/26 | Plumbing | Underground | Passed | Paul Nitz | |
2024/06/25 | Plumbing | Storm Piping & Test | Passed | Paul Nitz | |
2024/06/25 | Plumbing | Underground | Passed | Paul Nitz | |
2024/06/25 | Plumbing | Storm Piping & Test | Passed | Paul Nitz | |
2024/06/24 | Building/Structural | Masonry | Failed | Kody Boswell | Reviewed reinforcing steel for the 1st lift of bathroom and concession stands masonry walls in area B. First lift goes from top of foundation elevation to top of slab elevation. There were two areas where bond beam reinforcing was not installed per RFI response. These locations are at the intersection of grids WE/W8S and WE/W9S. Other areas had reinforcing steel in substantial completion with the contract documents. |
2024/06/24 | Plumbing | Underground | Passed | Paul Nitz | |
2024/06/21 | Building/Structural | Masonry | Passed | Kody Boswell | Foundation block area b restrooms. |
2024/06/20 | Building/Structural | Masonry | Passed | Kody Boswell | Foundation block for area b restrooms. |
2024/06/20 | Plumbing | Underground | Passed | Dwayne Mahony | |
2024/06/20 | Building/Structural | Slab | Passed | Kody Boswell | Rebar inspection for slab on metal deck at upper concourse sequence 2 |
2024/06/19 | Building/Structural | Masonry | Passed | James Melvin | Foundation block inspection area b restroom. |
2024/06/18 | Building/Structural | Masonry | Passed | Kody Boswell | Masonry rebar before cell grout |
2024/06/07 | Building/Structural | Slab | Failed | Kody Boswell | Reviewed reinforcing steel for the elevated slab on deck on level 3 in the area between girds M-WD/W8S-W11S. Contractor had not finished tying reinforcing in place. There were deck penetrations that need additional reinforcing and one curb did not have reinforcing tied in place. Contractor to reschedule once work is complete. |
2024/06/06 | Building/Structural | Slab | Postponed | Kody Boswell | Contractor contacted FSU BCA prior to arriving on site to postpone the inspection for a later date. |
2024/06/04 | Plumbing | Underground | Failed | Paul Nitz | Inspecting storm line taps and sanitary leveling 1) sloope not met for waist drain fbc p704.1 |
2024/06/03 | Plumbing | Underground | Failed | Paul Nitz | slope not met for waist drain fbc p704.1 |
2024/06/03 | Building/Structural | Slab | Passed | Kody Boswell | Reviewed reinforcing steel for the founders level elevated slab in the area between grids WD-M/W4S-W11S. |
2024/06/03 | Plumbing | Underground | NOT READY | Paul Nitz | this was for the storm drain connections, all were ok but the 16'' needs to be looked at |
2024/05/31 | Plumbing | Underground | Failed | Paul Nitz | Sanitary and grease as per our conversation in regards to the drain line that was laid above grade the entire area will have to be reinspected after its corrected |
2024/05/31 | Building/Structural | Slab | NOT READY | Kody Boswell | Contractor was not ready for inspection and will reschedule for a later date. |
2024/05/28 | Building/Structural | Structural | Cancelled | Kody Boswell | Phase 1 structural steel inspection FSU communicated to Contractor that structural steel inspection to be done by threshold inspector. |
2024/05/28 | Fire Safety | Fire Water Underground | Passed | Sam Sevor | Inspected the megalug restraints. The open ditch had excessive water and I could not complete the inspection. I will return on 5/29 to reinspect remaining portion of the pipe, bolt coatings and thrust block installation. No leaks were present on the visible pipe section at the time of inspection. |
2024/05/21 | Plumbing | Underground | Passed | Neely Lewis | |
2024/05/21 | Building/Structural | Footing | Cancelled | Kody Boswell | This was a request for observation of grout placement under steel column baseplates. Threshold inspector was on site. |
2024/05/20 | Building/Structural | Footing | Passed | Kody Boswell | Reviewed reinforcing steel for the following: 1) Pedestal at grids W11N/WF 2) Wall footing along grid M/W5S-W6S |
2024/05/20 | Plumbing | Underground | Failed | Paul Nitz | 5/21/2024:Slope was not accordig to FBC requirements. |
2024/05/17 | Building/Structural | Footing | Passed | Kody Boswell | Reviewed reinforcing steel for the following footings: 1) Column footing at grids WC.1/W11N 2) Column footing at grids WC.1/W9N 3) Column footing at grids WE/W10N 4) Column footing at grids WF/W11N 5) Column footing at grids WF/W10N 6) Wall footing in the area between grids WA-WB/W10N-W11N |
2024/05/17 | Plumbing | Underground | NOT READY | Paul Nitz | not ready for inspection |
2024/05/09 | Plumbing | Underground | Passed | Neely Lewis | storm |
2024/05/09 | Building/Structural | Footing | Passed | Kody Boswell | Reviewed reinforcing steel for the following footings: 1) Along grid W9N/WA-WB 2) Along grid W10N/WA-WB 3) Along grid W11N/WA-WB 4) Along grid WA/W9N-W11N 5) At grids WE/W11N 6) In the area between grids WC-WD/W8N-W9N 7) In the area between grids WC-WD/W8S-W9S |
2024/05/08 | Building/Structural | Footing | Failed | Kody Boswell | Reviewed reinforcing steel for the following foundations: 1) Contractor to request re-inspection prior to concrete placement |
2024/05/07 | Plumbing | Underground | Failed | Paul Nitz | 1) slope not met on drain fbcp 704.1 2) cleanouts required min every 100' fbcp 708.1 |
2024/05/06 | Fire Safety | Fire Water Underground | Passed | Sam Sevor | Inspection on the UG fire line had passed earlier, but this inspection is to review the thrustblock installation. All previous items corrected and passed |
2024/05/06 | Electrical | Ground | Passed | Dwayne Mahony | 4/0 Ufer ground |
2024/05/02 | Fire Safety | Fire Water Underground | Passed | Sam Sevor | Reinspection to insure coating on magalugs and full review of the bolts and tightening. Reinspection of mega lugs and corrosion coating passed. Note: 1) Will need to verify clearance of sanitary pipe once the sanitary lline has been installed over the fire line. 2) We will need to conduct a visual inspection of the thrust blocks once installed and conduct funtional hydro test via the fire pump. |
2024/05/02 | Electrical | Ground | Postponed | Dwayne Mahony | |
2024/05/02 | Plumbing | Underground | Passed | Dwayne Mahony | Approved 16" trunk line as marked on paper plans in trailer. |
2024/05/01 | Fire Safety | Fire Water Underground | Failed | Sam Sevor | Inspection of UG 10" fire main pipe per RFI-0151 new pipe & valve (North section only). Inspection did not pass, the following items need correction: 1. Mega lugs not tightened. 2. Mega lugs not coated with anti-corrosion material. 3. Provide Contractors UG certification paperwork. 4. Ensure all bolts for mega lugs are visible for reinspection No leaks were identified at time of visual inspection. Fire water system has been re-pressurized under city pressure only. A follow-up inspection will be required for a hydro test at fire pump pressure (160PSI) after placement before work is covered up. Note: Contractor to provide mega lug manufacturers instruction sheet. |
2024/05/01 | Building/Structural | Footing | Passed | Kody Boswell | Reviewed reinforcing steel for the following wall footings: 1) Along grid M/W3S-W5S 2) Along grid M/W3N-W10N |
2024/04/30 | Plumbing | Underground | Passed | Neely Lewis | |
2024/04/29 | Building/Structural | Footing | Passed | Kody Boswell | Reviewed reinforcing steel for the following wall footings: 1) In the area between grids WE-M/W8.5N-W9.5N 2) In the area between grids WF-M/W5.5S-W8.5S |
2024/04/29 | Plumbing | Underground | Failed | Neely Lewis | 4/29: Slops of drains not per FBC-P Table 704.1. |
2024/04/26 | Building/Structural | Footing | Passed | Dwayne Mahony | approved elevator walls foundation to slab level. |
2024/04/25 | Plumbing | Underground | Passed | Neely Lewis | |
2024/04/25 | Building/Structural | Footing | Passed | Dwayne Mahony | |
2024/04/24 | Building/Structural | Footing | Conditional | Kody Boswell | Reviewed reinforcing steel for the following structural elements: 1) Wall footing east of grid WA between grids 5N-7N 2) Column & wall footings along grid W5N/WA-WB 3) Column & wall footings along grid W4N/WA-WB 4) Elevator walls in the area between grids WD-WE/W7N-W8N 5) Column & wall footings along grid WF/W5S-W6S Items (1) thru (4) have a "passed" result. Item (5): Column footing at grids WF/W5S has a 1'-0" tall pedestal on top of it. Reinforcing is called out on elevation view 1 on sheet S4-4. It is unclear if the pedestal reinforcing needs to be hooked at the top or not. Also, anchor bolt embedment at this pedestal is 1'-0" which would be at the construction joint between top of footing and top of pedestal. These two items should be clarified with the EOR. Inspection result is conditional pending EOR response. |
2024/04/24 | Building/Structural | Footing | Failed | Kody Boswell | Reviewed reinforcing steel for the elvator mat foundation located in the area between grids WF-M/W5S-W6S. Top and bottom reinforcing layers do not have the proper out-to-out dimension. The foundation is 33" thick, so the out-to-out dimension should be 28". I measured between 25"-26" consistently in several areas of the foundation. This issue is to be corrected and called for a reinspection. |
2024/04/23 | Building/Structural | Footing | Conditional | Kody Boswell | Reviewed reinforcing steel for the following structural elements: 1) Elevator walls located between grids WD-WE/W7N-W8N 2) Elevator mat foundation located between grids WE-WF/W4N-W5N 3) Field wall footing located east of grid WA between grids W5N-W5S 4) Elevator walls located between grids W4S-W5S Item (1): Elevator walls were missing 2#5 continuous at the top and bottom of wall per detail 2/S5-5-1. Result is conditional until missing reinforcing is installed. |
2024/04/22 | Building/Structural | Footing | Passed | Kody Boswell | Reviewed reinforcing steel for the following footings: 1) Spread footings in the area between grids WB-WC/W2N-W3N 2) Spread footing and elevator pad located near grids WD-W8N 3) Elevator pad in the area between grids WE-WF/W4S-W5S |
2024/04/19 | Plumbing | Underground | Passed | Dwayne Mahony | Cleanouts added as required. |
2024/04/19 | Building/Structural | Footing | Passed | Kody Boswell | Reviewed reinforcing steel for the following footings: 1) At grids WC.1/W8N 2) At grids WC/W7N 3) At grids WC/W6N |
2024/04/18 | Plumbing | Underground | Failed | Neely Lewis | Grease waste line. Insufficient cleanouts. FBC708.1.1. |
2024/04/18 | Building/Structural | Footing | Passed | Kody Boswell | Reviewed reinforcing steel for the following footings: 1) Along grid W10N/WA-WB 2) At grids WC/W5N 3) At grids WC/W4N 4) Along grid WD/W2N-W3N 5) In the area between grids WB-WC/Ww2N-W3N |
2024/04/17 | Building/Structural | Footing | Passed | Kody Boswell | Reviewed reinforcing steel for the following footings: 1) At grids WD/W11N 2) Along grid WF/W8N-W9N 3) Along grid WF/W5N-W6N 4) At grids WD/W5N 5) At grids WD/W4N 6) Along grid WE/W6S-W9S 7) In the area between grids WB-WC/W2S-W3S |
2024/04/16 | Plumbing | Underground | Passed | Neely Lewis | GW, DW piping southwest side |
2024/04/16 | Building/Structural | Footing | Passed | Dwayne Mahony | Approved single column footing at column line WF @ W7, and column footings and CMU wall footings column line W5.5 to W3 on line WE. CMU wall footings do not have vertical dowels. An email has been sent requesting clarifiaction on use of epoxy dowels: During today’s inspection at the west stands project I questioned the lack of dowels for CMU walls on column line WE. A RFI was provided that allowed epoxy installed dowels at the field wall and at “thickened slabs”. These walls are on continuous grade beam foundations and will not be in the area of the temporary stands. I do not think (subjective opinion) that epoxy dowels are equivalent to dowels that are cast-in-place since to achieve the same structural value the dowel holes, preparation, cleaning, and epoxy mixing all must be near perfect, not likely. With this I am requesting greater clarity from the engineer of record, Dylan Richard, on the extent of epoxy dowels for CMU walls, and concurrence from the owner’s representative, Mike Materna, that 100% epoxy dowels for the CMU walls are acceptable to the owner if that is to be the case. |
2024/04/15 | Building/Structural | Footing | Passed | Kody Boswell | Reviewed reinforcing steel for the following footings: 1) At grids WC.1/W10N 2) Along grid WD/W9N-W10N 3) In the area between grids WE-WF/W3N-W4N |
2024/04/12 | Building/Structural | Footing | Passed | Kody Boswell | Reviewed reinforcing steel for the following spread footings: 1) Along grid W1/WB-WC 2) Along grid WD/W6N-W7N |
2024/04/11 | Building/Structural | Footing | Postponed | Kody Boswell | Contractor contacted FSU to cancel and postpone inspection due to overnight rain |
2024/04/10 | Plumbing | Underground | Passed | Neely Lewis | Sewer waste, grease waste |
2024/04/10 | Building/Structural | Footing | Passed | Kody Boswell | Reviewed reinforcing steel for the following footings: 1) Several column footings and wall footings along grid WE/W6N-W9.5N 2) Several column footings and wall footings in the area between grids WB-WC/W2S-W3S |
2024/04/10 | Plumbing | Underground | Passed | Neely Lewis | sewer, and grease waste |
2024/04/09 | Building/Structural | Footing | Passed | Kody Boswell | Reviewed reinforcing steel for the following footings: 1) Along grid WD/W9S-W10S 2) In the area between grids WA-WB/W10S/W10.5S 3) At grids WE/W1 4) At grids WE/W2S 5) At grids WD/W1 6) Along grid WD/W2S-W3S 7) In the area between grids WE-WF/W3N-W6N |
2024/04/09 | Plumbing | Underground | Conditional | Neely Lewis | sewer waste inspection. Need to reslop;e about 20' of pipe. Slope is 0 deg. |
2024/04/08 | Building/Structural | Footing | Passed | Kody Boswell | Reviewed reinforcing steel for the following footings: 1) Along grid WF/W3S-W4S 2) At grids WF/W1 3) At grids WF/W2S 4) At grids WF/W2N 5) At grids WE/W2N |
2024/04/05 | Building/Structural | Footing | Passed | Kody Boswell | Reviewed reinforcing steel for the following spread footings: 1) Along grid W11S/WA-WB 2) At grids W11S/WC.1 3) At grids W11S/WD 4) In the area between grids W10.5S-W11S/WE-M 5) In the area between grids W8S-W10S/WE-M 6) At grids W7S/WF |
2024/04/05 | Plumbing | Underground | Passed | Neely Lewis | grease waste inspection |
2024/04/04 | Building/Structural | Footing | Failed | Kody Boswell | Reviewed reinforcing steel for the following spread footings: 1) Along grid W11S/WA-WB 2) At grids W11S/WC.1 Locations 1 & 2 above were not per structural drawings and RFIs. Contractor to correct reinforcing to match structural drawings or contact EOR to verify field conditions are acceptable. |
2024/04/04 | Building/Structural | Footing | Passed | Kody Boswell | Reviewed reinforcing steel for the following spread footings: 1) At grids W11S/WD 2) In the area between grids WA-WB/W8S-W9S |
2024/04/02 | Building/Structural | Footing | Passed | Kody Boswell | Reviewed reinforcing steel for the following spread footings for columns/walls: - Along grid W4S/WA-WB - Along grid W5S/WA-WB - Along grid WD/W6S-W7S - At grids W4S/WD - At grids W5S/WD - At grids W4S/WC - At grids W5S/WC - At grids W6S/WC - At grids W7S/WC - At grids W8S/WC.1 - At grids W9S/WC.1 - At grids W10S/WC.1 |
2024/04/02 | Plumbing | Underground | Passed | Neely Lewis | sewer line on North elevation |
2024/04/01 | Building/Structural | Footing | Passed | Kody Boswell | Reviewed reinforcing steel for spread footings for columns/walls along grids W7S/WA-WB, W8S/WA-WB and WA/W5S-W8S. |
2024/03/29 | Building/Structural | Footing | Passed | Kody Boswell | Reviewed reinforcing steel for several spread footings for walls/columns along grids W10S, W8S and between grids W5S-W8S. |
2024/03/27 | Plumbing | Underground | Conditional | Neely Lewis | underground grease piping 03/27/2024. Pressure test passed. Awaiting information on slope from EOR. |
2024/03/26 | Building/Structural | Footing | Passed | Kody Boswell | Reviewed reinforcing steel for several wall footings and column footings in the area between grids WA-WB/W8S-W9S. The field wall footing reinforcing (WF3) was reviewed approximately from grids W7S-W10S. |
2024/03/25 | Electrical | Panel/Feeder | Passed | Dwayne Mahony | Inspected and approved new feeders for west stadium lights, from the ground level electrical room to the roof - junction at old Musco contactors. |
Building/Structural | Re-Inspection | Postponed | Kody Boswell | Framing inspection for the south pantry, where studs must be changed to 6" studs. Contractor contacted FSU BCA prior to site arrival to cancel/postpone inspection to a later date | |
Building/Structural | Framing | Postponed | Kody Boswell | Interior framing area b main concourse founders level. | |
Plumbing | Underground | Passed | Rocky Wilde | -Upper con women’s restroom insulation inspection -Upper con copper & drain/vent in grab-n-go -Main con underground partial grease inspection (back fill before rain Wednesday) | |
Building/Structural | Framing | Cancelled | Kody Boswell | Framing for level four south end zone ceiling. | |
Building/Structural | Slab | Postponed | Kody Boswell | Contractor contacted FSU BCA prior to site arrival to cancel/postpone founders level slab inspection to a later date | |
Building/Structural | Wall/Ceiling | Cancelled | Kody Boswell | Wall insulation on the founders for completed suites. | |
Building/Structural | Slab | Postponed | Kody Boswell | Mcjv is requesting a reinforcement inspection for upper part of north founders. Thanks Contractor contacted FSU BCA prior to site arrival to cancel/postpone inspection to a later date. | |
Building/Structural | Framing | Cancelled | Kody Boswell | Framing around the field club columns. | |
Electrical | Underground | James Melvin | Reinspection of 15kva Duct Bank at Gate D (Partial inside of gate ) | ||
Building/Structural | Framing | Postponed | Kody Boswell | exterior framing in area a founders level. Inspection was postponed to a later date | |
Building/Structural | Structural | Postponed | Kody Boswell | Decking in seq 2 on upper concourse. This inspection was postponed to tomorrow morning. | |
Building/Structural | Framing | Postponed | Kody Boswell | Exterior framing for columns at the field club plaza. | |
Building/Structural | Framing | Postponed | Kody Boswell | Contractor contacted FSU BCA prior to site arrival to cancel/postpone inspection to a later date. | |
Building/Structural | Structural | Postponed | Kody Boswell | Stadia Steel Deck Extension Inspection @ SEZ lvl 6 West side. Inspection has been postponed due to incoming weather | |
Building/Structural | Wall/Ceiling | Postponed | Kody Boswell | Mcjv is requesting a reinforcement inspection for curb on founders level north side. Contractor contacted FSU BCA prior to site arrival to cancel/postpone inspection to a later date. | |
Plumbing | Water Piping & Test | Passed | Rocky Wilde | -Upper con women’s restroom insulation inspection -Upper con copper & drain/vent in grab-n-go -Main con underground partial grease inspection (back fill before rain Wednesday) | |
Plumbing | Underground | Neely Lewis | |||
Building/Structural | Wall/Ceiling | Postponed | Kody Boswell | MCJV is requesting a reinforcement inspection for field wall on north side. Contractor contacted FSU BCA prior to site arrival to postpone inspection until tomorrow due to severe weather | |
Electrical | Underground | Postponed | Rocky Wilde | Penetrations into manhole and underground duct bank | |
Plumbing | Stack Piping & Test | Passed | Rocky Wilde | -Upper con women’s restroom insulation inspection -Upper con copper & drain/vent in grab-n-go -Main con underground partial grease inspection (back fill before rain Wednesday) | |
Building/Structural | Framing | Cancelled | Kody Boswell | Framing for the Field Club kitchen. | |
Electrical | Underground | Passed | Rocky Wilde | Duct bank under ramp by Gate D . | |
Building/Structural | Structural | Postponed | Kody Boswell | East portion of south endzone steel for curtainwall. Contractor contacted FSU BCA prior to site arrival to cancel/postpone inspection to a later date. | |
Plumbing | Water Piping & Test | Passed | James Melvin | Inspecting overhead plumbing on upper concourse | |
Building/Structural | Framing | Postponed | Kody Boswell | Exterior ceiling framing for the fourth floor south end zone. Contractor contacted FSU BCA to postpone inspection to a later date. | |
Building/Structural | Framing | Cancelled | Kody Boswell | Exterior ceiling framing for the fourth floor south end zone. | |
Building/Structural | Framing | Postponed | Kody Boswell | Columns on the fourth floor, south endzone. Contractor contacted FSU BCA to postpone inspection to a later date. | |
Building/Structural | Framing | Postponed | Kody Boswell | Framing for founders North Suite bathrooms and suite 7&8. Contractor communicated with FSU BCA this inspection was being cancelled/postponed | |
Building/Structural | Framing | Postponed | Kody Boswell | Framing on upper concourse area B Grab and Go, and front knee wall on speed of concession. Contractor cancelled/postponed inspection to a later date | |
Building/Structural | Framing | Postponed | Kody Boswell | Framing on founders level area b phase 1. Contractor postponed inspection to a later date | |
Building/Structural | Framing | Postponed | Kody Boswell | Six floor loge box welding inspection Contractor postponed inspection to a later date due to weather causing work delay. This was discussed on site while FSU BCA was performing other inspections. | |
Electrical | Wall Rough-in | Passed | Al Smythe | electrical in wall rough inspection at the entry portal soffit at gate C | |
Plumbing | Stack Piping & Test | Passed | James Melvin | Inspecting overhead plumbing on upper concourse | |
Building/Structural | Framing | Cancelled | Kody Boswell | Columns on the fourth floor, south endzone. | |
Electrical | Ceiling Rough-in | Al Smythe | Main concourse back of house. | ||
Building/Structural | Framing | Postponed | Kody Boswell | Framing for the field club kitchen. Contractor contacted FSU BCA to postpone inspection to a later date. | |
Electrical | Wall Rough-in | Rocky Wilde | Electric and framing for founders lounge suites | ||
Building/Structural | Masonry | Cancelled | Kody Boswell | Inspecting masonry rebar on upper concourse. Inspection was cancelled due to Hurricane Debby | |
Building/Structural | Framing | Rocky Wilde | Electric and framing for founders lounge suites | ||
Electrical | Wall Rough-in | Postponed | James Melvin | partial inwall rough inspection on founder's level | |
Building/Structural | Slab | Postponed | Kody Boswell | Inspection for reinforcing steel for topping slabs on founders level, area B. Contractor contacted FSU BCA prior to site arrival to cancel/postpne inspection to a later date | |
Fire Safety | Final Fire Safety | Curtis Rogers | kitchen ansul system. | ||
Building/Structural | Framing | Postponed | Kody Boswell | Framing for the ceilings outside of the main kitchen. | |
Building/Structural | Framing | Cancelled | Kody Boswell | Framing for south endzone columns on level four, starting on the east. | |
Electrical | Wall Rough-in | Al Smythe | Loge boxes for the south side of founders. | ||
Building/Structural | Masonry | Cancelled | Kody Boswell | Sequence 2 masonry rebar inspection. Inspection was cancelled due to Hurricane Debby |
BCA Project #: 23-03418-A Doak Campbell - West Stands Renovation DEMOLITION
Inspection Date | Discipline | Type | Result | Inspector | Comments |
2024/03/15 | Fire Safety | Final Fire Safety | Conditional | Mary Creason | Construction Trailers Inspections 1. Electrical breaker missing on 1st offices panel. 2. Mechanical trailer - need 5LB ABC fire extinguisher. And not florida state approved sticker on trailer. |
BCA Project #: 23-03418- Doak Campbell - West Stands Enabling Package
Inspection Date | Discipline | Type | Result | Inspector | Comments |
2025/06/12 | Fire Safety | Fire Water Above Ground | Passed | Mary Creason | Hydro/ visual test for main concourse back-of-house areas sprinklers Visual of partial back of house sprinklers - see approved plans |
2025/03/10 | Plumbing | Underground | NOT READY | Paul Nitz | -Looking at underground sanitary line area L4. -Inspecting copper insulation upper concourse women’s restroom Area A |
2025/03/10 | Electrical | Underground | Failed | James Melvin | Conduit in the Duct bank at Gate D . Building out to sidewalk beside the bus top . 1) red die not installed per plans nor installation instructions, contractor is going to ask the electrical engineer if they will allow a alternative method in leu of the red die. Contractor is ok to cover the trench so that other trades can continue their work but is aware that he may have to uncover to address not following the plans. |
2025/03/07 | Electrical | Underground | Failed | James Melvin | Concrete inspection for the duct bank at Gate D by the ramp . 1) red die not installed per plans nor installation instructions, contractor is going to ask the electrical engineer if they will allow a alternative method in leu of the red die. Contractor is ok to cover the trench so that other trades can continue their work but is aware that he may have to uncover to address not following the plans. |
2025/02/21 | Plumbing | Stack Piping & Test | Passed | Paul Nitz | Testing Main Con Market Concession overhead roof drains. Tested and passed in 1/21/25, calling in for 1/22/25 |
2025/02/20 | Building/Structural | Slab | Failed | Paul Nitz | MCJV is requesting a SOG reinforcement inspection for south side slab. Thanks |
2025/02/20 | Building/Structural | Framing | Passed | Paul Nitz | Entry portal soffit by gate c. |
2025/02/10 | Electrical | Underground | Failed | James Melvin | Underground duct bank at Gate D sidewalk out to manhole . 1) coverage not met 2) minimum supports not met |
2025/02/05 | Building/Structural | Framing | Passed | Paul Nitz | Interior framing for mother's room in area b main concourse. |
2025/01/28 | Building/Structural | Roofing | Failed | Paul Nitz | Re-Inspection at Upper Concourse North and South grab and go Sub-roofing Framing 1) missing fasteners |
2025/01/28 | Building/Structural | Structural | Passed | Kody Boswell | SEZ stadium deck extension structural framing and plate install on level 6 |
2025/01/28 | Building/Structural | Masonry | Passed | Kody Boswell | Interior CMU Inspection in area B of Upper Concourse 12" and 8" CMU |
2025/01/28 | Building/Structural | Footing | Passed | Kody Boswell | Reviewed reinforcing steel for a portion of the field wall and a footer |
2025/01/28 | Building/Structural | Wall/Ceiling | Passed | Kody Boswell | Reviewed reinforcing steel for a portion of the field wall and a footer |
2025/01/28 | Building/Structural | Framing | NOT READY | Paul Nitz | Inspection for framing fixed in area b main concourse. Inspecting while MEP inspection is going on 01/27/25. |
2025/01/27 | Building/Structural | Masonry | Failed | Paul Nitz | Inspected Upper Concourse CMU 1/27/25. Failed. This is taking place for missed reschedule from last week’s ice closure days. 1) not ready |
2025/01/27 | Plumbing | Stack Piping & Test | Passed | Paul Nitz | Testing in-wall/overhead in the framing portion of wall. Main Con, multiple areas. |
2025/01/27 | Building/Structural | Framing | Failed | Paul Nitz | Framing for area b main concourse restrooms and concession stands. 1) Framing was not secured |
2025/01/27 | Building/Structural | Roofing | Passed | Paul Nitz | Roofing in area b main concourse at restrooms and concession stands. |
2025/01/27 | Electrical | Ceiling Rough-in | Passed | James Melvin | Rough in on Main Con Area B. From market concession up to men’s bathroom. |
2025/01/27 | Electrical | Wall Rough-in | Passed | James Melvin | Rough in on Main Con Area B. From market concession up to men’s bathroom. |
2025/01/27 | Plumbing | Stack Piping & Test | Passed | Paul Nitz | Testing in-wall/overhead in the framing portion of wall. Main Con Area B, multiple rooms. |
2025/01/24 | Fire Safety | Opening Protections | Failed | Sam Sevor | Inspect in wall floor penetrations for plumbing pipe. Area B1 Upper Concourse. Nova arrived to conduct inspection on 1/24 and the appropriate paperwork was not available. |
2025/01/22 | Plumbing | Water Piping & Test | Passed | Paul Nitz | Testing small corner of HW copper line in the NE corner of Main Con Market Concession. Tested and passed in 1/21/25, calling in for 1/22/25 |
2025/01/21 | Plumbing | Specialty Piping | Passed | Paul Nitz | Checking off copper insulation in multiple areas: upper con women’s restroom (minus sink wall), main con Area B market concession. |
2025/01/21 | Plumbing | Water Piping & Test | Passed | Paul Nitz | Testing copper pipe sink wall in upper con women’s bathroom. |
2025/01/21 | Plumbing | Stack Piping & Test | Passed | Paul Nitz | Testing drain pipe in sink wall of upper con women’s restroom. |
2025/01/21 | Building/Structural | Roofing | Passed | Kody Boswell | In progress roofing inspection for the south bathroom, area B, main concourse. Contractor was installing insulation layer. |
2025/01/21 | Building/Structural | Wall/Ceiling | Passed | Kody Boswell | Reviewed reinforcing for a portion of the field wall, area A |
2025/01/10 | Building/Structural | Wall/Ceiling | Passed | Paul Nitz | Mcjv is requesting a reinforcement inspection for field wall on south side. Thanks 1) columns 6-11 only |
2025/01/10 | Plumbing | Water Piping & Test | Passed | Paul Nitz | DW/CW/HW in main concourse Area B Market Concession. Looked at on 1/9/25 along with Founders inspection. |
2025/01/09 | Plumbing | Water Piping & Test | Conditional | Paul Nitz | Testing DW/CW/HW on founders level 1) water arresters missing |
2025/01/07 | Plumbing | Water Piping & Test | Conditional | Paul Nitz | Testing DW/CW/HW copper lines on Level 2 Founders. 1) water aresters missing |
2025/01/07 | Fire Safety | Opening Protections | Failed | Sam Sevor | Upper concourse firestopping inspection - Need to provide UL or EJ for all fire stopping applications Nothing has currently been approved by FSU fire nor NOVA. |
2025/01/06 | Electrical | Wall Rough-in | Passed | James Melvin | Courtesy walk upper concourse |
2025/01/03 | Fire Safety | Fire Water Underground | Passed | Curtis Rogers | Inspecting underground fire main. Inspected repair on underground fire main on 1-3-2025 |
2024/12/26 | Building/Structural | Slab | Passed | Rocky Wilde | Upper bowl area A stairs/ decking |
2024/12/23 | Plumbing | Water Piping & Test | Passed | Rocky Wilde | Testing 3” and 4” main on main concourse |
2024/12/20 | Plumbing | Water Piping & Test | Conditional | Paul Nitz | DW pressure testing on northern-most bathroom group, Founders level. 1) check plans for water hammers installed on LAV sinks |
2024/12/20 | Building/Structural | Slab | Passed | Kody Boswell | Mcjv is requesting an inspection for walk in cooler slabs. Thanks |
2024/12/17 | Building/Structural | Structural | Passed | Kody Boswell | Reviewed reinforcing steel for the upper bowl slab and aisle steps for area B |
2024/12/17 | Building/Structural | Structural | Passed | Kody Boswell | Decking area b screw and weld inspection |
2024/12/16 | Building/Structural | Structural | Passed | Kody Boswell | Decking inspection for area b main concourse. RTU and joist in area a1 on main concourse. |
2024/12/12 | Building/Structural | Masonry | Passed | Kody Boswell | Reviewed reinforcing steel for upper concourse sequence 1 pantry walls |
2024/12/12 | Building/Structural | Slab | Failed | Kody Boswell | Reviewed reinforcing steel for 3 isolation pads for walk-in coolers on the lower concourse level. Reinforcing steel was in substantial compliance with the contract documents. Waterproofing membrance had many punctures and holes present. Contractor to repair or replace waterproofing membrance and schedule reinspection. |
2024/12/10 | Building/Structural | Masonry | Conditional | Kody Boswell | Masonry rebar inspection, elevator 4 Result is conditional pending missing reinforcing at jamb for rough opening. Threshold inspector will verify prior to grout placement. |
2024/12/09 | Building/Structural | Slab | Passed | Kody Boswell | Inspecting void areas diamonds and walk in cooler areas on upper concourse. |
2024/12/09 | Building/Structural | Masonry | Passed | Kody Boswell | Inspecting interior cmu walls on main concourse area a. |
2024/12/06 | Building/Structural | Framing | Passed | Kody Boswell | Joist bridging rtu frames on main concourse area b. Upper bowl decking and bent plate. |
2024/12/06 | Building/Structural | Masonry | Passed | Kody Boswell | Interior masonry walls in area a main concourse. |
2024/12/05 | Building/Structural | Masonry | Passed | Kody Boswell | Interior masonry walls in area a main concourse. |
2024/12/05 | Building/Structural | Slab | Conditional | Kody Boswell | Upper concourse topping slab rebar inspection. Result is conditional pending photos of items to be addressed prior to concrete placement. |
2024/12/04 | Building/Structural | Masonry | Passed | Paul Nitz | Elevator 4 and interior walls in area a main concourse. |
2024/12/04 | Building/Structural | Sheetrock | Passed | Paul Nitz | Screw inspection at North and South electric and comm rooms. Interior walls only |
2024/12/03 | Building/Structural | Slab | Failed | Rocky Wilde | Seq 3 corridor rebar (topping slab) 1) minimum lap splicing not met 2) bars missing |
2024/12/03 | Building/Structural | Masonry | Failed | Rocky Wilde | Elevator 4 on upper concourse. Area a main concourse interior walls. 1) no access to the inspection |
2024/12/03 | Building/Structural | Structural | Cancelled | Rocky Wilde | Inspecting decking on upper bowl. |
2024/12/03 | Plumbing | Stack Piping & Test | Passed | Paul Nitz | Reinspect of level 2 sanitary drains/vents. |
2024/12/02 | Plumbing | Stack Piping & Test | Failed | Paul Nitz | Testing Founders level stub up drains. 1) Clamp Coupling not toqued to specs 2) vent and drain lines are not holding water |
2024/12/02 | Building/Structural | Masonry | Passed | Kody Boswell | Reviewed reinforcing steel for several interior masonry partition walls for the north bathroom group on the main concourse. |
2024/12/02 | Building/Structural | Slab | Passed | Kody Boswell | Seq 2 topping slab rebar inspection |
2024/11/26 | Building/Structural | Slab | Passed | Al Smythe | Sequence 3 topping slab rebar inspection |
2024/11/26 | Building/Structural | Masonry | Failed | Rocky Wilde | Mcjv is requesting a masonry reinforcing inspection for area A main concourse bathroom walls. Thanks Lap insufficient for corners, lap inisufficient for all uprights |
2024/11/25 | Building/Structural | Slab | Passed | Rocky Wilde | Sequence 1 topping slab |
2024/11/20 | Plumbing | Stack Piping & Test | Passed | Paul Nitz | Checking main drain line supporting Founders level. Riser near gate C. |
2024/11/20 | Building/Structural | Slab | Postponed | Kody Boswell | Sequence 2 rebar inspection topping slab. Contractor contacted FSU BCA prior to site arrival to cancel/postpone inspection to a later date |
2024/11/20 | Electrical | Wall Rough-in | Passed | Rocky Wilde | 2nd floor ( Founders Level ) electrical closet wall close in . North and Southside |
2024/11/20 | Building/Structural | Framing | Passed | Kody Boswell | Reviewed sheathing attachment to LG framing for main concourse soffit infront of gate C north and south sections |
2024/11/15 | Plumbing | Stack Piping & Test | Passed | Paul Nitz | Inspection on Area B men’s sink cluster and back side of mother’s room plumbing through masonry walls. All waste water. |
2024/11/06 | Building/Structural | Masonry | Postponed | Kody Boswell | Contractor called FSU BCA prior to site arrival to cancel/postpone masonry reinforcing inspection |
2024/10/03 | Plumbing | Water Piping & Test | Passed | Paul Nitz | |
2024/10/01 | Building/Structural | Masonry | Passed | Kody Boswell | Reviewed reinforcing steel for the 1st and 2nd lifts of masonry walls on the upper concourse |
2024/09/23 | Building/Structural | Masonry | Passed | Paul Nitz | CMU rebar inspection sequence 1 |
2024/08/30 | Fire Safety | Final Egress/Emergency Lights | Passed | Mary Creason | Inspection set up with Sam Sevor to have Mary Creason to review the egress lighting and exit sign placements. A prior walk-through was completed at 6:00 a.m. on Tuesday, August 27 that confirmed footcandles for the public concourse spaces. TCO is approved by Sam Sever, FIRE Manager FSU, Todd Pierce, State Fire Marshal office, and Jason Grisel, TFD. |
2024/08/23 | Building/Structural | Masonry | Passed | Paul Nitz | Masonry inspection for first lift on main concourse area a. |
2024/08/22 | Building/Structural | Slab | Failed | Paul Nitz | Inspecting diamonds on main concourse. 1) electrode not connected 2) rebar was not in the forms |
2024/08/22 | Building/Structural | Masonry | Passed | Paul Nitz | Masonry rebar at area b main concourse. |
2024/08/21 | Building/Structural | Footing | NOT READY | Paul Nitz | reinforcing inspection for diamonds around columns 1st level south side |
2024/08/21 | Building/Structural | Masonry | Passed | Paul Nitz | masonry rebar inspection for 1st level concourse south side |
2024/08/21 | Building/Structural | Footing | NOT READY | Paul Nitz | reinforcing inspection for diamonds around columns 1st level south side |
2024/08/20 | Building/Structural | Footing | NOT READY | Paul Nitz | rebar for diamonds |
2024/07/23 | Fire Safety | Fire Water Underground | Cancelled | Mary Creason | Inspection for tying the new fire riser into the existing fire line in area a main concourse. Cancelled by contractor |
2024/07/23 | Plumbing | Underground | Passed | Paul Nitz | No notification of first request attempted was received, double checking inspection scheduled. |
2024/07/23 | Building/Structural | Masonry | Failed | Paul Nitz | Masonry curb inspection for upper concourse. 1) missing bars on the corner and on each side of the control joint |
2024/07/23 | Building/Structural | Masonry | NOT READY | Paul Nitz | Masonry inspection for first course at upper concourse. |
2024/07/23 | Building/Structural | Masonry | Cancelled | Paul Nitz | Masonry inspection for curbs and second course on upper concourse. |
2024/07/23 | Building/Structural | Slab | Passed | Paul Nitz | Rebar inspection for slab on grade for the corridor between W3.9N and W5S. |
2024/07/16 | Building/Structural | Slab | NOT READY | Paul Nitz | Inspection for precast curb reinforcing 1) this was for 11:00am and they were not ready |
2024/07/16 | Building/Structural | Slab | Cancelled | Paul Nitz | slab on grade. |
2024/07/16 | Building/Structural | Slab | NOT READY | Paul Nitz | Inspection for precast curb reinforcing 1) this was scheduled for 8:00am and they were not redy |
2024/07/15 | Plumbing | Storm Piping & Test | Passed | Paul Nitz | Storm piping checked at 2pm 7/15 |
2024/07/01 | Plumbing | Underground | Failed | Paul Nitz | Storm pipe was not accessible |
2024/07/01 | Building/Structural | Masonry | Passed | Paul Nitz | Masonry inspection for cmu along WE line. |
2024/06/28 | Plumbing | Underground | Passed | Paul Nitz | |
2024/06/27 | Plumbing | Storm Piping & Test | Passed | Paul Nitz | Storm and sanitary |
2024/06/25 | Plumbing | Storm Piping & Test | Passed | Paul Nitz | |
2024/06/18 | Plumbing | Underground | Passed | Paul Nitz | 16'' storm section |
2024/06/13 | Building/Structural | Slab | Passed | Alex Masterton | Slab on Metal Deck Sequence 1B |
2024/06/13 | Plumbing | Underground | Passed | Paul Nitz | Grease |
2024/06/12 | Building/Structural | Slab | Passed | Alex Masterton | Slab on Metal Deck sequence 1c |
2024/06/12 | Plumbing | Underground | Passed | Paul Nitz | |
2024/06/12 | Plumbing | Underground | Passed | Paul Nitz | |
2024/06/11 | Plumbing | Underground | Passed | Paul Nitz | |
2024/06/11 | Building/Structural | Slab | Passed | Dwayne Mahony | Rebar inspection for slab on deck Sequence 1 area c. Approval is conditional to T.I. approval after curbs are completed. |
2024/05/24 | Plumbing | Underground | Passed | Dwayne Mahony | |
2024/04/04 | Building/Structural | Structural | Passed | Kody Boswell | Visually inspection of cementitious spray applied fireproffing to column stiffeners of UCC. Contractor to forward thickness and adhesion reports to FSU BCA. |
2024/02/27 | Building/Structural | Structural | Passed | Dwayne Mahony | last 4 stiffening steel columns 2 and 6 North and 2 5 South |
2024/02/20 | Mechanical | Insulation | Passed | Neely Lewis | insulation inspection on hw and cw piping |
2024/02/16 | Building/Structural | Structural | Conditional | Kody Boswell | Reviewed column stiffeners for UCC located at gridlines 6S and 8S. There was two locations on each stiffener that were partially missing a weld located at the existing column splice. Contractor to send photos after welds have been complete. Photos received 2/19/2024 . See Folder dated 2024-02-16 Inspection. (KB) |
2024/02/13 | Building/Structural | Structural | Passed | Kody Boswell | col,12 and 10 North stiffening steel Reviewed structural steel stiffening of columns located at gridlines 10N and 12N (KB) |
2024/02/12 | Building/Structural | Sheetrock | Passed | Kody Boswell | Reviewed 2nd layer of interior sheathing attachment in room 5301. Contractor emailed photos of 1st layer attachment and insulation installation. See folder "2024-02-12 C5301 screws" in "West Stands Demolition" --> "Contractor Photos" folder (KB) |
2024/02/08 | Building/Structural | Structural | Passed | Kody Boswell | Reviewed column stiffeners for UCC located at gridlines 10S and 12S. (KB) |
2024/02/08 | Building/Structural | Framing | Passed | Kody Boswell | Reviewed LG framing located where steel stiffening occurred at grids 2N and 2S. (KB) |
2024/02/08 | Electrical | Ground | Passed | Dwayne Mahony | 301 hendry service for new office trailer |
2024/02/02 | Building/Structural | Structural | Passed | Dwayne Mahony | inspecting steel column reinforcing, column line 16 and 14 North Reviewed column stiffeners for UCC on grids 14N & 16N with the threshold inspector. Inspection was initially failed by Kody Boswell so I returned in the afternoon after issues were corrected. Stiffener plate within stiffener columns were corrected per EOR direction. |
2024/02/02 | Building/Structural | Structural | Failed | Kody Boswell | Reviewed column stiffeners for UCC on grids 14N & 16N with the threshold inspector. Stiffener plate within stiffener columns did not align with UCC floor slabs, as required by structural drawings. Threshold inspector contacted the EOR about the condition and EOR confirmed the stiffeneer plates were to align with UCC floor slabs. (KB) |
2024/01/30 | Building/Structural | Structural | Passed | Kody Boswell | Looking at stiffening steel connections, at column 16 and 14 South Reviewed stiffening connections as stated above. (KB) |
2024/01/25 | Building/Structural | Insulation | Passed | Kody Boswell | Looking at intumescent paint on columns in room 5301 before insulation and framing. |
2024/01/24 | Building/Structural | Structural | Conditional | Kody Boswell | structural steel inspection for enabling package 5th, and 6th floor Reviewed existing bracing strengthening for the 5th and 6th floor along grids 2N & 2S. Contractor was touching up a few small areas with additional welded plated. FSU deferring to BNI (threshold inspector) to verify the touch-ups were complete. |
2024/01/18 | Building/Structural | Slab | Passed | Kody Boswell | There was no detail on how to replace a portion of a slab on grade that had been chipped out for underground piping installation. Concrete area that was chipped out was approximately 2' wide by 25' long. Contractor doweled #5 bars at 24" OC into each side of existing slab and ran 1#5 continuous with the strip to be replaced. Reinforcing installed was more than what was in the existing slab. (KB) |
2024/01/18 | Mechanical | CHW Piping & Test | Conditional | Neely Lewis | inspect welds and insulation for chilled and hot water piping. 1. Add proper supports for vertical risers on piping per FBC requirements FBC-P Table 308.5. 2. Separate piping of dissimilar metals from ubolt hangers. |
2024/01/16 | Plumbing | Underground | Passed | Neely Lewis | All ok except for last 10' before turning up against the wall, which doesw not have the required slope. Site personnel promised to fix and provide pictures of pipe with required slope. Additionally, contractor is to provide pictures of grout around piping at manhole. 1/17/2024: Items listed above were resolved. Passed |
2024/01/10 | Electrical | Wall Rough-in | Passed | Dwayne Mahony | was approved on previous inspection. |
2024/01/10 | Building/Structural | Sheetrock | Conditional | Kody Boswell | Reviewed drywall screws for new LG framing walls at grids 18N and 18S on 5th and 6th floors (4 locations). In 3 locations there were areas where screw spacing was excessive. This was discussed with the Contractor. Contractor to send photos after screw spacing is corrected. (KB) Photos from Contractor received. See Folder dated 2024-01-10 Inspection |
2024/01/09 | Building/Structural | Framing | Passed | Dwayne Mahony | |
2024/01/08 | Building/Structural | Framing | Conditional | Dwayne Mahony | Approval is conditional to providing a 2-hour rated fire stop at floor penetrations at the existing rainwater leaders. If the unrated penetration was existing it constitutes an existing condition code deficiency that must be remedied in all "work areas", per the Existing Building code, section EB 803.2.1. |
2024/01/08 | Electrical | Wall Rough-in | Passed | Dwayne Mahony | Contractor called and requested the original 2pm request to 8:30am (KB) |
2023/12/21 | Electrical | Ground | Passed | Dwayne Mahony | This inspection is for the temp power release for the Manhattan construction's job trailers. Approved, with the understanding that all feeder breakers are to be identified to which trailer unit, and backfed breakers in the trailers must have supplemental restraint. |
2023/12/21 | Building/Structural | Structural | Passed | Kody Boswell | This will be for inspection of the stiffening steel on the north end of the 5th and 6th floors. BNI will be on site in conjunction as the third-party inspector for the project. Work completed appears to be in conformance with the EOR Construction documents Thold inspector on site and approved work |
2023/12/12 | Building/Structural | Structural | Passed | Kody Boswell | Would like to request an inspection for the interior stiffening steel installation on the south side of the sixth floor to allow for demolition of stadia to be performed. New bracing reviewed at levels 5 & 6, along grid 18S/N-O (KB) |
2023/01/18 | Mechanical | HW Piping & Test | Conditional | Neely Lewis | inspect welds and insulation for chilled and hot water piping. 1. Add proper supports for vertical risers per FBC. FBC-P Table308.5. |
Electrical | Wall Rough-in | Passed | Al Smythe | partial inwall rough inspection on founder's level | |
Building/Structural | Slab | Postponed | Kody Boswell | Topping slab in void areas on upper concourse. Contractor contacted FSU BCA prior to site arrival to cancel/postpone the inspection to another date. | |
Electrical | Wall Rough-in | NOT READY | Rocky Wilde | We will look at the walls on the main concourse, A-side (north) of the building. | |
Building/Structural | Roofing | Passed | Rocky Wilde | Roofing inspection for area b main concourse roof. | |
Building/Structural | Masonry | Cancelled | Kody Boswell | Inspecting elevator 4. | |
Building/Structural | Wall/Ceiling | Passed | Rocky Wilde | MCJV is requesting an inspection for secondary field wall. Thanks |
BCA Project #: 22-03400- New College of Florida College Hall Welcome Center Electrical Improvements
Inspection Date | Discipline | Type | Result | Inspector | Comments |
2023/11/09 | Electrical | Wall Rough-in | Passed | Hank Fulmer | The electrical wall rough is approved. Wires were ran for 2 new floor outlets and several wall lights. The floor outlets were ran through the crawl space in the floor and are correctly protected and sized for the circuit. The wall lights also were ran to NEC code. |
BCA Project #: 22-03364- President's House Camera Installation
Inspection Date | Discipline | Type | Result | Inspector | Comments |
2024/05/15 | Electrical | Final Electrical | Failed | Dwayne Mahony | Outdoor electrical receptacles shall be GFCI protected as required by NEC 210.8. |
BCA Project #: 22-03275- McCollum Hall - AT&T Cell Site Modifications
Inspection Date | Discipline | Type | Result | Inspector | Comments |
2024/03/04 | Building/Structural | Final Building | Failed | Dwayne Mahony | Ms. Rodriguez, I was provided this letter of inspection today. I just visited the site for my own inspection. This installation is on a roof, so easily accessed. The only aspect of the installation I inspected was the ballast of the sleds that carry the antennas. The total ballast is significantly short of that called for on the submitted permit documents. These documents require (140) 8”x4”x16” solid concrete blocks at each mount. There are at most 120 blocks at each mount. Some of the blocks are 8”x8”x16” hollow CMU (taking up the space of 2 solid units, less weight). Accordingly, the final inspection is not approved. Re-inspection is required. FSU Building Department requires the contractor to request inspection on all permits we issue, including all cell equipment on our buildings. Please have additional ballast added to meet requirements of the construction documents, and then schedule an inspection with my office via our website, as directed in the cover letter provided with the permit issuance. Regards, Dwayne Mahony, FSU BCA inspector Cell 850 294 1581 |
BCA Project #: 21-03229-B COB, Legacy Hall - Buildout
Inspection Date | Discipline | Type | Result | Inspector | Comments |
2025/08/22 | Fire Safety | Final Fire Safety | Passed | Curtis Rogers | Passed* Back up power electrical -Generator Passed *Final Fire Sprinkler - Need FIRE PUMP Docs for Final CO Passed *Emergency Lighting/Egress & Exit Signs & Fire Extinguishers Passed *Final Fire Alarm - Need a few Damper/AHU shutdown Program Changes (4th Floor) for Final CO ***Fire Alarm and Sprinkler System is LIVE and reporting to FSU PD Passed *BDA Radio Enhancement - Need Signal in Elevators for Final CO |
2025/08/21 | Building/Structural | Roofing | Conditional | Paul Nitz | Mechanical and rooftop final _—-TODD 1) documentation required for rooftop mechanical equipment tiedowns |
2025/08/21 | Mechanical | Final Mechanical | Passed | Paul Nitz | Mechanical and rooftop final _—-TODD |
2025/08/21 | Fire Safety | Final Fire Alarm | Partial | Curtis Rogers | Elevator Recall *PASSED |
2025/08/21 | Fire Safety | Final Fire Alarm | Conditional | Curtis Rogers | BDA inspections mandatory at 1PM. Tallahassee Fire Department will be here simultaneously. Has to be witnessed by FSU Fire or building official along with FSU fire department. *Duplicate Inspection ****Conditional |
2025/08/21 | Building/Structural | Final Building | Passed | Paul Nitz | Mechanical and rooftop final _—-TODD |
2025/08/21 | Fire Safety | Radio Enhancement Check | Conditional | Curtis Rogers | BDA System Requirements *No Signal in Elevators when doors are closed *No Signal In Basement Mechanical Room areas *All other areas PASSED |
2025/08/21 | Fire Safety | Fire/Smoke Damper | Partial | Curtis Rogers | Testing In Line Ducts and Smoke Dampers 50% Tested |
2025/08/21 | Building/Structural | Final Building | Passed | Rocky Wilde | Building Final for Stairs |
2025/08/19 | Fire Safety | Final Fire Safety | Conditional | Curtis Rogers | *Tested Pull Stations |
2025/08/19 | Fire Safety | Fire Water Above Ground | Passed | Curtis Rogers | PASSED*Above Ceiling Inspection Basemnet Mechanical Room Areas |
2025/08/15 | Building/Structural | Framing | Passed | Paul Nitz | 300 Seat Auditorium Ceiling ----------------------Todd |
2025/08/15 | Building/Structural | Final Building | Passed | Paul Nitz | Building final Seq 3&4 Floors 123 and all of floor4 |
2025/08/13 | Fire Safety | Fire Water Above Ground | Passed | Curtis Rogers | Fire pump inspection. Tested Pump Performance *Waiting for Contractor to send Documentation *Tested Emergency Back Up *Tested all Fire Alarm Points associated w/ the Fire Pump |
2025/08/13 | Fire Safety | Final Fire Alarm | Conditional | Curtis Rogers | Tampers & Flows and visuals *********Curtis **********Done 8/13/25 Passed*Checked Sprinkler Tampers & Flows via FACP Partial*Checked Fire Alarm Notification Devices (3 WP Speaker Strobes NOT WORKING on Penthouse Roof) |
2025/08/12 | Electrical | Ceiling Rough-in | Passed | Rocky Wilde | Above ceiling inspection floor 1 south porch.-------------Kenny |
2025/08/11 | Building/Structural | Final Building | Partial | Rocky Wilde | Sequence 1 & 2 levels 1-3 |
2025/08/08 | Plumbing | Rough-in | Passed | Rocky Wilde | CafƩ MEP for cover up-------------------Kenny |
2025/08/08 | Mechanical | Duct Rough-in | Passed | Rocky Wilde | CafƩ MEP for cover up-------------------Kenny |
2025/08/08 | Electrical | Ceiling Rough-in | Passed | Rocky Wilde | CafƩ MEP for cover up-------------------Kenny |
2025/08/05 | Mechanical | Final Mechanical | Partial | Rocky Wilde | All Communication, Electrical, and Fire alarm closets MEP Final--------------Kenny |
2025/08/05 | Electrical | Final Electrical | Partial | Rocky Wilde | All Communication, Electrical, and Fire alarm closets MEP Final--------------Kenny |
2025/08/05 | Plumbing | Final Plumbing | Partial | Rocky Wilde | All Communication, Electrical, and Fire alarm closets MEP Final--------------Kenny |
2025/08/05 | Fire Safety | Fire Water Above Ground | NOT READY | Curtis Rogers | Fire alarm pump test--Kenny |
2025/08/01 | Mechanical | Final Mechanical | Partial | Rocky Wilde | Above ceiling ground floor-*************Rocky has already inspected on 7/30/25*************** |
2025/08/01 | Plumbing | Final Plumbing | Partial | Rocky Wilde | Above ceiling ground floor-*************Rocky has already inspected on 7/30/25*************** |
2025/08/01 | Electrical | Final Electrical | Partial | Rocky Wilde | Above ceiling ground floor-*************Rocky has already inspected on 7/30/25*************** |
2025/07/31 | Fire Safety | Fire Water Above Ground | NOT READY | Curtis Rogers | Visual final ground and 3rd floor |
2025/07/30 | Mechanical | Final Mechanical | Partial | Paul Nitz | Ground final MEP---------------Randy/Kenny 1) Elavetor sump pump discharge needs labeled 2) Insulation and jacket missing on water supply 3) Return missing I multiple locations 4) Trap seals missing in floor drains 5) 15’’ clearance not met on water closets FBC P405.3.1 6) 15’’ clearance not met on urinals FBC P405.3.5 7) Torn insulation needs repaired |
2025/07/30 | Plumbing | Final Plumbing | Partial | Paul Nitz | Ground final MEP---------------Randy/Kenny 1) Elavetor sump pump discharge needs labeled 2) Insulation and jacket missing on water supply 3) Return missing I multiple locations 4) Trap seals missing in floor drains 5) 15’’ clearance not met on water closets FBC P405.3.1 6) 15’’ clearance not met on urinals FBC P405.3.5 7) Torn insulation needs repaired |
2025/07/30 | Electrical | Final Electrical | Partial | Rocky Wilde | Ground final MEP---------------Randy/Kenny |
2025/07/28 | Fire Safety | Fire Water Above Ground | Partial | Curtis Rogers | Basement Seq 3,4-----------Kenny 4th Floor is READY (Good to Cover up) 3rd Floor NOT Ready! (DO NOT COVER UP) |
2025/07/23 | Electrical | Final Electrical | Partial | Rocky Wilde | MEP Final Seq3,4 Floors 1,2------------Kenny |
2025/07/23 | Mechanical | Final Mechanical | Partial | Rocky Wilde | MEP Final Seq3,4 Floors 1,2------------Kenny |
2025/07/23 | Fire Safety | Fire Water Above Ground | Passed | Curtis Rogers | Café Area - Elevator lobbies floor1,2 visual inspection for sprinkler |
2025/07/23 | Plumbing | Final Plumbing | Partial | Rocky Wilde | MEP Final Seq3,4 Floors 1,2------------Kenny |
2025/07/21 | Plumbing | Final Plumbing | Partial | Paul Nitz | Ground floor boiler room Seq 3,4 Floors 3,4---------------------Kenny 1) THIRD FLOOR 2) Room 3730 mastic missing on duct 3) Rooms 3708,3706 and 3704 AC was not working in these rooms 4) Fire wall needs to be labeled 5) Check why there was water on the floor in the women’s restroom 6) Mastic missing in room 3604 7) Insulation missing on hydronic piping in room 3801 8) Check why the mini split in the stairway is not blowing cold Fourth Floor 1) Sounds like a damper on the fourth floor is closed, it is whistling 2) Fan coil unit in the electrical room is not working 3) Rooms 4614,4615, and 4617 AC was not working 4) Insulation needs to be repaired on the storm drain |
2025/07/21 | Electrical | Final Electrical | Conditional | Rocky Wilde | Ground floor boiler room Seq 3,4 Floors 3,4---------------------Kenny |
2025/07/21 | Mechanical | Final Mechanical | Partial | Paul Nitz | Ground floor boiler room Seq 3,4 Floors 3,4---------------------Kenny 1) Clamps missing 2) Insulation torn 3) Saddles missing 4) Strainers missing 5) Broken drain needs to be replaced 6) Grease trap pump out line was not hooked up 7) Straps need to be added to the grease trap pump out line |
2025/07/18 | Plumbing | Final Plumbing | Cancelled | Paul Nitz | Final MEP Seq3,4 floor 3,4 Ground Boiler Room |
2025/07/18 | Electrical | Final Electrical | Cancelled | Rocky Wilde | Final MEP Seq3,4 floor 3,4 Ground Boiler Room |
2025/07/18 | Mechanical | Final Mechanical | Cancelled | Paul Nitz | Final MEP Seq3,4 floor 3,4 Ground Boiler Room |
2025/07/17 | Mechanical | Final Mechanical | Cancelled | Paul Nitz | MEP final Ground Boiler Room |
2025/07/17 | Plumbing | Final Plumbing | Cancelled | Paul Nitz | MEP For final Seq3,4 Floors 3,4 |
2025/07/17 | Electrical | Final Electrical | Cancelled | Rocky Wilde | MEP final Ground Boiler Room |
2025/07/17 | Mechanical | Final Mechanical | Cancelled | Paul Nitz | MEP For final Seq3,4 Floors 3,4 |
2025/07/17 | Electrical | Final Electrical | Cancelled | Rocky Wilde | MEP For final Seq3,4 Floors 3,4 |
2025/07/17 | Plumbing | Final Plumbing | Cancelled | Paul Nitz | MEP final Ground Boiler Room |
2025/07/15 | Electrical | Final Electrical | Cancelled | Rocky Wilde | MEP for final Seq3,4 Floors3,4 |
2025/07/15 | Mechanical | Final Mechanical | Cancelled | Paul Nitz | MEP for final Seq3,4 Floors3,4 |
2025/07/15 | Plumbing | Final Plumbing | Cancelled | Paul Nitz | MEP for final Seq3,4 Floors3,4 |
2025/07/11 | Fire Safety | Hydro-Test | Passed | Mary Creason | North Penthouse------Sam Mullinax spoke to Mary @FSU start 745am at 234psi end at 11:40am at 235psi passed |
2025/07/10 | Mechanical | Final Mechanical | Partial | Paul Nitz | North and south penthouses for final inspection.--------------Kenny 1. Torn insulation needs to be repaired 2. Missing insulation needs to be added to locations pointed out to Nate with Kelly sheet metal 3. Mastic missing around supply duct 4. Louvers on the roof need to be sealed 5. Supply and return need to be labeled 6. Check manufacture installation instructions for the roof top unit hold downs |
2025/07/09 | Electrical | Final Electrical | Conditional | Rocky Wilde | North and south penthouses for final inspection.--------------Kenny |
2025/07/09 | Plumbing | Final Plumbing | Partial | Paul Nitz | North and south penthouses for final inspection.--------------Kenny |
2025/07/08 | Plumbing | Final Plumbing | Partial | Paul Nitz | Seq1,2 Floors 3,4 MEP Final inspection-------------Kenny |
2025/07/08 | Electrical | Final Electrical | Partial | Rocky Wilde | Seq1,2 Floors 3,4 MEP Final inspection-------------Kenny |
2025/07/08 | Mechanical | Final Mechanical | Partial | Paul Nitz | Seq1,2 Floors 3,4 MEP Final inspection-------------Kenny |
2025/07/02 | Electrical | Final Electrical | Passed | Rocky Wilde | Sequence 1 & 2 - 1st and 2nd floor |
2025/07/02 | Mechanical | Final Mechanical | Partial | Paul Nitz | Sequence 1 & 2 - 1st and 2nd floor 1) returns missing in multiple locations |
2025/07/02 | Plumbing | Final Plumbing | Partial | Paul Nitz | Sequence 1 & 2 - 1st and 2nd floor 1) cleanout access missing in bathroom |
2025/06/25 | Fire Safety | Fire Water Above Ground | Passed | Curtis Rogers | Above Ceiling Inspection *1st-3rdFL Catwalks |
2025/06/24 | Fire Safety | Fire Water Above Ground | Passed | Curtis Rogers | Above Hard-Ceiling Inspection SE 1st FL Café Area *New Shop Drawlings (Signed) via Email |
2025/06/24 | Electrical | Ceiling Rough-in | Passed | Rocky Wilde | Above ceiling for cover up---------Kenny |
2025/06/20 | Electrical | Ceiling Rough-in | Failed | Rocky Wilde | Inspection for cover up-----------Kenny |
2025/06/13 | Mechanical | Duct Rough-in | Passed | Paul Nitz | CafƩ--------Kenny |
2025/06/13 | Plumbing | Rough-in | Passed | Paul Nitz | CafƩ--------Kenny |
2025/06/13 | Electrical | Wall Rough-in | Passed | Rocky Wilde | CafƩ--------Kenny |
2025/06/13 | Building/Structural | Slab | Passed | Paul Nitz | Rebar inspection South Porch Steps 1) this was passed by al smythe on 6/12/25 |
2025/06/12 | Electrical | Wall Rough-in | Failed | Al Smythe | CafƩ-Kenny 1) raceways not installed multiple appliances |
2025/06/12 | Electrical | Wall Rough-in | Passed | Al Smythe | CafƩ--------Kenny |
2025/06/12 | Plumbing | Rough-in | Passed | Paul Nitz | CafƩ-Kenny |
2025/06/12 | Building/Structural | Framing | Passed | Paul Nitz | CafƩ-Kenny |
2025/06/12 | Mechanical | Duct Rough-in | Conditional | Paul Nitz | CafƩ-Kenny 1) previous inspection of supply trunks needs to be verified |
2025/06/11 | Electrical | Ceiling Rough-in | Passed | James Melvin | Ground floor above ceiling------------Kenny |
2025/06/06 | Electrical | Wall Rough-in | NOT READY | James Melvin | Wall inspection CafƩ--------Kenny |
2025/06/05 | Fire Safety | Fire Water Above Ground | Passed | Mary Creason | Ground Floor Visual Inspection - conference room Visual approved |
2025/05/30 | Electrical | Ceiling Rough-in | Passed | James Melvin | Ground floor for cover up--------------Kenny |
2025/05/28 | Fire Safety | Fire Water Above Ground | Partial | Mary Creason | visual sprinklers ground---------Kenny Parial approval of ground floor - see approved plans for areas that were approved. MKC |
2025/05/22 | Electrical | Ceiling Rough-in | Passed | Rocky Wilde | cover up Ground floor First floor corridors-------------------------Kenny |
2025/05/15 | Electrical | Ceiling Rough-in | NOT READY | Rocky Wilde | Ground Floor Ceiling for Cover Up-------------Kenny |
2025/05/01 | Electrical | Ceiling Rough-in | Passed | Rocky Wilde | Corridors Sequence 3,4 Floors 2 & Ground for Cover Up----------------------Kenny |
2025/04/25 | Building/Structural | Structural | Postponed | Al Smythe | Precon meeting for FSU/Culpepper for Al or Rocky to attend ----Meeting Location is 634 W Call St.------ ----- Precon meeting with Culpepper/Ted. |
2025/04/24 | Electrical | Ceiling Rough-in | Passed | Al Smythe | Above ceiling inspection Floor 3,4 Ground ----------------Kenny |
2025/04/21 | Fire Safety | Fire Water Above Ground | Passed | Mary Creason | Above ceiling inspection room 1800----------Randy Pictures received and approved MKC |
2025/04/21 | Electrical | Ceiling Rough-in | Passed | James Melvin | Above ceiling inspection room 1800----------Randy |
2025/04/18 | Electrical | Ceiling Rough-in | Cancelled | Rocky Wilde | Room 1800 above ceiling inspection, fire above ceiling 1) we could not find the marked up plans |
2025/04/18 | Fire Safety | Hydro-Test | Cancelled | Mary Creason | Room 1800 above ceiling inspection, fire above ceiling School closed per Shooter |
2025/04/17 | Electrical | Ceiling Rough-in | Failed | Al Smythe | Above ceiling for cover up Seq 3,4 floor4 room1800 |
2025/04/17 | Fire Safety | Hydro-Test | Cancelled | Mary Creason | 2nd & 3rd floor window heads----------Randy Ground Room 1800 School on lockdown - per shooter |
2025/04/17 | Building/Structural | Framing | Passed | Kody Boswell | Inspection done by Kody on 4/17/25 Pics from Isaac/Rhyno Photos filed in job folder in "Inspections" |
2025/04/08 | Fire Safety | Fire Alarm Rough-In | Failed | Mary Creason | Kenny --- Showed Kenny where one of the inline detectors are blocked and not easily accessable. There are several more per Chris - SunCoast and Park - Johnson Control These all must be corrected prior to finals |
2025/04/08 | Fire Safety | Fire Water Above Ground | Passed | Mary Creason | Kenny/Randy South Penthouse visual - Passed need head guards and 1 head under 7 ft duct. |
2025/04/08 | Fire Safety | Fire Water Above Ground | Passed | Mary Creason | Kenny/Randy visual of standpipe |
2025/04/08 | Fire Safety | Hydro-Test | Passed | Mary Creason | Kenny/Randy Visual of Sprinklers observed in South Penthouse - passed (need guards on heads still) Hydro start 7;06AM AT 216PSI End at 10:46am at 216psi |
2025/04/08 | Fire Safety | Hydro-Test | Passed | Mary Creason | Kenny/Randy Standpipe Hydro Start at 7:06am at 246psi End at 10:06am at 245psi |
2025/04/04 | Electrical | Ceiling Rough-in | Passed | Al Smythe | Above ceiling inspection Seq1,2 Floors 2,3,4 |
2025/04/04 | Fire Safety | Hydro-Test | NOT READY | Mary Creason | Pent House & stairs-------Kenny Sam called to cancel again - they found a major blow out in pipe. He will call in to reschedule |
2025/04/03 | Fire Safety | Hydro-Test | NOT READY | Mary Creason | Pent House & stairs-------Kenny Sam called to cancel - he discovered a leak in the dry wall. |
2025/03/28 | Fire Safety | Hydro-Test | Passed | Mary Creason | 4th Floor- hydro passed start = 7:23am at 248psi end = 9:35am at 248psi |
2025/03/27 | Fire Safety | Fire Water Above Ground | Passed | Mary Creason | Sprinkler Inspection Seq 3,4 Floor 4 ---Thursday 8:30am---3-27-25 Visual inspection of sprinklers pass however several rooms not ready see approved plans Hydro did not pass - guage dropped 10 psi |
2025/03/26 | Electrical | Ceiling Rough-in | Passed | James Melvin | Inspection for Fsu sequence for first floor hard ceiling inspection |
2025/03/21 | Building/Structural | Structural | Passed | Kody Boswell | Reviewed reinforcing steel for east retaining wall |
2025/03/20 | Fire Safety | Fire Water Above Ground | Passed | Mary Creason | 3rd Floor-----------------------Randy Visual on floor 3 - see marked plans to see what we skipped. |
2025/03/20 | Fire Safety | Hydro-Test | Passed | Mary Creason | 3rd Floor-----------------------Randy Start Hydro - 647am at 259psi Finish Hydro - 859am at 255 psi - lost 4 lbs due to small leak in pipe. Will fix pipe today. |
2025/03/14 | Fire Safety | Fire Water Above Ground | Passed | Mary Creason | All Sequences Floor 2 above ceiling Fire Inspection visual 2nd floor - a couple of some areas weren't ready - will see on next inspection. All other areas approved. |
2025/03/14 | Fire Safety | Hydro-Test | Passed | Mary Creason | 2rd floor ------------------Randy Start test 7:33am 250psi Finish test 11:27pm 252psi |
2025/03/14 | Electrical | Re-Inspection | Passed | Al Smythe | Above ceiling inspection------------Kenny |
2025/03/13 | Building/Structural | Structural | Passed | Kody Boswell | Reviewed reinforcing steel for a portion of the landscaping retaining wall footer located near the NE corner of the job site. |
2025/03/12 | Fire Safety | Hydro-Test | NOT READY | Mary Creason | All Sequences Floor 2 above ceiling Fire Inspection CANCELLED - SPRINKLER COMPANY NOT READY |
2025/03/10 | Electrical | Ceiling Rough-in | Partial Approval | James Melvin | Above ceiling cover up inspection Seq1,2 Floors 1,2,3,4 Seq3,4 Floors1---------------Kenny |
2025/03/10 | Plumbing | Rough-in | Partial Approval | Paul Nitz | Above ceiling cover up inspection Seq1,2 Floors 1,2,3,4 Seq3,4 Floors1---------------Kenny |
2025/03/10 | Mechanical | Duct Rough-in | Partial Approval | Paul Nitz | Above ceiling cover up inspection Seq1,2 Floors 1,2,3,4 Seq3,4 Floors1---------------Kenny |
2025/03/06 | Fire Safety | Hydro-Test | Passed | Mary Creason | 1st floor hydro - Approved Start 11:09am 211psi End 1:55pm 209Psi |
2025/03/06 | Building/Structural | Framing | Passed | Paul Nitz | Seq 1 Floor G hard ceiling inspection electrical, framing---------Kenny |
2025/03/06 | Fire Safety | Fire Water Above Ground | Passed | Mary Creason | Above ceiling visual - 1st floor Please see sprinkler plans in office for areas we have checked on 1st floor |
2025/03/06 | Electrical | Ceiling Rough-in | Passed | James Melvin | Seq 1 Floor G hard ceiling inspection electrical, framing---------Kenny |
2025/03/04 | Plumbing | Water Piping & Test | Passed | Paul Nitz | Storm South porch floor 1 Domestic -water heater-------------Eddie/MillerWorks |
2025/03/04 | Plumbing | Storm Piping & Test | Passed | Paul Nitz | Storm South porch floor 1 Domestic -water heater-------------Eddie/MillerWorks |
2025/02/28 | Plumbing | Re-Inspection | Partial Approval | Paul Nitz | Above ceiling/grid inspection floors 1,2,3,4 Sequence 1,2----------Kenny 1) hangers, insulation, lights, unistrut need addressed) hangers, 2)80+ rooms have been passed and been approved |
2025/02/28 | Mechanical | Re-Inspection | Partial Approval | Paul Nitz | Above ceiling/grid inspection floors 1,2,3,4 Sequence 1,2----------Kenny 1) hangers, insulation, lights, unistrut need addressed in some rooms. 2) 80+ rooms have been passed and been approved |
2025/02/28 | Electrical | Re-Inspection | Partial Approval | James Melvin | Above ceiling/grid inspection floors 1,2,3,4 Sequence 1,2----------Kenny 1) hangers, insulation, lights, unistrut need addressed in some rooms. 80+ rooms have been passed and been approved |
2025/02/27 | Fire Safety | Fire Water Above Ground | Passed | Curtis Rogers | sprinkler visual inspection G500 Multipurpose room----------Kenny Above Ceiling Hard Inspection (Passed) Flex Drops |
2025/02/21 | Building/Structural | Re-Inspection | NOT READY | Rocky Wilde | Above ceiling grid inspection floors 1,2,3 Sequence 1,2--------Kenny |
2025/02/21 | Electrical | Re-Inspection | NOT READY | Rocky Wilde | Above ceiling grid inspection floors 1,2,3 Sequence 1,2--------Kenny |
2025/02/21 | Plumbing | Re-Inspection | NOT READY | Paul Nitz | Above ceiling grid inspection floors 1,2,3 Sequence 1,2--------Kenny |
2025/02/21 | Mechanical | Re-Inspection | NOT READY | Paul Nitz | Above ceiling grid inspection floors 1,2,3 Sequence 1,2--------Kenny |
2025/02/21 | Fire Safety | Re-Inspection | NOT READY | Curtis Rogers | Above ceiling grid inspection floors 1,2,3 Sequence 1,2--------Kenny |
2025/02/14 | Building/Structural | Framing | Conditional | Kody Boswell | Framing West entrance Result is conditional pending photos from Contractor showing fasteners attaching LG clip angle to steel angle. FSU BCA did not have access during the inspection. |
2025/02/13 | Mechanical | HW Piping & Test | Passed | Paul Nitz | Mechanical piping and storm piping ground floor Sequence 4 |
2025/02/13 | Plumbing | Storm Piping & Test | Passed | Paul Nitz | Mechanical piping and storm piping ground floor Sequence 4 |
2025/02/13 | Electrical | Ground | Passed | James Melvin | Meter release |
2025/02/13 | Electrical | Re-Inspection | Passed | James Melvin | Meter release |
2025/02/12 | Mechanical | CHW Piping & Test | Passed | Paul Nitz | Mechanical piping and storm piping ground floor Sequence 4 |
2025/02/12 | Building/Structural | Framing | Failed | Kody Boswell | South Colonnade Framing Most of the built up column members had the bottom clip connection occuring at a pre-punched opening in the member. |
2025/02/12 | Electrical | Ground | Failed | James Melvin | Meter Release 1) bonding not complete |
2025/02/11 | Mechanical | CHW Piping & Test | Passed | Paul Nitz | Chilled and Hot water piping pressure test - NE and SW penthouses |
2025/02/11 | Building/Structural | Framing | Passed | Paul Nitz | Framing and electrical rough in stair 7, Sequence 1 floors 2&3 and ground floor commons video wall. 1) 2:50pm inspection per pics |
2025/02/11 | Building/Structural | Framing | Failed | Paul Nitz | Framing and electrical rough in stair 7, Sequence 1 floors 2&3 and ground floor commons video wall. 1) stud fasteners missing 2) track not connected to the wall |
2025/02/11 | Mechanical | HW Piping & Test | Passed | Paul Nitz | Chilled and Hot water piping pressure test - NE and SW penthouses |
2025/02/10 | Electrical | Ceiling Rough-in | NOT READY | James Melvin | Floors 1,2 grid inspection for cover up. |
2025/02/07 | Electrical | Ceiling Rough-in | Passed | Rocky Wilde | *******For record only******300 seat hard ceiling electrical done by Rocky on 2-2-25 |
2025/02/07 | Building/Structural | Framing | Passed | Paul Nitz | East entry high ceiling framing and deans terrace framing---Cliff/Nelson |
2025/02/04 | Fire Safety | Fire Water Above Ground | Postponed | Sam Sevor | Sprinkler head Inspection Postponed until 2/4/2025 New inspection created |
2025/02/04 | Fire Safety | Fire Water Above Ground | Passed | Curtis Rogers | Sprinkler visual for ground floor lecture hall and auditorium, also electrical and framing for 150 seat lecture hall and top half of auditorium, and wall sequence 1 1st floor by buckhoist. *Above Ceiling Sprinkler (Hard Ceiling) visual for ground floor lecture hall and auditorium PASSED |
2025/01/31 | Fire Safety | Hydro-Test | Passed | Sam Sevor | Fire pressure/flush inspection Hydro inspection and flush on 8" fire line and 6" FDC line on |
2025/01/31 | Building/Structural | Framing | Passed | Kody Boswell | Reviewed curtain wall attachment to structure along the west entry, levels 2-4 |
2025/01/30 | Building/Structural | Framing | Passed | Paul Nitz | Ground Floor framing and electrical rough in.--Kenny/Culpepper and Cliff/Nelson add access for the cleanout in the hall |
2025/01/30 | Electrical | Wall Rough-in | Passed | Rocky Wilde | Ground Floor framing and electrical rough in.--Kenny/Culpepper and Cliff/Nelson |
2025/01/30 | Fire Safety | Fire Water Underground | Passed | Sam Sevor | Fire pipe cover up. Conducted visusal inspection of FDC fire line. |
2025/01/29 | Plumbing | Stack Piping & Test | Passed | Paul Nitz | Ground Floor-----Eddie/MillerWorks |
2025/01/28 | Fire Safety | Fire Water Underground | Passed | Sam Sevor | Partial visual for 8"fire line and FDC for cover up. |
2025/01/17 | Plumbing | Stack Piping & Test | Failed | Paul Nitz | Ground Floor Sanitary------Eddie/MillerWorks 1) test ball was not holding |
2025/01/16 | Mechanical | Wall & Ceiling | Failed | Paul Nitz | (Above Ceiling Inspection) Ceiling Grid Sequence 1 & 2 Floors1&2 ---------Culpepper/Kenny 1) buckets, saddles and strapping were missing |
2025/01/16 | Electrical | Ceiling Rough-in | Failed | Rocky Wilde | (Above Ceiling Inspection) Ceiling Grid Sequence 1 & 2 Floors1&2 ---------Culpepper/Kenny 1) covers missing |
2025/01/07 | Fire Safety | Rough Fire Sprinkler | Passed | Sam Sevor | Sprinkler inspection for cover up. |
2024/12/31 | Building/Structural | Framing | Passed | Kody Boswell | Reviewed LG framing for the west side soffit at the roof |
2024/12/31 | Building/Structural | Slab | Passed | Kody Boswell | Reviewed reinforcing steel for the bus loop slab on the north side of the building |
2024/12/31 | Electrical | Wall Rough-in | Passed | James Melvin | Sequence 3 floor 4 Bathroom Electrical and Framing rough in inspection------Kenny |
2024/12/19 | Mechanical | Duct Rough-in | Passed | Paul Nitz | Duct visual inspection for the auditorium.---------Nate/Kelly Sheet Metal--This was done by Paul on 12/18/24 and is for record. |
2024/12/18 | Building/Structural | Framing | Passed | Paul Nitz | Seq3 Floor3 bathrooms electrical and framing inspection-------Kenny |
2024/12/18 | Electrical | Wall Rough-in | Passed | James Melvin | Seq3 Floor3 bathrooms electrical and framing inspection-------Kenny |
2024/12/12 | Plumbing | Final Plumbing | Conditional | Paul Nitz | Seq1,Seq 2 Floor 1 Above Ceiling Courtesy Inspection Kenny->Paul 1) courtesy inspection |
2024/12/11 | Mechanical | Final Mechanical | Conditional | Paul Nitz | Seq1,Seq 2 Floor 1 Above Ceiling Courtesy Inspection Kenny->Paul 1) courtesy inspection |
2024/12/11 | Electrical | Final Electrical | Conditional | James Melvin | Seq1,Seq 2 Floor 1 Above Ceiling Courtesy Inspection Kenny->Paul 1) courtesy inspection |
2024/12/11 | Building/Structural | Slab | Passed | Kody Boswell | Reviewed reinforcing steel for Forum stairs on ground level |
2024/11/21 | Plumbing | Water Piping & Test | Passed | Paul Nitz | See Eddie/Miller Works |
2024/11/21 | Mechanical | CHW Piping & Test | Failed | Paul Nitz | See Eddie/Miller Works 1) pressure dropped |
2024/11/21 | Plumbing | Stack Piping & Test | Passed | Paul Nitz | See Eddie/Miller Works |
2024/11/21 | Building/Structural | Framing | Passed | Paul Nitz | Framing above stair 6 parapet wall-see Cliff Electrical Rough in AV 1st floor Seq2---see Kenny/Suncoast Hard ceiling Seq3,4 |
2024/11/21 | Electrical | Wall Rough-in | Passed | Alex Masterton | Framing above stair 6 parapet wall-see Cliff Electrical Rough in AV 1st floor Seq2---see Kenny/Suncoast Hard ceiling Seq3,4 |
2024/11/21 | Electrical | Ceiling Rough-in | Passed | Alex Masterton | Framing above stair 6 parapet wall-see Cliff Electrical Rough in AV 1st floor Seq2---see Kenny/Suncoast Hard ceiling Seq3,4 |
2024/11/19 | Plumbing | Stack Piping & Test | NOT READY | Paul Nitz | Stack Piping and Test @nd Floor Drains Eddie/Miller Works |
2024/11/19 | Building/Structural | Framing | Passed | Kody Boswell | Ground Floor Seq 2 bathroom Framing |
2024/11/18 | Plumbing | Stack Piping & Test | Passed | Paul Nitz | Eddie /Miller Works 1)m oisgj[ej[ehppompok |
2024/11/18 | Mechanical | HW Piping & Test | Passed | Paul Nitz | Eddie /Miller Works |
2024/11/18 | Mechanical | CHW Piping & Test | Passed | Paul Nitz | Eddie /Miller Works |
2024/11/14 | Mechanical | HW Piping & Test | Failed | Paul Nitz | Plumbing Floor1 SW Mechanical Floor3 SW----------Eddie/Miller Works The gauge was broken |
2024/11/14 | Plumbing | Stack Piping & Test | Passed | Paul Nitz | Plumbing Floor1 SW Mechanical Floor3 SW----------Eddie/Miller Works |
2024/11/14 | Mechanical | CHW Piping & Test | Failed | Paul Nitz | Plumbing Floor1 SW Mechanical Floor3 SW----------Eddie/Miller Works 1) The gauge was broken |
2024/11/14 | Building/Structural | Framing | Passed | Kody Boswell | Reviewed fasteners and steel angles for the east entry curtain wall, levels 2 and 3 |
2024/11/13 | Building/Structural | Framing | Conditional | Kody Boswell | Seq 3 Floors 1 & 2 hard ceiling framing Some framing members are to be stiffened and/or replaced where other trades have cut framing. Photos are to be provided by the Contractor after work is complete. |
2024/11/13 | Electrical | Ceiling Rough-in | Passed | Rocky Wilde | Seq3 Floors 1,2 hard ceiling rough in-------Kenny |
2024/11/13 | Plumbing | Stack Piping & Test | Failed | Paul Nitz | Sanitary Floor 1 bathrooms Mechanical Ground Seq1&2--------------Eddie/Miller Works----850-879-1036 1) test ball broke loose |
2024/11/13 | Plumbing | Specialty Piping | Passed | Paul Nitz | Sanitary Floor 1 bathrooms Mechanical Ground Seq1&2--------------Eddie/Miller Works----850-879-1036 |
2024/11/08 | Plumbing | Water Piping & Test | Passed | Paul Nitz | 2nd Floor Bathrooms ------Eddie/Millerworks overhead supply lines |
2024/11/06 | Fire Safety | Fire Water Above Ground | Passed | Mary Creason | For visual on hard ceilings (Seq3,4 Floors 1,2,3) One flex head was crimped (Less than 90 degree angle) and needs to be widened |
2024/11/05 | Building/Structural | Framing | Passed | Kody Boswell | Reviewed LG framing for the south gable roof, south side soffit. |
2024/11/01 | Plumbing | Water Piping & Test | Passed | Paul Nitz | Eddie / Miller Works 850-879-1036 |
2024/11/01 | Building/Structural | Structural | Passed | Kody Boswell | Seq4 floors 3,4 columns fireproofing |
2024/10/31 | Building/Structural | Framing | Passed | Kody Boswell | Reviewed LG framing for seq4 floors 3 and 4. Reviewed LG framing for seq3 floor 4 |
2024/10/30 | Building/Structural | Framing | Passed | Kody Boswell | Reviewed fireproofing application to several columns (seq4 floor2) |
2024/10/28 | Plumbing | Water Piping & Test | Passed | Paul Nitz | Seq 3 Risers Floors G-4 ---------Miller Works Eddie---850-879-1036 |
2024/10/28 | Building/Structural | Framing | Conditional | Kody Boswell | Reviewed LG framing for sequence 4, levels 1-4. Result is conditional pending the following items being addressed/corrected: 1) Bottom track to be cleaned out in a few locations. 2) Top track for exterior walls that have been cut need to be reattached to exterior masonry walls in several locations. 3) Bracing at midheight of furred walls that was cut needs to be reattached. 4) Areas where fireproofing has been scraped off of structural steel need to remain accessible for reapplication of fireproofing spray. The above items were provided to the Contractor via marked up plan sheets. |
2024/10/25 | Building/Structural | Framing | Passed | Kody Boswell | Reviewed LG framing for ground floor, multipurpose room. |
2024/10/24 | Electrical | Wall Rough-in | Passed | Alex Masterton | Sequence 4 floors 2, 3, and 4 wall rough in Provide 6-feet of dedicated space above electrical panels P-246, P-225, and P-226 (NEC 110.26 E(1) (a)) See interference with mechanical ductwork. Continue to support conduit within 3-feet of all junction boxes and every 10-feet. Note-Wall is not a listed support. |
2024/10/23 | Electrical | Wall Rough-in | Passed | James Melvin | Sequence 4 Floor 1 electrical rough in -----------Kenny |
2024/10/22 | Building/Structural | Masonry | Passed | Kody Boswell | Reviewed reinforcing steel for the dumpster enclosure walls located near the loading dock, north side of building. Walls were constructed in a single high lift. Cleanouts were provided. |
2024/10/22 | Building/Structural | Structural | Passed | Kody Boswell | Reviewed reinforcing steel for the tie beam at the south gable roof located near the SW corner of the building. |
2024/10/22 | Building/Structural | Framing | Failed | Kody Boswell | Reviewed LG soffit framing located at the roof along the south elevation, towards the southeast corner of the building. The following item must be addressed in order to pass inspection: 1) A moderate amount of studs used were pre-punched with a lot of connections occuring right at the punches, decreasing connection capacity. This was briefly discussed with the Contractor prior to FSU leaving the site. FSU attempted to contact the subcontractor in charge of LG work via phone call with no success. |
2024/10/22 | Building/Structural | Framing | Failed | Kody Boswell | Reviewed LG framing for seq. 1 and 2 on the ground floor. This was a reinspection. The following items must be addressed in order to pass inspection: 1) Design professional letter or industry standard repair for LG studs that were cut/damaged during other trades' work. Per previous failed inspection and direction by Paul Nitz and Rocky Wilde. 2) Repairs were done since the prior failed inspection. These repairs will have to be verified after receipt of item (1). 3) It appears some areas weren't repaired at all. Repairs will have to be done and verifed after receipt of item (1). This was briefly discussed with the Contractor prior to FSU leaving the site. FSU attempted to contact the subcontractor in charge of LG work via phone call with no success. |
2024/10/18 | Mechanical | Duct Rough-in | Passed | Paul Nitz | Visual on duct supply/return/outside air --N penthouse, Basement Mechanical room---This was done Friday10/18/24 by Paul. |
2024/10/17 | Electrical | Wall Rough-in | Passed | Alex Masterton | Atrium Seq1,2 floor 3 electrical rough in.----------Kenny |
2024/10/17 | Fire Safety | Fire Water Above Ground | Passed | Mary Creason | We would like to request an inspection at the FSU College of business/ Legacy Hall on this Thursday morning at 9am for Sequence 3 Atrium and catwalk for caulking and a visual inspection on the heads.-----------See Kenny Visual of fire sprinklers in the above areas. - Passed |
2024/10/16 | Building/Structural | Framing | Failed | Paul Nitz | Seq 1,2 Floor G Window opening Framing Southeast, South Seq 2---------Cliff 1) studs missing 2) studs over notched 3) headers cut out 4) nail plates missing |
2024/10/15 | Building/Structural | Framing | Failed | Paul Nitz | Seq 1,2 Floor G Window opening Framing Southeast, South Seq 2---------Cliff 1) studs missing 2) studs over notched 3) headers cut out 4) nail plates missing |
2024/10/10 | Building/Structural | Slab | Passed | Kody Boswell | Reviewed reinforcing steel for the loading dock slab on the north side of the building |
2024/10/04 | Mechanical | Duct Pressure Test | Passed | Paul Nitz | Pressure test and visual inspection of the middle riser-----------Nate |
2024/10/03 | Mechanical | Duct Pressure Test | Passed | Paul Nitz | Duct pressure test ground floor east side Visual inspection low pressure Floor 4------------this was inspected on 10-2-24 - in the afternoon by Paul- |
2024/10/02 | Plumbing | Stack Piping & Test | Passed | Paul Nitz | Miller Plumbing is requesting a sanitary inspection on the ground floor of Sequence 2. |
2024/09/23 | Plumbing | Water Piping & Test | Passed | Paul Nitz | Storm drains 1st to ground floor and bathrooms------Inspected by Paul on Monday pm 9-23-24 |
2024/09/23 | Plumbing | Stack Piping & Test | Failed | Paul Nitz | sanitary drain------Inspected by Paul on Monday pm 9-23-24 1) line was not holding water |
2024/09/23 | Plumbing | Storm Piping & Test | Passed | Paul Nitz | Storm drains 1st to ground floor and bathrooms------Inspected by Paul on Monday pm 9-23-24 |
2024/09/23 | Plumbing | Water Piping & Test | Failed | Paul Nitz | Domestic water Sequence 3 Floor2 Sanitary Re-inspection----------------Eddie 1) line was not holding water |
2024/09/20 | Mechanical | Duct Pressure Test | Passed | Paul Nitz | Pressure test and visual inspection on 1st floor middle riser-----------------Nate this inspection was completed on 9-20-2024 |
2024/09/20 | Building/Structural | Masonry | Passed | Paul Nitz | a masonry rebar inspection for the west gable first lift for tomorrow morning @9am, pouring grout at 10am |
2024/09/19 | Building/Structural | Masonry | Passed | Kody Boswell | Reviewed reinforcing steel for masonry walls on the south elevation fourth floor top out of the southwest building |
2024/09/17 | Building/Structural | Structural | NOT READY | Kody Boswell | FSU BCA arrived on site to review reinforcing steel for Stair 9 on ground level. Formwork was not yet installed so FSU BCA will review once formwork is complete. |
2024/09/16 | Fire Safety | Fire Water Above Ground | Passed | Mary Creason | See shop drawings for areas that were looked at in sequence 1&2 floors 1 and 2. Visual Approved |
2024/09/16 | Building/Structural | Framing | Passed | Kody Boswell | Reviewed interior LG framing for several hard ceilings and atrium walls on levels 1 and 2 |
2024/09/16 | Building/Structural | Structural | Passed | Kody Boswell | Reviewed reinforcing steel for a portion of the ADA ramp located near the north stair on the ground floor |
2024/09/12 | Building/Structural | Structural | Passed | Kody Boswell | Reviewed reinforcing steel for a ramp on the ground floor, located near the North stair. |
2024/09/12 | Mechanical | Duct Pressure Test | Passed | Paul Nitz | Mechanical ---North riser pressure test and visual.---------Nate(Paul checked Thursday am) Framing ---shaft wall 1st& 2nd floors-------Cliff(Kody checked Thursday am) |
2024/09/12 | Plumbing | Water Piping & Test | Failed | Paul Nitz | Rebar inspection @9am tomorrow with a planned pour at 10:15 for the ramp on the ground floor.----Tucker Domestic water ground floor Sequence 2 bathroom---------Eddied w/Millers 1) water hammer Arresters are missing 2) separation required between the supply lines and studs |
2024/09/12 | Building/Structural | Framing | Passed | Kody Boswell | Southeast Parapet wall inspection at the roof and shaft inspection on levels 1 and 2 |
2024/09/10 | Mechanical | CHW Piping & Test | Passed | Paul Nitz | ------------Eddie w/Millers |
2024/09/10 | Mechanical | HW Piping & Test | Passed | Paul Nitz | ------------Eddie w/Millers |
2024/09/10 | Building/Structural | Masonry | Passed | Kody Boswell | Reviewed reinforcing steel for the top out lifts of levels 2-4 at the southwest corner and sout elevation of the building. |
2024/09/10 | Mechanical | Duct Pressure Test | Passed | Paul Nitz | Duct pressure test Seq4 floor 4 ---------This has already been inspected by Paul on Monday 9-9-24 as well the Mechanical piping inspection that was put in for today. |
2024/09/06 | Building/Structural | Structural | Passed | Kody Boswell | Reviewed reinforcing steel for the tie beam at the north gable roof |
2024/08/30 | Fire Safety | Opening Protections | Passed | Mary Creason | an inspection floor penetrations at FSU COB this Friday 8/30/24@9amin the morning. Walked with 3rd party inspector - penetrations were properly caulk - Passed |
2024/08/29 | Fire Safety | Fire Alarm Rough-In | Passed | Mary Creason | Sequence 4 Floor1 and Sequence 3 fourth floor = wall Rough in |
2024/08/29 | Mechanical | Duct Rough-in | Passed | Paul Nitz | Northeast visual/pressure test---------------performed on 8/28/24 per Paul N. (for record) low pressure High pressure |
2024/08/29 | Building/Structural | Framing | Passed | Paul Nitz | Sequence 4 Floor 1 Framing |
2024/08/29 | Mechanical | Duct Pressure Test | Passed | Paul Nitz | Northeast visual/pressure test---------------performed on 8/28/24 per Paul N. (for record) low pressure High pressure |
2024/08/28 | Mechanical | CHW Piping & Test | Passed | Paul Nitz | Pressure test Seq1,2 Floor 4--------------------------------Nate CW & HW Seq3,4 Floor 2------------------- Eddie |
2024/08/28 | Mechanical | HW Piping & Test | Passed | Paul Nitz | Pressure test Seq1,2 Floor 4--------------------------------Nate CW & HW Seq3,4 Floor 2------------------- Eddie |
2024/08/28 | Mechanical | Duct Pressure Test | Passed | Paul Nitz | Pressure test Seq1,2 Floor 4--------------------------------Nate CW & HW Seq3,4 Floor 2------------------- Eddie |
2024/08/28 | Electrical | Wall Rough-in | Passed | James Melvin | Sequence4Floor1---------Chris |
2024/08/23 | Mechanical | HW Piping & Test | Passed | Paul Nitz | First Floor Sequence 3&4--------Eddie ----Miller Works |
2024/08/23 | Mechanical | CHW Piping & Test | Passed | Paul Nitz | Re-Inspection HW Piping and Test CHW Piping and Test Also Mech Low pressure level 2 |
2024/08/23 | Mechanical | HW Piping & Test | Passed | Paul Nitz | Re-Inspection HW Piping and Test CHW Piping and Test Also Mech Low pressure level 2 |
2024/08/23 | Mechanical | CHW Piping & Test | Failed | Paul Nitz | First Floor Sequence 3&4--------Eddie ----Miller Works 1) pressure not met, I will come back later in the day to check again |
2024/08/23 | Mechanical | Re-Inspection | Passed | Paul Nitz | Re-Inspection HW Piping and Test CHW Piping and Test Also Mech Low pressure level 2 |
2024/08/22 | Building/Structural | Framing | Cancelled | Paul Nitz | Framing inspection in South Penthouse |
2024/08/20 | Fire Safety | Fire Alarm Rough-In | Passed | Mary Creason | Fire alarm - wall rough in 3,4th floor section 3 and stairwell 5 - passed |
2024/08/20 | Building/Structural | Framing | Passed | Paul Nitz | Requesting a framing inspection on west entry parapet wall |
2024/08/20 | Electrical | Wall Rough-in | Passed | James Melvin | Seq3 Floors 1,2,3 wall rough in |
2024/08/19 | Fire Safety | Fire Water Above Ground | Passed | Mary Creason | Courtesy walk - I looked at 3 sprinkler heads in soffit - hard ceilings needed to cover them. And they passed Spoke to Todd cuulpepper, kevin century fire, burritio suncoast, etc. Went over my expectations for sprinkler inspections, Kevin needs to have a measurment for the angles of the flex head. I will do partial inspections. Just call them in. Electric /IT/Fire Alarm/Mechanical ducts will need to make no wires etc. are not sitting on the sprinkler pipes. Electrical, I would like to see rough in of fire alarm boxed, exits signs, pull stations. Todd, I want to be called in for the 3rd party fire penetration inspection. Also have someone walk with me that has the approved plans. |
2024/08/19 | Building/Structural | Masonry | Passed | Kody Boswell | Reviewed reinforcing steel for the 1st lift of the east gable masonry wall on the 5th floor |
2024/08/19 | Building/Structural | Footing | Passed | Kody Boswell | Reviewed reinforcing steel for the loading dock wall foundations |
2024/08/16 | Mechanical | Duct Pressure Test | Passed | Paul Nitz | 3rd floor sequence 3 & 4 pressure test 1) this inspection was done on 8-16-24 |
2024/08/15 | Building/Structural | Masonry | Passed | Kody Boswell | Reviewed reinforcing steel for the 9th lift of CMU walls at stair 6. |
2024/08/14 | Building/Structural | Slab | Passed | Kody Boswell | Reviewed reinforcing steel for the south porch slab on grade. |
2024/08/13 | Mechanical | Duct Rough-in | Conditional | Paul Nitz | Low pressure Floor 1 Seq4 visual inspection------------Nate Cooksey 1) All low pressure ducting was good, ok to insulate . Exhaust duct was not ready, contractor was waiting for a lift |
2024/08/13 | Building/Structural | Masonry | Passed | Kody Boswell | Reviewed reinforcing steel for stair 6, the 8th lift. |
2024/08/12 | Building/Structural | Structural | Conditional | Kody Boswell | Reviewed LG framing for the roof soffit at the east side of the south gable roof. Some fasteners were not installed. This was discussed with the contractor. |
2024/08/09 | Building/Structural | Framing | Passed | Kody Boswell | Reviewed LG framing for the west entrance columns |
2024/08/08 | Building/Structural | Masonry | Passed | Kody Boswell | Reviewed reinforcing steel for stair 6, seventh lift |
2024/08/07 | Building/Structural | Masonry | Passed | Kody Boswell | Reviewed reinforcing steel for masonry walls for stair 6 |
2024/08/07 | Mechanical | Duct Pressure Test | Passed | Paul Nitz | Duct pressure test and visual inspection of South Duct shaft - level 1 - 3. |
2024/08/07 | Mechanical | Duct Pressure Test | Passed | Paul Nitz | an inspection for riser tomorrow, pressure ready and visual south duct shaft sew 3 ground to 2nd 1) thisa inspection was done on 8-7-2024 Paul |
2024/08/07 | Building/Structural | Slab | Passed | Kody Boswell | Reviewed reinforcing steel for 2 ramps in the auditorium on the ground floor |
2024/08/07 | Building/Structural | Framing | Passed | Kody Boswell | Reviewed Z-purlin attachment to walls above the commons area roof. |
2024/07/31 | Mechanical | Duct Pressure Test | Passed | Paul Nitz | Floor 2 Visual and Pressure Test section Seq 3 (E&F) -----------Nate |
2024/07/31 | Plumbing | Re-Inspection | Passed | Paul Nitz | Sanitary Vent Sequence 2 Floor 4 |
2024/07/31 | Mechanical | Re-Inspection | Passed | Paul Nitz | Floor 2 Visual and Pressure Test section Seq 3 (E&F) -----------Nate |
2024/07/31 | Building/Structural | Framing | Passed | Kody Boswell | Reviewed LG framing at the north gable roof on the north side. Framing is only to fill the space between the overhang of the roof and CMU wall in the attic. |
2024/07/31 | Mechanical | Duct Rough-in | Passed | Paul Nitz | Floor 2 Visual and Pressure Test section Seq 3 (E&F) -----------Nate |
2024/07/29 | Mechanical | CHW Piping & Test | Passed | Paul Nitz | 4th Floor Sequence 2 Mechanical |
2024/07/29 | Plumbing | Rough-in | Failed | Paul Nitz | 4th Floor Sequence 2 Mechanical and Sanitary Vent 1) water was not in the vent for testing |
2024/07/29 | Mechanical | HW Piping & Test | Passed | Paul Nitz | 4th Floor Sequence 2 Mechanical |
2024/07/26 | Building/Structural | Masonry | Passed | Kody Boswell | Reviewed reinforcing steel for the south elevation of the northeast building the top out of the 1st, 2nd, 3rd, and fourth floors as well as the next lift on stair 7 |
2024/07/26 | Mechanical | Duct Pressure Test | Failed | Paul Nitz | Pressure Test Floor 2 Supply Seq3/4 (E&F on shops) Visual for Trunk return-----------------------------------------------Nate Cooksey 1) supply ducts had multiple leeks |
2024/07/25 | Fire Safety | Opening Protections | Cancelled | Mary Creason | Please cancel the Fire inspection for the atrium/commons 2nd and 3rd floor this Friday 7-26-24 @10am. Apologies for any inconvenience. |
2024/07/25 | Fire Safety | Opening Protections | Cancelled | Mary Creason | Fire inspection for the atrium/commons 2nd and 3rd floor this Friday 7-26-24 @10am. Cliff with sub Nelson Cancelled by contractor |
2024/07/23 | Building/Structural | Framing | NOT READY | Paul Nitz | Seq1&2 Framing in bathrooms all floors. 1) floors 1&2 were ok but 3&4 were not ready. |
2024/07/18 | Building/Structural | Structural | Passed | Kody Boswell | Reviewed steel framing, decking and reinforcing steel for a portion of elevated slab in the area between grids E.3-F/3.7-4.6 |
2024/07/17 | Building/Structural | Framing | Failed | Paul Nitz | Plumbing Sequence 2 Floor 4 Domestic water, Sanitary water ---Eddie/Millers plumbing Electrical rough in Sequence 1,2 Floors 1,2,3 bathrooms---Matt/Suncoast electric Framing inspection Sequence 1,2 Floors 1,2,3 bathrooms & soffits---Cliff/Nelson 1) blocking for ADA handrails were not installed on 1,2 and 3rd floor |
2024/07/17 | Plumbing | Water Piping & Test | Failed | Paul Nitz | Plumbing Sequence 2 Floor 4 Domestic water, Sanitary water ---Eddie/Millers plumbing Electrical rough in Sequence 1,2 Floors 1,2,3 bathrooms---Matt/Suncoast electric Framing inspection Sequence 1,2 Floors 1,2,3 bathrooms & soffits---Cliff/Nelson 1) pipe seperation not met going through the studs on 1,2 and 3rd floors. I informed Eddie 2) sanitary line was leaking on 3rd floor |
2024/07/17 | Electrical | Wall Rough-in | Passed | James Melvin | Plumbing Sequence 2 Floor 4 Domestic water, Sanitary water ---Eddie/Millers plumbing Electrical rough in Sequence 1,2 Floors 1,2,3 bathrooms---Matt/Suncoast electric Framing inspection Sequence 1,2 Floors 1,2,3 bathrooms & soffits---Cliff/Nelson |
2024/07/17 | Mechanical | Duct Pressure Test | Passed | Paul Nitz | *********This inspection has already been done by Paul *********** Pressure test duct section F Floor 1 *********Input is for record only**************************************** 1) inspection passed on 7-16-2024 Paul Nitz |
2024/07/16 | Building/Structural | Roofing | Passed | Paul Nitz | Roof Observation |
2024/07/15 | Mechanical | Re-Inspection | Passed | Paul Nitz | third floor seq 1&2 |
2024/07/15 | Plumbing | Rough-in | Passed | Paul Nitz | 2nd floor bathroom |
2024/07/15 | Mechanical | CHW Piping & Test | Passed | Paul Nitz | 3rd floor chilled |
2024/07/10 | Mechanical | CHW Piping & Test | NOT READY | Paul Nitz | Water piping and test 2nd Floor HW piping and test 3rd Floor CHW piping and test 3rd Floor Eddie with Millers-850-879-1036 |
2024/07/10 | Mechanical | HW Piping & Test | NOT READY | Paul Nitz | Water piping and test 2nd Floor HW piping and test 3rd Floor CHW piping and test 3rd Floor Eddie with Millers-850-879-1036 |
2024/07/10 | Plumbing | Water Piping & Test | NOT READY | Paul Nitz | Water piping and test 2nd Floor HW piping and test 3rd Floor CHW piping and test 3rd Floor Eddie with Millers-850-879-1036 |
2024/07/08 | Plumbing | Storm Piping & Test | NOT READY | Paul Nitz | Contact is Eddie with Millers Plumbing Pent house- Storm Sanitary-Domestic-Seq1 Floor2 & Seq2 Floor 4 |
2024/07/08 | Plumbing | Water Piping & Test | Passed | Paul Nitz | Contact is Eddie with Millers Plumbing Pent house- Storm Sanitary-Domestic-Seq1 Floor2 & Seq2 Floor 4 1) third floor waist only |
2024/07/03 | Mechanical | CHW Piping & Test | Passed | Paul Nitz | Chiller Pipe Pressure |
2024/07/01 | Building/Structural | Framing | Passed | James Melvin | Sequence 3 Floors 1,2,3 |
2024/07/01 | Building/Structural | Slab | Passed | James Melvin | Chiller Pad inspection Monday 7-1-24 @2pm for pour on Tuesday 7-2-24 @1pm |
2024/06/28 | Mechanical | Duct Pressure Test | Passed | Paul Nitz | Sequence 3 floor1 Pressure and Return Sequence 1 floor 4 Return low pressure 1) 1st floor |
2024/06/28 | Mechanical | Duct Pressure Test | Passed | Paul Nitz | Sequence 3 floor1 Pressure and Return Sequence 1 floor 4 Return low pressure 1) 4th floor |
2024/06/26 | Fire Safety | Opening Protections | Passed | Mary Creason | We would like to request an inspection for FSU COB on Wednesday (06/26/2024)@1pm Sequence 1 Stair 5---Floors1 & 2. We would also like to request an inspection for FSU COB Sequence 1&2 Floors 3&4 for floor penetrations. 3rd party will send their results to me for this installation. |
2024/06/25 | Electrical | Wall Rough-in | Passed | Dwayne Mahony | 3rd Floor Seq. 3 partial wall inspection |
2024/06/24 | Mechanical | Duct Pressure Test | Passed | Paul Nitz | first and third floor duct pressure test that was approved per the commissoning report |
2024/06/21 | Mechanical | Duct Pressure Test | Passed | Dwayne Mahony | Supply Pressure Sequence 3 Floor 3 |
2024/06/20 | Building/Structural | Wall/Ceiling | Failed | Kody Boswell | Reviewed shafts for stairs 5 & 7 shafts. There are several penetrations that need to be fire caulked as well as drywall joints at corners need to be installed correctly. |
2024/06/20 | Building/Structural | Structural | Passed | Kody Boswell | Chiller pad wall rebar |
2024/06/13 | Mechanical | Duct Pressure Test | NOT READY | Paul Nitz | Low Pressure and Return Sequence 1,2&3 Floor 3 |
2024/06/12 | Plumbing | Water Piping & Test | Passed | Paul Nitz | SOG 112’ rebar inspection for tomorrow (Wednesday 6-12-24) @ 1pm with a scheduled pour for Thursday morning @3am. Domestic water Sequence 1&2 Floors2&3 1) third floor seq 1&2 only |
2024/06/05 | Mechanical | Duct Pressure Test | Conditional | Paul Nitz | Ground and First Floor see Tito (850-528-0997) for locations I need the commissioning report with results for the first and third floor |
2024/06/04 | Fire Safety | Opening Protections | Pass | Mary Creason | Through floor penetrations Sequence 1 & 2 floors 1 & 2 on Tuesday 6-4-24 @1pm NOTE: THIS WAS A MEETING TO GO OVER JOBS AND REQUIRER FOR THE FIRE PENETRATION INSPECTIONS. |
2024/06/04 | Mechanical | Insulation | Passed | Neely Lewis | Ground and First Floor see Tito (850-528-0997) for locations mastic inspection only. Not insulation. Ready to begin insulating ductwork. |
2024/06/04 | Building/Structural | Framing | Conditional | Kody Boswell | Reviewed LG wall framing and soffit sheathing fastening for the commons area on levels 2 and 3. There were some missing fasteners for LG to LG connections and one verticla stud that was damaged nd needed to be replaced. |
2024/05/29 | Building/Structural | Slab | Passed | Kody Boswell | Reviewed reinforcing steel for the slab on grade on the ground floor in the approxximate areas between grids E-H/9-13 |
2024/05/28 | Mechanical | Cond. Piping & Test | NOT READY | Neely Lewis | Mechanical piping Ground floor ,Refrigerant piping Floors 1&2 Tuesday 5-28-24 @ 10 am. Refrigerant piiping test was not perfored proerly. |
2024/05/21 | Building/Structural | Framing | Conditional | Kody Boswell | Framing inspection for Seq1 &2 Floors 3&4 @1pm Only approved seq. 1 & 2 on floor 3, and did not include any walls with plumbing or floor pipe penetrations which still need fire stopping and inspection. |
2024/05/20 | Plumbing | Water Piping & Test | Passed | Neely Lewis | Ground Floor Domestic Water ,Mechanical Water, Sanitary Monday @10:30 (Eddie) |
2024/05/02 | Building/Structural | Masonry | Passed | Dwayne Mahony | Rebar inspection for the north and west elevation of the auditorium 3rd lift,1pm Concrete is scheduled at 2pm |
2024/05/01 | Plumbing | Storm Piping & Test | Passed | Neely Lewis | Storm Drain 2nd Floor Seq 1 San 3rd Floor Seq 2 Also, some wast piping 2.3 floor |
2024/04/30 | Building/Structural | Framing | Conditional | Dwayne Mahony | Sequence 1 and 2, Levels 1 and 2. Approved conditional to: Repair all damaged studs where marked during inspection. Repair fire spray insulation on columns and beams as noted, where damaged or material removed. Provide correct depth trim rings (double gypsum layers) for thermostats. Walls at floor penetrations for pipes are not approved for complete gypsum board installation. Leave open one side until you have fire stopping inspection approval. |
2024/04/30 | Fire Safety | Fire Alarm Rough-In | Passed | Dwayne Mahony | Wall rough in. All electrical rough-ins (including power, data, door and lighting controls, toilet flush valves, thermostats and fire alarms) have been inspected in all requested areas (partial inspections listed by floor numbers and sequence numbers) to date. All fire alarm inspections will continue to be done by the electrical inspector. |
2024/04/30 | Plumbing | Stack Piping & Test | Passed | Neely Lewis | Storm drains 3rd floor, Sequence 1, 2 & 3 And Sanitary Piping 2nd floor, Sequence 2 Inspected sttorm drains only. |
2024/04/24 | Electrical | Wall Rough-in | Passed | Dwayne Mahony | Sequence 3 Second floor Wall inspection. |
2024/04/24 | Building/Structural | Wall/Ceiling | Conditional | Dwayne Mahony | Window inspection Conditional to enginer of record providing verification that the components and cladding loads listed on sheet S0.02 are Vult, not Vasd. |
2024/04/05 | Electrical | Wall Rough-in | Passed | Dwayne Mahony | Sequence 1&2 Ground floor electrical rough in and added sequense 3, second floor. |
2024/04/03 | Building/Structural | Structural | Passed | Dwayne Mahony | Framing inspection for behind the elevator Seq1 & 2 |
2024/04/03 | Building/Structural | Wall/Ceiling | Passed | Dwayne Mahony | Framing inspection for behind the elevator Seq1 & 2 |
2024/04/02 | Mechanical | Duct Rough-in | Passed | Neely Lewis | an inspection on duct work any time – ready now. Seq. 1 & 2, Floors 1 & 2. Visual inspection on duct work. Low pressure & return. |
2024/03/22 | Electrical | Wall Rough-in | Passed | Dwayne Mahony | Sequence 1&2 fourth floor |
2024/03/19 | Plumbing | Water Piping & Test | Passed | Neely Lewis | Sequence 1 First Floor Sanitary, Domestic and Mechanical. Need to add pipe guards at studs for plumbing lines |
2024/03/15 | Plumbing | Stack Piping & Test | Passed | Neely Lewis | Need inspections please for 3/15/24, at 9:00 a.m. The request is for: Mechanical piping, Sequence 1 & 2, 1st & 2nd floors Domestic water, Sequence 1, 1st floor Storm piping, Sequence 1 & 2, 1st floor |
2024/03/15 | Mechanical | HW Piping & Test | Passed | Neely Lewis | Need inspections please for 3/15/24, at 9:00 a.m. The request is for: Mechanical piping, Sequence 1 & 2, 1st & 2nd floors Domestic water, Sequence 1, 1st floor Storm piping, Sequence 1 & 2, 1st floor |
2024/03/15 | Mechanical | CHW Piping & Test | Passed | Neely Lewis | Need inspections please for 3/15/24, at 9:00 a.m. The request is for: Mechanical piping, Sequence 1 & 2, 1st & 2nd floors Domestic water, Sequence 1, 1st floor Storm piping, Sequence 1 & 2, 1st floor INSPECTED: includes extension of CHWS,CHWR at building edge from chillers NOT INSPECTED: Chilled water piping inside building. Domestic water inside building. |
2024/03/01 | Electrical | Wall Rough-in | Conditional | Dwayne Mahony | Partial electrical wall inspection Sequence 1&2 third floor. |
2024/02/23 | Electrical | Wall Rough-in | Passed | Dwayne Mahony | Masonry rebar inspection for tomorrow morning 02-23-24, 1st floor, 4th lift on the west elevation. Pouring cell fill at 9am Electrical wall inspection Seq 1 & Seq 2 second floor |
2024/02/09 | Electrical | Wall Rough-in | Passed | Dwayne Mahony | Sequence 1 & 2 Floor 1 |
2024/02/01 | Fire Safety | Fire Water Underground | Passed | Mary Creason | Riser |
2024/01/12 | Plumbing | Underground | Passed | Dwayne Mahony | Underground Sanitary NE Seq2 section C. |
2024/01/04 | Plumbing | Underground | Passed | Neely Lewis | Storm Water on NE quadrant. Underground slab |
Fire Safety | Final Fire Safety | Postponed | Curtis Rogers | Pull Stations Sprinkler Heads visual mechanical room—————Todd | |
Electrical | Wall Rough-in | Passed | Rocky Wilde | Sprinkler visual for ground floor lecture hall and auditorium, also electrical and framing for 150 seat lecture hall and top half of auditorium, and wall sequence 1 1st floor by buckhoist. | |
Building/Structural | Framing | Passed | Rocky Wilde | Sprinkler visual for ground floor lecture hall and auditorium, also electrical and framing for 150 seat lecture hall and top half of auditorium, and wall sequence 1 1st floor by buckhoist. | |
Electrical | Wall Rough-in | James Melvin | Ground Floor framing and electrical rough in.--Kenny/Culpepper and Cliff/Nelson | ||
Fire Safety | Hydro-Test | Postponed | Curtis Rogers | Pull Stations Sprinkler Heads visual mechanical room—————Todd | |
Building/Structural | Framing | James Melvin | Ground Floor framing and electrical rough in.--Kenny/Culpepper and Cliff/Nelson | ||
Electrical | Wall Rough-in | James Melvin | Framing and electrical rough in stair 7, Sequence 1 floors 2&3 and ground floor commons video wall. | ||
Electrical | Wall Rough-in | James Melvin | Stair 7 electrical and commons av wall electrical | ||
Electrical | Ceiling Rough-in | Al Smythe | Above ceiling inspection Seq 3,4 Floor 4----- Friday 8:30am---3-28-25 | ||
Building/Structural | Framing | Passed | Paul Nitz | Electrical rough in and framing in stair 6,7 as well as lecture hall 150 upper and lower soffits. | |
Electrical | Ceiling Rough-in | Conditional | James Melvin | above ceiling inspection Seq1,2Floor3,4------------------Kenny Seq3,4 Floor3 | |
Electrical | Wall Rough-in | Alex Masterton | Sun Coast has requested electrical wall rough-in inspection on the following: Sequence 2 / Penthouse and Sequence 3 / 4th Floor | ||
Electrical | Ceiling Rough-in | Passed | James Melvin | Electrical rough in and framing in stair 6,7 as well as lecture hall 150 upper and lower soffits. |
BCA Project #: 21-03227- Football Operations Facility
Inspection Date | Discipline | Type | Result | Inspector | Comments |
2025/09/09 | Fire Safety | Fire Water Above Ground | Passed | Curtis Rogers | 1) Male/Female GA & Staff Locker Room Ceilings - Level A200 2) Coaches Locker Room Ceiling - Level B200 3) Position Meeting Room Ceilings - Level's B200 & C200 |
2025/09/09 | Electrical | Ceiling Rough-in | Passed | Rocky Wilde | 1) Male/Female GA & Staff Locker Room Ceilings - Level A200 2) Coaches Locker Room Ceiling - Level B200 3) Position Meeting Room Ceilings - Level's B200 & C200 |
2025/09/09 | Fire Safety | Fire Alarm Rough-In | Passed | Curtis Rogers | 1) Male/Female GA & Staff Locker Room Ceilings - Level A200 2) Coaches Locker Room Ceiling - Level B200 3) Position Meeting Room Ceilings - Level's B200 & C200 |
2025/09/09 | Building/Structural | Structural | Passed | Kody Boswell | Reviewed holes for D&E reinforcing steel for the archway leading to the outfdoor practice fields per RFI 48.1. Holes were the correct depth and clean. |
2025/09/05 | Fire Safety | Fire Water Above Ground | Passed | Curtis Rogers | 1) Area A Level 200 - Cardio Balcony offices 2) Area D Level 100 - Main Corridor |
2025/09/05 | Fire Safety | Fire Alarm Rough-In | Passed | Curtis Rogers | 1) Area A Level 200 - Cardio Balcony offices 2) Area D Level 100 - Main Corridor |
2025/09/05 | Electrical | Ceiling Rough-in | Passed | Rocky Wilde | 1) Area A Level 200 - Cardio Balcony Offices/Conference Room 2) Area D Level 100 - Main Corridor |
2025/09/04 | Electrical | Ceiling Rough-in | Conditional | Rocky Wilde | 1) Area A Level 100 - Training Room (Grid Ceiling) 2) Area A/B Level 100 - Practice Field Corridor (remaining section) 3) Area D Level 100 - Main Corridor |
2025/09/04 | Fire Safety | Fire Alarm Rough-In | Passed | Curtis Rogers | 1) Area A Level 100 - Training Room (Grid Ceiling) 2) Area A Level 100 - Fuel Bar Storage |
2025/09/04 | Fire Safety | Fire Water Above Ground | Passed | Curtis Rogers | 1) Area A Level 100 - Training Room (Grid Ceiling) 2) Area A Level 100 - Fuel Bar Storage |
2025/09/03 | Building/Structural | Framing | Passed | Kody Boswell | Framing inspection for Level 2 area C elevator C1 lobby ceiling, Stair C1 2nd layer and elevator C3 Level 1 and 2 sheetrock screw inspection. |
2025/09/03 | Fire Safety | Fire Water Above Ground | Cancelled | Curtis Rogers | Area A Level 100 - Training Room (Grid Ceiling) Area A Level 100 - Fuel Bar Storage (Grid Ceiling) Area A Level 200 - Cardio Balcony Trainer Offices (Grid Ceiling) Area A Level 200 - Male/Female GA Restrooms + Male/Female Staff Restrooms |
2025/09/03 | Building/Structural | Sheetrock | Passed | Kody Boswell | Framing inspection for Level 2 area C elevator C1 lobby ceiling, Stair C1 2nd layer and elevator C3 Level 1 and 2 sheetrock screw inspection. |
2025/09/03 | Electrical | Ceiling Rough-in | Passed | Rocky Wilde | Area A Level 100 - Training Room (Grid Ceiling) Area D Level 100 - Offensive & Defensive Conference Rooms (Grid Ceilings) |
2025/09/02 | Electrical | Ceiling Rough-in | Cancelled | Rocky Wilde | 1) Area C Level 100 - Barber Shop Ceiling 2) Area A level 200 - Cardio Balcony - above grid ceilings |
2025/08/29 | Electrical | Ceiling Rough-in | Passed | Rocky Wilde | 1) Area D - Level 100 - Offensive/Defensive Conference Rooms 2) Area A - Level 100 - Fuel Bar Storage |
2025/08/29 | Fire Safety | Opening Protections | Passed | Curtis Rogers | 1) Area C - Level 200 - Tm Mtg Rm Corridor (around C1 elevator) |
2025/08/28 | Mechanical | Insulation | Passed | Paul Nitz | 1) Area A/B - Level 100 - MEP Insulation - Training Room Grid Ceiling 2) Area A - Level 100 - Fuel Bar Storage |
2025/08/27 | Electrical | Ceiling Rough-in | Passed | Rocky Wilde | 1) Area A/B/C - Level 100 - Practice Field Corridor 2) Area D - Level 100 - Remaining Offices and Grid Ceilings 3) Area A - Level 100 - Training Room Grid Ceiling |
2025/08/26 | Electrical | Ceiling Rough-in | Passed | Rocky Wilde | 1) Area A/B/C - Level 100 - Practice Field Corridor Ceiling 2) Area D - Level 100 - Offices (Above Grid Ceiling) Area d-level 100 only |
2025/08/26 | Fire Safety | Fire Water Above Ground | Passed | Curtis Rogers | 1) Area A/B/C - Level 100 - Practice Field Corridor Ceiling 2) Area B - Level 300 - Grid Ceiling Heads |
2025/08/22 | Building/Structural | Framing | Passed | Kody Boswell | Framing L 300 ceiling. Drywall ceiling at player entrance |
2025/08/22 | Building/Structural | Sheetrock | Passed | Kody Boswell | Framing L 300 ceiling. Drywall ceiling at player entrance |
2025/08/22 | Fire Safety | Fire Water Above Ground | Passed | Curtis Rogers | 1) Area A - Level 100 - Training Room Offices |
2025/08/22 | Electrical | Ceiling Rough-in | Passed | Rocky Wilde | 1) Area A - Level 100 - Training Room Offices |
2025/08/22 | Building/Structural | Slab | Passed | Kody Boswell | AD Pour #3 AD Dumpster wall for record |
2025/08/22 | Building/Structural | Slab | Passed | Kody Boswell | Heavy duty pour #2 Reviewed reinforcing steel for heavy duty slab near the loading dock. |
2025/08/22 | Building/Structural | Structural | Passed | Kody Boswell | AD Pour #3 AD Dumpster wall For record |
2025/08/21 | Fire Safety | Opening Protections | Cancelled | Curtis Rogers | Area B - Level 300 - Fire penetrations through B1 elevator (level 300) |
2025/08/21 | Mechanical | Insulation | Passed | Paul Nitz | 1) Area B - Level 300 - Remaining Hard Ceiling + Drop Ceilings |
2025/08/21 | Electrical | Ceiling Rough-in | Passed | Rocky Wilde | 1) Area A/B - Level 200 - Tm Mtg Rm Corridor/Main Corridor 2) Area B - Level 300 - Remaining Hard Ceiling |
2025/08/20 | Mechanical | Insulation | Failed | Paul Nitz | 1) All MEPs - Area B Level 300 - All Ceilings 1) Torn insulation needs to be repaired |
2025/08/20 | Fire Safety | Fire Alarm Rough-In | Passed | Curtis Rogers | 1) Area A & B - Level 200 - Main Corridor/Tm Mtg Rm Corridor 2) Area B - Level 300 - All Hard Ceilings |
2025/08/20 | Building/Structural | Slab | Passed | Kody Boswell | Pour#1 Heavy duty paving Reviewed reinforcing steel for heavy duty slab at loading dock. Inspection was done virtual via photos. |
2025/08/20 | Electrical | Ceiling Rough-in | Failed | Rocky Wilde | 1) Area A & B - Level 200 - Main Corridor/Tm Mtg Rm Corridor 2) Area B - Level 300 - All Hard Ceilings |
2025/08/20 | Fire Safety | Fire Water Above Ground | Passed | Curtis Rogers | 1) Area A & B - Level 200 - Main Corridor/Tm Mtg Rm Corridor 2) Area B - Level 300 - All Hard Ceilings |
2025/08/20 | Electrical | Wall Rough-in | Passed | Rocky Wilde | 1) Area C level 100 - Theatre Room & Remaining Main Lobby Walls |
2025/08/19 | Building/Structural | Wall/Ceiling | Passed | Kody Boswell | Reviewed reinforcing steel for AD wall and 6 light poles bases |
2025/08/19 | Electrical | Ceiling Rough-in | Partial | Rocky Wilde | 1) Area C Level 100 - Entry Foyer (#01.23.01) 2) Area D Level 100 - All Offices - Above Grid Ceiling |
2025/08/19 | Mechanical | Insulation | Partial | Paul Nitz | 1) Area C Level 100 - Entry Foyer (#01.23.01) 2) Area A/B Level 200 - Tm Mtg Corridor (#02.09.02) |
2025/08/15 | Mechanical | Insulation | Passed | Paul Nitz | MEP Insulation Above Ceiling 1) Area B/C Level 100 - Locker Room 2) Area B/C Level 100 - Practice Field Corridor |
2025/08/14 | Mechanical | Insulation | Passed | Paul Nitz | 1) Area B100 - Changing Room - Above Ceiling 2) Area B100 - Toilet Room #01.16.03 - Above Ceiling 3) Area C100 - Restroom #01.25.02 - Above Ceiling 4) Area A100/B100 - Training Room - Above Remaining Ceilings Plus Offices |
2025/08/14 | Building/Structural | Footing | Passed | Kody Boswell | Reviewed reinforcing steel for electrical light pole ftgs |
2025/08/14 | Electrical | Ceiling Rough-in | Passed | Rocky Wilde | 1) Area B100 - Changing Room - Above Ceiling 2) Area B100 - Toilet Room #01.16.03 - Above Ceiling 3) Area C100 - Restroom #01.25.02 - Above Ceiling |
2025/08/13 | Mechanical | Insulation | Passed | Paul Nitz | Area D - Level 1 - Overhead MEP insulation (prior to ceiling grid install) - all corridors and offices |
2025/08/13 | Building/Structural | Masonry | Conditional | Paul Nitz | |
2025/08/12 | Building/Structural | Slab | NOT READY | Kody Boswell | Area Development Dumpster pad slab |
2025/08/11 | Building/Structural | Sheetrock | Passed | Kody Boswell | Reviewed sheathing attachment to LG framing level 100, area C and area D, lockerroom shoe dry, open corridor lounge, and working café |
2025/08/11 | Building/Structural | Framing | Passed | Kody Boswell | Reviewed LG framing for Level 200, area C, main lobby framing |
2025/08/11 | Electrical | Ceiling Rough-in | Partial | Rocky Wilde | 1) Area A - Level 100 (Training Room offices) - Above ceiling items 2) Area C - Level 100 (Equipment Room offices) - Above ceiling items 3) Area D - Level 100 (North side offices) - Above ceiling items |
2025/08/11 | Fire Safety | Fire Water Above Ground | Passed | Curtis Rogers | 1) Area A - Level 100 (Training Room) - Fire Sprinkler Heads & Piping Above Ceiling (prior to close up) 2) Area D - Level 100 (North Office) - Fire Sprinkler Heads (prior to close up) |
2025/08/11 | Mechanical | Insulation | Passed | Paul Nitz | 1) Area A - Level 100 (Training Room offices) - Above ceiling items 2) Area C - Level 100 (Equipment Room offices) - Above ceiling items 3) Area D - Level 100 (North side offices) - Above ceiling items |
2025/08/08 | Fire Safety | Hydro-Test | Passed | Curtis Rogers | This is for the hydro test in the IPF new overhead system. Kurt witnessed the test on 8/8. This is for record. |
2025/08/07 | Building/Structural | Sheetrock | Passed | Kody Boswell | Reviewed LG framing at the C3 stairs walls and sheathing attachment to LG framing at the soffit at B1 stairs. |
2025/08/07 | Electrical | Ceiling Rough-in | Passed | Rocky Wilde | Area B - Level 200 - Defensive Meeting Room & Hydration Station Lounge - Hard Ceilings |
2025/08/07 | Building/Structural | Framing | Passed | Kody Boswell | Reviewed LG framing at the C3 stairs walls and sheathing attachment to LG framing at the soffit at B1 stairs. |
2025/08/07 | Mechanical | Insulation | Passed | Rocky Wilde | Area B - Level 200 - Defensive Meeting Room & Hydration Station Lounge - Hard Ceilings |
2025/08/06 | Building/Structural | Wall/Ceiling | Passed | Kody Boswell | Reviewed reinforcing steel for the stair wall fix per RFI 627 |
2025/08/06 | Mechanical | Insulation | Cancelled | Rocky Wilde | 1) Area B Level 200 - Hard Ceiling - Defensive Meeting Room/Hydration Station |
2025/08/06 | Electrical | Ceiling Rough-in | Cancelled | Rocky Wilde | 1) Area B Level 200 - Hard Ceiling - Defensive Meeting Room/Hydration Station |
2025/08/06 | Building/Structural | Framing | Passed | Kody Boswell | Reviewed LG framing for B1 east soffit model |
2025/08/06 | Building/Structural | Sheetrock | Passed | Kody Boswell | Game room sheathing and East wall lobby sheathing attachment to LG framing |
2025/08/05 | Building/Structural | Structural | Passed | Kody Boswell | Hole inspection for stair wall that was poured incorrectly. Holes for epoxied rebar were the correct depth in accordance with RFI 627 |
2025/08/05 | Fire Safety | Fire Water Above Ground | Passed | Curtis Rogers | 1) Area A/B Level 100 - Practice Field Corridor Walls and Soffits - Column Line's 8 to 11 2) Area B Level 200 - Hydration Station Lounge, Defensive Meeting Room, Storage Room #02.09.03 |
2025/08/05 | Building/Structural | Framing | Passed | Kody Boswell | Reviewed LG framing for all elevator shaft liner framing, B100 elevator lobby ceiling framing, fuel bar east walls framing at IPF, L100B unisex bathroom ceiling framing, recovery suite framing |
2025/08/05 | Building/Structural | Sheetrock | Passed | Kody Boswell | Reviewed sheathing attachment to LG framing at A3 & A4 stairs |
2025/08/05 | Fire Safety | Fire Alarm Rough-In | Passed | Curtis Rogers | 1) Area A/B Level 100 - Practice Field Corridor Walls and Soffits - Column Line's 8 to 11 2) Area B Level 200 - Hydration Station Lounge, Defensive Meeting Room, Storage Room #02.09.03 |
2025/08/05 | Building/Structural | Wall/Ceiling | Passed | Kody Boswell | *8/05/2025 Inspection* - Area B Level 200 Sauna Room - Plywood Wall and Ceiling Re-Inspection (Prior to waterproofing) |
2025/08/05 | Electrical | Ceiling Rough-in | Passed | Rocky Wilde | 1) Area A/B Level 100 - Practice Field Corridor Walls & Soffits - Column Line's 8 to 11 |
2025/08/05 | Electrical | Wall Rough-in | Passed | Rocky Wilde | 1) Area A/B Level 100 - Practice Field Corridor Walls & Soffits - Column Line's 8 to 11 |
2025/08/05 | Mechanical | Insulation | Passed | Rocky Wilde | 1) Area A/B Level 100 - Practice Field Corridor Walls & Soffits - Column Line's 8 to 11 |
2025/08/01 | Electrical | Wall Rough-in | Partial | Rocky Wilde | 1) Area C200 - Remaining Wall Rough-In |
2025/08/01 | Mechanical | Insulation | Passed | Rocky Wilde | 1) Area C100 - South Locker Room Ceiling; Game Room Ceilings - Above Ceiling Inspection |
2025/08/01 | Electrical | Ceiling Rough-in | Partial | Rocky Wilde | 1) Area C100 - South Locker Room Ceiling; Game Room Ceilings - Above Ceiling Inspection |
2025/08/01 | Fire Safety | Fire Alarm Rough-In | Passed | Curtis Rogers | 1) Area C100 - South Locker Room Ceiling; Game Room Ceilings - Head Coverage & Fire Alarm R/I |
2025/08/01 | Fire Safety | Fire Water Above Ground | Passed | Curtis Rogers | 1) Area C100 - South Locker Room Ceiling; Game Room Ceilings - Head Coverage & Fire Alarm R/I |
2025/07/31 | Building/Structural | Footing | Passed | Kody Boswell | Reviewed reinforcing steel for the following: 1.) Masonry wall at 7-way switch 2.) Stairs on west side near C (Near player ramp). 3.) Players Ramp. 4.) AD wall near shoring wall (12") North of dumpster pad. |
2025/07/31 | Building/Structural | Masonry | Passed | Kody Boswell | Reviewed reinforcing steel for the following: 1.) Masonry wall at 7-way switch 2.) Stairs on west side near C (Near player ramp). 3.) Players Ramp. 4.) AD wall near shoring wall (12") North of dumpster pad. |
2025/07/31 | Building/Structural | Wall/Ceiling | Failed | Kody Boswell | Area B level 200 - Sauna Screw Inspection - Wall and Ceiling Most plywood that was installed appeared to have organic material. Contractor to replace affected plywood. |
2025/07/30 | Electrical | Wall Rough-in | Passed | Rocky Wilde | Area C - Level 200 - Exterior wall rough-in (exterior balcony walls) |
2025/07/29 | Building/Structural | Sheetrock | Passed | Kody Boswell | Stair B3 screw inspection and C3 stair framing |
2025/07/29 | Building/Structural | Framing | Passed | Kody Boswell | Stair B3 screw inspection and C3 stair framing |
2025/07/28 | Building/Structural | Final Building | Passed | Rocky Wilde | Beneficial TCO for turf playing field ONLY. |
2025/07/28 | Building/Structural | Sheetrock | Passed | Kody Boswell | Reviewed sheathing attachment to LG framing for Level 100 Area D work room ceilings. |
2025/07/28 | Building/Structural | Footing | Passed | Kody Boswell | Reviewed reinforcing steel for the following: - footing at 7 way-switch back, North IPF - exterior stairs in area C - exterior ramp at the loading dock |
2025/07/28 | Fire Safety | Final Fire Safety | Passed | Rocky Wilde | Beneficial TCO for turf playing field ONLY. |
2025/07/25 | Fire Safety | Fire Water Above Ground | Passed | Curtis Rogers | Area C - Level 1/2 - Branch Line feeding sidewall heads at main entry lobby (high ceiling) |
2025/07/25 | Fire Safety | Hydro-Test | Passed | Curtis Rogers | Area C - Level 1/2 - Branch Line feeding sidewall heads at main entry lobby (high ceiling) *See Attachments for Time Stamps |
2025/07/24 | Plumbing | Water Piping & Test | Conditional | Rocky Wilde | Spoke with Paul Nitz about inspection for potable water into building. Test results of Bac"T test were emailed to FSU. |
2025/07/23 | Building/Structural | Sheetrock | Passed | Kody Boswell | Reviewed sheathing attachment to LG framing in the Weight room at the IPF wall |
2025/07/23 | Building/Structural | Framing | Passed | Kody Boswell | Reviewed LG framing for level 3, area B |
2025/07/22 | Electrical | Ceiling Rough-in | Passed | Rocky Wilde | *7/21/2025 Inspection* Area B Level 200 - Main Team Meeting Room - All O/H electrical installation |
2025/07/22 | Fire Safety | Fire Water Above Ground | Passed | Curtis Rogers | 1) Area B Level 100 - Shoe Dry #01.14.05 - Ceiling head coverage 2) Area B Level 200 - Sauna Room - Ceiling head coverage |
2025/07/21 | Fire Safety | Fire Water Above Ground | Passed | Rocky Wilde | 1) Area B level 2 - Main Team meeting room - stepped ceiling head coverage 2) Area B level 2 - stair B3 ceiling - head coverage |
2025/07/21 | Building/Structural | Sheetrock | Passed | Kody Boswell | Reviewed sheathing attachment for B1 stair lobby L2, Area A Restroom ceiling, Area D Ceiling restroom |
2025/07/18 | Fire Safety | Fire Alarm Rough-In | Passed | Mary Creason | 1) Area C - Level 100 - Fire Alarm wall rough-in Informed Alex that a manual fire pull station is required within 5 feet of the front lobby exit doors. A horn /strobe is required for the exterior of the building at front area. |
2025/07/18 | Plumbing | Underground | Passed | Paul Nitz | This inspection is for the sanitary remediation behind the baseball field. |
2025/07/18 | Building/Structural | Footing | Passed | Kody Boswell | Reviewed reinforcing steel for goal post foting at practice field and AD wall footing for switch back ramp |
2025/07/18 | Building/Structural | Insulation | Passed | Paul Nitz | 1) Area B Level 100 - Steam Room Walls and Ceilings (prior to close up) |
2025/07/18 | Electrical | Wall Rough-in | Passed | Rocky Wilde | 1) Area C - Level 100 - Remaining Wall Rough-In (Not including theatre room) 2) Area B - Level 300 - Remaining Wall Rough-In |
2025/07/17 | Building/Structural | Framing | Passed | Kody Boswell | Reviewed LG framing for Jet-walk bulkhead, Area D ceilings. |
2025/07/17 | Building/Structural | Footing | NOT READY | Kody Boswell | Goal post foundation at practice field FSU BCA arrived on site and was informed by the Contractor they were not ready |
2025/07/17 | Plumbing | Underground | Passed | Paul Nitz | We need to look at the second run of Sanitary Remedition. If someone could please come first thing so we can get backfilled. DRMP the Civil designer has already looked at it and passed the inspection on 7/10. Behind the Baseball field. 1) Documentation has been sent and approved from 7/11/25 |
2025/07/17 | Plumbing | Underground | Passed | Paul Nitz | Final run of the sanitary remediation work at the back of the baseball stadium. |
2025/07/16 | Electrical | Wall Rough-in | Passed | Rocky Wilde | 1) Area C Level 200 - Exterior Wall Rough-In - North and East walls of exterior balcony 2) Area A Level 100 - Weight Room - East Wall and Soffits |
2025/07/16 | Building/Structural | Sheetrock | Passed | Kody Boswell | We need a screw inspection for Equipment lockers, B1 |
2025/07/15 | Fire Safety | Hydro-Test | Passed | Mary Creason | Area A Level 1 - Hydro Test & Fire Water Above Ground R/I - Soffit above IPF Roll-up doors and storefronts start 11:14am 210psi and end 1:30pm at 215psi - approved |
2025/07/15 | Fire Safety | Fire Water Above Ground | Passed | Mary Creason | Area A Level 1 - Hydro Test & Fire Water Above Ground R/I - Soffit above IPF Roll-up doors and storefronts visual approved |
2025/07/11 | Plumbing | Underground | Conditional | Paul Nitz | We need to look at the second run of Sanitary Remedition. If someone could please come first thing so we can get backfilled. DRMP the Civil designer has already looked at it and passed the inspection on 7/10. Behind the Baseball field. |
2025/07/10 | Electrical | Ceiling Rough-in | Passed | Rocky Wilde | 1) Area D Level 100 - Male & Female Restrooms (01.24.03/01.24.04) 2) Area C Level 200 - Male & Female Restrooms (02.20.05/02.21.02) |
2025/07/10 | Mechanical | Insulation | Passed | Paul Nitz | 1) Area D Level 100 - Male & Female Restrooms (01.24.03/01.24.04) - All MEPs Above Ceiling |
2025/07/09 | Building/Structural | Framing | Passed | Kody Boswell | This inspection is to look at the coach's screw inspection area D and Fuel bar area. |
2025/07/09 | Mechanical | Insulation | Passed | Paul Nitz | 1) Area B/C Level 100 - Practice Field Corridor - Duct Insulation Above Soffit 2) Area C Level 200 - Male & Female Restrooms - All MEPs above ceiling 3) Area D Level 100 - Male & Female Restrooms - All MEPs above ceiling 1) Need to check on smoke damper locations in smoke wall 2) Need to look into installing floor drains in areas 02.20.05 and 02.21.02, I will get with the building official and have you an answer by Friday |
2025/07/08 | Electrical | Ceiling Rough-in | Passed | Rocky Wilde | 1) Area B/C - Level 1 - Practice Field Corridor Soffit 2) Area C200 - Male/Female Restrooms 3) Area D100 - Male/Female Restrooms |
2025/07/08 | Mechanical | Duct Rough-in | Passed | Paul Nitz | *7/07/2025 Inspection* Area B/C Level 100 - Practice Field Corridor - Plenum R/I in Soffit |
2025/07/07 | Electrical | Panel/Feeder | Passed | Rocky Wilde | 1) Riser B - Level 1 - 1BR1 & Other Misc. Panels 2) Area B - Level 300 - Panel 3AR1 |
2025/07/03 | Building/Structural | Framing | Passed | Paul Nitz | We need Ceiling framing inspections for all of area D level 1. Soffit Framing for Equipment room area B level 1. Wall Framing area C Level 1. A line vestibule screws at the loading dock entrance. 1) as per pics of stud repair and detail |
2025/07/03 | Fire Safety | Fire Water Above Ground | Passed | Mary Creason | Pressure test on FDC and fire hydrants All underground hydro/ visual/flush for FDC, Fire riser and fire hydrant have been completed |
2025/07/03 | Electrical | Wall Rough-in | Postponed | Rocky Wilde | Area C - Level 2 - Exterior Wall Rough-in along exterior balcony (prior to wall close-up) |
2025/07/02 | Electrical | Wall Rough-in | Passed | Rocky Wilde | 1) Area B Level 100 - Car Wash Walls |
2025/07/02 | Building/Structural | Slab | Passed | Kody Boswell | -Tiered Seating at defensive team meeting room, -Stairs at team meeting room. -Tiered seating at different locations. |
2025/07/02 | Building/Structural | Structural | Passed | Kody Boswell | -Tiered Seating at defensive team meeting room, -Stairs at team meeting room. -Tiered seating at different locations. |
2025/07/02 | Plumbing | Underground | Passed | Rocky Wilde | This inspection is for Rocky. We need him to look at the sanitary remediation at the outside of the baseball field. |
2025/07/01 | Fire Safety | Fire Water Above Ground | Passed | Mary Creason | 1) Area C - Level 200 - Recruiting Lobby Soffit 2) Area D - Level 100 - Head Coach Admin Assistant |
2025/07/01 | Fire Safety | Opening Protections | Partial | Mary Creason | 1) Area B100 - Elevator Lobby, Corridors, Recovery Suite, & South Locker Soffit 2) Area B200 - Stair Lobby 3) Area C200 - Recruiting Lobby (North Wall - above soffit) 4) Area D100 - Boiler Room (West Wall); Electric Room (South wall) Note: corridors around elevator lobby has large square openings not sealed. Need to correct |
2025/07/01 | Building/Structural | Structural | Conditional | Kody Boswell | Reviewed reinforcing steel for 2 portions of the AD wall on the south side of the building. Contractor was still in the process of installing reinforcing for the back wall. Reinforcing was in place for the back wall. Result is conditional pending photos from Contractor showing reinforcing is installed on the front wall |
2025/07/01 | Fire Safety | Fire Water Underground | Passed | Mary Creason | 1.) Fire hydrant near FDC connection at 10AM visual of pipe ending at Fire hydrant - still need hydro and flush |
2025/07/01 | Electrical | Wall Rough-in | Passed | Rocky Wilde | 1) Area B - Level 300 - Remaining Walls 2) Area C - Level 100 - All Walls |
2025/07/01 | Electrical | Ceiling Rough-in | Passed | Rocky Wilde | 1) Area B100 - Elevator Lobby, Corridors, and Recovery Suite 2) Area D100 - Office Corridor Lounge, Offensive & Defensive Staff Conference Rooms, & Working Cafe |
2025/07/01 | Building/Structural | Framing | Passed | Kody Boswell | Reviewed LG ceiling framing for head coaches office area D |
2025/06/30 | Building/Structural | Structural | NOT READY | Kody Boswell | Site wall area development FSU BCA arrived on site and was informed by the Contractor they were not ready for inspection |
2025/06/30 | Building/Structural | Wall/Ceiling | NOT READY | Kody Boswell | Site wall area development FSU BCA arrived on site and was informed by the Contractor they were not ready for inspection |
2025/06/30 | Fire Safety | Fire Water Underground | Passed | Mary Creason | 1.) Site wall area development 1.) Fire line install for fire hydrant Visual conducted to fire hydrant - passed Still need to conduct hydro and flush |
2025/06/27 | Fire Safety | Fire Water Above Ground | Passed | Rocky Wilde | 1) Area D Level 100 - Head Coach admin assistant - sprinkler coverage 2) Area C level 200 - Ceiling soffits - sprinkler coverage |
2025/06/27 | Fire Safety | Fire Water Underground | Passed | Rocky Wilde | 1.)Fire tap connections Main at 1 location. Fire line valve and line inspection. 1.) A3 ceilings framing 2.) A4 ceiling inspection. |
2025/06/27 | Building/Structural | Framing | Passed | Rocky Wilde | 1.)Fire tap connections Main at 1 location. Fire line valve and line inspection. 1.) A3 ceilings framing 2.) A4 ceiling inspection. |
2025/06/27 | Building/Structural | Wall/Ceiling | Passed | Rocky Wilde | 1.)Fire tap connections Main at 1 location. Fire line valve and line inspection. 1.) A3 ceilings framing 2.) A4 ceiling inspection. |
2025/06/27 | Mechanical | Insulation | Passed | Paul Nitz | 1) Head Coaches Office and Wet Areas - Area D level 100 - Overhead MEP insulation (all MEPs) 2) C200 Recruiting Lobby - Soffits - Overhead MEP insulation (all MEPs) |
2025/06/27 | Electrical | Ceiling Rough-in | Passed | Rocky Wilde | C200 Recruiting Lobby - Soffits |
2025/06/27 | Fire Safety | Opening Protections | Failed | Rocky Wilde | Fire Rated Walls 1) Boiler Room - West Wall 2) B1 Elevator Shaft wall - Level 1 and 2 3) Riser B electrical room - East Wall 4) D100 electrical room - South wall Smoke Rated Walls 1) B200 Stair lobby 2) B100 stair lobby and nearby corridors |
2025/06/25 | Building/Structural | Framing | Passed | Rocky Wilde | Fire tap connections Main at 2 locations. Fire hydrant install 1 location / 1 valve at second location, 1.) Training room ceilings 2.) Team hydration lounge Ceiling GWB. 3.) Players Bathroom 4.) Satir A2, 2nd layer. |
2025/06/25 | Fire Safety | Fire Water Underground | Passed | Curtis Rogers | Fire tap connections Main at 2 locations. Fire hydrant install 1 location / 1 valve at second location |
2025/06/25 | Building/Structural | Wall/Ceiling | Passed | Paul Nitz | Fire tap connections Main at 2 locations. Fire hydrant install 1 location / 1 valve at second location, 1.) Training room ceilings 2.) Team hydration lounge Ceiling GWB. 3.) Players Bathroom 4.) Satir A2, 2nd layer. |
2025/06/25 | Fire Safety | Fire Water Above Ground | Passed | Curtis Rogers | Team Meeting Room - Area A Level 200 - Sprinkler Coverage in Stair #A3 and A4 Ceilings + Storage 02.09.03 |
2025/06/25 | Fire Safety | Fire Water Underground | Passed | Curtis Rogers | Fire tap connections Main at 2 locations. Fire hydrant install 1 location / 1 valve at second location. |
2025/06/24 | Electrical | Ceiling Rough-in | Passed | Rocky Wilde | 1) Team Meeting Room - Hard Ceiling Only - P2 Hard Ceiling at 16'-0" AFF (area not above stepped seating) |
2025/06/24 | Fire Safety | Fire Water Underground | Passed | Curtis Rogers | Fire tap into existing 8" Main at 2 locations. |
2025/06/23 | Fire Safety | Opening Protections | Failed | Rocky Wilde | 1) Fire Water Above Ground - Area A200 - Remaining Training Room Ceiling 2) Opening Protections - Area B200 & D100 - Fire Walls and Smoke Walls - MEP penetrations |
2025/06/23 | Fire Safety | Fire Water Above Ground | Failed | Rocky Wilde | 1) Fire Water Above Ground - Area A200 - Remaining Training Room Ceiling 2) Opening Protections - Area B200 & D100 - Fire Walls and Smoke Walls - MEP penetrations failed Fire/Smoke penetrations 1) B200 Stair Lobby walls (02.12.05) 2) Boiler Room walls (West and South) 3) C200 Riser B electrical room wall (East) |
2025/06/20 | Electrical | Ceiling Rough-in | Conditional | Rocky Wilde | 1) Area D - Level 100 - South soffit ceiling rough-in 2) Area B - Level 200 - Team Meeting Room - Ceiling rough-in - Area not above steps only Area A Level 100 Remaining Training Room |
2025/06/20 | Building/Structural | Framing | Passed | Rocky Wilde | *6/18/2025 Inspection w/ Rocky Wilde* - signed off the following areas for ceiling framing during electrical OH inspection: A100 Training Room, B100 Player’s RR/Showers, B200 Tm Mtg Hydration Lounge & Stair Lobby |
2025/06/20 | Building/Structural | Wall/Ceiling | Passed | Rocky Wilde | *6/18/2025 Inspection w/ Rocky Wilde* - signed off the following areas for ceiling framing during electrical OH inspection: A100 Training Room, B100 Player’s RR/Showers, B200 Tm Mtg Hydration Lounge & Stair Lobby |
2025/06/20 | Building/Structural | Framing | Passed | Kody Boswell | This inspection is scheduled to look at the screws at the wing walls. Exterior. |
2025/06/18 | Building/Structural | Framing | Passed | Kody Boswell | This inspection is to look at the east side of the ceiling at the store front assembly at the IPF. Kody looked at this on 6/18 and passed it. This approval allows WT to hang the east side of the expansion joint so we can install the curtain wall. |
2025/06/18 | Fire Safety | Fire Water Above Ground | Passed | Mary Creason | Area B200 - Team Meeting hydration lounge, Stair lobby, and Team meeting room |
2025/06/18 | Mechanical | Insulation | Passed | Paul Nitz | 1) Area B200 - Team Meeting Hydration Lounge - All MEP Insulation (above ceiling) 2) Area B200 - Stair Lobby - All MEP Insulation (above ceiling) |
2025/06/18 | Fire Safety | Fire Alarm Rough-In | Passed | Mary Creason | Area B200 - Team Meeting hydration lounge, Stair lobby, and Team meeting room |
2025/06/18 | Electrical | Ceiling Rough-in | Passed | Rocky Wilde | 1) Area B200 - Stair Lobby Ceiling (02.12.05) 2) Area B200 - Team Meeting Room Ceilings (02.10.06) 3) Area D100 - South Facade Soffit |
2025/06/18 | Mechanical | Duct Rough-in | Passed | Paul Nitz | 1) Area B300 - Mechanical Room - Duct Rough-In (prior to insulation) 2) Area A - Roof - Roof Duct Visual (prior to insulation) |
2025/06/18 | Building/Structural | Structural | Passed | Kody Boswell | Reviewed reinforcing steel for AD wall |
2025/06/17 | Building/Structural | Structural | Passed | Paul Nitz | This inspection is to look at the wing walls. Katie will B&I will be onsite along with Carson which is Ingram's engineer. Together everyone can be clear what the intent is. |
2025/06/17 | Building/Structural | Framing | Partial | Rocky Wilde | We need ceilings inspections for the training room, player wet areas, elevator lobby L100 and L200 and team meeting hydration station. |
2025/06/16 | Electrical | Wall Rough-in | Conditional | Rocky Wilde | 1) Wall Rough-in - Weight Room - East Wall (Up against IPF) 2) Ceiling Rough-in - Team Hydration Lounge - Area B level 2 |
2025/06/16 | Fire Safety | Hydro-Test | Passed | Mary Creason | 1) Hydro Test - Weight Room Sprinkler System 2) Fire Water Above Ground - Training Room Ceiling - Area A and B Level 1 Hydro start 921am 230psi and finished at 1145am 229psi |
2025/06/16 | Fire Safety | Fire Water Above Ground | Passed | Mary Creason | 1) Hydro Test - Weight Room Sprinkler System 2) Fire Water Above Ground - Training Room Ceiling - Area A and B Level 1 passed |
2025/06/16 | Fire Safety | Opening Protections | Passed | Mary Creason | 1) Area D - Level 1 - Fire Wall Penetrations - Boiler Room South Walls Penetrations sealed and chaulk |
2025/06/16 | Fire Safety | Fire Alarm Rough-In | Passed | Mary Creason | 1) Area A and B - Level 1 Training Room - Hard Ceilings 2) Area D - Level 1 - All Hard Ceilings |
2025/06/16 | Electrical | Ceiling Rough-in | Conditional | Rocky Wilde | 1) Wall Rough-in - Weight Room - East Wall (Up against IPF) 2) Ceiling Rough-in - Team Hydration Lounge - Area B level 2 |
2025/06/13 | Building/Structural | Framing | Failed | Paul Nitz | Also, a screw inspection for area D. 1) screws missing |
2025/06/13 | Building/Structural | Framing | Passed | Paul Nitz | Fuel bar and decking in the meeting rooms. D. |
2025/06/13 | Building/Structural | Structural | NOT READY | Rocky Wilde | AD wall close up. |
2025/06/13 | Building/Structural | Framing | NOT READY | Paul Nitz | We need a framing inspection for the IPF soffits. 1) Framing inspection has not been completed |
2025/06/13 | Building/Structural | Framing | Conditional | Paul Nitz | We need a framing inspection for the IPF soffits, Fuel bar and decking in the meeting rooms. Also, a screw inspection for area D. |
2025/06/11 | Fire Safety | Hydro-Test | Passed | Mary Creason | Hydro Test - Area D Level 1 - Overhead Bulk Main Fire Water Above Ground - Area D Level 1 - Overhead Bulk Main |
2025/06/11 | Building/Structural | Structural | Passed | Kody Boswell | Reviewed store front area C bolts Main lobby. |
2025/06/11 | Building/Structural | Framing | NOT READY | Kody Boswell | Exterior framing at area D Contractor was still installing framing |
2025/06/11 | Electrical | Ceiling Rough-in | Passed | James Melvin | Area D - Exterior Facade (East) - Overhead soffit rough-in (prior to close up) |
2025/06/11 | Fire Safety | Fire Water Above Ground | Passed | Mary Creason | Hydro Test - Area D Level 1 - Overhead Bulk Main Fire Water Above Ground - Area D Level 1 - Overhead Bulk Main |
2025/06/09 | Building/Structural | Wall/Ceiling | Passed | Kody Boswell | Reviewed sheathing attachment to LG framing in the following areas: - North Locker room walls, area B - Restroom ceiling, level 200, area A. - Hydrotherapy pit ceiling, level 100, area B |
2025/06/09 | Fire Safety | Hydro-Test | Passed | Mary Creason | 1) Hydro test - Area D - Level 1 - All Branch and Main Lines 2) Fire Water Above Ground - Area D - Level 1 - All Head Locations in Hard Ceilings |
2025/06/09 | Fire Safety | Fire Water Above Ground | Passed | Mary Creason | 1) Hydro test - Area D - Level 1 - All Branch and Main Lines 2) Fire Water Above Ground - Area D - Level 1 - All Head Locations in Hard Ceilings |
2025/06/09 | Building/Structural | Framing | Passed | Kody Boswell | Area B - Level 200 - Coaches Sauna - Wood framing (walls & ceiling) |
2025/06/09 | Building/Structural | Framing | Passed | Kody Boswell | Reviewed sheathing attachment to LG framing in the following areas: - North Locker room walls, area B - Restroom ceiling, level 200, area A. - Hydrotherapy pit ceiling, level 100, area B |
2025/06/06 | Plumbing | Gas Piping & Test | Passed | Paul Nitz | Area B - Level 100 - Gas Piping Taps for dryers (01.15.03) |
2025/06/06 | Building/Structural | Framing | Passed | Kody Boswell | IPF opening Tiered seating defense Team meeting room. |
2025/06/06 | Building/Structural | Framing | Passed | Kody Boswell | Framing for defensive team meeting room tiered seating. |
2025/06/05 | Fire Safety | Fire Alarm Rough-In | Passed | Mary Creason | 1) Area B100 - Players Restrooms & Showers plus Surrounding Corridors 2) Area A200/B200 - Corridors, Team Meeting Hydration Lounge |
2025/06/05 | Fire Safety | Fire Water Above Ground | Passed | Mary Creason | 1) Hydro Test - Stand Pipe - Level 1 to Level 3 - Area's A and B 2) Fire Water Above Ground - Main and Branch Lines - Level's 1 & 2 - Area's A and B |
2025/06/05 | Mechanical | Insulation | Passed | James Melvin | *All MEP Insulation Above Ceiling* Area's A200, B200, & C200 - All corridors and Position meeting rooms Corridors only, rooms failed. |
2025/06/05 | Building/Structural | Framing | Passed | Kody Boswell | Reviewed LG framing for area D, level 100 |
2025/06/05 | Fire Safety | Hydro-Test | Passed | Mary Creason | 1) Hydro Test - Stand Pipe - Level 1 to Level 3 - Area's A and B 2) Fire Water Above Ground - Main and Branch Lines - Level's 1 & 2 - Area's A and B Start of pressure test: 720am 225psi End 12pm 225psi |
2025/06/04 | Electrical | Panel/Feeder | Passed | James Melvin | 1) Area D Electrical Room - Panel #'s 1DR1, 1DL1, & E1DL1 2) Area D Electrical Room - Transformer #'s T-1DR1, T-1DL1, T-1TD, T-1AVD1 3) Area D Electrical Room - Disconnect #'s D-1TD & D-1AVD1 4) Area C - Level 2 Electrical Room - Panel #2BM1 |
2025/06/04 | Fire Safety | Fire Water Above Ground | Passed | Mary Creason | 6/03/2025 Inspection - A100 Fuel Bar, B100 Hydrotherapy Room, B100 Players Restrooms/Showers, B200 Coaches Showers 6/04/2025 Inspection - A100/B100 - Miscellaneous Locations - Tracked via stamped drawing set |
2025/06/04 | Building/Structural | Framing | Passed | Kody Boswell | This inspection is to look at the framing in area D. It failed because of material was in the way. Kody- Please call me when you arrive. I will remove the material today. 813 614 6362 Scott |
2025/06/04 | Mechanical | Insulation | Passed | James Melvin | *All MEPs Above Ceiling* 1) Area B100 - Player's Restrooms, Showers, Wet Areas |
2025/06/03 | Electrical | Ceiling Rough-in | Passed | James Melvin | 1) Area C200 - Ceiling R/I - Male Restroom 02.20.05 |
2025/06/03 | Building/Structural | Framing | Conditional | Kody Boswell | Reviewed LG framing for walls in area D, 1st floor. Some walls were not able to be accessed so not all walls were reviewed. Result is conditional pending full review of all walls in area D. Markup of inspection is saved in "Photos" folder. |
2025/06/03 | Mechanical | Insulation | Passed | James Melvin | *This insulation inspection is for all MEPs above ceiling* 1) A100 - Fuel Bar - Above ceiling 2) A100/B100 - Training Room - Above ceiling 3) B100 - Locker Room - Above Ceiling |
2025/06/03 | Fire Safety | Fire Alarm Rough-In | Passed | Mary Creason | 1) Miscellaneous Areas - Fire Alarm Ceiling R/I - *Will be tracked on stamped drawing set in WT office* |
2025/06/03 | Mechanical | Duct Rough-in | Passed | James Melvin | 1) Area C100 - Mechanical Room 02.20.04 - Duct R/I prior to insulation install |
2025/06/02 | Fire Safety | Fire Water Above Ground | Passed | Mary Creason | 1) Area's A100, A200, B100 - Fire Sprinkler R/I (heads set) - *Hydro has already been witnessed in previous inspections* |
2025/06/02 | Building/Structural | Framing | Passed | Kody Boswell | Reviewed reinforcing steel for several meeting rooms, level 2, area B |
2025/06/02 | Building/Structural | Framing | Passed | Kody Boswell | Reviewed LG framing for Hydrotherapy ceiling |
2025/06/02 | Building/Structural | Framing | Passed | Kody Boswell | Reviewed LG framing for ceiling grid in area A Level 2. |
2025/06/02 | Fire Safety | Fire Water Above Ground | Passed | Mary Creason | 1) Area's A100, A200, B100 - Fire Sprinkler R/I (heads set) - *Hydro has already been witnessed in previous inspections* |
2025/06/02 | Electrical | Ceiling Rough-in | Passed | James Melvin | Area A - Level 1 - will be tracked via inspection log Area B - Level 1 - Will be tracked via inspection log Area D - Level 1 - Exterior Soffit |
2025/05/30 | Building/Structural | Footing | Passed | Kody Boswell | Reviewed reinforcing steel for the area development wall in area C and D |
2025/05/29 | Building/Structural | Framing | Passed | Kody Boswell | Reviewed LG framing, insulation, and interior sheathing attchmnet for partition walls in Area-D, coaches' offices on the north side of area D |
2025/05/28 | Electrical | Ceiling Rough-in | Passed | Rocky Wilde | 1) Area D - Level 1 - Ceiling R/I - Hard Ceilings Only 2) Area A - Level 1 - Ceiling R/I - Training Room, Weight room restrooms, changing room 3) Area B - Level 1 - Ceiling R/I - Recovery suite, Corridor (01.13.04), Grooming, & Misc hallways |
2025/05/27 | Electrical | Ceiling Rough-in | Passed | James Melvin | 1) Area A/B - Level 100 - Training Room 2) Area D - Level 100 - Exterior Soffit |
2025/05/27 | Building/Structural | Framing | Passed | Kody Boswell | Reviewed steel deck attachment for the tiered seating in the following rooms: - Tiered seating for team meeting room - Tiered seating for linebackers meeting room - Tiered seating for wide receivers meeting room - Tiered seating for offensive line meeting room |
2025/05/27 | Mechanical | Insulation | Failed | Paul Nitz | Area A/B - Level 100 - Hydrotherapy Area - Remaining above ceiling insulation (prior to close up) 1) flex connections were not taped |
2025/05/23 | Fire Safety | Fire Alarm Rough-In | Passed | Mary Creason | Area B - Level 1 - Hydrotherapy Area - Fire Alarm ceiling rough-in See approved plans for areas that passed inspection |
2025/05/23 | Fire Safety | Hydro-Test | Passed | Mary Creason | 1) Level 1 - Area A and B - Sprinkler hydro inspection 2) Level 2 - Area A and B - Sprinkler hydro inspection See approved plans for areas that passed.MKC |
2025/05/23 | Fire Safety | Fire Water Above Ground | Passed | Mary Creason | 1) Level 1 - Area A and B - Sprinkler hydro inspection 2) Level 2 - Area A and B - Sprinkler visual Hydro for level 1 and 2 passed inspection. Mary |
2025/05/23 | Plumbing | Gas Piping & Test | Passed | Paul Nitz | All Areas - Main Gas Line (Overhead) - Final Piping and Test - Tie-In to Boiler Room 1) this was for the overhead main gas line only, the taps have to be installed and tested before the meeter can be set |
2025/05/22 | Building/Structural | Insulation | Conditional | Kody Boswell | Reviewed insulation installation for level 1, area D, offensive and defensive coach's offices (located in the area between grids M-S/22.7-23.7. Result is conditional pending cleanout of debris in bottom track for several walls. |
2025/05/22 | Building/Structural | Framing | Passed | Kody Boswell | Reviewed LG framing for the following: - 4 framed openings going from the new weightroom to the existing IPF - Tiered seating for linebackers meetingh room - Tiered seating for wide receivers meeting room - Tiered seating for offensive line meeting room |
2025/05/22 | Building/Structural | Framing | Passed | Kody Boswell | Reviewed LG framing for 4 openings going from the new weightroom to existing Indoor Practice Facility, located along grid IPF3/2-6. Items outlined in prior failed inspection notes dated 5/6/25 were corrected. |
2025/05/21 | Electrical | Ceiling Rough-in | Passed | James Melvin | Area B - Level 1 - Ceiling R/I - Hydrotherapy Room (Ceilings over Hydroworx and Resistance Pools) |
2025/05/20 | Building/Structural | Framing | Passed | Kody Boswell | Reviewed LG framing for the team meeting room on level 2, area B |
2025/05/20 | Building/Structural | Structural | Passed | Kody Boswell | Reviewed LG framing for the team meeting room on level 2, area B |
2025/05/20 | Fire Safety | Opening Protections | Passed | Mary Creason | Fire: Edge of slab at level 2 area C. Passed visual. |
2025/05/19 | Plumbing | Gas Piping & Test | NOT READY | Paul Nitz | 1) OH Gas Piping - All remaining area’s - full system under test as of Friday, 5/16 |
2025/05/19 | Fire Safety | Fire Alarm Rough-In | Passed | Mary Creason | In-Wall FA R/I - Remaining Locations - Area’s A, B, C, and D - Level’s 1 & 2 all wall FA rough in comleted. |
2025/05/19 | Electrical | Panel/Feeder | Passed | James Melvin | 1) Panel/Feeder Inspection (prior to energization) - Riser A (level 1 & 2), Riser B (level 1 & 2), and Riser D (level 1) 2) Ceiling Rough-In - Level 2 Area’s A & B - Male & Female Staff Wet Areas + Coaches Wet Areas |
2025/05/19 | Electrical | Ceiling Rough-in | Passed | James Melvin | 1) Panel/Feeder Inspection (prior to energization) - Riser A (level 1 & 2), Riser B (level 1 & 2), and Riser D (level 1) 2) Ceiling Rough-In - Level 2 Area’s A & B - Male & Female Staff Wet Areas + Coaches Wet Areas |
2025/05/16 | Electrical | Ceiling Rough-in | Passed | Rocky Wilde | Level 200 - Area A - Male & Female GA Restrooms & Locker Rooms - Above ceiling |
2025/05/09 | Building/Structural | Framing | Passed | Kody Boswell | Reviewed LG framing for the exterior soffits in area D, east and south sides. |
2025/05/08 | Fire Safety | Opening Protections | Passed | Mary Creason | Head of wall inspection. |
2025/05/08 | Plumbing | Water Piping & Test | Failed | Paul Nitz | Area B Level 1 - Washer/Dryer Room - Copper Piping for DCW & DHW Drops 1) plans call for water hammers on all quick closing solenoid valves (Washing Machines) |
2025/05/08 | Fire Safety | Re-Inspection | Passed | Mary Creason | Framing- East soffit Area-D level 100 Corridor at loading dock Area-C level 100 Elevator C1 head of wall detail for shaft wall. |
2025/05/07 | Mechanical | Insulation | Passed | Paul Nitz | Hydrotherapy Room (Level 1 Area B) - Above Ceiling Insulation - All MEP components |
2025/05/07 | Electrical | Wall Rough-in | Passed | James Melvin | Area B - Elevator B1 - In-Shaft Electrical Rough-In inspection (prior to scaffold removal) |
2025/05/06 | Building/Structural | Framing | Failed | Kody Boswell | Reviewed LG framing for 2 infill openings at IPF at the following locations: - Along grid J/2-3 - Along grid J/5-6 Both framed openings were missing screws connecting jamb studs together. Shop drawings call for 8" spacing but at time of inspection spacing was 16". A re-inspection is required after additional fasteners are installed |
2025/05/06 | Building/Structural | Wall/Ceiling | Passed | Kody Boswell | Reviewed reinforcing steel for stair wall located south of grid 27.3 between grids E-F |
2025/05/06 | Plumbing | Water Piping & Test | Passed | Paul Nitz | Hydrotherapy Pit - DCW & DHW Piping (Copper) - Rough-In and Pressure Test |
2025/05/06 | Electrical | Wall Rough-in | Passed | Rocky Wilde | Area D - Level 1 - Column Line's K to M & 22.7 to 27 |
2025/05/06 | Building/Structural | Sheetrock | Passed | Kody Boswell | Reviewed sheathing installation for service corrior on level 1, along grid A/7-21 |
2025/05/06 | Mechanical | Insulation | Cancelled | Paul Nitz | Area D - All MEP Insulation (In-Wall Only) - Column Line's K to S & 22.7 to 27 |
2025/05/02 | Building/Structural | Structural | Passed | Kody Boswell | joist screw inspection for joist fix per RFI 424.1, located in weight room |
2025/05/02 | Building/Structural | Masonry | Passed | Kody Boswell | Reviewed reinforcing steel for infill masonry walls located at the IPF |
2025/05/02 | Building/Structural | Slab | NOT READY | Kody Boswell | Reviewed reinforcing steel for curbs in area C, main entrance. |
2025/05/01 | Electrical | Panel/Feeder | Passed | Rocky Wilde | *name*Alex Trudeau*name* *phone*4074044689*phone* *email*Alex.trudeau@whiting-turner.com*email* *requested inspection date*05/01/2025*requested inspection date* *requested inspection time*2:00pm*requested inspection time* *submitted date*4/30/2025*submitted date* Project: 21-03227- Football Operations Facility Requested Inspections: Electrical-PanelFeeder *notes*Panel Inspection Prior to Energization 1) Riser A - 1AMDB, 1ADB, 2AR1, 2AM1 2) Riser B - 1BMDB, C1 Elevator Disconnect 3) Riser D - 1DM1*notes* |
2025/05/01 | Building/Structural | Structural | Passed | Kody Boswell | Reviewed steel joist fix per RFI 424, located in the weight room |
2025/05/01 | Building/Structural | Slab | Passed | Kody Boswell | Reviewed reinforcing steel for a few column pour backs located on the east side of area D |
2025/04/30 | Building/Structural | Masonry | Passed | Kody Boswell | Reviewed reinforcing steel for block infill at IPF Masonry, first lift |
2025/04/30 | Electrical | Wall Rough-in | Conditional | James Melvin | Area B - Level 2 - Walk Thru Space - West Wall (Video Wall) 1) verify the last outlet on the wall is connected to the raceway |
2025/04/30 | Building/Structural | Structural | Passed | Kody Boswell | Reviewed sheathing attachment to LG framing on L100 Area B east |
2025/04/30 | Fire Safety | Opening Protections | Conditional | Mary Creason | Area C - Level 1 and 2 - C1 Elevator Shaft Wall System - Fire Penetrations & Head of Wall Details Through hole penetrations in shaft walls inspection - passed Need EJ for head of wall detailes. |
2025/04/30 | Building/Structural | Framing | Passed | Kody Boswell | Reviewed LG framing for the main entrance lobby ceiling soffit, interior |
2025/04/30 | Fire Safety | Fire Water Above Ground | Passed | Mary Creason | Visual of M/F bathrooms on 2nd floor and hard ceiling in teams room. |
2025/04/30 | Fire Safety | Hydro-Test | Passed | Mary Creason | Area A and B - Level 2 Hydro start 10:46am at 204psi Finish at 1:07pm at 205psi |
2025/04/29 | Mechanical | Insulation | Passed | Paul Nitz | Area B and C - Level 1 - Locker Room Above Ceiling Insulation - Above Soffits Only |
2025/04/28 | Building/Structural | Slab | Passed | Kody Boswell | Reviewed sidewalk on the east side or building in area D |
2025/04/28 | Building/Structural | Footing | Failed | Kody Boswell | Contractor requested inspection for reinforcing steel for a portion of a wall footer that was cut out in order to install undeground utilities in area C, located along grid 27.3/E-F. At time of inspection, there was no documentation from the EOR providing direction on how reinforcing steel should be placed. Therefore, inspection has failed. Contractor to contact EOR for approval on a fix and schedule re-inspection. |
2025/04/25 | Plumbing | Rough-in | Passed | Paul Nitz | Area A and B - Level 200 - All MEP Insulation (Above Ceiling) - Ongoing Inspection |
2025/04/25 | Building/Structural | Insulation | Passed | Kody Boswell | Reviewed LG framing and insulation in service corridor along grid A |
2025/04/25 | Building/Structural | Sheetrock | Passed | Kody Boswell | Screw inspection for stair A1, 2nd layer of GWB. |
2025/04/25 | Building/Structural | Framing | Passed | Kody Boswell | Reviewed LG framing and insulation in service corridor along grid A |
2025/04/25 | Building/Structural | Slab | Passed | Kody Boswell | Team seating for tight end and running backs room. |
2025/04/25 | Building/Structural | Framing | Passed | Kody Boswell | Reviewed LG framing for soffits in locker room (partial area) |
2025/04/25 | Mechanical | Equipment | Passed | Paul Nitz | Area B and C - Level 2 - Fire Damper Visual and Test - Specific locations will be tracked via marked up paperwork w/ signatures |
2025/04/25 | Mechanical | Insulation | Passed | Paul Nitz | Area A and B - Level 200 - All MEP Insulation (Above Ceiling) - Ongoing Inspection |
2025/04/25 | Mechanical | Duct Rough-in | Passed | Paul Nitz | Area C - Level 2 - Main Lobby Duct Rough-In |
2025/04/24 | Building/Structural | Framing | Passed | Kody Boswell | Reviewed LG framing for soffits at level 400 roof in area C, south elevation |
2025/04/24 | Building/Structural | Structural | Passed | Kody Boswell | Reinspection of roof deck attachment to structure for level 400 roof in area C. |
2025/04/22 | Building/Structural | Sheetrock | Passed | Kody Boswell | L200 GWB screw inspection |
2025/04/22 | Building/Structural | Wall/Ceiling | Passed | Kody Boswell | Shaft at hydrotherapy pit L200 south shaft wall inspection C1 elevator shaft inspection. |
2025/04/22 | Building/Structural | Structural | Failed | Kody Boswell | Reviewed roof deck attachment to structure for level 400 roof in area C. There was one location where roof deck was fastened to steel roof joist with screws. Per structural drawings attachment method should be puddle welds. Contractor to use puddle welds and call for reinspection. |
2025/04/22 | Building/Structural | Framing | Passed | Kody Boswell | Shaft at hydrotherapy pit L200 south shaft wall inspection C1 elevator shaft inspection. |
2025/04/22 | Fire Safety | Fire Water Underground | Passed | Mary Creason | Fire line underground visual. FDC from fire pump to yard Visual observed and signed off - MKC |
2025/04/21 | Mechanical | Insulation | NOT READY | Paul Nitz | Area A and B - Level 200 - All MEP Insulation (Above Ceiling) - Ongoing Inspection |
2025/04/21 | Plumbing | Rough-in | NOT READY | Paul Nitz | Area A and B - Level 200 - All MEP Insulation (Above Ceiling) - Ongoing Inspection |
2025/04/18 | Plumbing | Rough-in | Passed | Paul Nitz | Area A - Level 2 - All Areas - All MEP Insulation - Above Ceiling 1) labeling missing |
2025/04/18 | Building/Structural | Slab | Passed | Rocky Wilde | side walk and heavy duty concrete. |
2025/04/18 | Mechanical | Insulation | Passed | Paul Nitz | Area A - Level 2 - All Areas - All MEP Insulation - Above Ceiling |
2025/04/18 | Mechanical | Duct Rough-in | Passed | Paul Nitz | Area B - Level 3 - Fire Damper Visual & Test - AHU's 2-3 & 2-4 (Remaining Two Locations) Only One Location |
2025/04/18 | Fire Safety | Opening Protections | Passed | Mary Creason | edge of slab and penetrations. Pictures taken and approved |
2025/04/18 | Electrical | Panel/Feeder | Passed | Rocky Wilde | Riser B Electrical Room - Miscellaneous Panel Inspection (prior to energization) |
2025/04/17 | Mechanical | Duct Rough-in | Passed | Paul Nitz | Area B - Level 3 - Fire Damper Visual & Test - Underneath AHU's 2-3 (1 total) & 2-4 (2 total) |
2025/04/17 | Fire Safety | Re-Inspection | Cancelled | Mary Creason | Storm test Area-B level 300 gutter, Area-D overflow&primary full area, Level 100 Area-C/D in-wall copper test. Area-C level 200 stair wall drain test. Fire Test- Edge of slab detail for West A-line wall. Building walk for fireproofing&Penetrations School on lockdown = per shooter |
2025/04/17 | Plumbing | Storm Piping & Test | Passed | Paul Nitz | Storm test Area-B level 300 gutter, Area-D overflow&primary full area, Level 100 Area-C/D in-wall copper test. Area-C level 200 stair wall drain test. Fire Test- Edge of slab detail for West A-line wall. Building walk for fireproofing&Penetrations |
2025/04/17 | Plumbing | Water Piping & Test | Passed | Paul Nitz | 1) Area D - Level 1 - Remaining In-Wall & Overhead (DW) 2) Area D - Level 1 to Roof - All storm piping testing 3) Area B - Level 3 (gutter system) - All storm piping testing |
2025/04/17 | Electrical | Panel/Feeder | Passed | Rocky Wilde | East Annex - Panel & Transformer Inspection (prior to energization) - Includes building transformer, MSSB, ATS (2 total) |
2025/04/17 | Plumbing | Storm Piping & Test | Passed | Paul Nitz | 1) Area D - Level 1 - Remaining In-Wall & Overhead (DW) 2) Area D - Level 1 to Roof - All storm piping testing 3) Area B - Level 3 (gutter system) - All storm piping testing |
2025/04/16 | Plumbing | Storm Piping & Test | Passed | Paul Nitz | Area-B level 300 roof gutter storm drain water test. |
2025/04/16 | Fire Safety | Opening Protections | Failed | Mary Creason | Edge of slab detail for West exterior A-line wall. Numerous holes and material coverage not per the UL listing. |
2025/04/15 | Building/Structural | Framing | Conditional | Kody Boswell | Reviewed LG framing for ceiling soffits on level 200, area B, team meeting room. Result is conditional pending installation of horizontal bracing for one soffit area. |
2025/04/15 | Fire Safety | Opening Protections | Passed | Mary Creason | Exterior soffit south. Edge of slab fire stopping on west wall. |
2025/04/15 | Building/Structural | Sheetrock | Passed | Kody Boswell | Reviewed sheathing attaachment for interior walls in Area-A level 200 Large Team Meeting Room. |
2025/04/11 | Plumbing | Water Piping & Test | Passed | Paul Nitz | 1) Area C and D - Level 1 - DW Mains & Branch Lines 2) Area D - Level 1 - DWV (PVC) - All Locations |
2025/04/11 | Plumbing | Rough-in | Passed | Paul Nitz | 1) Area C and D - Level 1 - DW Mains & Branch Lines 2) Area D - Level 1 - DWV (PVC) - All Locations |
2025/04/10 | Building/Structural | Sheetrock | Passed | Paul Nitz | Sheathing inspection for Area-C level 400 south, Area-D level 100 East. |
2025/04/10 | Mechanical | HW Piping & Test | Passed | Paul Nitz | *Inspected on 4/08/2025* - Area C and D - Level 1 - HW Piping Mains |
2025/04/10 | Building/Structural | Structural | Passed | Paul Nitz | Joist added support. |
2025/04/09 | Plumbing | Rough-in | Passed | Paul Nitz | Area C - Level 2 - In-Wall and Overhead PVC Piping (re-inspection) |
2025/04/08 | Building/Structural | Structural | Passed | Kody Boswell | Reviewed roof deck attachment to structure for level 400 sloped roof |
2025/04/08 | Plumbing | Rough-in | NOT READY | Paul Nitz | Area C - Level 1 & 2 - Remaining In-Wall Plumbing - (Re-inspection) |
2025/04/08 | Plumbing | Water Piping & Test | Passed | Paul Nitz | Area C - Level 1 & 2 - Remaining In-Wall Plumbing - (Re-inspection) |
2025/04/08 | Electrical | Wall Rough-in | Passed | Rocky Wilde | Area D - Level 1 - In-Wall Rough-In - Column Line's M to T & 22.7 to 27 |
2025/04/08 | Building/Structural | Framing | Passed | Kody Boswell | Exterior framing area C Framing L200 C |
2025/04/08 | Fire Safety | Opening Protections | Passed | Mary Creason | Roof at 400area B. Exterior framing area C Framing L200 C Mary/ Fireproof penetrations. Fire penetrations observed = Passed (Handbook available to reference) Informed Shawn that I will need the paperwork from Aramond contractors for previous installs that were not called into our department. |
2025/04/08 | Building/Structural | Wall/Ceiling | Passed | Kody Boswell | Exterior framing area C Framing L200 |
2025/04/07 | Fire Safety | Opening Protections | NOT READY | Mary Creason | Framing in-wall final inspection for Area-C level 200 walls. CL 19-27 Hilti fire sleeve inspection and pipe penetrations in Area-C walls. |
2025/04/07 | Mechanical | HW Piping & Test | Passed | Paul Nitz | Area C and D - Level 1 - CW and HW (Supply and Return) Mains |
2025/04/07 | Mechanical | CHW Piping & Test | Cancelled | Paul Nitz | Area C and D - Level 1 - CW and HW (Supply and Return) Mains |
2025/04/07 | Plumbing | Rough-in | Cancelled | Paul Nitz | Area A - Level 2 - All overhead MEP insulation (prior to ceiling close up) Area B - Level 2 - All overhead MEP insulation (prior to ceiling close up) |
2025/04/07 | Plumbing | Rough-in | NOT READY | Paul Nitz | Area C - Level 1 and 2 - DWV (PVC re-inspection) - Remaining Areas |
2025/04/07 | Electrical | Wall Rough-in | NOT READY | James Melvin | Area D - Level 1 - In-Wall Electrical Rough-In - Column Line's M to T & 22.7 to 27 |
2025/04/07 | Mechanical | Insulation | Cancelled | Paul Nitz | Area A - Level 2 - All overhead MEP insulation (prior to ceiling close up) Area B - Level 2 - All overhead MEP insulation (prior to ceiling close up) |
2025/04/04 | Building/Structural | Wall/Ceiling | Failed | Kody Boswell | Reviewed reinforcing steel for stair wall at area development. There were missing vertical hook bars at the brick ledge. This was discussed with the Contractor while on site. |
2025/04/04 | Building/Structural | Slab | Passed | Kody Boswell | Reviewed reinforcing steel for slab infill at IPF per RFI 460 |
2025/04/04 | Plumbing | Rough-in | Passed | Paul Nitz | 1) Area C - Level 2 - DW and DWV - Remaining Restroom & Lobby Piping 2) Area C - Level 1 - DW and DWV - Restroom & Barber Shop 3) Area D - Level 1 - DWV - Miscellaneous Rooms (to be tracked on marked up paperwork) |
2025/04/04 | Plumbing | Water Piping & Test | Failed | Paul Nitz | 1) Area C - Level 2 - DW and DWV - Remaining Restroom & Lobby Piping 2) Area C - Level 1 - DW and DWV - Restroom & Barber Shop 3) Area D - Level 1 - DWV - Miscellaneous Rooms (to be tracked on marked up paperwork) 1) vent not filled with water 2) water closet was leaking |
2025/04/03 | Building/Structural | Framing | Passed | Kody Boswell | Exterior soffit on level 400 roof. |
2025/04/03 | Mechanical | Equipment | Passed | Paul Nitz | 1) Duct/Fire Smoke Damper Visual - Hydrotherapy Pit Rated Shaft - Area A level 1 - *this was inspected on 4/03* 2) VAV Visuals - Area B/C - Level’s 1 and 2 |
2025/04/03 | Mechanical | Duct Rough-in | Passed | Paul Nitz | 1) Duct/Fire Smoke Damper Visual - Hydrotherapy Pit Rated Shaft - Area A level 1 - *this was inspected on 4/03* 2) VAV Visuals - Area B/C - Level’s 1 and 2 |
2025/04/02 | Mechanical | Duct Rough-in | Passed | Paul Nitz | Duct Visual - A100, C100, D100 - Ongoing Inspections |
2025/04/02 | Building/Structural | Sheetrock | Passed | Kody Boswell | Exterior screw inspection area C and D, level 100 |
2025/04/01 | Mechanical | Duct Rough-in | NOT READY | Paul Nitz | 1) Duct Visual - Level 1 - A100 (Hydro pit rated shaft), C100, and D100 - Ongoing Inspections |
2025/04/01 | Mechanical | Insulation | NOT READY | Paul Nitz | Area B and C - Level 1 - Locker Room & Hydrotherapy Area - All duct insulation |
2025/04/01 | Building/Structural | Structural | NOT READY | Kody Boswell | Reviewed reinforcing steel for area development wall., area D |
2025/04/01 | Building/Structural | Slab | Passed | Kody Boswell | Sidewalk section on west side of building. |
2025/04/01 | Plumbing | Water Piping & Test | Passed | Paul Nitz | Area C - Level 2 - In-wall and overhead DW & DWV - Remaining Areas - CL's A to K & 18 to 27 |
2025/04/01 | Plumbing | Rough-in | NOT READY | Paul Nitz | Area C - Level 2 - In-wall and overhead DW & DWV - Remaining Areas - CL's A to K & 18 to 27 |
2025/03/31 | Mechanical | Duct Rough-in | Passed | Paul Nitz | Duct Visual - Ongoing Inspections - L100 - Area’s B, C, and D |
2025/03/28 | Electrical | Wall Rough-in | Cancelled | Rocky Wilde | In-wall electrical rough-in for Area-C level 200. CL 19-27. Visual duct inspection Area-D Level 100 CL M-T. 1) this area was previously lookedat byy Al Smythe |
2025/03/28 | Mechanical | Duct Rough-in | Passed | Paul Nitz | Area D - Level 1 - Duct Visual - Ongoing inspections |
2025/03/28 | Mechanical | Duct Rough-in | Passed | Paul Nitz | In-wall electrical rough-in for Area-C level 200. CL 19-27. Visual duct inspection Area-D Level 100 CL M-T. |
2025/03/27 | Building/Structural | Wall/Ceiling | Passed | Kody Boswell | In-progress inspection for Insulated Metal Panels (East facade K-line) Fasteners and panel install. |
2025/03/27 | Building/Structural | Framing | Passed | Kody Boswell | Reviewed LG framing for exterior players entrance ramp wall and loading dock |
2025/03/27 | Building/Structural | Framing | Passed | Kody Boswell | Reviewed sheathing attachment to interior LG partition walls for Area A and Area B, level 100. |
2025/03/25 | Electrical | Wall Rough-in | Passed | Al Smythe | Area C - Level 2 - In-Wall Electrical R/I - Column Line’s 18-27 & A to K |
2025/03/25 | Fire Safety | Fire Alarm Rough-In | Passed | Mary Creason | Area C - Level 2 - In-Wall FA rough-in FA rough in passed however one strobe light required in restroom (mens) - See approved plans |
2025/03/25 | Mechanical | Duct Rough-in | Passed | Paul Nitz | Duct Visual - Areas: L100 Area C & L100 Area D - Ongoing Inspections |
2025/03/25 | Plumbing | Rough-in | Passed | Paul Nitz | Area C - Level 2 - In-Wall & OH DW + DWV (PVC and Copper) - Remaining Areas - Column Line's 18 to 27 & A to K |
2025/03/24 | Plumbing | Water Piping & Test | Passed | Paul Nitz | Area C - Level 2 - In-Wall & OH DW + DWV (PVC and Copper) - Remaining Areas - Column Line's 18 to 27 & A to K |
2025/03/24 | Building/Structural | Slab | Passed | Kody Boswell | reviewed reinforcing steel fo site sidewalk at North end of the building |
2025/03/24 | Electrical | Wall Rough-in | NOT READY | James Melvin | Area C - Level 2 - In-Wall electrical rough-in (prior to wall close up) - Column line's 18 to 27: A to K |
2025/03/24 | Fire Safety | Fire Alarm Rough-In | NOT READY | Mary Creason | Area C - Level 2 - In-Wall Fire Alarm Rough-In - Column line's 18 to 27 & A to K Inspected one device and then Alex -WT said they weren't ready and for me to come back tomorrow. |
2025/03/24 | Mechanical | Duct Rough-in | Passed | Paul Nitz | Duct Visual - Area C L100, Area D L100, Area B L300 - Ongoing inspection |
2025/03/21 | Building/Structural | Framing | Passed | Kody Boswell | Reviewed LG framing for Area-B level 100 |
2025/03/21 | Mechanical | Duct Rough-in | Passed | James Melvin | Area B/C - Level 1 - Duct Visual - Ongoing inspections prior to insulation |
2025/03/20 | Plumbing | Rough-in | Passed | Paul Nitz | Area B Level 1 - In-Wall Piping Insulation - *Re-inspection* - Column Lines A to K & 10 to 18 |
2025/03/19 | Building/Structural | Slab | Passed | Kody Boswell | Reviewed reinforcing steel for loading dock slab on grade in area C |
2025/03/19 | Plumbing | Rough-in | Failed | Paul Nitz | Area B - Level 1 - In-Wall Plumbing Insulation - Column Line's 10 to 18 & A to K 1) insulation was not sealed properly and was missing in multiple locations |
2025/03/19 | Building/Structural | Structural | Passed | Kody Boswell | Reviewed reinforcing steel for loading dock slab on grade in area C |
2025/03/19 | Building/Structural | Roofing | Passed | Kody Boswell | In-progress inspection of ongoing roofing in areas C and D |
2025/03/18 | Building/Structural | Framing | Passed | Kody Boswell | Reviewed LG framing for 2 knee walls on level 100, area A. |
2025/03/18 | Building/Structural | Masonry | Passed | Kody Boswell | Reviewed 2nd lift of a wall in the hydrotherapy pit, this wall is topped out. |
2025/03/18 | Building/Structural | Roofing | Passed | Kody Boswell | In-progress of inspection of ongoing roofing in areas C and D. Area C, level 300, cap sheet installation. Area D, level 200, foam insulation and LWE concrete. |
2025/03/18 | Building/Structural | Sheetrock | Passed | Kody Boswell | Reviewed interior sheathing for several walls on Level 200, Area B between grids 17-21 |
2025/03/18 | Building/Structural | Framing | NOT READY | Kody Boswell | Exterior soffit level 400 B. Contractor was not ready for inspection at time of arrival of FSU BCA on site |
2025/03/18 | Building/Structural | Masonry | Passed | Kody Boswell | Reviewed masonry bond beam at hydro pit. This was the 2nd lift, wall is topped out. |
2025/03/18 | Mechanical | Duct Rough-in | NOT READY | Paul Nitz | Miscellaneous Duct OH Visuals - Area A level 1+2 and Area C |
2025/03/17 | Mechanical | Insulation | Passed | Paul Nitz | 1) Duct Rough-In (Visual) - Area B Level 1 - Partial Inspection 2) Duct Insulation - Area A Level 2 - Fire Rated Shaft at Team Meeting Room |
2025/03/17 | Building/Structural | Framing | Failed | Kody Boswell | Reviewed LG framing for exterior wall along grid E/21-24, between levels 200 and 300. LG wall was not in compliance with the contract documents. The following issues need to be addressed: 1) Missing clip angles for window sills need to be installed. 2) Window jamb framing was not verifiable due to windows being installed. Jamb framing must be verified. 3) Built-up header beams for openings were constructed with punched members. Per "Headers" note 1 on sheet LG0.1, headers must be constructed with unpunched membrs. This was discussed on site. It is acceptable for the LG Engineer to provide a statement allowing headers to be constructed with punched members. |
2025/03/17 | Plumbing | Water Piping & Test | Partial | Paul Nitz | Area C - Level 2 - OH and In-Wall Plumbing (DW and DWV) |
2025/03/17 | Plumbing | Rough-in | Passed | Paul Nitz | Area C - Level 2 - OH and In-Wall Plumbing (DW and DWV) |
2025/03/17 | Mechanical | Duct Rough-in | Passed | Paul Nitz | 1) Duct Rough-In (Visual) - Area B Level 1 - Partial Inspection 2) Duct Insulation - Area A Level 2 - Fire Rated Shaft at Team Meeting Room |
2025/03/17 | Building/Structural | Roofing | NOT READY | Kody Boswell | Ongoing roofing area C level 300. FSU BCA did not observe any progress on roofing. |
2025/03/17 | Building/Structural | Sheetrock | NOT READY | Kody Boswell | There was no sheathing inspection ready |
2025/03/17 | Building/Structural | Structural | Conditional | Kody Boswell | Reviewed reinforcing steel for the landscape retaining wall south of the building in area D. Resuls is conditional pending pipe sleeve pentration installation and vertical control joint installation. |
2025/03/17 | Building/Structural | Framing | Passed | Kody Boswell | Reviewed LG framing for the level 400 roof soffit (west elevation) and LG framing for exterior walls along grid E/24-27. |
2025/03/17 | Building/Structural | Masonry | Passed | Kody Boswell | Reviewed reinforcing steel for masonry walls down in the hydrotherapy pit. Walls are nonload bearing |
2025/03/17 | Plumbing | Rough-in | Passed | Paul Nitz | In-Wall Plumbing Insulation - Area A and B Level 1 - *Prior to Wall Close Up* |
2025/03/14 | Building/Structural | Sheetrock | Passed | Paul Nitz | Screw inspection level 2 for mud up. courtesy inspection stairs C1 Masonry at hydro pit. ongoing roof at D Exterior sheeting |
2025/03/14 | Fire Safety | Fire Alarm Rough-In | Passed | Mary Creason | Fire Alarm wall rough-in - Level 1 - Area B and Area D Visual inspection conducted - passed |
2025/03/14 | Mechanical | Duct Rough-in | Passed | Paul Nitz | 1) Area B - Levels 1/2 - Duct pressure/leak test #'s 8 and 9 2) Area A - Level 2 - Duct & Fire Damper Visual - Fire Rated Shaft at Team Meeting Room 3) Area B/C - Level 1 - Duct Visual - Locker Room & Other Misc. Rooms |
2025/03/14 | Mechanical | Duct Pressure Test | Passed | Paul Nitz | 1) Area B - Levels 1/2 - Duct pressure/leak test #'s 8 and 9 2) Area A - Level 2 - Duct & Fire Damper Visual - Fire Rated Shaft at Team Meeting Room 3) Area B/C - Level 1 - Duct Visual - Locker Room & Other Misc. Rooms |
2025/03/14 | Building/Structural | Framing | Passed | Paul Nitz | Screw inspection level 2 for mud up. courtesy inspection stairs C1 Masonry at hydro pit. ongoing roof at D Exterior sheeting |
2025/03/14 | Fire Safety | Fire Alarm Rough-In | Passed | Mary Creason | Fire alarm rough-in - Walls only - Level 100 Area's B and D visual - passed |
2025/03/14 | Building/Structural | Roofing | Passed | Paul Nitz | Screw inspection level 2 for mud up. courtesy inspection stairs C1 Masonry at hydro pit. ongoing roof at D Exterior sheeting |
2025/03/14 | Building/Structural | Masonry | Passed | Paul Nitz | Screw inspection level 2 for mud up. courtesy inspection stairs C1 Masonry at hydro pit. ongoing roof at D Exterior sheeting |
2025/03/13 | Building/Structural | Roofing | Passed | Kody Boswell | Reviewed roof deck attachment for level B 400 in the area between grids E-L/13-20 |
2025/03/13 | Building/Structural | Framing | Passed | Kody Boswell | Reviewed LG framing for level 400 roof, south side, along grid 20/E-L |
2025/03/13 | Building/Structural | Structural | Passed | Kody Boswell | Reviewed reinforcing steel for several curbs and pour backs Area C level 1. This was a re-inspection. |
2025/03/13 | Mechanical | HW Piping & Test | Passed | Paul Nitz | Area C - Level 2 - CW and HW piping - Visual and pressure test |
2025/03/13 | Building/Structural | Slab | Passed | Kody Boswell | Reviewed reinforcing steel for several curbs and pour backs Area C level 1. This was a re-inspection. |
2025/03/13 | Mechanical | CHW Piping & Test | Passed | Paul Nitz | Area C - Level 2 - CW and HW piping - Visual and pressure test |
2025/03/13 | Mechanical | Duct Rough-in | Failed | Paul Nitz | Duct Visual Inspections - Area A L100 (remaining areas), Area B L100, and Area C L200 1) missing straps in multiple areas |
2025/03/13 | Building/Structural | Insulation | Passed | Kody Boswell | Reviewed insulated metal Panels east facade on grid K |
2025/03/12 | Building/Structural | Slab | NOT READY | Kody Boswell | Reviewed reinforcing steel for several curbs in area C. Contractor was not ready. |
2025/03/11 | Building/Structural | Slab | Passed | Kody Boswell | Reviewed reinforcing steel for several curbs in area C |
2025/03/11 | Building/Structural | Structural | Passed | Kody Boswell | Reviewed reinforcing steel for several curbs in area C |
2025/03/10 | Fire Safety | Fire Alarm Rough-In | Passed | Mary Creason | Area A - Level 1 - In-Wall Fire Alarm Rough-In - Column Line's 1 to 10 & A to K Visual on rough in for FA - Passed |
2025/03/10 | Mechanical | Duct Rough-in | Failed | Paul Nitz | Area A and B - Level 2 - VAV install and duct tie-ins - Column Line's 1 to 18 & A to K - *Not including walk thru space* 1) straps missing on VAV's 2) Access panels required for VAV's above the hard lid 3) Framing was blocking one VAV Access |
2025/03/10 | Mechanical | Equipment | Failed | Paul Nitz | Area A and B - Level 2 - VAV install and duct tie-ins - Column Line's 1 to 18 & A to K - *Not including walk thru space* 1) straps missing on VAV's 2) Access panels required for VAV's above the hard lid 3) Framing was blocking one VAV Access |
2025/03/07 | Plumbing | Gas Piping & Test | Passed | Paul Nitz | OH Gas Main - Level 1 - Column line’s 7 to 21 |
2025/03/07 | Building/Structural | Framing | Passed | Kody Boswell | Reviewed LG framing for interior walls in the follwing areas: 1) Level 100, area A, between grids C-D/1-3 2) Level 100, area A, between grids D-G/6.9-10 3) Level 200, area B, between grids A-F/10-18 |
2025/03/07 | Mechanical | Equipment | Passed | Paul Nitz | 1) Area A Level 2 - Duct Insulation/Fire-Smoke Damper - Rated Shaft in Female GA locker room 2) Area B Level 1 - OH Duct visual - Hydrotherapy Area |
2025/03/07 | Mechanical | Insulation | Passed | Paul Nitz | 1) Area A Level 2 - Duct Insulation/Fire-Smoke Damper - Rated Shaft in Female GA locker room 2) Area B Level 1 - OH Duct visual - Hydrotherapy Area |
2025/03/07 | Mechanical | Duct Rough-in | Passed | Paul Nitz | 1) Area A Level 2 - Duct Insulation/Fire-Smoke Damper - Rated Shaft in Female GA locker room 2) Area B Level 1 - OH Duct visual - Hydrotherapy Area |
2025/03/07 | Plumbing | Gas Piping & Test | Passed | Paul Nitz | OH Gas Main - Level 1 - Column line’s 7 to 21 |
2025/03/07 | Building/Structural | Framing | Passed | Kody Boswell | Reviewed LG framing for the following: 1) Exterior parapet wall on level 200 roof along grid 27/M-L 2) Exterior wing wall framing located at grids K/13 and K/19 |
2025/03/06 | Building/Structural | Framing | Postponed | Kody Boswell | LG framing for wing walls located at grids L/13 and L/18. FSU BCA arrived on site at 4pm. Inspection postponed due to subcontractor not on site. |
2025/03/06 | Building/Structural | Slab | Passed | Kody Boswell | Reviewed reinforcing steel for slab on grade in the area between grids 22.7-26/L-M |
2025/03/05 | Mechanical | Duct Rough-in | Passed | Paul Nitz | Area A - Level 1 - OH Duct Visual - Remaining Areas |
2025/03/05 | Building/Structural | Structural | Passed | Kody Boswell | FTG for area development at stairs |
2025/03/05 | Building/Structural | Footing | Passed | Kody Boswell | FTG for area development at stairs |
2025/03/04 | Plumbing | Storm Piping & Test | Failed | Paul Nitz | Area B and C - Levels 2+3 - OH Storm piping - Column Line's 10 to 20:A to D 1) PVC horizontal spacing not met per fbcP308.5 |
2025/03/04 | Building/Structural | Framing | Failed | Kody Boswell | Reviewed exterior LG framing for the following: 1) West soffit framing, level 400 roof 2) Pop up roof framing in area C West soffit framing was missing a screw at each vertical stud into the horizontal custom track. Pop up roof framing and built up column framing did not match shop drawings at the NE and NW corners. Re-inspection is required for the soffit and pop up roof. |
2025/03/04 | Building/Structural | Wall/Ceiling | Passed | Kody Boswell | Interior framing screw inspection level 2, CL 7 to 12. |
2025/03/04 | Mechanical | Duct Rough-in | Conditional | Paul Nitz | Area A - Level 1 - OH Duct Rough-In Visual - Partial Inspection 1) straps missing |
2025/03/04 | Building/Structural | Footing | Passed | Kody Boswell | Reviewed reiinforcing steel for several footings for the ramp located in area D |
2025/03/03 | Plumbing | Storm Piping & Test | NOT READY | Paul Nitz | Area B and C - Levels 2+3 - OH Storm piping - Column Line's 10 to 20:A to D |
2025/03/03 | Fire Safety | Fire Alarm Rough-In | Passed | Mary Creason | Area B - Level 2 - In-Wall Fire Alarm Rough-In - Column Line's 10 to 18 & A to K - *Does not include team meeting room and walk thru space |
2025/02/28 | Building/Structural | Footing | Passed | Kody Boswell | Re-inspection for reinforcing steel for retaining wall footing from grids Q.5- M on the south side of the site |
2025/02/28 | Building/Structural | Framing | Passed | Kody Boswell | level 200 area A screw inspection from GL-1-10 |
2025/02/28 | Plumbing | Storm Piping & Test | NOT READY | Paul Nitz | Area B - Levels 2 to 3 - OH Storm Piping (6" and 8") - Column Line's 10-14 & A-D |
2025/02/28 | Mechanical | Duct Pressure Test | Passed | Paul Nitz | 1) Area A - Level 2 - Duct Pressure/Leakage Test - Test #7 (AHU 1-2, Riser Area A2) 2) Area B - Level 2 - Duct Rough-In Visual 3) Area A - Level 1 - Duct Rough-In Visual |
2025/02/28 | Mechanical | Duct Rough-in | Passed | Paul Nitz | 1) Area A - Level 2 - Duct Pressure/Leakage Test - Test #7 (AHU 1-2, Riser Area A2) 2) Area B - Level 2 - Duct Rough-In Visual 3) Area A - Level 1 - Duct Rough-In Visual |
2025/02/28 | Building/Structural | Slab | Failed | Kody Boswell | Reviewed reinforcing steel for the washroom slab located in the area between grids D-E/15-16. There were some cover issues around the trench and excessive debris where concrete is to be placed. |
2025/02/27 | Mechanical | Duct Rough-in | Passed | Paul Nitz | 1) Area A - Level 2 - Duct Pressure/Leakage Test - Test #7 - AHU 1-2 (Riser Area A2) 2) Area A - Level 2 - Duct Rough-In Visual - Remaining Areas 3) Area B - Level 2 - Duct Rough-In Visual - Column Line's 10 to 15 & A to F |
2025/02/27 | Electrical | Wall Rough-in | Passed | James Melvin | 1) Area B - Level 2 - In-Wall Electrical Rough-In - Column Line's 15 to 18 - *Does not include walk thru space* 2) Area A - Level 1 - In-Wall Electrical Rough-In - Column Line's 1 to 10 & A to K - *Does not include weight room* |
2025/02/27 | Mechanical | Duct Pressure Test | NOT READY | Paul Nitz | 1) Area A - Level 2 - Duct Pressure/Leakage Test - Test #7 - AHU 1-2 (Riser Area A2) 2) Area A - Level 2 - Duct Rough-In Visual - Remaining Areas 3) Area B - Level 2 - Duct Rough-In Visual - Column Line's 10 to 15 & A to F |
2025/02/27 | Building/Structural | Footing | Failed | Kody Boswell | Reviewed reinforcing steel for the south site wall footing between grids Q-N |
2025/02/27 | Plumbing | Storm Piping & Test | Passed | Paul Nitz | Area B - Level 2 - OH Storm (6" & 8") - Column line's 10 to 14 & A to D |
2025/02/27 | Building/Structural | Slab | NOT READY | Kody Boswell | Contractor informed FSU BCA after site arrival that the washing machine room slab /curb was not ready for inspection |
2025/02/27 | Building/Structural | Framing | NOT READY | Kody Boswell | There was no framing ready for inspection. FSU BCA was on site for another inspection |
2025/02/27 | Electrical | Wall Rough-in | Passed | Al Smythe | 1) Area B - Level 2 - In-Wall Electrical Rough-In - Column Line's 15-18 & A to F 2) Area A - Level 1 - In-Wall Electrical Rough-In - Column Line's 1 to 10 & A to K - *Not including weight room* |
2025/02/26 | Building/Structural | Sheetrock | Passed | Kody Boswell | Reviewed sheathing attachment in the electrical room in area C |
2025/02/26 | Building/Structural | Structural | Passed | Kody Boswell | Reviewed reinforcing steel for the foundation for the southern site wall, between grids Q-T |
2025/02/26 | Building/Structural | Footing | Passed | Kody Boswell | Reviewed reinforcing steel for the foundtion for the southern site wall, between grids Q-T |
2025/02/26 | Mechanical | Duct Pressure Test | Passed | Paul Nitz | 1) Area A - Level’s 1 and 2 - OH duct rough-in and pressure test (supply - medium pressure and return mains) - *does not include Weight room* |
2025/02/26 | Mechanical | Duct Rough-in | Passed | Paul Nitz | 1) Area A - Level’s 1 and 2 - OH duct rough-in and pressure test (supply - medium pressure and return mains) - *does not include Weight room* |
2025/02/26 | Mechanical | Duct Pressure Test | Passed | Paul Nitz | Area B - Level’s 1 and 2 - OH duct rough-in and pressure test (supply - medium pressure and return mains) - does not include team meeting room, walk thru space, and hydrotherapy area) |
2025/02/26 | Mechanical | Duct Rough-in | Passed | Paul Nitz | Area B - Level’s 1 and 2 - OH duct rough-in and pressure test (supply - medium pressure and return mains) - does not include team meeting room, walk thru space, and hydrotherapy area) |
2025/02/26 | Plumbing | Storm Piping & Test | Conditional | Paul Nitz | 1) Area B - Level 1 - In-Wall and OH DWV re-inspection 2) Area B - Level 2 - Storm piping mains feeding gutter system (level 2 to level 3) 1) test ball needs to be removed from the pipe it is stuck in |
2025/02/26 | Plumbing | Rough-in | Passed | Paul Nitz | 1) Area B - Level 1 - In-Wall and OH DWV re-inspection 2) Area B - Level 2 - Storm piping mains feeding gutter system (level 2 to level 3) |
2025/02/26 | Building/Structural | Wall/Ceiling | NOT READY | Kody Boswell | FSU BCA arrived on site and there was not wall to review |
2025/02/26 | Building/Structural | Framing | NOT READY | Kody Boswell | nterior framing Exterior framing. FSU BCA arrived on site and there was no framing ready for inspection |
2025/02/25 | Plumbing | Rough-in | Passed | Paul Nitz | Area B - Level 1 - In-Wall and Overhead Piping (DW and DWV) - *Does not include Hydrotherapy and Resistance Pool Areas* |
2025/02/25 | Plumbing | Water Piping & Test | Failed | Paul Nitz | Area B - Level 1 - In-Wall and Overhead Piping (DW and DWV) - *Does not include Hydrotherapy and Resistance Pool Areas* 1) venting needs to be retested |
2025/02/24 | Building/Structural | Insulation | Passed | Kody Boswell | Reviewed LG framing insulation on level 2 area A, between grids 1-4. |
2025/02/24 | Building/Structural | Framing | Conditional | Kody Boswell | Reviewed LG framing on level 2 area A, between grids 7-10. Result is conditional pending some repairs to be done where vertical studs were cut excessively by the plumbing subcontractor. |
2025/02/24 | Building/Structural | Slab | Passed | Kody Boswell | Reviewed reinforcing steel for several curbs on level one, areas C and D |
2025/02/21 | Building/Structural | Slab | Passed | Kody Boswell | Reviewed reinforcing steel for curbs in area C |
2025/02/21 | Electrical | Wall Rough-in | Passed | Rocky Wilde | Area B - Level 2 - In-Wall Rough-In - Column Line's 10 to 19 & A to K - *Does not include main team meeting room or walk-thru space* |
2025/02/20 | Building/Structural | ADA | Passed | Paul Nitz | Courtesy on Exterior stairs near score board. Fireproofing level 1 and 2. Area A. Curb inspection area C level 1&2 |
2025/02/20 | Building/Structural | Framing | Passed | Paul Nitz | Courtesy on Exterior stairs near score board. Fireproofing level 1 and 2. Area A. Curb inspection area C level 1&2 Fireproofing |
2025/02/20 | Building/Structural | Slab | NOT READY | Paul Nitz | Courtesy on Exterior stairs near score board. Fireproofing level 1 and 2. Area A. Curb inspection area C level 1&2 |
2025/02/20 | Fire Safety | Fire Alarm Rough-In | Passed | Sam Sevor | Area A - Level 2 - In-Wall Fire Alarm Rough-In - Column Line's 1 to 10 & A to K In Wall rough in only. |
2025/02/18 | Building/Structural | Slab | Passed | Kody Boswell | Reviewed renforcing steel for the several curbs. 2 areas on ground floor (area C & area D) and 1 area on second floor (patio) |
2025/02/18 | Building/Structural | Framing | Failed | Kody Boswell | Reviewed storefront framing attachment to structure in the following areas: (1) Level 1 to level 2, east elevation, between grids 13-15 (2) Level 2 to level 4 roof, east elevation, between grids 11-13 Notes: Storefront (1) head fastening was not in compliance with shop drawings\installation instructions. Shop drawings show connections occuring at vertical jambs. Contractor installed connections occuring approximately in the middle of each vertical jamb. Contractor to correct connections per shop drawings or get approval from the delegated design engineer |
2025/02/17 | Building/Structural | Roofing | NOT READY | Paul Nitz | Ongoing stair inspection Ongoing Roof Curbs |
2025/02/17 | Building/Structural | Structural | Passed | Paul Nitz | Ongoing stair inspection Ongoing Roof Curbs |
2025/02/17 | Building/Structural | Slab | NOT READY | Paul Nitz | Ongoing stair inspection Ongoing Roof Curbs |
2025/02/17 | Building/Structural | ADA | NOT READY | Paul Nitz | Ongoing stair inspection Ongoing Roof Curbs |
2025/02/14 | Building/Structural | Roofing | NOT READY | Kody Boswell | |
2025/02/14 | Building/Structural | Structural | Passed | Kody Boswell | |
2025/02/14 | Building/Structural | Slab | Passed | Kody Boswell | Reviewed reinforcing steel for a curb in area D |
2025/02/13 | Building/Structural | ADA | NOT READY | Kody Boswell | Courtesy inspection for stairs. No new stairs ready to be reviewed |
2025/02/13 | Electrical | Wall Rough-in | Passed | Al Smythe | 1) Area B - level 2 - in-wall electrical rough-in - column line's 10 to 19 & A to K - *does not include large team meeting room and walk through space* 2) Area D - level 1 - in-wall electrical rough-in - column line's 22.7 to 27 & M to T |
2025/02/13 | Building/Structural | Roofing | NOT READY | Kody Boswell | Ongoing roof Courtesy inspection for stairs |
2025/02/13 | Building/Structural | Structural | NOT READY | Kody Boswell | Ongoing roof. No no roofing to be reviewed |
2025/02/12 | Building/Structural | Slab | Passed | Kody Boswell | Reviewed reinforcing steel for the NW exterior stair |
2025/02/12 | Building/Structural | ADA | Passed | Kody Boswell | Courtesy inspection on stairs A1, A2,B2. Contractor requested FSU BCA to review riser dimensional uniformity |
2025/02/12 | Building/Structural | Structural | Passed | Kody Boswell | Reviewed reinforcing steel for the NW exterior stair |
2025/02/12 | Building/Structural | Roofing | Passed | Kody Boswell | |
2025/02/12 | Building/Structural | Framing | Passed | Kody Boswell | Reviewed exterior LG soffit framing along the east elevation along grids 11 and L/11-19 |
2025/02/12 | Building/Structural | Wall/Ceiling | Passed | Kody Boswell | |
2025/02/11 | Building/Structural | Framing | Postponed | Kody Boswell | East soffit framing was postponed |
2025/02/11 | Building/Structural | Slab | NOT READY | Kody Boswell | Reviewed reinforcing steel for curb on area D |
2025/02/11 | Building/Structural | Roofing | Passed | Kody Boswell | Ongoing roof |
2025/02/11 | Plumbing | Storm Piping & Test | Passed | Paul Nitz | Area C - Level 1 - OH Storm Piping and Test (10") - Primary and Overflow lines |
2025/02/10 | Building/Structural | Structural | Passed | Paul Nitz | Slab on grade area C Pour#2. Curbs area D On going Roof ON going IMP west side of building. |
2025/02/10 | Building/Structural | Roofing | Passed | Paul Nitz | Slab on grade area C Pour#2. Curbs area D On going Roof ON going IMP west side of building. |
2025/02/10 | Mechanical | CHW Piping & Test | Passed | Paul Nitz | Area B - Level 2 - Copper piping to Team Meeting Room Area B - Level 3 - OH Copper piping to equipment and devices |
2025/02/10 | Building/Structural | Slab | Passed | Paul Nitz | Slab on grade area C Pour#2. Curbs area D On going Roof ON going IMP west side of building. |
2025/02/10 | Building/Structural | Framing | Passed | Paul Nitz | Slab on grade area C Pour#2. Curbs area D On going Roof ON going IMP west side of building. |
2025/02/10 | Mechanical | HW Piping & Test | Passed | Paul Nitz | Area B - Level 2 - Copper piping to Team Meeting Room Area B - Level 3 - OH Copper piping to equipment and devices |
2025/02/07 | Building/Structural | Slab | Passed | Paul Nitz | Ongoing roofing area C. Bolt inspection for East glazing. Area B and C level 2. Curb in area D. Ongoing IMP panels west side. |
2025/02/07 | Building/Structural | Framing | Passed | Paul Nitz | Ongoing roofing area C. Bolt inspection for East glazing. Area B and C level 2. Curb in area D. Ongoing IMP panels west side. |
2025/02/07 | Building/Structural | Roofing | Passed | Paul Nitz | Ongoing roofing area C. Bolt inspection for East glazing. Area B and C level 2. Curb in area D. Ongoing IMP panels west side. |
2025/02/07 | Building/Structural | Structural | Passed | Paul Nitz | Ongoing roofing area C. Bolt inspection for East glazing. Area B and C level 2. Curb in area D. Ongoing IMP panels west side. |
2025/02/06 | Building/Structural | Roofing | NOT READY | Kody Boswell | Curbs area D ongoing Roof in C ongoing IMP Exterior framing / Interior framing FSU BCA arrived on site and there was nothing ready for inspection |
2025/02/06 | Building/Structural | Framing | NOT READY | Kody Boswell | Curbs area D ongoing Roof in C ongoing IMP Exterior framing / Interior framing FSU BCA arrived on site and there was nothing ready for inspection |
2025/02/06 | Building/Structural | Structural | NOT READY | Kody Boswell | Curbs area D ongoing Roof in C ongoing IMP Exterior framing / Interior framing FSU BCA arrived on site and there was nothing ready for inspection |
2025/02/06 | Building/Structural | Slab | NOT READY | Kody Boswell | Curbs area D ongoing Roof in C ongoing IMP Exterior framing / Interior framing FSU BCA arrived on site and there was nothing ready for inspection |
2025/02/06 | Building/Structural | Wall/Ceiling | NOT READY | Kody Boswell | Curbs area D ongoing Roof in C ongoing IMP Exterior framing / Interior framing FSU BCA arrived on site and there was nothing ready for inspection |
2025/02/05 | Building/Structural | Roofing | Failed | Paul Nitz | Ongoing Roofing Housekeeping pads Insulated metal panels Exterior framing / East soffit. 1) not ready |
2025/02/05 | Building/Structural | Framing | Failed | Paul Nitz | Ongoing Roofing Housekeeping pads Insulated metal panels Exterior framing / East soffit. 1) not ready |
2025/02/05 | Building/Structural | Structural | Failed | Paul Nitz | Ongoing Roofing Housekeeping pads Insulated metal panels Exterior framing / East soffit. 1) not ready |
2025/02/04 | Building/Structural | Slab | Passed | Kody Boswell | Reviewed reinforcing steel for several column pour backs in area C |
2025/02/04 | Building/Structural | Sheetrock | Passed | Kody Boswell | Reviewed sheathing attachment to exterior LG wall framing for level 300, west and south elevations. There were some screws missing in a few locations. Contractor installed screws as FSU BCA pointed them out. |
2025/02/04 | Building/Structural | Roofing | NOT READY | Kody Boswell | There was no on-going roofing progress at time of inspection |
2025/02/03 | Building/Structural | Framing | NOT READY | Kody Boswell | Reviewed curtain wall frmaing attachment to the structure along the east elevation. Contractor was still installing framing and not ready for inspection |
2025/02/03 | Building/Structural | Wall/Ceiling | NOT READY | Kody Boswell | There was no wall ready for inspection |
2025/02/03 | Building/Structural | Structural | NOT READY | Kody Boswell | There was no structural inspection |
2025/02/03 | Building/Structural | Slab | NOT READY | Kody Boswell | There was no slab inspection |
2025/01/31 | Building/Structural | Structural | Passed | Kody Boswell | |
2025/01/31 | Plumbing | Rough-in | Passed | Paul Nitz | Area's A and B (Level 1) - DW and DWV - All locations besides over Hydrotherapy and Resistance pools |
2025/01/31 | Plumbing | Water Piping & Test | Passed | Paul Nitz | Area's A and B (Level 1) - DW and DWV - All locations besides over Hydrotherapy and Resistance pools |
2025/01/31 | Building/Structural | Footing | Passed | Kody Boswell | Reviewed reinforicng steel for 10 coulmn pourbacks in area C |
2025/01/31 | Building/Structural | Framing | Passed | Kody Boswell | Reviewed attachment of curtain wall framing to structure on the north elevation of the building. |
2025/01/30 | Building/Structural | Framing | Passed | Kody Boswell | |
2025/01/30 | Building/Structural | Roofing | Passed | Kody Boswell | |
2025/01/30 | Building/Structural | Slab | Passed | Kody Boswell | Reviewed reinforcing steel for several column pourbacks in area D |
2025/01/29 | Building/Structural | Structural | Passed | Kody Boswell | Reviewed reinforcing steel for the patio in a rea C, level 2 |
2025/01/29 | Building/Structural | Framing | NOT READY | Kody Boswell | There was no framing to be inspected. FSU BCA was on site for other inspections. |
2025/01/28 | Building/Structural | Footing | Passed | Kody Boswell | ongoing exterior store front ongoing IMP panels ongoing roof Pour backs framing exterior. framing interior. |
2025/01/28 | Plumbing | Underground | Passed | Paul Nitz | *1/27 Inspection* Area C/D - Underground Sanitary and Storm (ranges from 2" to 8") - remaining plumbing underground for all areas |
2025/01/28 | Building/Structural | Roofing | Passed | Kody Boswell | ongoing exterior store front ongoing IMP panels ongoing roof Pour backs framing exterior. framing interior. |
2025/01/28 | Mechanical | CHW Piping & Test | Passed | Paul Nitz | 1) Area B Level 1 - CHWS, CHWR, HHWS, & HHWR (ranges from 3/4" to 3") - Column lines 10-15 & A to K 2) Area B Level 2 - CHWS, CHWR, HHWS, & HHWR (ranges from 3/4" to 8") - Column lines 17-19.2 & A to F |
2025/01/28 | Building/Structural | Framing | Passed | Kody Boswell | Top out framing for area D |
2025/01/28 | Mechanical | HW Piping & Test | Passed | Paul Nitz | 1) Area B Level 1 - CHWS, CHWR, HHWS, & HHWR (ranges from 3/4" to 3") - Column lines 10-15 & A to K 2) Area B Level 2 - CHWS, CHWR, HHWS, & HHWR (ranges from 3/4" to 8") - Column lines 17-19.2 & A to F |
2025/01/28 | Building/Structural | Structural | Passed | Kody Boswell | |
2025/01/27 | Building/Structural | Framing | Cancelled | Paul Nitz | |
2025/01/27 | Building/Structural | Structural | Passed | Paul Nitz | |
2025/01/27 | Building/Structural | Slab | Passed | Paul Nitz | |
2025/01/24 | Building/Structural | Framing | Cancelled | Paul Nitz | SOG final inspection Pour backs Exterior Framing 1) I was contacted by Tony, and I informed him that the university was closed due to weather, he was fine with rescheduling, no concrete was being poured and nothing was being held up |
2025/01/24 | Building/Structural | Slab | Cancelled | Paul Nitz | SOG final inspection Pour backs Exterior Framing 1) campus was closed due to weather |
2025/01/24 | Building/Structural | Footing | Cancelled | Paul Nitz | SOG final inspection Pour backs Exterior Framing 1) campus was closed due to weather |
2025/01/21 | Building/Structural | Slab | Passed | Kody Boswell | Exterior Framing Ongoing roofing exterior panels IMP Exterior glazing |
2025/01/21 | Building/Structural | Wall/Ceiling | Passed | Kody Boswell | Exterior Framing Ongoing roofing exterior panels IMP Exterior glazing |
2025/01/21 | Building/Structural | Framing | Passed | Kody Boswell | Exterior Framing Ongoing roofing exterior panels IMP Exterior glazing |
2025/01/21 | Building/Structural | Roofing | Passed | Kody Boswell | Exterior Framing Ongoing roofing exterior panels IMP Exterior glazing |
2025/01/21 | Building/Structural | Structural | Passed | Kody Boswell | Exterior Framing Ongoing roofing exterior panels IMP Exterior glazing |
2025/01/17 | Building/Structural | Slab | Passed | Kody Boswell | Pour backs Ongoing Roof IPF panels ongoing Exterior framing area D |
2025/01/17 | Building/Structural | Roofing | Passed | Kody Boswell | Pour backs Ongoing Roof IPF panels ongoing Exterior framing area D |
2025/01/17 | Building/Structural | Structural | Passed | Kody Boswell | Pour backs Ongoing Roof IPF panels ongoing Exterior framing area D |
2025/01/17 | Building/Structural | Framing | Passed | Kody Boswell | Pour backs Ongoing Roof IPF panels ongoing Exterior framing area D |
2025/01/16 | Building/Structural | Framing | Passed | Kody Boswell | Exterior framing D blockoutss / pour backs Roofing on going Exterior insulated metal panels. |
2025/01/16 | Building/Structural | Structural | Passed | Kody Boswell | Exterior framing D blockoutss / pour backs Roofing on going Exterior insulated metal panels. |
2025/01/16 | Building/Structural | Slab | Passed | Kody Boswell | Exterior framing D blockoutss / pour backs Roofing on going Exterior insulated metal panels. |
2025/01/16 | Building/Structural | Roofing | Passed | Kody Boswell | Exterior framing D blockoutss / pour backs Roofing on going Exterior insulated metal panels. |
2025/01/15 | Mechanical | Duct Rough-in | Passed | Paul Nitz | Area A Level 2 - Ductwork Visual Inspection - Column Line's D to H & 7 to 9 - *Does Not Include Tie-Ins to Roof top AHUs as well as tie-ins to ceiling devices* |
2025/01/15 | Mechanical | CHW Piping & Test | Cancelled | Paul Nitz | Area B Level 1 - CHW & HW Piping Installation & Test - Column Line's 10 to 18 & A to J |
2025/01/15 | Mechanical | HW Piping & Test | Cancelled | Paul Nitz | Area B Level 1 - CHW & HW Piping Installation & Test - Column Line's 10 to 18 & A to J |
2025/01/15 | Building/Structural | Roofing | Passed | Kody Boswell | |
2025/01/15 | Building/Structural | Framing | Passed | Kody Boswell | |
2025/01/15 | Building/Structural | Slab | Passed | Kody Boswell | |
2025/01/14 | Building/Structural | Roofing | Passed | Kody Boswell | In-progress roofing |
2025/01/14 | Building/Structural | Framing | Passed | Kody Boswell | Reviewed LG framing for the roof parapet over area D |
2025/01/13 | Building/Structural | Roofing | Cancelled | Paul Nitz | ongoing roof. Interior framing /exterior framing Pour backs in area B and D. |
2025/01/13 | Building/Structural | Framing | Cancelled | Paul Nitz | ongoing roof. Interior framing /exterior framing Pour backs in area B and D. |
2025/01/13 | Building/Structural | Slab | Cancelled | Paul Nitz | ongoing roof. Interior framing /exterior framing Pour backs in area B and D. |
2025/01/10 | Plumbing | Underground | Passed | Paul Nitz | Underground - 3" Storm - Column Line's G to K:23 to 23.5 Water Piping & Test (DW) - 3/4" & 1-1/2" Lines - Two Restrooms (01.02.02 & 01.02.03) - Column Line's C to D:1 to 7 |
2025/01/10 | Building/Structural | Roofing | Passed | Paul Nitz | ongoing roof. Interior framing Pour backs in area B and D. |
2025/01/10 | Building/Structural | Framing | Passed | Paul Nitz | ongoing roof. Interior framing Pour backs in area B and D. |
2025/01/10 | Plumbing | Water Piping & Test | Passed | Paul Nitz | Underground - 3" Storm - Column Line's G to K:23 to 23.5 Water Piping & Test (DW) - 3/4" & 1-1/2" Lines - Two Restrooms (01.02.02 & 01.02.03) - Column Line's C to D:1 to 7 |
2025/01/10 | Building/Structural | Slab | Passed | Paul Nitz | ongoing roof. Interior framing Pour backs in area B and D. |
2025/01/09 | Building/Structural | Slab | Passed | Kody Boswell | Reviewed reinforcing steel for several column blockouts in area B |
2025/01/08 | Plumbing | Water Piping & Test | Passed | Paul Nitz | Area B - Level 2 - DW Rough-In & Pressure Test - In-Wall & OH Piping - Column Line's 9.5 to 11.5 : A to D |
2025/01/08 | Plumbing | Underground | Passed | Paul Nitz | Area C - Level 1 - UG Sanitary (4") - CL's 20 to 21 : G to E |
2025/01/08 | Building/Structural | Framing | Passed | Kody Boswell | Reviewed sheathing attachment for the roof-side parapet sheathing, area C, level 300 roof, east parapet. |
2025/01/08 | Building/Structural | Slab | Passed | Kody Boswell | Reviewed reinforcing steel for 5 pourbacks around steel columns located on level 100, area B |
2025/01/08 | Building/Structural | Roofing | Passed | Kody Boswell | In-progress inspection of PVC roofing membrane around roof penetrations in area A, level 300 roof. |
2025/01/07 | Building/Structural | Framing | Passed | Kody Boswell | Reviewed interior LG framing (top out) on level 200, area C |
2025/01/07 | Building/Structural | Roofing | Passed | Kody Boswell | |
2025/01/06 | Building/Structural | Roofing | Postponed | Kody Boswell | There was no roofing ready for inspection due to impending weather. Inspection to be postponed to a later date. |
2025/01/06 | Building/Structural | Framing | Passed | Kody Boswell | Reviewed LG framing for several interior walls, top out only. Area C |
2025/01/06 | Building/Structural | Slab | Passed | Kody Boswell | Reviewed reinforcing steel for a curb on the east side of the building, ground floor |
2025/01/03 | Building/Structural | Slab | Passed | Kody Boswell | Reviewed reinforcing steel for ground floor curbs on the east side of the building, areas B and C |
2025/01/03 | Building/Structural | Roofing | Passed | Kody Boswell | In-progress inspection of PVC roofing installation for level 3 roof in area B |
2024/12/31 | Plumbing | Storm Piping & Test | Passed | Paul Nitz | |
2024/12/31 | Plumbing | Water Piping & Test | Passed | Paul Nitz | |
2024/12/31 | Mechanical | HW Piping & Test | Passed | Paul Nitz | |
2024/12/31 | Plumbing | Specialty Piping | Passed | Paul Nitz | Pressure test |
2024/12/31 | Mechanical | CHW Piping & Test | Passed | Paul Nitz | |
2024/12/31 | Building/Structural | Framing | Passed | Kody Boswell | Reviewed 2nd lvl and roof lvl exterior framing on the east side of the building, area C |
2024/12/30 | Building/Structural | Framing | Passed | Kody Boswell | Reviewed LG framing for the parapet walls at the expansion joint located in area C, 3rd lvl roof |
2024/12/30 | Building/Structural | Slab | NOT READY | Kody Boswell | While on site for other inspections, the Contractor informed FSUthey were not ready for curb reinforcing inspection aong the east side of the building, areas B and C |
2024/12/30 | Building/Structural | Roofing | Passed | Kody Boswell | In-progress inspection of PVC roofing in area A, 3rd lvl roof |
2024/12/26 | Building/Structural | Framing | Passed | Rocky Wilde | SOG inspection exterior framing area C and A and miss. areas. |
2024/12/26 | Building/Structural | Roofing | Conditional | Rocky Wilde | ongoing inspection for PVC roof |
2024/12/26 | Building/Structural | Slab | Passed | Rocky Wilde | SOG inspection exterior framing area C and A and miss. areas. |
2024/12/20 | Plumbing | Rough-in | Conditional | Paul Nitz | Area A - Level 2 - Column Line's 7.5-9 & A-D - Overhead and In-Wall Plumbing Rough-In (DW & DWV) Area B - Level 2 - Column Line’s 9-11.3 & A-K - Overhead and In-Wall Plumbing Rough-in (DW & DWV) 1) copper on A was Ok 2) vent slope on A needs to addressed 3) Vent s need to be supported |
2024/12/20 | Mechanical | CHW Piping & Test | Cancelled | Paul Nitz | Area A - Level 2 - Overhead HW & CHW Piping - Column Line's 8.5-11 & A-D Area B - Level 2 - Overhead HW & CHW Piping - Column Line's 11-17 & C-J |
2024/12/20 | Mechanical | HW Piping & Test | Cancelled | Paul Nitz | Area A - Level 2 - Overhead HW & CHW Piping - Column Line's 8.5-11 & A-D Area B - Level 2 - Overhead HW & CHW Piping - Column Line's 11-17 & C-J |
2024/12/19 | Building/Structural | Roofing | Passed | Kody Boswell | In-progress inspection for LWIC (Lightweight insulated concrete). This inspection is for Area-A grout and EPS board. |
2024/12/19 | Plumbing | Rough-in | Conditional | Paul Nitz | Area A - Level 2 - Column Line’s 7-10 & A-K - Overhead and In-Wall Plumbing Rough-in (DW & DWV) 1) water hammers are missing on the lavs 2) shut off valve missing on hose bibs 3) Vent pipe is missing vertical supports 4) access panels required for all valves |
2024/12/19 | Mechanical | HW Piping & Test | Conditional | Paul Nitz | Area A - Level 1 - Overhead HW & CHW Rough-In & Test - Column Line's A-K & 6-10 1) horizontal supports missing |
2024/12/19 | Mechanical | CHW Piping & Test | Passed | Paul Nitz | Area A - Level 1 - Overhead HW & CHW Rough-In & Test - Column Line's A-K & 6-10 |
2024/12/19 | Building/Structural | Structural | Passed | Kody Boswell | Inspection for puddle welds, lap screws, decking. Level 300 Area-C. |
2024/12/18 | Plumbing | Rough-in | Cancelled | Paul Nitz | Area A - Level 2 - Column Line’s 7-10 & A-K - Overhead and In-Wall Plumbing Rough-in (Sanitary and Domestic Water) |
2024/12/17 | Mechanical | Duct Rough-in | Failed | Paul Nitz | Area A - Level 2 - OH Duct Rough-In - Column Line's 7-10 & A-K - Does not include VAV's and FCU's 1) Duct supports not secured 2) Duct supports are missing 3) Damper lever clearance not met 4) inspection canceled per contractor |
2024/12/17 | Building/Structural | Framing | Passed | Kody Boswell | Reviewed several LG interior partition walls on level 1 |
2024/12/16 | Building/Structural | Slab | Passed | Kody Boswell | Reviewed reinforcing steel for the 2nd level slab on deck located in the area between grids A-L/21-27.3 |
2024/12/13 | Building/Structural | Slab | Passed | Kody Boswell | Curb at North Line 1. |
2024/12/13 | Building/Structural | Framing | Passed | Kody Boswell | Interior framing |
2024/12/11 | Building/Structural | Slab | Conditional | Kody Boswell | Reviewed reinforcing steel for level 2 slab on metal deck in area C. The following items are to be addressed/corrected prior to concrete placement: 1) Deck to be cleaned of excessive debris 2) Missing reinforcing steel around the slab edge at elevator needs to be installed 3) Missing nelson studs along the slab edge bent plate at elevator need to be welded 4) Reinforcing steel at the outdoor patio transition needs to be corrected 5) Structural steel framing to be complete near the brace located along grid 20.8/D-E Items above were a work in progress when BCA left the job site. The Contractor assured wprk would be complete prior to concrete placement. Threshold inspector will verify. Note: BCA remained on site until approximately 6pm |
2024/12/11 | Building/Structural | Footing | Passed | Kody Boswell | Reviewed reinforcing steel for several column encasements in Area C level 1. |
2024/12/10 | Building/Structural | Framing | Passed | Kody Boswell | Level 400 East elevation exterior sheathing. |
2024/12/06 | Building/Structural | Framing | Passed | Kody Boswell | Interior framing Level 100 east wall near IPF top track. |
2024/12/06 | Building/Structural | Structural | Passed | Kody Boswell | Decking,Studs,lap screws, puddle welds. level 300 CL 10-18 Exterior framing at east near IPF wall. Level 400. PLEASE BRING HARNESS. |
2024/12/06 | Fire Safety | Fire Water Underground | Conditional | Sam Sevor | Conducted a visual inspection only for the partially completed fire underground. The completed portion passed the visual inspection. The original route has chnge from the original approved cicil drawings. Please note before any further inspections are conducted for this underground an updated approved set of plans will be required. |
2024/12/04 | Building/Structural | Framing | Passed | James Melvin | Level 300 Mechanical room drywall. Level 300 roof sheathing screws. Level 100 North exterior wall sheathing at stair. |
2024/12/04 | Building/Structural | Slab | Passed | James Melvin | |
2024/12/04 | Building/Structural | Framing | Passed | James Melvin | |
2024/12/04 | Mechanical | Duct Rough-in | Passed | Paul Nitz | Area A - AHU + Exhaust Fan Curb attachment (fastening) to roof decking - AHU #'s 1-1, 1-2, 2-1, & 2-2; EF #'s 3A-01 & 3A-02 |
2024/12/02 | Building/Structural | Framing | Passed | Kody Boswell | Level 300 Section B top track LG framing |
2024/12/02 | Building/Structural | Wall/Ceiling | Passed | Kody Boswell | |
2024/12/02 | Building/Structural | Framing | Passed | Kody Boswell | Level 200 Area A roof parapet framing, NE corner |
2024/12/02 | Building/Structural | Structural | Passed | Kody Boswell | |
2024/11/29 | Building/Structural | Framing | Passed | Rocky Wilde | Track seal on exterior east elevation ClL10-18. |
2024/11/26 | Plumbing | Water Piping & Test | Passed | Al Smythe | |
2024/11/26 | Plumbing | Rough-in | Passed | Al Smythe | |
2024/11/26 | Building/Structural | Structural | Passed | Rocky Wilde | exterior framing line 1 |
2024/11/26 | Building/Structural | Wall/Ceiling | Passed | Rocky Wilde | exterior framing line 1 |
2024/11/25 | Building/Structural | Framing | NOT READY | Rocky Wilde | |
2024/11/25 | Building/Structural | Wall/Ceiling | NOT READY | Rocky Wilde | |
2024/11/22 | Plumbing | Underground | Passed | Paul Nitz | Area D - UG Sanitary piping (2", 3", & 6") - piping runs to Janitor closet and storage room |
2024/11/21 | Building/Structural | Framing | Passed | Kody Boswell | Reviewed top track framing and sheathing top out for a few walls in area B |
2024/11/21 | Building/Structural | Structural | Passed | Kody Boswell | |
2024/11/21 | Building/Structural | Wall/Ceiling | Passed | Kody Boswell | Reviewed top track framing and sheathing top out for a few walls in area B |
2024/11/21 | Building/Structural | Slab | Conditional | Kody Boswell | Reviewed reinforcing steel for partial slab on grade in area B. Contractor was not finished installing formwork for slab depression areas and needed to clean up the pour area. Threshold inspector to verify prior to conrete placement. |
2024/11/21 | Building/Structural | Sheetrock | Passed | Kody Boswell | Reviewed top track framing and sheathing top out for a few walls in area B |
2024/11/20 | Plumbing | Underground | Passed | Paul Nitz | *11/19/2024 Inspection* Area D - UG Sanitary piping (2" & 4") - Pipe run from sanitary main to head coach bathroom and grooming areas |
2024/11/20 | Building/Structural | Roofing | Passed | Kody Boswell | Reviewed partial level 2 roof deck attachment, area B |
2024/11/20 | Building/Structural | Structural | Passed | Kody Boswell | |
2024/11/19 | Building/Structural | Framing | Passed | Kody Boswell | Reviewed LG top track framing and sheathing top out for several walls on level 2 located in the area between grids A-F/12-17 |
2024/11/19 | Building/Structural | Sheetrock | Passed | Kody Boswell | Inspection for Top out of area-B level 200 electrical rooms. |
2024/11/19 | Building/Structural | Wall/Ceiling | Passed | Kody Boswell | Reviewed reinforcing steel for a ramp wall for the players entrance located near the Sw corner of the building. |
2024/11/19 | Building/Structural | Slab | NOT READY | Kody Boswell | FSU BCA showed up on site for several inspections. Contractor was not ready for slab inspection at this time. |
2024/11/15 | Building/Structural | Framing | Passed | Rocky Wilde | 1) Area's A and B - Level 2 - Framing inspection 2) Area's A and B - Level 2 - Drywall screw inspection |
2024/11/15 | Building/Structural | Wall/Ceiling | Passed | Rocky Wilde | 1) Area's A and B - Level 2 - Framing inspection 2) Area's A and B - Level 2 - Drywall screw inspection |
2024/11/14 | Plumbing | Underground | Passed | Paul Nitz | Area B - UG Storm piping (12") - Column Line's G to F:13.5 to 14 - Piping run to stub up near column F14 |
2024/11/13 | Building/Structural | Slab | Passed | Kody Boswell | Reviewed reinforcing steel for the curb on ground level along grid 1/A-J. Contractor did not have waterproofing installed at time of inspection. Contractor sent photos after FSU BCA left the site. Photos are filed in the job folder. |
2024/11/13 | Building/Structural | Wall/Ceiling | Passed | Kody Boswell | Reviewed top and bottom tracks for LG framing along grid J/8.5-11. LG spans from 3rd level to 4th level roof |
2024/11/13 | Electrical | Wall Rough-in | Conditional | James Melvin | Area A - Level 2 - Column Line's 1 to 10 - Electrical wall rough-in - *Courtesy inspection to ensure we are starting off on the right track* 1) verify that MC cable can be used as well a running the lines horizonal |
2024/11/13 | Fire Safety | Fire Alarm Rough-In | Passed | Mary Creason | Area A - Level 2 - Column Line's 1 to 10 - Fire Alarm wall rough-in - *Courtesy inspection to ensure we are starting off on the right track* Cortesy walk-thru only for F/A rough-in. |
2024/11/12 | Building/Structural | Framing | Passed | Kody Boswell | Reviewed LG framing, top track, located at stair A2. |
2024/11/12 | Building/Structural | Wall/Ceiling | Passed | Kody Boswell | Reviewed fasteners for interior sheathing to LG framing located at stair A2. Only the first layer, top couple of feet of wall, was reviewed. |
2024/11/12 | Plumbing | Underground | Passed | Paul Nitz | Area B - UG Sanitary piping - UG runs to Grooming room, Showers (01.14.01), Janitary drying area, and Toilets (01.14.04) |
2024/11/06 | Building/Structural | Slab | Passed | Kody Boswell | Area A - Rebar inspection - SOG from CL's A-J:5-10 |
2024/11/05 | Plumbing | Underground | Passed | Paul Nitz | *11/05/2024 Inspection* Area B - UG Sanitary (2" & 4") - Column line's A-G & 15.5-17.5 this inspection was completed on 11/5/24 |
2024/11/05 | Building/Structural | Framing | Passed | Kody Boswell | Reviewed the following LG wall framing on the 2nd floor: 1) Top track installation and drywall for the corridor between stair A1 and cardio balcony 2) Top track installation for 4 trainer offices near stair A1 3) Top track installation for partition wall along grid 7/A-K 4) Top track installation for femal staff locker room and wet area |
2024/11/04 | Plumbing | Underground | Passed | Paul Nitz | Remaining 3" at North run of resistance pools. |
2024/11/04 | Building/Structural | Structural | Conditional | Kody Boswell | Reviewed reinforcing steel for level 3 slab on deck located in the area between grids D-K/11.3-13. There were several kicker braces and one HSS tube beam that had not been installed on structural steel framing. FSU BCA remained on site to verify the HSS tube beam was installed. Result is conditional pending receipt of photos showing kicker braces were installed. Photos received on 11-4-2024 from the steel erector. Filed in job folder. |
2024/11/01 | Plumbing | Underground | Passed | Paul Nitz | Area B - UG Sanitary (3") - Trench drain main line and stub ups running from hydro pit to around resistance pools |
2024/10/31 | Electrical | Wall Rough-in | Passed | James Melvin | Level 2 Area A electrical room (02.07.07) - In-wall device rough-in - Duplex receptacle & single pole switch (release for wall close-up) |
2024/10/30 | Building/Structural | Framing | Passed | Kody Boswell | Reviewed LG framing (top track only) for the following rooms on level 2, area A: 1) Storage 02.09.04 2) IDF 02.07.06 3) Electrical 02.07.07 4) AV closet 02.08.05 5) Male GA locker room, restroom & showers 02.08.04, 02.08.03 & 02.07.05 6) Female GA locker room, restroom & showers 02.07.03, 02.07.02 & 02.07.04 Locations above are also marked on contractor's plans on site |
2024/10/30 | Building/Structural | Slab | Passed | Kody Boswell | Reviewed reinforcing steel for several pourbacks around steel columns, ground floor area A |
2024/10/30 | Plumbing | Underground | Passed | Paul Nitz | Area B - Underground DCW (2") & DHW (1-1/4") - Running from Hydro pit to above grade stub up locations |
2024/10/28 | Building/Structural | Footing | Passed | Kody Boswell | Reviewed reinforcing steel for 2 column footings located near the intersection of gridlines F.2/27 |
2024/10/28 | Building/Structural | Structural | Passed | Kody Boswell | Reviewed reinforcing steel for concrete encasements around steel columns at the following locations: 1) At grids F/12 2) At grids F/13 |
2024/10/28 | Building/Structural | Slab | Passed | Kody Boswell | Reviewed reinforcing steel for level 2 slab on metal deck in the approximate areas between grids A-K/14-16. There were a few deck penetrations that didn’t have required additional reinforcing. This was discussed with the contracotr while on site and was corrected prior to FSU leaving the site. |
2024/10/25 | Building/Structural | Footing | Passed | Kody Boswell | Reviewed reinforcing steel for several column footings and loading dock wall foundation in area C. |
2024/10/23 | Building/Structural | Structural | Passed | Kody Boswell | Reviewed reinforcing steel for a portion of the level 2 elevated slab on deck in the approximate area between grids A-K/9-14. There were some minor cover issues in a few places and the deck had excessive dirt and debris scattered throughout. Cover issues were corrected prior to FSU BCA leaving the job site. Threshold inspector will verify deck is cleaned properly prior to concrete placement. |
2024/10/22 | Building/Structural | Footing | Passed | Kody Boswell | Reviewed reinforcing steel for the following footings: - At the intersection of grids K/21 - At the intersection of grids K/22 - At the intersection of grids K/23 - At the intersection of grids G.7/21 - At the intersection of grids G.5/22 - At the intersection of grids G.4/23 - At the intersection of grids F.4/21 - At the intersection of grids F.6/22 - At the intersection of grids F.7/23 - At the intersection of grids E/23 |
2024/10/21 | Building/Structural | Slab | Passed | Kody Boswell | Reviewed reinforcing steel for slab on grade located in the area between grids A-J/1-5. There some minor cover issues present throughout the area and minor detail reinforing missing at the lighting trenches. These issues were discussed with the contractor and corrected prior to FSU leaving the site. |
2024/10/21 | Building/Structural | Footing | Postponed | Kody Boswell | Contractor informed FSU there were no footings ready for inspection while FSU was on site. Inspection is cancelled/postponed. |
2024/10/21 | Building/Structural | Framing | Conditional | Kody Boswell | Reviewed LG exterior wall framing located along grid A/7-12. Some clips were missing a fastener or two. |
2024/10/18 | Building/Structural | Framing | Passed | Kody Boswell | Reviewed LG framing for the exterior wall along grid A/1-7. Framing size, spacing and connections were reviewed. |
2024/10/18 | Building/Structural | Framing | Passed | Kody Boswell | Parapet wall LG framing in area A, level 3 |
2024/10/17 | Building/Structural | Slab | Passed | Kody Boswell | Reviewed reinforcing steel for several housekeeping pads in the hydrotherapy pit. |
2024/10/17 | Plumbing | Underground | Passed | Paul Nitz | Area A - Sanitary UG (3" & 4") - Sanitary runs coming out of hydrotherapy pit (tying into main sanitary system) |
2024/10/17 | Building/Structural | Footing | Conditional | Kody Boswell | Reviewed reinforcing steel for the following wall footings: (1) Along grid D.9/23.7-27 (2) Along grid E/23.7-27.3 Footing (2) deficiencies noted on 10/16 footing inspection were addressed and or/corrected. Result is conditional pending several cover issues are addressed. Threshold inspector will verify prior to concrete placement. |
2024/10/16 | Building/Structural | Footing | Failed | Kody Boswell | Reviewed reinforcing steel for the following wall footings: 1) Along grid D.9/23.7-27 2) Along grid E/23.7-27.3 Footing (2) above had several deficiences: a) Overall top/bottom reinforcing was not per structural drawings. Per structural drawings the out-to-out dimension of top to bottom reinforcing should be 37". Measuring in the field in several areas, it was consistently between 34-35" b) The incorrect anchor bolts are laid out at grids E/24 (c) There is a missing anchor bolt at grids E/27 |
2024/10/15 | Plumbing | Underground | Passed | Paul Nitz | Area A - UG Plumbing (2" & 3") - Column line's C to G & 7 to 8 |
2024/10/15 | Building/Structural | Framing | Passed | Paul Nitz | FTgs in Area C and Framing on the roof. |
2024/10/15 | Building/Structural | Footing | NOT READY | Paul Nitz | FTgs in Area C and Framing on the roof. |
2024/10/11 | Building/Structural | Framing | Passed | Kody Boswell | Reviewed LG framing for parapet walls over the locker room area (Area A) |
2024/10/10 | Building/Structural | Slab | Passed | Kody Boswell | Re-inspection on slab on metal deck. We have confirmation from EOR. |
2024/10/09 | Plumbing | Underground | Passed | Paul Nitz | Area A - UG Plumbing (3" piping) - Running parallel with CL 10 - Sanitary drain & vents |
2024/10/08 | Building/Structural | Slab | Failed | Kody Boswell | Reviewed reinforcing steel for a portion of the 2nd floor elevated slab on metal deck in the area between grids 1-10/A-J. Re-inspection to be called in after the following deficencies are addressed and/or corrected: 1) Some shear connector studs on a W24x68 girder (located near grids G/10) were not fully welded to the top flange. These studs need to be replaced so they are fully welded. 2) Verify shear connector stud diameter and length. This information is not clear in the structural drawings or specs. 3) Girder top steel needs to be chaired up along grids D, F and G. It is currently sitting on top of the deck. 4) The slab edge bent plate located where stairs come up from the first floor is missing studs. Studs need to be added. 5) Deck support angles need to be installed at columns per detail 12/S5-3-3 6) Verify the EOR response for RFI #273. The detail given in the response (12/S5-1-3) differs from the typical openings in composite slab detail (12/S5-3-2). The EOR response also does not address the cutting of the deck prior to concrete curing, only reinforcing around openings and penetrations. 7) Reinforcing needs to be added around other penetrations and openings not addressed in RFI #273. 8) While leaving the site, it was noticed that there are several columns along grid A that are missing nuts washers and nuts that secure the column baseplate to the top of foundation. These have to be installed. |
2024/10/07 | Building/Structural | Slab | Conditional | Kody Boswell | Reviewed reinforcing steel for the loading dock retaining wall located in the area between grids A-D.9/21-24. Result is conditional pending rebar cover issues are addressed and formwork is complete. Threshold inspector toverify prior to concrete placement. |
2024/10/03 | Plumbing | Underground | Passed | Paul Nitz | Area A - Shallow UG Sanitary & Storm - 2", 3", and 4" sanitary plus 6" storm - Column line's 7.5 to 9.5 & F to J |
2024/10/01 | Building/Structural | Framing | Passed | Kody Boswell | Reviewed LG framing for a portion of a parapet wall along grid J on level 3. This level is the roof level for the weightroom in area A. |
2024/09/25 | Building/Structural | Footing | Passed | Kody Boswell | Reviewed reinforcing steel for the wall footing and spread footings for the loading dock in the area between grids B-D.9/30.9-24 |
2024/09/24 | Building/Structural | Footing | Failed | Paul Nitz | 1) coverage not met for rebar |
2024/09/24 | Plumbing | Underground | Passed | Paul Nitz | Area B - UG Resistance Pool plumbing piping (2", 3", 4" & 6") - Pool main lines & tie-ins to skimmers, wall inlets, & therapy jets (routing from hydrotherapy pit) - Sheets SP-3-01 & SP-3-02 |
2024/09/23 | Plumbing | Underground | Passed | Paul Nitz | Area A - UG Storm Piping (6", 8", and 12") - Column Line's 6-6.9 & D-G.8 - Storm Main & Branch Lines/stub-ups Area B - |
2024/09/20 | Electrical | Underground | Passed | James Melvin | Area A - Riser A Electrical Room - Primary and Secondary UG Feeders to Riser A electrical room (1st layer) |
2024/09/19 | Building/Structural | Slab | Conditional | Paul Nitz | Housekeeping pads for pools. 1) Slab penetrations need to have a detailed repair |
2024/09/18 | Building/Structural | Footing | Passed | Kody Boswell | Reviewed reinforcing steel for 6 spread footings in area C |
2024/09/17 | Plumbing | Underground | Passed | Paul Nitz | Area A - UG Sanitary (2" & 4") - Sanitary run from main line to Weight Room bathrooms |
2024/09/16 | Plumbing | Underground | NOT READY | Paul Nitz | Area A - UG Sanitary (2" & 4") - Sanitary run from main line to Weight Room bathrooms |
2024/09/11 | Plumbing | Underground | Passed | Paul Nitz | Area D - UG Plumbing (4") - Pipe run to boiler room and floor drain |
2024/09/11 | Building/Structural | Footing | Passed | Kody Boswell | Reviewed reinforcing steel for several footings located at the intersection of grids E/19.2, E/20, D/19.2 and E/20. |
2024/09/10 | Building/Structural | Structural | Passed | Kody Boswell | Reviewed reinforcing steel for the first lift of the elevator walls at the intersection of grids B/20 |
2024/09/10 | Electrical | Ground | Passed | Al Smythe | Resistance Pools - Grounding loop installation (prior to backfill) |
2024/09/05 | Building/Structural | Footing | Passed | Kody Boswell | Reviewed reinforcing steel for the elevator foundation at grids C/20. |
2024/08/30 | Plumbing | Underground | Passed | Paul Nitz | Area D - Underground sanitary - 4" & 6" piping to Boiler Room & Storage (01.24.15 & 01.25.13) |
2024/08/30 | Plumbing | Underground | Failed | Paul Nitz | Area D - Underground sanitary - 4" & 6" piping to Boiler Room & Storage (01.24.15 & 01.25.13) 1) slopre not met on drain pipe FBC P 704.1 they are fixing it and in will come back to inspect again at 12:00pm |
2024/08/28 | Building/Structural | Structural | Passed | Paul Nitz | A-Line wall CL 18-21. Area-D footers CL 22.4-27.3/T-M.- These were inspected by Paul on Wednesday 8/28/2024. |
2024/08/28 | Building/Structural | Structural | NOT READY | Paul Nitz | Column footers CL- 22.4-27.2/S-M. |
2024/08/26 | Building/Structural | Structural | NOT READY | Paul Nitz | CL- 19.2-21 A-line wall. |
2024/08/23 | Building/Structural | Structural | Passed | Paul Nitz | CL- T/23.1-27 column footers. |
2024/08/23 | Building/Structural | Structural | Passed | Paul Nitz | CL- T/23.1-27 footers. |
2024/08/22 | Building/Structural | Structural | Passed | Paul Nitz | A-line wall rebar CL 19.2-21. |
2024/08/21 | Building/Structural | Structural | Passed | Paul Nitz | A-line wall rebar CL 18-19.2 |
2024/08/19 | Building/Structural | Structural | Passed | Kody Boswell | Reviewed reinforcing steel cover and steel embeds for steel framing for the 2nd lift of elevator wall located between grids H-K/24-25 |
2024/08/15 | Building/Structural | Wall/Ceiling | Passed | Kody Boswell | Reviewed reinforcing steel for the following structural elements: - 2nd lift of elevator wall located between grids H-K/24-25 |
2024/08/15 | Building/Structural | Footing | Passed | Kody Boswell | Reviewed reinforcing steel for the following structural elements: - Footings at the intersection of grids E/18, F.2/18, H/18 and K/18 |
2024/08/15 | Building/Structural | Structural | Passed | Kody Boswell | Reviewed reinforcing steel for the resistance pools in the area between grids C-F.7/12-13. |
2024/08/15 | Electrical | Ground | Passed | Alex Masterton | Resistance Pools - Grounding - sheet SP-4-02 on Aquatic drawing set |
2024/08/15 | Building/Structural | Structural | Passed | Kody Boswell | Reviewed reinforcing steel for the following structural elements: - Footings at the intersection of grids E/18, F.2/18, H/18 and K/18 - 2nd lift of elevator wall located between grids H-K/24-25 |
2024/08/13 | Building/Structural | Structural | Failed | Kody Boswell | Reviewed reinforcing steel for resistance pool slab on grade, walls and stairs in the area between grids C-F.7/12-13. Reinforcing at plumbing encasements in walls and slab was not per contract documents. This was discussed with the contractor and will be corrected. Re-inspection is required prior to concrete pour. |
2024/08/13 | Building/Structural | Structural | Passed | Kody Boswell | Reviewed reinforcing steel for building retaining wall along grid A/15-18. |
2024/08/12 | Building/Structural | Structural | Passed | Kody Boswell | Reviewed reinforcing steel for several column footingsin the area between grids F-F.6/14-17 |
2024/08/09 | Building/Structural | Structural | Postponed | Kody Boswell | Contractor contacted FSU prior to site arrival to cancel and postpone inspection for reinforcing steel for footings. |
2024/08/07 | Building/Structural | Structural | Passed | Kody Boswell | Reviewed reinforcing steel for several column footers on Grid lines F-G/11.3-12.8. A-Line Wall Footing CL 11-13 |
2024/08/02 | Building/Structural | Structural | Passed | Kody Boswell | Reviewed reinforcing steel for column footers on Grid lines F-G/7-9, Elevator B1 walls. |
2024/08/01 | Building/Structural | Structural | Passed | Kody Boswell | Reviewed reinforcing steel for footings on Grid lines F-G/7-9 |
2024/07/31 | Plumbing | Underground | Passed | Paul Nitz | Area A - U/G Storm & Sanitary lines (8") - From Hydro pit to sanitary main tie-in; from hydro pit storm main (partial) - Column Lines D.5 to G & 9 to 10 |
2024/07/31 | Building/Structural | Footing | Postponed | Kody Boswell | Contractor contacted FSU prior to site arrival to cancel and postpone the inspection of several spread footings. |
2024/07/30 | Plumbing | Underground | Passed | Paul Nitz | Area A - U/G Storm & Sanitary lines (8") - From Hydro pit to sanitary main tie-in; from hydro pit storm main (partial) - Column Lines D.5 to G & 9 to 10 |
2024/07/30 | Building/Structural | Footing | Passed | Kody Boswell | Reviewed reinforcing steel for the elevator mat foundation located in the area between grids G-G.4/11.3-12.8 |
2024/07/26 | Building/Structural | Structural | Passed | Kody Boswell | Reviewed reinforcing steel for the hydrotherapy pit lid in the area between grids B-D.9/7-12. |
2024/07/26 | Plumbing | Underground | Passed | Paul Nitz | Resistance Pools - U/G piping (8” & 10”) - (4) Main Drains and Corresponding Piping - Sheet #SP-3-01 |
2024/07/25 | Electrical | Ground | Passed | Alex Masterton | Hydrotherapy Pit Lid - Grounding - Sheet #SP-4-02 No comments |
2024/07/25 | Building/Structural | Structural | Passed | Kody Boswell | Reviewed reinforcing steel for the wall fotting along grid A/18-19.2 |
2024/07/25 | Plumbing | Underground | Failed | Paul Nitz | Resistance Pools - U/G piping (8” & 10”) - (4) Main Drains and Corresponding Piping - Sheet #SP-3-01 1) slope not met for the second time |
2024/07/25 | Plumbing | Underground | Failed | Paul Nitz | Resistance Pools - U/G piping (8” & 10”) - (4) Main Drains and Corresponding Piping - Sheet #SP-3-01 1) slope not met |
2024/07/23 | Electrical | Ground | Passed | James Melvin | Inspection for release of temporary site power, specifically drop pole and panel assembly installed near SW corner of project limits |
2024/07/23 | Building/Structural | Structural | Conditional | James Melvin | Hydrotherapy pit lid. CL 6-12/D-B. 1) partial approval |
2024/07/22 | Building/Structural | Structural | Passed | Paul Nitz | Footers CL S/R/Q/. |
2024/07/20 | Building/Structural | Wall/Ceiling | Passed | Kody Boswell | FSU was contacted Saturday morning (7/20) by the contractor requesting inspection of reinforcing steel at the elevator located in the area between grids J-K/24-25. FSU was not available, but had looked at approximately 90% of reinforcing at prior inspections. With the threshold inspector on site, FSU defered the inspection to threshold. FSU spoke to Dan Bendix (threshold inspector) and he stated reinforcing was in substantial compliance with the contract documents. |
2024/07/19 | Electrical | Ceiling Rough-in | Passed | James Melvin | Hydrotherapy Pit Lid (Ceiling) - All required rough-in (receptacle raceways, smoke detectors, etc) |
2024/07/17 | Building/Structural | Structural | Passed | Kody Boswell | Reviewed reinforcing steel for the building retaining wall along grid A/6-10 |
2024/07/12 | Plumbing | Underground | Passed | Paul Nitz | *7/11/2024 Inspection* Area B (Hydro Pit Area) - U/G Pool Plumbing - (2) Recirculation Lines (6") & (2) Suction lines (4") - Column Line's 9.5 to 12 & D to D.5 |
2024/07/12 | Building/Structural | Structural | Passed | Kody Boswell | Reviewed reinforcing steel for the following structural elements: 1) SF4.0 at grids R/22.7 2) SF4.0 at grids S/22.7 3) SF4.0 at grids R/25 4) SF4.0 at grids S/25 5) Building retaining wall along grid A/6.1-12 |
2024/07/11 | Plumbing | Underground | Passed | Paul Nitz | Area B (Hydro Pit Area) - U/G Pool Plumbing - Resistance Pool Main Drain Lines (8" & 10") - Column Line's 9.5 to 12 & D to D.5 |
2024/07/11 | Building/Structural | Wall/Ceiling | Passed | Kody Boswell | In-progress review of reinforcing steel for the building retaining wall located along grid A/6.1-12.5 prior to formwork being fully installed. There will be another inspection once formwork is up, prior to concrete placement. |
2024/07/10 | Building/Structural | Wall/Ceiling | Passed | Kody Boswell | Reviewed reinforcing steel for site walls and stari walls in the area between grids A-C/0-1 |
2024/07/10 | Plumbing | Underground | Passed | Paul Nitz | Area C - U/G Storm Main Line (12" & 15") - Column Line's G.4 to F.7 & 25 to 27.5 |
2024/07/08 | Building/Structural | Wall/Ceiling | Postponed | Kody Boswell | Contractor contacted FSU prior to arrival on site to postpone inspection to a later date. |
2024/07/03 | Plumbing | Underground | Passed | Paul Nitz | U/G Rough-In - Resistance Pool Piping (6") - Wall Inlet & Skimmer feeds - Column Line's 9 to 12 (along West hydro pit wall) |
2024/07/03 | Building/Structural | Structural | Passed | Kody Boswell | Reviewed reinforcing steel for the elevator walls in the area between grids K-H/24-25 from top of foundation to 2nd level. Reinforcing steel was in substantial compliance with the contract documents. Contractor to call in another inspection after forms and steel embeds have been set. |
2024/07/02 | Building/Structural | Structural | Passed | Kody Boswell | Reviewed reinforcing steel for the footer CF12.0 along grid F/14-15. |
2024/07/01 | Building/Structural | Structural | Passed | James Melvin | A-line wall in Area-B. |
2024/07/01 | Building/Structural | Footing | Passed | Paul Nitz | this inspection passed on Friday 6-28-24 |
2024/07/01 | Building/Structural | Wall/Ceiling | Passed | Paul Nitz | this inspection passed on Friday 6-28-24 |
2024/06/28 | Building/Structural | Structural | Passed | Kody Boswell | Reviewed reinforcing steel for stair walls located NW of grids B/1 |
2024/06/28 | Building/Structural | Structural | Conditional | Kody Boswell | Reviewed reinforcing steel for the following foundations: 1) Wall footer CF9.0A along grid A/6.5-12.5 2) Wall footer CF12.0 along grid 7/A-D.5 Result is conditional pending installation of stirrups per detail 13/S6-1-2 at grids D/7. Threshold inspector to verify prior to concrete placement. |
2024/06/28 | Plumbing | Underground | Passed | Paul Nitz | Area C - U/G Storm Main Line (10" & 12") - Column Line's G.4 to F.7 & 20 to 25 |
2024/06/25 | Building/Structural | Structural | Conditional | Kody Boswell | Reviewed reinforcing steel for the building retaining wall along grid A/12.5-15.5. Result is conditional pending minor corrections to reinforcing, anchor bolt installation and form installation. |
2024/06/21 | Building/Structural | Footing | Passed | Kody Boswell | Reviewed reinforcing steel for the building retaining wall along grid A/3-6 |
2024/06/21 | Building/Structural | Wall/Ceiling | Passed | Kody Boswell | Reviewed reinforcing steel for the building retaining wall along grid A/3-6 |
2024/06/20 | Plumbing | Underground | Passed | Dwayne Mahony | Area D - UG Storm Mains (two lines total - 8", 10", & 12") - Column Line's 25 to 29:P to S) |
2024/06/18 | Electrical | Wall Rough-in | Passed | Dwayne Mahony | Area A - Retaining Wall - Wall Rough-in (receptacles, fire alarm, etc.) - Column line's A:4 to 6 |
2024/06/17 | Building/Structural | Structural | Passed | Kody Boswell | Reviewed reinforcing steel for the footer CF12 along grid 13/D-F. |
2024/06/14 | Plumbing | Underground | Passed | Paul Nitz | Area C - UG Storm Main (16") - last 20' of storm line (future tie in to exterior storm system at CL 21) |
2024/06/12 | Building/Structural | Structural | Passed | Paul Nitz | Hydrotherapy pit. |
2024/06/12 | Plumbing | Underground | Passed | Paul Nitz | *FOR RECORD* Area B/C - UG Storm Main (16") - Column line's C-D:16-20 *Inspected on Tuesday, June 11th by FSU* |
2024/06/10 | Plumbing | Underground | Passed | Paul Nitz | Area D - UG Sanitary Main (6") - Column Line's 23-23.7:K-S |
2024/06/10 | Building/Structural | Footing | Passed | Dwayne Mahony | FTgs on line A, between 12 and 18. Interior wall at hydro pit. |
2024/06/10 | Plumbing | Underground | Passed | Paul Nitz | |
2024/06/10 | Building/Structural | Wall/Ceiling | Passed | Dwayne Mahony | FTgs on line A, between 12 and 18. Interior wall at hydro pit. |
2024/06/07 | Building/Structural | Structural | Passed | Kody Boswell | Hydrotherapy pit walls (South,East,North). Footers CL D6, F7,F8. Reviewed reinforcing steel for the following: 1) For north, south and east hydrotherapy walls 2) Footer at grids D/6 3) Footer at grids F/8 |
2024/06/06 | Building/Structural | Structural | Conditional | Kody Boswell | Reviewed reinforcing steel for the west hydrotherapy pit wall along grid B/8-12. Result is conditional upon installation of waterstop, chamfer installation on forms at vertical control joints and clarification of blockouts for beams bearing on wall. |
2024/06/06 | Plumbing | Underground | Passed | Paul Nitz | Area B - UG Storm Main (16") - Column Line's 16-17: G-D Area D - UG Sanitary Main (6") - Column Line's 23-23.7:K-S 1) this was for the the storm drain only |
2024/06/05 | Building/Structural | Structural | Passed | Kody Boswell | Reviewed reinforcing steel for the building retaining wall along grid A/2-3. |
2024/06/04 | Electrical | Wall Rough-in | Passed | Tom Deckert | Electrical Wall R/I - Hydrotherapy Pit Cast-In-Place Walls - All required wall R/I (receptacles, fire alarm, telecom, etc.) 3 boxes installed per code |
2024/06/03 | Building/Structural | Structural | Failed | Kody Boswell | Reviewed reinforcing steel for the building retaining wall along grid A/2-3. Hairpins around anchor bolts were not installed and several horizontal bars were not cut at vertical control joints. |
2024/06/03 | Plumbing | Underground | Passed | Paul Nitz | UG Storm Main (16") - Area B - Column Line's 13.5 to 16.5: F.7 to G.4 UG Sanitary Main (6") - Area C/D - Column Line's 23 to 24: F.7 to K |
2024/05/31 | Building/Structural | Structural | Passed | Kody Boswell | Reviewed reinforcing steel for the footer loacted at grids F/12 |
2024/05/30 | Plumbing | Underground | Passed | Neely Lewis | 16" UG Storm - Area B - Column Line's 12.8 to 13.5 - Per conversation in the field on 5/29, WT to call FSU as soon as the pipe is ready to be inspected (due to logistical constraints). Inspection may differ from 1 PM, pending completion. |
2024/05/30 | Building/Structural | Structural | NOT READY | Kody Boswell | Reviewed reinforcing steel for the building retaining wall along grid A/2-3. Contractor was still installing rebar towards the top of the wall where the anchor bolts were. Contractor to reschedule after work is complete. |
2024/05/29 | Plumbing | Underground | Passed | Paul Nitz | UG Storm main - Area B |
2024/05/29 | Building/Structural | Structural | Passed | Kody Boswell | Reviewed reinforcing steel for the following foundations: - At grids K/11.3 - At grids K/12 - At grids K/13 - At grids K/14 - At grids K/15 - At grids K/16 - At grids K/17 |
2024/05/28 | Plumbing | Underground | Passed | Neely Lewis | 40 ft of sanitary line. |
2024/05/28 | Electrical | Underground | Passed | Tom Deckert | Rought in underground south of IPF. Conduit installed at 36" deep with marking tape 12 inched above. |
2024/05/28 | Building/Structural | Footing | Passed | Kody Boswell | Reviewed reinforcing steel for the elevator mat foundation located between grids H-K/24-25 |
2024/05/22 | Building/Structural | Slab | Passed | Kody Boswell | Reviewed reinforcing steel for the hydrotherapy pit slab and footings in the area betweeng grids B-D.9/7-12. |
2024/05/22 | Building/Structural | Footing | Passed | Kody Boswell | Reviewed reinforcing steel for the building retaining wall along grid A/4-6. Wall dowels were corrected as required from inspection on 5/21/2024 |
2024/05/22 | Electrical | Ground | Passed | Dwayne Mahony | Grounding for the hydrotherapy pit (prior to hydrotherapy pit slab pour) |
2024/05/22 | Plumbing | Underground | Passed | Paul Nitz | Hydrotherapy Pit plumbing UG - final sign-off prior to pit slab pour |
2024/05/22 | Plumbing | Underground | Passed | Paul Nitz | 1) UG Storm Main - Area A/B - Column line's 9 to 10.5 - 12" & 16" Piping 2) UG Sanitary Main - Area B/C - Column line's 16 to 20.9 - 6" Piping |
2024/05/21 | Electrical | Ground | Conditional | Dwayne Mahony | Grounding for the hydrotherapy pit (prior to hydrotherapy pit slab pour) Partial. Work is not complete. |
2024/05/21 | Building/Structural | Slab | Failed | Kody Boswell | FSU arrived on site to review reinforcing steel for the hydrotherapy pit slab and footings in the area betweeng grids B-D.9/7-12. Contractor had to rip out an area of reinforcing and waterproofing due to weekend storm erosion into the formwork so the area was not ready for review. |
2024/05/21 | Building/Structural | Footing | Failed | Kody Boswell | Reviewed reinforcing steel for the building retaining wall along grid A/4-6. Wall dowels were not centered on the footing, as required per plan note 9. |
2024/05/21 | Plumbing | Underground | Failed | Neely Lewis | 1) UG Sanitary piping (6") - Area C - Column Line's 16-19:F-G 2) Hydrotherapy Pit UG - final sign-off prior to pit slab pour 5/21/2024: slope was not per FBC requirements |
2024/05/20 | Building/Structural | Slab | Failed | Kody Boswell | FSU arrived on site to review reinforcing steel for the hydrotherapy pit slab and footings in the area betweeng grids B-D.9/7-12. Contractor had to rip out an area of reinforcing and waterproofing due to weekend storm erosion into the formwork so the area was not ready for review. |
2024/05/20 | Building/Structural | Footing | Failed | Kody Boswell | FSU arrived on site to review reinforcing steel for the hydrotherapy pit slab and footings in the area betweeng grids B-D.9/7-12. Contractor had to rip out an area of reinforcing and waterproofing due to weekend storm erosion into the formwork so the area was not ready for review. |
2024/05/20 | Plumbing | Underground | Postponed | Paul Nitz | Electrical: Hydrotherapy Pit Grounding Plumbing: Hydrotherapy Pit UG - final sign-off prior to pit slab pour |
2024/05/17 | Plumbing | Underground | Passed | Paul Nitz | 1) Underground Storm Main (12") - Area A - Column line's 6.5-9.5:G-J 2) Underground Sanitary Drain (2") - Hydrotherapy Pit - Column line's 11-12:C-D - Remaining portion of piping within concrete pit slab |
2024/05/17 | Building/Structural | Footing | Passed | Kody Boswell | Reviewed reinforcing steel for the following footings: 1) At grids G.2/1 2) At grids J/1 3) At grids J/2 4) At grids J/4 5) At grids J/5 6) At grids J/6 7) At grids J/7 |
2024/05/16 | Building/Structural | Structural | NOT READY | Kody Boswell | FSU BCA arrived on site and was told by the Contractor they were not ready for inspection |
2024/05/16 | Plumbing | Underground | Passed | Paul Nitz | UG Sanitary piping (6" and 8") - Area B - Column Line's 12-16:F-G |
2024/05/15 | Building/Structural | Structural | Failed | Kody Boswell | Reviewed reinforcing steel for the building retaining wall along grid A/2-3. Reinforcing was not fully installed and tied in place. The following deficiencies are as follows: 1) #4 hairpins around anchor bolts (detail 14/S6-1-2) 2) Anchor bolts were not installed at plinths 3) Vertical control joint reinforcing was not installed (detail 8/S5-1-3) |
2024/05/13 | Plumbing | Underground | Passed | Neely Lewis | UG Sanitary Piping - Area B - Column Lines 9.5-12:F-G UG 2" drain line - Hydrotherapy Pit - Column Lines 9-12:B-D - Re-Inspection UG 8" Sanitary Line, SSMH-5, & Conflict Box - Tie-In to Building Sanitary Stub Out - Sheet C6-0-N Section X-X |
2024/05/09 | Building/Structural | Structural | Passed | Kody Boswell | Reviewed reinforcing steel for the following footings: 1) At grids J/8 2) At grids J/9 |
2024/05/08 | Plumbing | Underground | Conditional | Paul Nitz | Re-inspection of the two 2" sanitary drain lines for the two hydroworx pools underneath the hydrotherapy pit slab. WT has email confirmation from Aquatics engineer stating these two lines can be ran flat (no slope). 1) provide positive slope, reinspection required after rebar is placed |
2024/05/07 | Building/Structural | Structural | Passed | Kody Boswell | Reviewed reinforcing steel for the following footings: 1) At the intersection of grids D.9/1 2) At the intersection of grids D/2 3) At the intersection of grids D/3 4) At the intersection of grids D/4 5) At the intersection of grids D/5 6) Along grid 1/A-D.5 7) Along grid A/0.5-4 8) Stair footer located north of grid 0.7 |
2024/05/07 | Plumbing | Underground | Failed | Paul Nitz | Underground Sanitary Piping - Area A - Column Lines 8-9.5:F-G Remaining Underground Sanitary & Pool Piping - Hydrotherapy Pit - Column Lines 9-12:B-D 1) Slope not met for 2" pipe fbcp 704 2) rock support for 2" pipe is not approved |
2024/04/30 | Building/Structural | Footing | Postponed | Kody Boswell | Contractor informed FSU they were not ready for inspection prior to FSU arriving on site. |
2024/04/30 | Plumbing | Underground | Passed | Neely Lewis | Hydrotherapy Pit U/G piping - Hydroworx and Resistance Pool U/G - column line's 9-12:B-E - (2) 6" suction lines, (4) 4" suction lines Area A Deep sanitary U/G piping - column line's 3-8:F-G |
2024/04/29 | Plumbing | Underground | Passed | Neely Lewis | Hydrotherapy Pit - Underground sanitary piping - Column line's 10-12:B-D |
2024/04/29 | Building/Structural | Footing | Postponed | Kody Boswell | Contractor contacted FSU while FSU was on site to postpone the inspection of building foundations to a later date. |
2024/04/26 | Plumbing | Underground | Conditional | Neely Lewis | Area A underground sanitary main (column line's J-F.7:1-3) 4/26: Slope was too steep. They will reslope for 1/8". |
2024/04/26 | Building/Structural | Structural | NOT READY | Dwayne Mahony | Rebar Inspection For CF7&CF9 Footer |
2024/04/25 | Building/Structural | Structural | Passed | Dwayne Mahony | Hydrotherapy sewage ejector and sump pit slabs (2 total) reinforcement on 4/24/2024 |
2024/04/25 | Building/Structural | Structural | Passed | Dwayne Mahony | Inspection for CF9&CF7 footer at North stair. |
2024/04/25 | Plumbing | Underground | Passed | Neely Lewis | Underground sanitary piping underneath hydrotherapy pit slab (column line's 8-9:C-D) |
2024/04/25 | Building/Structural | Slab | Passed | Dwayne Mahony | slab at hydrotherapy pit for sump pump and ejector pit |
2024/04/23 | Building/Structural | Wall/Ceiling | Passed | Kody Boswell | Reviewed reinforcing steel for a portion of the site retaining wall at the north side of the project site. |
2024/04/19 | Plumbing | Underground | Passed | Dwayne Mahony | Underground 8" sanitary sewer inspection prior to backfill. First 20' stick of pipe at CL's J:1.5 (NW corner of IPF building). Approved, filled with 10' of head pressure test for this pipe section and the two clean-outs. |
2024/04/19 | Building/Structural | Footing | Passed | Kody Boswell | Reviewed reinforcing steel for more of the retaining wall spread footing located at the NW corner of the site (sheet S2-1-A). There was a conflict with the shotcrete wall piers and retaining wall footing. RFI 20.2 addresses this concern. Reinforcing steel was corrected and in substantial compliance with the contract documents. |
2024/04/18 | Building/Structural | Footing | Failed | Kody Boswell | Reviewed reinforcing steel for more of the retaining wall spread footing located at the NW corner of the site (sheet S2-1-A). There was a conflict with the shotcrete wall piers and retaining wall footing. RFI 20.2 addresses this concern. Reinforcing steel was not placed per typical site retaining wall detail near the conflict with the shotcrete wall. Contractor to correct reinforcing and schedule re-inspection. |
2024/04/15 | Building/Structural | Wall/Ceiling | Passed | Kody Boswell | Reviewed reinforcing steel for a portion of the site retaining wall at the north side of the project site. Contractor added a control joint near the corner of the wall per last inspection on 4/12/2024. |
2024/04/15 | Plumbing | Underground | Passed | Neely Lewis | Courtesy inspection - new plumbing contractor on-site (Comfort Systems) - want to go over underground plumbing inspection expectations |
2024/04/12 | Building/Structural | Wall/Ceiling | Conditional | Kody Boswell | Reviewed reinforcing steel for a portion of the site retaining wall at the north side of the project site. Result is conditional due to vertical control joint location at the corner of the wall where it turns south. Contractor to either add a control joint at the correct spacing or move existing control joint to the correct location. |
2024/04/08 | Building/Structural | Footing | Passed | Kody Boswell | Reviewed reinforcing steel for more of the retaining wall spread footing located at the NW corner of the site (sheet S2-1-A) |
2024/04/05 | Electrical | Underground | Passed | Dwayne Mahony | This inspection is for the first layer of conduits for our U/G duct bank coming from the East Annex building. Would like this inspection first thing in the morning, if possible. Thank you. |
2024/04/02 | Building/Structural | Footing | Passed | Kody Boswell | Reviewed reinforcing steel for retaining wall spread footing located at the NW corner of the site (sheet S2-1-A) |
2024/03/11 | Electrical | Service Release | Passed | Dwayne Mahony | Inspection for release of temporary power for job-site trailer offices, specifically the drop poles. Approved all four 200-amp services for utility connection. Dwayne Mahony, Electrical Inspector, cell 850 294 1581 |
2024/03/06 | Building/Structural | Framing | Passed | Dwayne Mahony | Inspecting annex building sofit |
2024/03/06 | Fire Safety | Final Egress/Emergency Lights | Passed | Mary Creason | We need an inspection on our temporary offices. (Trailers) Inspecting annex building sofit The planning trailer has no violations: Passed The following items need to be corrected forTrailer that is not in operation as of yet. 1. Fire extinguisher required in large trailer for meeting room/staff offices 2. Exit signs need to be in working order when trailer is in operation. 3. Electrical panel in first office has a breaker missing.(Gap in panel observed) 4. Two hand rails required on stairs from exits out of buildings. 5. Occupancy load sign needed for trailer that will have over 50 people. |
2024/03/06 | Building/Structural | Final Building | NOT READY | Dwayne Mahony | We need an inspection on our temporary offices. (Trailers) Inspecting annex building sofit Electrical work is incomplete. |
2024/02/27 | Building/Structural | Wall/Ceiling | Passed | Kody Boswell | framing at end wall where section of building will be demolished. |
2023/11/08 | Plumbing | Specialty Piping | Passed | Dwayne Mahony | Inspection on new back flow and water meter |
2023/11/08 | Plumbing | Underground | Passed | Dwayne Mahony | Inspection on new back flow and water meter |
2023/10/25 | Building/Structural | Sheetrock | Passed | Dwayne Mahony | Screw inspection on ceiling bathrooms |
2023/09/22 | Plumbing | Rough-in | Failed | Dwayne Mahony | Inspection on water fountains Early am inspection not approved, piping not under test. Late am inspection not approved, only potable water piping under test, need to test DWV too. What we have here is a failure to communicate. |
2023/07/11 | Building/Structural | Footing | Passed | Dwayne Mahony | Inspection on Retaining Wall rebar in footer Wall on baseball side approved. A wee different from the plan, which dimensions / drafting did not agree. |
2023/06/06 | Building/Structural | Masonry | Conditional | Dwayne Mahony | Inspection on CMU re-bar |
2023/05/18 | Building/Structural | Footing | Passed | Dwayne Mahony | Inspection on slab and footing re-bar |
2023/05/18 | Building/Structural | Slab | Passed | Dwayne Mahony | Inspection on slab and footing re-bar |
2023/05/12 | Plumbing | Underground | Passed | Dwayne Mahony | Inspection on remainder of underground Storm and sanitary piping |
2023/04/10 | Plumbing | Underground | Passed | Neely Lewis | Partial inspection on underground main. Main line ok. No branches inspected. |
Building/Structural | Framing | Postponed | Kody Boswell | hydro pit shaft inspection. edge of slab and penetrations. Inspection postponed due to active shooter situation on campus | |
Building/Structural | Footing | NOT READY | Dwayne Mahony | elevator pit and FTGs | |
Building/Structural | Framing | Postponed | Kody Boswell | Pop up roof deck inspection Exterior framing Inspection was postponed | |
Building/Structural | Structural | Postponed | Kody Boswell | Pop up roof deck inspection Exterior framing Inspection was postponed | |
Building/Structural | Footing | Cancelled | Kody Boswell | Area C FTG, site wall. Contractor cancelled inspection due to inadequate soil bearing pressure | |
Building/Structural | Slab | Passed | Rocky Wilde | Slab pour backs | |
Building/Structural | Footing | Postponed | Kody Boswell | Inspection was postponed to a later date | |
Plumbing | Water Piping & Test | Passed | Rocky Wilde | 1) Area A - Level 1 - Remaining In-Wall Plumbing (Copper & PVC) 2) Area C - Level 2 - Storm Piping (Primary and Overflow lines) - System #2 3) Area B - Level 1 - Storm Piping (Primary and Overflow lines) - System feeding storm gutter | |
Electrical | Ground | Postponed | Dwayne Mahony | Electrical: Hydrotherapy Pit Grounding Plumbing: Hydrotherapy Pit UG - final sign-off prior to pit slab pour | |
Plumbing | Rough-in | Passed | Rocky Wilde | 1) Area A - Level 1 - Remaining In-Wall Plumbing (Copper & PVC) 2) Area C - Level 2 - Storm Piping (Primary and Overflow lines) - System #2 3) Area B - Level 1 - Storm Piping (Primary and Overflow lines) - System feeding storm gutter | |
Building/Structural | Slab | Postponed | Kody Boswell | Inspection was cancelled/postponed to a later date | |
Plumbing | Storm Piping & Test | Passed | Rocky Wilde | 1) Area A - Level 1 - Remaining In-Wall Plumbing (Copper & PVC) 2) Area C - Level 2 - Storm Piping (Primary and Overflow lines) - System #2 3) Area B - Level 1 - Storm Piping (Primary and Overflow lines) - System feeding storm gutter | |
Building/Structural | Framing | Passed | Rocky Wilde | Final inspection for framing, in wall.Area A level 2 housekeeping pads area D, and area C level 1 and 2. | |
Building/Structural | Slab | Passed | Rocky Wilde | Curbs and exterior framing. | |
Building/Structural | Slab | NOT READY | Dwayne Mahony | elevator pit and FTGs | |
Building/Structural | Footing | Postponed | Kody Boswell | Footing inspection was cancelled/potponed to a later date due to them not being ready for inspection. | |
Building/Structural | Footing | NOT READY | Dwayne Mahony | rain delay | |
Electrical | Wall Rough-in | Passed | Al Smythe | Area B - Level 1 - In-wall electrical rough-in - Column line's 10 to 18 & A to K - *Does not include locker room* | |
Building/Structural | Framing | Postponed | Kody Boswell | Framing in-wall final inspection for Area-C level 200 walls. CL 19-27 Hilti fire sleeve inspection and pipe penetrations in Area-C walls. Contractor contacted FSU BCA prior to site arrival to cancel/postpone inspection to a later date | |
Electrical | Wall Rough-in | Passed | Rocky Wilde | Area A - Level 2 - In-wall electrical rough-in - Column line's A to K & 1 to 10 | |
Electrical | Ground | Passed | Al Smythe | Exterior Ground Loop - Along Column Line A retaining wall - column line's 1 to 21 | |
Building/Structural | Framing | Cancelled | Kody Boswell | Contractor request: Inspection for framing at level 300 roof expansion joint CL 6.9/7 | |
Building/Structural | Framing | Passed | Al Smythe | exterior framing area C and A and miss. areas. | |
Mechanical | HW Piping & Test | Passed | Rocky Wilde | Area A - Level 2 - Overhead HW & CHW Piping - Column Line's 8.5-11 & A-D Area B - Level 2 - Overhead HW & CHW Piping - Column Line's 11-17 & C-J | |
Building/Structural | Framing | Postponed | Kody Boswell | Exterior framing for North parapet for level 400 roof. FSU BCA spoke to the Contractor prior to site arrival. Inspection has been postponed to a later date due to impending severe weather. | |
Mechanical | CHW Piping & Test | Passed | Rocky Wilde | Area A - Level 2 - Overhead HW & CHW Piping - Column Line's 8.5-11 & A-D Area B - Level 2 - Overhead HW & CHW Piping - Column Line's 11-17 & C-J | |
Building/Structural | Framing | Postponed | Kody Boswell | Area-B level 100 In-wall close up inspection. Postponed to due a failed plumbing/mechanical in-wall inspection. |
BCA Project #: 21-03205- Critchfield Hall - Classroom Improvements
Inspection Date | Discipline | Type | Result | Inspector | Comments |
2025/02/27 | Fire Safety | Final Fire Safety | Conditional | Mary Creason | Need Fire alarm and sprinkler ROC. All other violations completed. NOTE: Address on building is the responsibility of FSU not Southern standard. I inform Phil from Critchfield building maintenance that Numbers are required on building or a sign at front of property) |
2023/12/08 | Fire Safety | Final Fire Safety | Conditional | Mary Creason | Final The following items are still outstanding: 1. Need Fire alarm and sprinkler final paperwork 2. Em. Light not working near water fountain/kitchen 3. EXIT sign over the front entrance door not working 4. Em. Light over main door discharge did not work when tested. NEW item : need address on building and Sign stating where sprinkler risers located on outside door to riser room. |
2023/12/08 | Building/Structural | Final Building | Failed | Dwayne Mahony | Grab bar in one of the accessible toilet rooms is missing. |
2023/12/08 | Electrical | Final Electrical | Failed | Dwayne Mahony | Items from previous inspection have not been corrected. New breaker for feeder to new panel H1A is not a new breaker, rather a used old breaker that the AIC rating is inadequate for the panel has been installed. Install adjustable trip breaker as per plans. |
2023/11/15 | Fire Safety | Final Fire Sprinkler | Conditional | Mary Creason | Need to provide the Contractor’s Material and Test certificate for Aboveground piping. NFPA 13: 25.1(3) edition 2016 |
2023/11/15 | Fire Safety | Final Fire Alarm | Conditional | Mary Creason | Fire Alarm final paperwork is required. Devices worked when tested |
2023/11/15 | Fire Safety | Final Fire Safety | Conditional | Mary Creason | 1. Need final paperwork from Fire alarm and sprinkler contractors 2. Emergency light did not work near kitchen area. 3. Exterior em. Light at front exit door was not installed as required on plans. |
2023/11/07 | Mechanical | Final Mechanical | Conditional | Dwayne Mahony | Provide test and balance report. Of specific interest will be control and operation of the toilet room (s) exhaust fan. This fan was not running at time of inspection. The plans call for toilet room doors to have 1 1/2" undercut, for "return air", which may have been intended to be for exhaust make-up air. The doors have some undercut; the architect is to determine if this is satisfactory. |
2023/11/07 | Electrical | Final Electrical | Conditional | Dwayne Mahony | This building has two separate electrical services. These have long ago been installed in violation of basic NEC requirements, and must be corrected: 1. The 200 amp service is not grounded. This is a fundamental life safety hazard, and must be corrected by installing a lug in the fuse box, and running a #4 minimum conductor the grounding electrode (water pipe) at panel MDP. 2. NEC 230.2(E) requires each service to be identified (in this case Service 1 of 2, Service 2 of 2, with system voltages listed (in this case service 1 is 120/208 volts, three phase, and service two is 120/240 volts, single phase). Identifying multiple services is important for emergency personnel trying to de-energize a building. Identifying voltages and phases is important to electrical service technicians. 3. Identify where the circuit breaker is that feeds new panel H1A. No 200 amp breaker located. |
2023/11/07 | Building/Structural | Final Building | Conditional | Dwayne Mahony | Install the accessible parking sign as noted on the plans. Install signage for the toilet rooms. |
2023/09/28 | Fire Safety | Final Fire Safety | NOT READY | Mary Creason | Need to call in sprinkler and fire alarm finals Also trade finals. |
2023/06/15 | Building/Structural | Framing | Passed | Dwayne Mahony | Approved the soffit framing over the main entry bar/counter. |
2023/02/23 | Building/Structural | Masonry | Passed | Tom Deckert | Rebar for 8' bond beam- RI steel in place per CD's. All cells clean for grout placement. |
2023/02/08 | Building/Structural | Masonry | Passed | Andy Howard | Andy Howard met with Travis Sullivan for this inspection. The first lift of vertical masonry passed inspection. |
2023/02/06 | Building/Structural | Slab | Passed | Andy Howard | FaceTime call with Andy. This inspection was performed using video telephone between Andy Howard and Travis Sullivan on 02/06/2023. |
2023/01/20 | Building/Structural | Footing | Passed | Andy Howard | Andy Howard met with Travis Sullivan and Mike Walker/Gulf Coast Masonry for this inspection. Footer width, depth, and steel sizes and placement were as per plans. Inspection passed. |
2023/01/11 | Electrical | Ceiling Rough-in | Passed | Andy Howard | Andy Howard/FSU BCA, Travis Sullivan/Southern, and Shannon Stephens/L&L Electric met for this inspection. The second floor junction boxes and conduits were inspected for above ceiling installation. This inspection was done at 11:15 A.M. est. |
2022/11/21 | Building/Structural | Sheetrock | Passed | Tom Deckert | Wall Patches secured OK to finish |
2022/11/15 | Building/Structural | Framing | Passed | Andy Howard | Andy Hoard, Neely Lewis, Travis Sullivan, and Shannon Stephens were present for the stud wall framing and electrical wall rough inspections. Both inspections passed. |
2022/11/15 | Electrical | Wall Rough-in | Passed | Andy Howard | Andy Hoard, Neely Lewis, Travis Sullivan, and Shannon Stephens were present for the stud wall framing and electrical wall rough inspections. Both inspections passed. |
Mechanical | Final Mechanical | Neely Lewis | Final |
BCA Project #: 20-03138- Keen Building Re-Roofing
Inspection Date | Discipline | Type | Result | Inspector | Comments |
2023/02/07 | Electrical | Final Electrical | Conditional | Andy Howard | Final Electrical: Andy Howard, Neely Lewis, Sean Mitchell, Travis Marchant, Kent Malik, Matt Ganskop, Mark Poindexter, and Kurt Koetz were present for this joint inspection. The panel on the roof requires a permanent placard identifying the panel, the feed from panel, and the circuit breaker associated with the new exhaust fan. 2017 NEC 408.4 field identification of new equipment. |
2023/02/07 | Mechanical | Final Mechanical | Failed | Neely Lewis | 1. Roof drains appear to not be installed according to manufacturers instructions, including the interfacing of the roof membrane with the roof drain. The hole cut into the membrane is smaller than the bowl below it. See Zurn product literature rd-cvr-21. 2. Condensate lines from the package a/c units need to be secured to the roof. FBC2020-M Section 301.15. |
2023/02/07 | Building/Structural | Roof Final | Conditional | Andy Howard | Roof Final Building Inspection: Andy Howard, Neely Lewis, Sean Mitchell, Travis Marchant, Kent Malik, Matt Ganskop, Mark Poindexter, and Kurt Koetz were present for this joint inspection. The final building inspection is dependent on the final mechanical deficiencies and the final electrical deficiencies to be corrected. Once Final Mechanical and Final Electrical pass, the Final Building can be passed. See the final mechanical and final electrical results for dificiencies. |
2023/01/10 | Building/Structural | Roofing | Passed | Andy Howard | Andy Howard/FSU BCA met with Matt Ganskop and Nick Polovich of OWC at the walk way concrete roof covering the sidewalk between Keen and Collins. This inspection was for the MDC Product Approved Siplast Liquid Applied Roof Coating. This stage of the work included approximately 70% of the roof area with the first stage of the installation which includes a coating directly on the existing coating, a textile membrane, and a coating on top of the membrane. This is stage one of a multilayer installation - see the MDCPA for the exact steps. This is an inprogress inspection. A final inspection is required. |
2022/09/06 | Building/Structural | Roofing | Passed | Andy Howard | Andy Howard, Sean Mitchell, Kent Malik, and John Travis Marchant of FSU and Jacob Winters of OWC met for a cap sheet inprogress inspection. The cap inprogress passed, however, the FSU Design team and Project Manager discussed multiple quality control tems to be reworked. John Travis Marchant will be producing a report on the items that were discussed. |
2022/08/18 | Building/Structural | Roofing | Conditional | Tom Deckert | This work was concealed without BCA inspection. AOR and Manufacturers inspections will be reviewed for records and acceptance. Contractor needs to verify roof drains / capacities and wall flashing detail. Note- Contractor ceased torching activities until 2 charged extinguishers were on site. |