Florida State University Search
Active Building Code Administration Project Inspection Results

BCA Project #: 25-03705- Keen Bldg 0041 - Basement Remodel
| Inspection Date | Discipline | Type | Result | Inspector | Comments |
| 2026/01/26 | Plumbing | Re-Inspection | Passed | Paul Nitz | this was for the waist and nitrogen line only |
| 2026/01/26 | Building/Structural | Framing | Passed | Paul Nitz | |
| 2026/01/23 | Plumbing | Rough-in | Partial | Paul Nitz | 1) no2 not ready 2) Venting Not ready 3) waist not ready |
| 2026/01/23 | Plumbing | Stack Piping & Test | Failed | Paul Nitz | 1) stacks not filled |
| 2026/01/23 | Electrical | Wall Rough-in | Passed | Rocky Wilde | |
| 2026/01/23 | Mechanical | CHW Piping & Test | Passed | Paul Nitz | |
| 2026/01/23 | Mechanical | HW Piping & Test | Passed | Paul Nitz |

BCA Project #: 25-03703- Softball Pole Barn
| Inspection Date | Discipline | Type | Result | Inspector | Comments |
| 2025/01/08 | Building/Structural | Footing | Passed | Kody Boswell | Reviewed embedment depth of vertical support posts into grade. Posts were embedded at the depth specified in contract drawings. |
| Building/Structural | Footing | Cancelled | Kody Boswell | Pole barn post holes | |
| Building/Structural | Footing | Cancelled | Kody Boswell | Contractor contacted FSU BCA prior to site arrival requesting to cancel inspection. |

BCA Project #: 25-03702- Basketball Training Fac, 0819 - remodel offices, lobby Weight rm & showers- PH 2
| Inspection Date | Discipline | Type | Result | Inspector | Comments |
| 2025/09/18 | Plumbing | Rough-in | Passed | Paul Nitz | This inspection was for the LAV in the hallway that backs up to a bathroom |
| 2025/09/18 | Electrical | Wall Rough-in | Passed | Rocky Wilde | This inspection was for the LAV in the hallway that backs up to a bathroom, One GFI outlet |

BCA Project #: 25-03701- Ringling Circus Museum - Storm Repairs -Roof
| Inspection Date | Discipline | Type | Result | Inspector | Comments |
| 2025/10/22 | Building/Structural | Roofing | Conditional | Rocky Wilde | In-Progress: Tear-Off/Dry-In Site Contact: Al Moreno 386-628-6283 I was instructed by Jose Morales to schedule these inspections, but that they will be done virtually, seeing as this project is in Sarasota, FL. But Final will be in person. |
| 2025/09/04 | Fire Safety | Fire Water Above Ground | Cancelled | Curtis Rogers | Can this inspection be for 9.4? This inspection should have been for Dirac Starbucks and not Ringling |
| 2025/09/04 | Plumbing | Final Plumbing | Cancelled | Paul Nitz | Can this inspection be for 9.4? This inspection should have been for Dirac Starbucks and not Ringling |
| 2025/09/04 | Electrical | Ceiling Rough-in | Cancelled | Rocky Wilde | Can this inspection be for 9.4? This inspection should have been for Dirac Starbucks and not Ringling |

BCA Project #: 25-03695- Alumni Ctr Fac - 0465 Renovate RM 145
| Inspection Date | Discipline | Type | Result | Inspector | Comments |
| 2025/12/17 | Building/Structural | Final Building | Partial | Rocky Wilde | TCO inspection for conclusion of Phase 1 |
| 2025/12/17 | Building/Structural | Final Building | Partial | Rocky Wilde | TCO inspection for conclusion of Phase 1, closet areas are closed off unable to inspect the elctrical. |
| 2025/12/17 | Building/Structural | Final Building | Partial | Paul Nitz | TCO inspection for conclusion of Phase 1 |
| 2025/11/19 | Electrical | Ceiling Rough-in | Partial | Rocky Wilde | |
| 2025/10/30 | Building/Structural | Sheetrock | Conditional | Kody Boswell | Reviewed interior sheathing attachment to LG framing. Result is condtional pending receipt of photos from the Contractort showing screws were added in two areas that were missing at the time of inspection. |
| 2025/10/28 | Building/Structural | Framing | Conditional | Paul Nitz | framing pics |
| 2025/10/28 | Electrical | Wall Rough-in | Passed | Rocky Wilde |

BCA Project #: 25-03692- Howser Stadium Upgrade Ph 2
| Inspection Date | Discipline | Type | Result | Inspector | Comments |
| 2025/10/07 | Building/Structural | Slab | Passed | Kody Boswell | Reviewed reinforcing steel for sidewalk pour back |
| 2025/09/30 | Building/Structural | Structural | Failed | Paul Nitz | Window/storefront installation 1) fasteners were required to be 1/4" min per manufacturers installation instructions and they were using 3/16". |
| 2025/09/26 | Building/Structural | Structural | Failed | Paul Nitz | Not ready |
| 2025/09/25 | Mechanical | Duct Rough-in | Conditional | Paul Nitz | 1) round duct 19"-24" require (2) 10ga wire for support. SMACNA 5-2 2) plans need to reflect the change of location of the condensing/heat pump units by CO |
| 2025/09/17 | Electrical | Wall Rough-in | Passed | Rocky Wilde | |
| 2025/09/16 | Building/Structural | Sheetrock | Passed | Paul Nitz | this inspection was completed on 9/16/25. the inspection was for both sheetrock and plywood. This does not include the plywood for the IT room. That will be furnished by the IT team |
| 2025/09/12 | Electrical | Wall Rough-in | Passed | Rocky Wilde | |
| 2025/09/10 | Building/Structural | Insulation | Passed | Paul Nitz | |
| 2025/09/09 | Building/Structural | Re-Inspection | Passed | Paul Nitz | |
| 2025/09/08 | Building/Structural | Framing | Cancelled | Paul Nitz | |
| 2025/09/08 | Mechanical | Duct Rough-in | Passed | Paul Nitz | |
| 2025/09/04 | Building/Structural | Sheetrock | Failed | Paul Nitz | Georgia Pacific installation instructions call for a 6 & 8 screw pattern for structural dens glass panels |
| 2025/09/04 | Building/Structural | Framing | Failed | Paul Nitz | 1) Studs missing 2) Screws missing 3) Bracing (blocking) missing for dens glass |
| 2025/08/28 | Electrical | Underground | Passed | Rocky Wilde | |
| 2025/08/15 | Building/Structural | Framing | Failed | Kody Boswell | Reviewed LG framing for new exterior infill walls. The following needs to be corrected or addressed: 1) It's unclear where bracing and blocking should be installed. Half points of vertical studs? Third points of vertical studs? Contractor to get clarification from EOR. 2) Top and bottom continuous track doesn't have the required fastener spacing per structural drawings. Contractor to install fasteners at 6" OC 3) Double vertical studs are required at new window jamb locations. They were not in place at time of inspection. Contractor to install vertical studs as needed. 4) Additional connections at interior door headers for IT and mech room are to be installed. |

BCA Project #: 24-03690- FSU Coastal & Marine Lab 462 Deck
| Inspection Date | Discipline | Type | Result | Inspector | Comments |
| 2026/01/21 | Building/Structural | Final Building | Failed | Kody Boswell | Final inspection for new deck installation. The following items need to be corrected: 1) Handrails and guardrails for the stairs need to be adjusted to meet building code. Handrail height should be between 34-38" in height, measured from tread nosing to top of rail. Guardrail height should be 42" minimum, measured from tread nosing to top of guardrail. Currently they are approximately 1" too low. 2) Handrail mounted to the building along the ramp needs to be adjusted to meet fire code. Clearance between the wall of the building and surface of rail should be 2 1/4" minumum. Current clearance is approximately 1 7/8". 3) Install blocking at each end of the ramp handrail return along the open side. Contractor to call for re-inspection after corrections have been made. |

BCA Project #: 24-03684-D FSU Lacrosse Facility - Press Box/Concessions
| Inspection Date | Discipline | Type | Result | Inspector | Comments |
| 2026/01/26 | Building/Structural | Slab | Passed | Paul Nitz | Press Box stadium seating for ramp landing support. 1) this was for the left and right side only, the landing was not formed up |
| 2026/01/26 | Building/Structural | Slab | Passed | Paul Nitz | Stadium Seating next to last pour |
| 2026/01/26 | Building/Structural | Framing | Passed | Paul Nitz | Restrooms / Server room 1) this was for the restrooms only, the server room was not compelte |
| 2026/01/23 | Electrical | Final Electrical | Passed | Rocky Wilde | Temp Trailer Clubhouse |
| 2026/01/23 | Building/Structural | Roofing | Passed | Rocky Wilde | Roof Roof |
| 2026/01/23 | Building/Structural | Framing | Partial | Paul Nitz | Frame for restrooms / Frame for server room. At Press Box. 1) mens and women restroom back wall only |
| 2026/01/23 | Building/Structural | Framing | Partial | Paul Nitz | Interior metal stud restrooms only 1) mens and women restroom back wall only |
| 2026/01/22 | Passed | Paul Nitz | MEP pipe insulation inspection for cover. Restrooms / Janitors closet / Grab and Go only PB Restroom only. 1) this was for the insulation, press box mens and womens bathroom in wall | ||
| 2026/01/22 | Building/Structural | Slab | Passed | Rocky Wilde | Another round of stadium seating concrete. |
| 2026/01/21 | Building/Structural | Roofing | Passed | Kody Boswell | In-progress roofing inspection for the flat roof area. Contractor was in the process of mechanically fastening coverboard over insulation, secured to the structural steel deck below. |
| 2026/01/21 | Building/Structural | Structural | Passed | Kody Boswell | Reviewed reinforcing steel for the fourth row of spectator seating |
| 2026/01/20 | Plumbing | Rough-in | NOT READY | Paul Nitz | Cover insp for PB restrooms |
| 2026/01/20 | Plumbing | Rough-in | Passed | Paul Nitz | Mens and PB restrooms. |
| 2026/01/20 | Building/Structural | Slab | Passed | Kody Boswell | Reviewed reinforcing steel for the thrid row of seating |
| 2026/01/20 | Plumbing | Rough-in | NOT READY | Paul Nitz | Cover insp for PB restrooms |
| 2026/01/20 | Building/Structural | Structural | Passed | Kody Boswell | Reviewed steel roof deck attachment to steel structure for the flat roof area and two sloped roof areas. Sloped roof areas were covered with membrane so review was performed from the ground. |
| 2026/01/16 | Building/Structural | Slab | Passed | Kody Boswell | Reviewed reinforcing steel for the second row of stadium seating |
| 2026/01/15 | Plumbing | Water Piping & Test | Passed | Paul Nitz | Civil DOM water pressure test |
| 2026/01/15 | Plumbing | Storm Piping & Test | Passed | Paul Nitz | UG civil stormwater pipe. |
| 2026/01/14 | Building/Structural | Slab | Conditional | Kody Boswell | Reviewed reinforcing steel for the bottom row of stadium seating. There were a few areas with insufficient bottom cover of rebar to grade below. There were also 2 missing longitudinal bars located at the bottom of each side of the trench drain. Result is conditional pending the above items are corrected/installed. Contractor was in the process of installing missing rebar and correcting cover issues as FSU BCA left the site. |
| 2026/01/13 | Plumbing | Rough-in | Passed | Paul Nitz | Womens restroom at Press Box |
| 2026/01/12 | Plumbing | Storm Piping & Test | Passed | Paul Nitz | Stormwater pipe at back of Clubhouse |
| 2026/01/09 | Building/Structural | Slab | Passed | Kody Boswell | Reviewed reinforcing steel for the exterior SOG at the sout side plaza seating area |
| 2026/01/08 | Building/Structural | Slab | Passed | Kody Boswell | Reviewed reinforcing steel for SOG located at the north exterior recreational seating area |
| 2026/01/07 | Plumbing | Underground | Passed | Paul Nitz | |
| 2026/01/07 | Building/Structural | Slab | Passed | Kody Boswell | Reviewed reinforcing steel for 4 ramps |
| 2026/01/06 | Plumbing | Underground | Passed | Paul Nitz | |
| 2025/12/30 | Fire Safety | Hydro-Test | Passed | Rocky Wilde | Flush and Hydro of 8" underground Fire Main and 3 Fire Hydrants. |
| 2025/12/23 | Building/Structural | Masonry | Passed | Rocky Wilde | Masonry wall rebar 3 rd lift |
| 2025/12/22 | Building/Structural | Masonry | Passed | Rocky Wilde | |
| 2025/12/19 | Plumbing | Underground | Passed | Paul Nitz | |
| 2025/12/19 | Plumbing | Underground | Passed | Paul Nitz | |
| 2025/12/19 | Plumbing | Underground | Passed | Paul Nitz | |
| 2025/12/17 | Building/Structural | Masonry | Conditional | Kody Boswell | Reviewed reinforcing steel for the 3rd lift for CMU walls above floor level. Result is conditional pending the following: 1) Sawcutting of bond beam after grout has cured for one interior wall. During inspection it was observed that bond beam reinforcing ran continuous over a vertical control joint, which is not in compliance with masonry typical details. 2) Missing vertical bars are installed. Only a few locations had missing reinforcing. This was discussed with the contractor prior to FSU BCA leaving the job site. Contractor was in the process of installing missing vertical reinforcing as FSU BCA left the site. |
| 2025/12/17 | Plumbing | Underground | Passed | Paul Nitz | |
| 2025/12/16 | Plumbing | Underground | Failed | Paul Nitz | 1) Slope not met for the storm drain |
| 2025/12/16 | Building/Structural | Re-Inspection | Passed | Paul Nitz | Reinspection |
| 2025/12/12 | Building/Structural | Slab | Passed | Kody Boswell | Reviewed reinforcing steel for the interior SOG for the clubhouse. |
| 2025/12/10 | Building/Structural | Masonry | Conditional | Kody Boswell | Reviewed reinforcing steel for the 2nd lift for CMU walls above floor level. Result is conditional pending receipt of photos of showing additional vertical reinforcing has been added where lap splice lengths were too short. This was discussed with the Contractor while on site. Photos were received by the Contractor after FSU BCA left the site. |
| 2025/12/10 | Plumbing | Storm Piping & Test | Passed | Paul Nitz | backside of Press Box stormwater pipe. |
| 2025/12/09 | Plumbing | Storm Piping & Test | Passed | Paul Nitz | UG Civil UP stormwater at the Press box. |
| 2025/12/09 | Building/Structural | Masonry | NOT READY | Kody Boswell | CMU infill at LAX Press Box Cleanout holes in block containing vertical reinforcing were not cut (8 ft lift) and there were some walls with no access (scaffolding) to look down into reinforced cells |
| 2025/12/04 | Plumbing | Underground | Passed | Paul Nitz | |
| 2025/12/03 | Plumbing | Underground | Passed | Paul Nitz | |
| 2025/12/02 | Plumbing | Underground | Passed | Paul Nitz | |
| 2025/11/25 | Building/Structural | Masonry | Conditional | Kody Boswell | Reviewed reinforcing steel for the 1st lift for CMU walls above floor level. Result is conditional pending recepit of video/photos of masonry sills at pressbox windows being cleaned out. There was excessive mortar in a few locations. Video and photos were received by the Contractor after FSU BCA left the site. |
| 2025/11/20 | Plumbing | Underground | NOT READY | Paul Nitz | more civil |
| 2025/11/19 | Plumbing | Underground | Passed | paul nitz | |
| 2025/11/18 | Building/Structural | Slab | Passed | Kody Boswell | Reviewed reinforcing steel for portions of the slab on grade. Areas reviewed include the pressbox interior slab and exterior covered seating on both side of the building. |
| 2025/11/18 | Plumbing | Underground | Passed | Paul Nitz | |
| 2025/11/13 | Plumbing | Underground | Passed | Paul Nitz | Fire water |
| 2025/11/12 | Plumbing | Underground | Passed | Paul Nitz | Civil Storm water insp |
| 2025/11/12 | Plumbing | Underground | Passed | Paul Nitz | FOR THE CLUBHOUSE. |
| 2025/11/12 | Plumbing | Underground | Passed | Paul Nitz | |
| 2025/11/06 | Building/Structural | Masonry | Passed | Rocky Wilde | Stem wall insp at PB and Clubhouse. |
| 2025/11/06 | Plumbing | Underground | Passed | Rocky Wilde | Stormwater continues |
| 2025/11/04 | Plumbing | Underground | Passed | Paul Nitz | Stormwater pipe and structure. LAX |
| 2025/11/04 | Building/Structural | Structural | Passed | Paul Nitz | Stormwater pipe and structure. LAX |
| 2025/10/31 | Building/Structural | Structural | Passed | Kody Boswell | Reviewed reinforcing steel for tie columns at the intersection of grids A-3 and A-6 |
| 2025/10/31 | Plumbing | Underground | Passed | Paul Nitz | This request is taking the place of the 1 pm request. Thank you. Press Box UG plumbing for cover |
| 2025/10/31 | Plumbing | Underground | Passed | Paul Nitz | Press Box UG plumbing for cover |
| 2025/10/30 | Building/Structural | Structural | Passed | Kody Boswell | Reviewed reinforcing steel for 2 tie columns (TC-2) |
| 2025/10/30 | Plumbing | Underground | Passed | Paul Nitz | Thanks |
| 2025/10/29 | Building/Structural | Masonry | Passed | Kody Boswell | Reviewed reinforcing steel for the 1st lift of CMU walls at the press box. 1st lift went from top of foundations to top of floor slab. All of the 1st lift is below grade and to be grouted soild. |
| 2025/10/29 | Plumbing | Specialty Piping | Passed | Paul Nitz | CIVIL Sanitation Pipe for cover. |
| 2025/10/28 | Building/Structural | Masonry | Failed | Paul Nitz | Stem walls LAX 1) Rocky and I visited the job site two times on 10/28 and both times they were not ready in addition to legible plans not being on site. |
| 2025/10/23 | Plumbing | Specialty Piping | Passed | Rocky Wilde | civil retaining wall ug drainage cover. |
| 2025/10/06 | Building/Structural | Wall/Ceiling | Passed | Kody Boswell | FSU BCA reviewed reinforcing steel for the field retaining wall on the Press Box side. Reinforcing steel was in substantial compliance with the contract documents. |
| 2025/10/06 | Building/Structural | Footing | Passed | Kody Boswell | Reviewed reinforcing steel for some Pressbox foundations. As discussed on site, the Press Box foundations inspection has passed with the understanding the following conditions/items are addressed: - Finish installing vertical wall dowels for exterior walls at 2’ on center. This was almost completed before I left the job site. - Adjust footing step formwork at one WF3.0 location. This was a work in progress when I left the job site. - Maintain 3” bottom and side cover for reinforcing steel. There were a few locations that didn’t have required cover. This was a work in progress when I left the job site. |
| 2025/09/15 | Building/Structural | Footing | Passed | Kody Boswell | Reviewed reinforcing steel for the field wall foundation (WF3.5) on the pressbox side. Reinbforcing steel was in substantial compliance with the contract documents. |
| Building/Structural | Masonry | Postponed | Kody Boswell | Contractor contacted FSU BCA prior to site arrival to cancel/postpone inspection due to weather | |
| Plumbing | Specialty Piping | Paul Nitz | CIVIL Sanitation Pipe for cover. | ||
| Building/Structural | Structural | Cancelled | Kody Boswell | Contractor called to cancel inspection for concrete tie beams and tie columns prior to FSU BCA arriving on site | |
| Building/Structural | Masonry | Cancelled | Kody Boswell | ||
| Building/Structural | Slab | Kody Boswell | stadium seating at PB | ||
| Building/Structural | Framing | Kody Boswell | Frame for PB / Screw insection for restroom sheetrock |

BCA Project #: 24-03684-C FSU Lacrosse - Clubhouse
| Inspection Date | Discipline | Type | Result | Inspector | Comments |
| 2026/01/22 | Building/Structural | Masonry | Passed | Paul Nitz | Re-Inspection for masonry 1) This was for the back wall corrections that Kody had failed on 01/21/2026 only. |
| 2026/01/22 | Building/Structural | Re-Inspection | Passed | Paul Nitz | Re-Inspection for masonry |
| 2026/01/21 | Building/Structural | Masonry | Failed | Kody Boswell | Reviewed reinforcing steel for CMU walls. There are still missing reinforcing bars for 5 locations where roof rafters bear on CMU wall. This was discussed with the Contractor while on site. |
| 2026/01/16 | Building/Structural | Re-Inspection | NOT READY | Kody Boswell | Reinspection Clubhouse CMU for rebar. Mason was not on site and CMU was not able to be accessed for inspection |
| 2026/01/14 | Building/Structural | Masonry | Failed | Kody Boswell | Reviewed reinforcing steel for the first lift of CMU walls (high lift). The back wall along grid A was missing reinforcing steel called out in details 3/S601 and 10/S601. Missing reinforcing is the "2 vertical bars at 8in. in solid grout". Contractor to contact EOR and verify if missing bars need to be drilled and epoxied into slab or not. Also, cleanouts have excessive debris that must be removed prior to close up and grouting. Contractor to request inspection after items above have been addressed. |
| 2026/01/14 | Building/Structural | Masonry | NOT READY | Kody Boswell | Masonry Rebar Masons were still laying block when FSU BCA arrived on site. Contractor requested FSU BCA to return to the site in the PM. |
| 2026/01/13 | Plumbing | Storm Piping & Test | Passed | Paul Nitz | civil stormwater behind clubhouse |
| 2025/10/24 | Building/Structural | Footing | Passed | Kody Boswell | Reviewed reinforcing steel for several foundations |
| 2025/10/22 | Building/Structural | Footing | Passed | Kody Boswell | Reviewed reinforcing steel for some LAX Clubhouse foundations |
| Building/Structural | Footing | Postponed | Kody Boswell | LAX Clubhouse foundations Contractor contacted FSU BCA prior to site arrival to cancel/postpone inspection | |
| Building/Structural | Masonry | Postponed | Kody Boswell | CMU rebar at Clubhouse Contractor postponed inspection to a later date in order to use high lift grouting over low lift grouting. |

BCA Project #: 24-03684-B FSUPD Unit 2 Demo-Lacrosse
| Inspection Date | Discipline | Type | Result | Inspector | Comments |
| 2025/07/09 | Plumbing | Re-Inspection | Passed | Paul Nitz | Cut & Caps are now painted with tar, ready for reinspection |
| 2025/07/09 | Plumbing | Underground | Passed | Paul Nitz | Cut & Caps are now painted with tar, ready for reinspection |
| 2025/07/08 | Plumbing | Underground | Failed | Paul Nitz | Shane with English Earthworks is utility contractor onsite. He can be reached at 407-433-3261 1) some of the drains had been covered and could not be inspected 2) The underground caps need to be protected from corrosion |

BCA Project #: 24-03682- Regal Theatre Property Electrical Upgrades
| Inspection Date | Discipline | Type | Result | Inspector | Comments |
| 2025/08/08 | Electrical | Final Electrical | Passed | Rocky Wilde | Please have the inspector call 45 minutes before, Gary is not on site. Gary (850) 247-7418 |
| 2025/07/31 | Electrical | Final Electrical | Passed | Rocky Wilde | Gary Mansell (850) 247-7418, please have the inspector call when he is 45 minutes out because Gary is not on site. |

BCA Project #: 24-03677- BSIR Post Project Revisions
| Inspection Date | Discipline | Type | Result | Inspector | Comments |
| 2025/07/21 | Electrical | Final Electrical | Postponed | Rocky Wilde | ASI 5 electrical revisions. Rooms 0119P and 0119N. |
| 2025/07/11 | Mechanical | Final Mechanical | Passed | Paul Nitz | Paul and Rocky, This inspection will be in room 0116 that was part of the BSIR Lab permit for the 0119 suite. It's the one we discussed this past Tuesday morning. Thanks, Larry |
| 2025/07/11 | Electrical | Final Electrical | Passed | Al Smythe | Paul and Rocky, This inspection will be in room 0116 that was part of the BSIR Lab permit for the 0119 suite. It's the one we discussed this past Tuesday morning. Thanks, Larry |
| 2025/07/11 | Plumbing | Final Plumbing | Passed | Paul Nitz | Paul inspected this on 7/11/25. Room 116 emergency shower and eyewash. |
| 2025/06/16 | Electrical | Final Electrical | Passed | Rocky Wilde | This final will be for 0119P and 0119Q in the BSIR Lab. It was agreed upon, that the whips in question will actually be a part of the equipment and will connect to the disconnects. Thank you, Larry |
| Electrical | Ceiling Rough-in | Passed | Rocky Wilde | This inspection will be in room 0119. Larry |

BCA Project #: 24-03676- Tucker Civic Center Investigate Sewer Piping in Restrooms
| Inspection Date | Discipline | Type | Result | Inspector | Comments |
| 2025/06/02 | Plumbing | Underground | Passed | James Melvin |

BCA Project #: 24-03674- Strozier Sub-Basement Upgrades
| Inspection Date | Discipline | Type | Result | Inspector | Comments |
| 2026/01/21 | Building/Structural | Masonry | Passed | Kody Boswell | Reviewed reinforcing steel for CMU walls for the new stair exterior of the NE corner of the building |
| 2026/01/21 | Building/Structural | Structural | Passed | Kody Boswell | Reviewed reinforcing steel for CMU walls for the new stair exterior of the NE corner of the building |
| 2026/01/14 | Building/Structural | Footing | Conditional | Kody Boswell | Reviewed reinforcing steel for footers for new walls at sidewalk near the NE corner of the building. Contractor was in the process of placing wall dowels when FSU BCA arrived on site. Result is conditional pending photo(s) from the Contractor showing wall dowels have been installed. |
| 2026/01/14 | Fire Safety | Final Egress/Emergency Lights | Conditional | Curtis Rogers | Requesting a fire egress inspection to close down the East side emergency stair of Strozier Library |
| Building/Structural | Footing | Postponed | Kody Boswell | Contractor contacted FSU BCA prior to site arrival to postpone inspection to a later date. | |
| Building/Structural | Structural | Cancelled | Kody Boswell | Rebar for pour on Tuesday morning Contractor cancelled inspection via email | |
| Building/Structural | Structural | Cancelled | Kody Boswell | Rebar for pour on Tuesday morning Contractor cancelled inspection via email |

BCA Project #: 24-03665- Dirac Starbucks
| Inspection Date | Discipline | Type | Result | Inspector | Comments |
| 2026/01/05 | Plumbing | Above Ceiling | Passed | Paul Nitz | |
| 2025/09/11 | Building/Structural | Final Building | Passed | Rocky Wilde | |
| 2025/09/11 | Fire Safety | Final Egress/Emergency Lights | Passed | Curtis Rogers | with rocky |
| 2025/09/11 | Fire Safety | Final Fire Sprinkler | Passed | Curtis Rogers | with rocky |
| 2025/09/11 | Electrical | Final Electrical | Passed | Rocky Wilde | |
| 2025/09/11 | Fire Safety | Final Fire Alarm | Passed | Curtis Rogers | with rocky |
| 2025/09/11 | Fire Safety | Final Fire Safety | Passed | Curtis Rogers | with rocky |
| 2025/09/10 | Electrical | Final Electrical | NOT READY | Rocky Wilde | |
| 2025/09/09 | Mechanical | Final Mechanical | Passed | Paul Nitz | MP&E Final inspection. |
| 2025/09/09 | Plumbing | Final Plumbing | Conditional | Paul Nitz | MP&E Final inspection. 1) Bacteria report required |
| 2025/09/09 | Electrical | Final Electrical | Failed | Rocky Wilde | MP&E Final inspection. |
| 2025/09/05 | Mechanical | Wall & Ceiling | Passed | Paul Nitz | |
| 2025/09/05 | Electrical | Ceiling Rough-in | Paul Nitz | plumbing innspection is for insulation and all were performed on 09/04/2025 @ 3:30pm by Rock Wilde and Paul Nitz | |
| 2025/09/05 | Electrical | Wall Rough-in | Paul Nitz | plumbing innspection is for insulation and all were performed on 09/04/2025 @ 3:30pm by Rock Wilde and Paul Nitz | |
| 2025/09/05 | Mechanical | Duct Rough-in | Paul Nitz | plumbing innspection is for insulation and all were performed on 09/04/2025 @ 3:30pm by Rock Wilde and Paul Nitz | |
| 2025/09/05 | Mechanical | Insulation | Paul Nitz | plumbing innspection is for insulation and all were performed on 09/04/2025 @ 3:30pm by Rock Wilde and Paul Nitz | |
| 2025/09/05 | Plumbing | Final Plumbing | Conditional | Paul Nitz | 1) hot and cold-water supply lines need to be labeled before final plumbing inspection. Ok to hang ceiling tile |
| 2025/09/05 | Plumbing | Rough-in | Paul Nitz | plumbing innspection is for insulation and all were performed on 09/04/2025 @ 3:30pm by Rock Wilde and Paul Nitz | |
| 2025/09/04 | Mechanical | Insulation | Conditional | Paul Nitz | these inspections were performed on 09/04/2025 by Paul Nitz and Rocky Wilde, they were accidently loged in for Ringling Circus Musium by Garrison.the plumbing inspection is for plumbing insulation |
| 2025/09/04 | Mechanical | Duct Rough-in | Conditional | Paul Nitz | these inspections were performed on 09/04/2025 by Paul Nitz and Rocky Wilde, they were accidently loged in for Ringling Circus Musium by Garrison.the plumbing inspection is for plumbing insulation 1) ducting needs to be taped off at boot 2) some ducting needs to be repaired (holes patched) OK TO START HANGING CEILING TILE |
| 2025/09/04 | Plumbing | Rough-in | Passed | Paul Nitz | these inspections were performed on 09/04/2025 by Paul Nitz and Rocky Wilde, they were accidently loged in for Ringling Circus Musium by Garrison.the plumbing inspection is for plumbing insulation |
| 2025/09/04 | Electrical | Ceiling Rough-in | Passed | Rocky Wilde | these inspections were performed on 09/04/2025 by Paul Nitz and Rocky Wilde, they were accidently loged in for Ringling Circus Musium by Garrison.the plumbing inspection is for plumbing insulation |
| 2025/09/04 | Electrical | Wall Rough-in | Passed | Rocky Wilde | these inspections were performed on 09/04/2025 by Paul Nitz and Rocky Wilde, they were accidently loged in for Ringling Circus Musium by Garrison.the plumbing inspection is for plumbing insulation |
| 2025/09/03 | Electrical | Ceiling Rough-in | Cancelled | Rocky Wilde | |
| 2025/09/03 | Mechanical | Wall & Ceiling | Cancelled | Paul Nitz | |
| 2025/09/03 | Mechanical | Final Mechanical | Cancelled | Paul Nitz | |
| 2025/09/03 | Fire Safety | Fire Alarm Rough-In | Passed | Curtis Rogers | Fire Alarm Rough-IN PASSED Side Note: Put it for Fire Water Above Ground *Add hangers to Sprinkler Pipe (1ft from end w/ Fire Pump) *Change (1) 155 degree head to 200 degree head |
| 2025/09/02 | Electrical | Ceiling Rough-in | NOT READY | Rocky Wilde | |
| 2025/09/02 | Electrical | Re-Inspection | NOT READY | Rocky Wilde | |
| 2025/08/29 | Plumbing | Final Plumbing | Failed | Paul Nitz | 1) plumbing insulation has not been inspected. |
| 2025/08/27 | Electrical | Ceiling Rough-in | Failed | Rocky Wilde | Please call me on your way. Not ready for inspection |
| 2025/08/01 | Mechanical | Insulation | Partial | Rocky Wilde | hard lid only |
| 2025/08/01 | Electrical | Ceiling Rough-in | Partial | Rocky Wilde | hard lid only |
| 2025/07/30 | Electrical | Ceiling Rough-in | Conditional | Rocky Wilde | fire alarm box missing, temporary lighting wires are power out of an open box. |
| 2025/07/29 | Electrical | Ceiling Rough-in | NOT READY | Rocky Wilde | |
| 2025/07/29 | Mechanical | Duct Rough-in | Passed | Paul Nitz | This inspection was for the mastic and duct to diffuser connection for the main lobby only. |
| 2025/07/14 | Plumbing | Rough-in | Passed | Paul Nitz | |
| 2025/07/14 | Building/Structural | Wall/Ceiling | Passed | Paul Nitz | |
| 2025/07/14 | Electrical | Wall Rough-in | Passed | Rocky Wilde | |
| 2025/07/03 | Mechanical | Duct Rough-in | Passed | Paul Nitz | . 1) As Built Plans will be required at final for revisions from approved plans regarding flex and duct locations. Ok To insulate duct |
| 2025/07/03 | Building/Structural | Framing | Failed | Paul Nitz | In-wall framing inspection 1) MEP need to pass before framing can be inspected |
| Mechanical | Wall & Ceiling | Paul Nitz | |||
| Plumbing | Rough-in | Paul Nitz | |||
| Electrical | Wall Rough-in | Paul Nitz |

BCA Project #: 24-03663- Montgomery Flooring & Lighting Replacement
| Inspection Date | Discipline | Type | Result | Inspector | Comments |
| 2025/08/22 | Electrical | Final Electrical | Passed | Rocky Wilde | On site Tech. Jake 850-264-3320 |

BCA Project #: 24-03644- Law School Advocacy Center 2nd Floor Offices
| Inspection Date | Discipline | Type | Result | Inspector | Comments |
| 2025/09/05 | Building/Structural | Final Building | Conditional | Kody Boswell | Final building inspection Result is conditional pending items below being addressed: 1) Ground floor - cover plates need to be installed, paint needs to be touched up in several spots, signage needs to be posted 2) 2nd floor - cover plates need to be installed, signage needs to be posted, data line was a work in progress at time of inspection |
| 2025/08/13 | Fire Safety | Final Fire Alarm | Passed | Curtis Rogers | Passed- Relocated Speaker Strobes on Ground & 2nd Floors |
| 2025/08/13 | Fire Safety | Final Fire Sprinkler | Passed | Curtis Rogers | *Intsall missing (2)Escutcheon plates |
| 2025/07/31 | Mechanical | Wall & Ceiling | Conditional | Rocky Wilde | Call when on your way. |
| 2025/07/31 | Fire Safety | Fire Water Above Ground | Passed | Curtis Rogers | Above Ceiling Inspection Visual- 1st & 2nd Floors |
| 2025/07/31 | Electrical | Final Electrical | Conditional | Rocky Wilde | Call when on your way. |
| 2025/06/11 | Building/Structural | Insulation | Passed | Kody Boswell | |
| 2025/06/11 | Building/Structural | Sheetrock | Passed | Kody Boswell | |
| 2025/06/05 | Electrical | Wall Rough-in | Passed | James Melvin | Partial framing inspection |
| 2025/06/05 | Building/Structural | Framing | Passed | James Melvin | Partial framing inspection |
| 2025/06/05 | Electrical | Ceiling Rough-in | Passed | James Melvin | Partial framing inspection |

BCA Project #: 24-03639- Love Building Envelope
| Inspection Date | Discipline | Type | Result | Inspector | Comments |
| 2026/01/06 | Building/Structural | Final Building | Passed | Kody Boswell | Reviewed all new windows installed for the project not previously reviewed in past inspections. |
| 2025/12/02 | Building/Structural | Other | Passed | Kody Boswell | Reviewed fire caulking for windows in the East stair well |
| 2025/11/21 | Building/Structural | Structural | Passed | Kody Boswell | East Stair well window attachment to structure |
| 2025/08/21 | Building/Structural | Wall/Ceiling | Passed | Paul Nitz | 4th floor, east elevation |
| 2025/08/15 | Building/Structural | Wall/Ceiling | Passed | Kody Boswell | 1st-4th floors East elevation |
| 2025/08/08 | Building/Structural | Wall/Ceiling | Passed | Kody Boswell | Interior final for the 2nd, 3rd, and 4th floors on the North and South elevations. |
| 2025/07/30 | Building/Structural | Wall/Ceiling | Passed | Kody Boswell | Reviewed the following rooms on the 1st floor for substantial completion so furniture could be moved back in: 108B, 108C, 108D, 105, 104A, 104B, 103, 102, 107, 106 |
| 2025/07/29 | Building/Structural | Wall/Ceiling | Passed | Kody Boswell | Reviewed window installation procedures for the 1st-4th floors West elevation |
| 2025/07/16 | Building/Structural | Wall/Ceiling | Passed | Kody Boswell | 3rd and 4th floors North and South Elevations. |
| 2025/06/24 | Building/Structural | Wall/Ceiling | Passed | Kody Boswell | North side 2nd floor, south side basement and 1st floor |
| 2025/06/13 | Building/Structural | Masonry | Passed | Paul Nitz | |
| Building/Structural | Structural | Cancelled | Kody Boswell | East Stair Well |

BCA Project #: 24-03631- Biomedical Facility ATS and New Generator
| Inspection Date | Discipline | Type | Result | Inspector | Comments |
| 2025/10/27 | Electrical | Final Electrical | Passed | Rocky Wilde | |
| 2025/10/23 | Electrical | Appliance/Equipment | Passed | Rocky Wilde | Removing temp back up generators/tying in new permanent back up generator |
| 2025/10/13 | Electrical | Underground | Passed | Rocky Wilde | |
| 2025/10/10 | Electrical | Underground | Passed | Rocky Wilde | |
| 2025/09/15 | Building/Structural | Slab | Passed | Kody Boswell | Reviewed reinforcing steel for the access slabs on either side of the generator pad that was previously poured. |
| 2025/09/10 | Building/Structural | Slab | Passed | Kody Boswell | Reviewed reinforcing steel for new generator pad |

BCA Project #: 24-03628-A Bio Unit 1 - Second Floor Remodling
| Inspection Date | Discipline | Type | Result | Inspector | Comments |
| 2026/01/22 | Building/Structural | Sheetrock | Passed | Paul Nitz | Gang and HC baths |
| 2026/01/20 | Electrical | Wall Rough-in | Passed | Rocky Wilde | Partial elevator wall. |
| 2026/01/15 | Building/Structural | Framing | Passed | Kody Boswell | Reviewed LG framing for several walls |
| 2026/01/13 | Building/Structural | Framing | Passed | Paul Nitz | Inspections will be in the gang baths. |
| 2026/01/13 | Electrical | Wall Rough-in | Passed | Rocky Wilde | Inspections will be in the gang baths. |
| 2026/01/12 | Mechanical | CHW Piping & Test | Passed | Paul Nitz | CHW piping to serve AHU 2.1 |
| 2026/01/12 | Mechanical | Duct Rough-in | Passed | Paul Nitz | |
| 2026/01/08 | Building/Structural | Sheetrock | Passed | Kody Boswell | Reviewed sheathing attachment to LG framing in several areas |
| 2026/01/07 | Mechanical | HW Piping & Test | Passed | Paul Nitz | |
| 2025/12/30 | Electrical | Wall Rough-in | Passed | Rocky Wilde | If you don't have card access to the building, the exterior door is unlocked on the north end of the building at the service road. Thanks, Larry |
| 2025/12/22 | Building/Structural | Sheetrock | Passed | Rocky Wilde | |
| 2025/12/22 | Mechanical | CHW Piping & Test | Passed | Rocky Wilde | This is hydro test/ inspection for Glycol piping. |
| 2025/12/22 | Plumbing | Water Piping & Test | Passed | Rocky Wilde | Inspection for water piping in restrooms on 2nd floor. |
| 2025/12/18 | Building/Structural | Framing | Passed | Paul Nitz | |
| 2025/12/18 | Building/Structural | Sheetrock | Passed | Paul Nitz | |
| 2025/12/18 | Building/Structural | Insulation | Passed | Paul Nitz | |
| 2025/12/15 | Mechanical | Duct Pressure Test | Failed | Paul Nitz | This inspection will be with Vause Mechanical. 1) Duct pressure test failed, ducts would not hold the minimum pressure specified on the plans |
| 2025/12/12 | Mechanical | CHW Piping & Test | Passed | Paul Nitz | CHW piping to serve AHU-4 |
| 2025/12/12 | Mechanical | Re-Inspection | Passed | Paul Nitz | CHW piping to serve AHU-4 |
| 2025/12/10 | Mechanical | CHW Piping & Test | Failed | Paul Nitz | Inspection for CHW piping to serve AHU 4. 1) air in the hydro test lines |
| 2025/12/10 | Mechanical | Duct Rough-in | Passed | Paul Nitz | Partial mechanical duct rough in. Paul looked at this on 12-10-25. |
| 2025/12/10 | Mechanical | Duct Pressure Test | NOT READY | Paul Nitz | This inspection will be with Vause Mechanical. Larry |
| 2025/12/09 | Building/Structural | Sheetrock | Passed | Paul Nitz | These inspections will be in room 2001. 1) first layer on the fire wall |
| 2025/12/09 | Electrical | Wall Rough-in | Passed | Rocky Wilde | These inspections will be in room 2001. |
| 2025/12/08 | Electrical | Wall Rough-in | Passed | Rocky Wilde | This inspection will be for the following rooms, 2001A, 2001B, 2001C, 2008, 2009, 2017, 2018, 2019, 2020, 2021 and 2022. Thank you, |
| 2025/12/05 | Plumbing | Rough-in | Passed | Paul Nitz | This inspection will be in the 1st and 2nd floor gang baths. Larry |
| 2025/12/05 | Plumbing | Stack Piping & Test | Passed | Paul Nitz | This inspection will be in the 1st and 2nd floor gang baths. Larry |
| 2025/12/03 | Building/Structural | Sheetrock | Passed | Paul Nitz | Screw inspection in room 2007 |
| 2025/12/03 | Plumbing | Rough-in | NOT READY | Paul Nitz | This inspection will be in the two gang bathrooms and the H/C bathroom. Larry |
| 2025/12/03 | Plumbing | Stack Piping & Test | NOT READY | Paul Nitz | This inspection will be in the two gang bathrooms and the H/C bathroom. Larry |
| 2025/12/03 | Plumbing | Water Piping & Test | NOT READY | Paul Nitz | This inspection will be in the two gang bathrooms and the H/C bathroom. Larry |
| 2025/12/02 | Building/Structural | Slab | Passed | Kody Boswell | Reviewed reinforcing steel for 2 slab infills in lab areas |
| 2025/12/01 | Electrical | Wall Rough-in | Passed | Rocky Wilde | This will be a partial in room 2027. The framing inspection passed on 11-25-2025. We'd like to complete this room in order to relocate the fire alarm equipment. Larry |
| 2025/11/25 | Building/Structural | Sheetrock | Passed | Kody Boswell | top out |
| 2025/11/25 | Building/Structural | Framing | Passed | Kody Boswell | |
| 2025/11/20 | Building/Structural | Masonry | Passed | Kody Boswell | Reviewed reinforcing steel for CMU sill for new window in office 2019 |
| 2025/11/19 | Building/Structural | Framing | Passed | Kody Boswell | Reviewed LG framing in rooms 2016,2017,2018,2019,2020,2021, and 2022. |
| 2025/11/19 | Building/Structural | Masonry | Passed | Kody Boswell | Reviewed reinforcing steel for CMU jambs and header for new window in office 2019. |
| 2025/11/19 | Building/Structural | Sheetrock | Partial | Paul Nitz | Please call when you get here and we'll get everyone gathered. Thanks, Larry |
| 2025/11/19 | Mechanical | Duct Rough-in | Partial | Paul Nitz | Please call when you get here and we'll get everyone gathered. Thanks, Larry |
| 2025/11/19 | Building/Structural | Structural | Passed | Kody Boswell | Reviewed reinforcing steel for CMU jambs and header for new window in office 2019. |
| 2025/11/17 | Building/Structural | Framing | Partial | Paul Nitz | This inspection was completed on 1-17-2025. Thank you, Larry |
| 2025/11/17 | Building/Structural | Sheetrock | Partial | Paul Nitz | This will be a screw inspection for some of the top out areas. Larry |
| 2025/11/06 | Building/Structural | Framing | Conditional | Paul Nitz | Paul, We are asking for a courtesy inspection regarding the gyp board top out areas located in the open corridors. We'd like to hang the open corridor side of the wall, finish and paint the walls, the exposed structural steel and deck above. Larry |
| Plumbing | Water Piping & Test | Paul Nitz | Partial DCW and HW return & supply. | ||
| Plumbing | Stack Piping & Test | Paul Nitz | Rooms 2007, 2011, 2012, and 2014. | ||
| Mechanical | Duct Pressure Test | Paul Nitz | |||
| Mechanical | Duct Pressure Test | Paul Nitz |

BCA Project #: 24-03628- Bio Unit One Second Floor Remodeling
| Inspection Date | Discipline | Type | Result | Inspector | Comments |
| 2025/11/17 | Building/Structural | Framing | Partial | Paul Nitz | This inspection was completed on 11-17-2025. Thank you, Larry |
| 2025/11/06 | Building/Structural | Framing | Conditional | Paul Nitz | Thanks for the help today, Larry |

BCA Project #: 24-03625- Sliger Data Center Chiller
| Inspection Date | Discipline | Type | Result | Inspector | Comments |
| 2025/07/02 | Mechanical | CHW Piping & Test | Passed | Paul Nitz |

BCA Project #: 24-03623- Westcott Ruby Diamond OVPR Suite Modifications
| Inspection Date | Discipline | Type | Result | Inspector | Comments |
| 2025/09/03 | Building/Structural | Final Building | Passed | Kody Boswell | Final building inspection. Project can be closed out. |
| 2025/08/22 | Plumbing | Final Plumbing | Passed | Paul Nitz | |
| 2025/07/15 | Electrical | Final Electrical | Failed | Rocky Wilde | open boxes, several boxes need to be labeled |
| 2025/07/11 | Mechanical | Insulation | Passed | Paul Nitz | |
| 2025/07/11 | Plumbing | Final Plumbing | Failed | Paul Nitz | 1) Plans call for a brass p trap 2) Plans call for a angle valve 3) Water supply line needs supported |
| 2025/06/30 | Building/Structural | Wall/Ceiling | Passed | Paul Nitz | Cieling grid inspection |
| 2025/06/30 | Mechanical | Duct Rough-in | Passed | Paul Nitz | |
| 2025/06/09 | Building/Structural | Sheetrock | Passed | Kody Boswell | Reviewed sheathing attachment for one new partiiton wall and two door infill areas |
| 2025/06/05 | Electrical | Wall Rough-in | Passed | James Melvin | |
| 2025/05/30 | Building/Structural | Framing | Conditional | Kody Boswell | Reviewed LG framing for a new partition wall and two door infills. Result is conditional pending addional bracing installation at the top of new partition wall. |
| 2025/05/21 | Plumbing | Rough-in | Passed | Paul Nitz |

BCA Project #: 24-03619- Fine Arts Waterproofing
| Inspection Date | Discipline | Type | Result | Inspector | Comments |
| 2025/08/13 | Building/Structural | Framing | Passed | Paul Nitz | Inspection on new stairs 1) Gaps in stair wall over 4” wide need to be filled before final CC 2) Feet of stair landing support need to be grouted with non-shrinking grout before final CC |
| 2025/06/26 | Building/Structural | Slab | Passed | Kody Boswell | Inspection on sidewalk |
| 2025/06/20 | Building/Structural | Slab | Passed | Kody Boswell | Inspection on Wire for new concrete slab and sidewalk |
| 2025/06/17 | Building/Structural | Structural | Passed | Kody Boswell | Reviewed reinforcing steel for two site walls. |
| 2025/06/11 | Building/Structural | Footing | Passed | Kody Boswell | Reviewed reinforcing steel for new footers for walls around Radius classroom area |
| 2025/06/06 | Building/Structural | Slab | Passed | Kody Boswell | Inspection on Rebar for Pad at Fire egress area in front and steps on West side |
| 2025/05/30 | Building/Structural | Slab | Passed | Kody Boswell | Reviewed reinforcing steel for sidewalk on the west side of the job site |
| 2025/05/27 | Building/Structural | Erosion Control | Passed | Paul Nitz | Inspection on remaining revisions storm water piping 1) this is for the 12" pipe inspectipon only |
| 2025/05/27 | Building/Structural | Framing | Failed | Paul Nitz | Inspection on added Storm water box re-bar 1) an engineered letter will be required for the construction of the storm water box, FSU BCA has not received the plans for its construction 2) an engineered letter will be required for the deviation of the plans on how the 6" and 8" pipe were ran to the storm box. |
| 2025/05/23 | Building/Structural | Erosion Control | Conditional | Paul Nitz | Inspection on revised itein 1) engineered plans required for the storm box tie in |
| 2025/05/06 | Plumbing | Underground | Conditional | Paul Nitz | Inspection on final section of new Trench drain piping 1) not a final drainpipe inspection, there is still an incomplete section at the entrance of the buildings south side |
| 2025/05/06 | Building/Structural | Wall/Ceiling | Passed | Paul Nitz | Inspection on Final section of new Waterproofing |
| 2025/04/29 | Plumbing | Underground | Passed | Paul Nitz | |
| 2025/04/29 | Building/Structural | Wall/Ceiling | Passed | Paul Nitz | Inspection on new Waterproofing system |
| 2025/04/25 | Building/Structural | Structural | Passed | Kody Boswell | In-progress inspection of new Waterproofing system, base bid scope of work. Contractor had one area where underlayment and drainage mat was installed and another area where underlayment installation was in progress. |

BCA Project #: 24-03615-A Dittmer Building Reroof
| Inspection Date | Discipline | Type | Result | Inspector | Comments |
| 2025/11/19 | Building/Structural | Roofing | Passed | Kody Boswell | In-Progress Inspection of PVC capsheet installation |

BCA Project #: 24-03615- Dittmer Building Envelope Parapet
| Inspection Date | Discipline | Type | Result | Inspector | Comments |
| 2025/10/09 | Building/Structural | Roofing | Passed | Paul Nitz | In-Progress Inspection - LWIC/Weld Plates |
| 2025/09/10 | Building/Structural | Re-Inspection | Passed | Kody Boswell | Reviewed LG framing for new roof parapet. The items specified for prior framing inspection were addressed. |
| 2025/09/10 | Building/Structural | Framing | Passed | Kody Boswell | Reviewed LG framing for new roof parapet. The items specified for prior framing inspection were addressed. |
| 2025/09/08 | Building/Structural | Framing | Conditional | Kody Boswell | Reviewed LG framing for the roof parapet. The following was observed: 1) There were a few LG connection screws and a few LG to structural steel connection PAFs. Fasteners were installed as BCA pointed them out. 2) There were a few vertical studs where the connection at the bottom track occurred at the prepunched location. Contractor was in the process of stiffening these locations when BCA left the site. Resolved with inspection on 9/10/2025 Inspection result is conditional pending item (2) above being completed. BCA will revisit the site this afternoon to confirm. |
| 2025/09/08 | Building/Structural | Structural | Passed | Kody Boswell | Reviewed steel framing for the new roof parapet |
| 2025/07/29 | Building/Structural | Roofing | Passed | Kody Boswell | Tear Off/Dry-In Inspection |
| Building/Structural | Framing | Postponed | Kody Boswell | Follow up from 9/8 inspection Contractor contacted FSU BCA prior to site arrival to postpone inspection | |
| Building/Structural | Structural | Postponed | Kody Boswell | Follow up from 9/8 inspection Contractor contacted FSU BCA prior to site arrival to postpone inspection |

BCA Project #: 24-03613- Panama City Tech Bldg ECAP Electrical Circuit
| Inspection Date | Discipline | Type | Result | Inspector | Comments |
| Electrical | Wall Rough-in | Passed | James Melvin | ||
| Electrical | Ceiling Rough-in | Passed | James Melvin |

BCA Project #: 24-03612- Haskins Circus Tent Concrete
| Inspection Date | Discipline | Type | Result | Inspector | Comments |
| 2025/07/31 | Building/Structural | Slab | Passed | Kody Boswell | Reviewed reinforcing steel for replacing 3 pads of the sidewalk |
| 2025/03/19 | Building/Structural | Slab | Passed | Paul Nitz | |
| 2025/02/17 | Building/Structural | Footing | Passed | Paul Nitz | |
| 2025/02/13 | Plumbing | Underground | Passed | Paul Nitz | I talked to Travis, he said this was for an underground plumbing inspection done yesterday -Kody |
| 2025/01/29 | Building/Structural | Slab | Passed | Kody Boswell | Preliminary rebar inspection for the new slab for the new circus tent. Contractor to schedule another inspection prior to concrete placement to verify embed installation and expansion material where new concrete meets old concrete. |

BCA Project #: 24-03607- UCB 4th and 5th Floor Modifications
| Inspection Date | Discipline | Type | Result | Inspector | Comments |
| 2025/04/18 | Electrical | Final Electrical | Passed | Rocky Wilde | All missing electrical covers have been installed and T&B sent |
| 2025/04/18 | Building/Structural | Final Building | Failed | Rocky Wilde | All missing electrical covers have been installed and T&B sent 1) signage missing |
| 2025/04/18 | Mechanical | Final Mechanical | Passed | Rocky Wilde | All missing electrical covers have been installed and T&B sent |
| 2025/04/14 | Electrical | Final Electrical | Failed | Paul Nitz | 1) outlet covers are still missing, this is the third failure for final electrical for this project |
| 2025/04/14 | Mechanical | Final Mechanical | Conditional | Paul Nitz | 1) Test And Balance report required |
| 2025/04/14 | Fire Safety | Final Fire Safety | Passed | Mary Creason | |
| 2025/03/28 | Electrical | Final Electrical | Failed | Rocky Wilde | |
| 2025/03/28 | Mechanical | Final Mechanical | Conditional | Paul Nitz | TAB required |
| 2025/03/28 | Fire Safety | Final Fire Sprinkler | Passed | Mary Creason | |
| 2025/03/28 | Fire Safety | Final Fire Safety | NOT READY | Mary Creason | Contractor not ready for a final - no door hardware, no glass panels on doors to hallways, electrical sockets not covered, tape on fire alarm devices due to painting, etc. |
| 2025/03/26 | Building/Structural | Final Building | Failed | Paul Nitz | This inspection is for the fourth floor only. Please call 850.252.7910 20-30 minutes before you 1) missing final mechanical, electrical 2) missing windows, carpet, door handles, outlet covers |
| 2025/03/25 | Building/Structural | Final Building | Failed | Paul Nitz | This inspection is for the fourth floor only. Please call 850.252.7910 20-30 minutes before you 1) glass for offices are missing 2) door knobs are missing 3) carpet is missing 4) outlet covers are missing I called the contractor but have not received a call back |
| 2025/02/11 | Fire Safety | Final Fire Sprinkler | Passed | Sam Sevor | Please call 30 minutes ahead of time so I will make sure to be there for the walk thru. |
| 2025/02/10 | Electrical | Ceiling Rough-in | Passed | James Melvin | Please call 30 minutes ahead of time so I will make sure to be there for the walk thru. |
| 2025/02/10 | Building/Structural | Wall/Ceiling | Passed | Paul Nitz | Please call 30 minutes ahead of time so I will make sure to be there for the walk thru. |
| 2025/02/10 | Building/Structural | Sheetrock | Passed | Paul Nitz | Please call 30 minutes ahead of time so I will make sure to be there for the walk thru. |
| 2025/02/10 | Mechanical | Duct Rough-in | Failed | Paul Nitz | Please call 30 minutes ahead of time so I will make sure to be there for the walk thru. 1) ducts need to be sealed |
| 2025/02/10 | Electrical | Wall Rough-in | Passed | James Melvin | Please call 30 minutes ahead of time so I will make sure to be there for the walk thru. |
| 2025/01/13 | Fire Safety | Final Fire Safety | Passed | Sam Sevor | This inspection is for the 5th floor kitchen area. Super onsite is Charles Burges, his number is 8506934872. |
| 2025/01/13 | Electrical | Final Electrical | Passed | James Melvin | This inspection is for the 5th floor kitchen area. Super onsite is Charles Burges, his number is 8506934872. |
| 2025/01/13 | Building/Structural | Final Building | Conditional | Paul Nitz | This inspection is for the 5th floor kitchen area. Super onsite is Charles Burges, his number is 8506934872. 1) 5th floor is ok for CC, the fourth floor was not ready |
| 2025/01/06 | Electrical | Ceiling Rough-in | Passed | James Melvin | Call me 30 minutes in advance please. |
| 2025/01/03 | Mechanical | Final Mechanical | Passed | Paul Nitz | Call me 30 minutes in advance please. |
| 2025/01/03 | Mechanical | Duct Rough-in | Passed | Paul Nitz | Call me 30 minutes in advance please. |
| 2025/01/03 | Fire Safety | Fire Water Above Ground | Passed | Curtis Rogers | Moved three heads. Pre Inspected by Kurt on 1/3/2025 and passed. |
| 2025/01/03 | Mechanical | Insulation | Passed | Paul Nitz | Call me 30 minutes in advance please. |
| Electrical | Final Electrical | James Melvin | Call me 30 minutes in advance please. |

BCA Project #: 24-03603- Askew Life Center Room 101 E-Sports Gaming Modifications
| Inspection Date | Discipline | Type | Result | Inspector | Comments |
| 2024/11/25 | Building/Structural | Final Building | Passed | Rocky Wilde | During the electrical final on 11/22/2024. Rock Wilde also looked over everything for the building final. |
| 2024/11/22 | Electrical | Final Electrical | Passed | Rocky Wilde | |
| 2024/11/12 | Electrical | Ceiling Rough-in | Passed | Alex Masterton | Requesting an above ceiling rough in inspection. If at all possible being there at 8am would be greatly appreciated since flooring is starting tomorrow. |
| 2024/10/29 | Building/Structural | Sheetrock | Passed | Paul Nitz | sheetrock screw pattern inspection. |
| 2024/10/23 | Electrical | Wall Rough-in | Passed | James Melvin | Electrical in wall inspection for Rooms 101A, B, C, and D. Please note, above ceiling will be requested at another day/time. |

BCA Project #: 24-03602- Doak Storm Damage Repairs
| Inspection Date | Discipline | Type | Result | Inspector | Comments |
| 2025/01/17 | Electrical | Final Electrical | Passed | Alex Masterton | Onsite contact is Todd Jones 850-544-4424 |
| Building/Structural | Final Building | Cancelled | Paul Nitz | Rob Thompson with RT Electric contacted FSU BCA via email to cancel this inspection due to roof work not being completed. | |
| Electrical | Final Electrical | Cancelled | Al Smythe | Rob Thompson with RT Electric contacted FSU BCA via email to cancel this inspection due to roof work not being completed. |

BCA Project #: 24-03601- Green-Lewis House Native American & Indigenous Studies
| Inspection Date | Discipline | Type | Result | Inspector | Comments |
| 2025/11/24 | Plumbing | Rough-in | Passed | Paul Nitz |

BCA Project #: 24-03600- Mag Lab NHMFL NMR Wing Emegency Circuit Reconfigure
| Inspection Date | Discipline | Type | Result | Inspector | Comments |
| 2025/09/12 | Electrical | Ceiling Rough-in | Passed | Rocky Wilde |

BCA Project #: 24-03593- AME Heating System for Wind Tunnel
| Inspection Date | Discipline | Type | Result | Inspector | Comments |
| 2026/01/13 | Electrical | Ground | Passed | Rocky Wilde | |
| 2026/01/07 | Building/Structural | Framing | Conditional | Paul Nitz | Canopy post notched details for Paul to review 1) A letter from the Canopy Manufacture will be required stating that the field notched post that were cut on site will be sufficient for the wind load in that zone. The detail will describe the size of notch that was cut, its location on the post and the footer size. 2) In regard to the opening on the side of the building a structural engineer is getting involved so no further action will be required on your part. Please let me know if you need any additional information Paul |
| 2025/12/17 | Electrical | Panel/Feeder | Passed | Rocky Wilde | |
| 2025/12/17 | Electrical | Underground | Passed | Rocky Wilde | |
| 2025/07/18 | Building/Structural | Footing | Passed | Kody Boswell | Reviewed reinorcing steel for a footing for new equipment. |

BCA Project #: 24-03582- Research Foundation Building A Neuromodulation Lab
| Inspection Date | Discipline | Type | Result | Inspector | Comments |
| Electrical | Final Electrical | James Melvin |

BCA Project #: 23-03567- FAMU-FSU Engineering Building A Building Envelope Improvements
| Inspection Date | Discipline | Type | Result | Inspector | Comments |
| 2025/12/16 | Building/Structural | Wall/Ceiling | Passed | Kody Boswell | College of Engineering - West Entrance Curtain Glass Wall Replacement Removal of top coping flashing and replacing the old existing lower flashing with the new flashing. |
| 2025/08/07 | Building/Structural | Wall/Ceiling | Cancelled | Kody Boswell | South Connector Entrance Roof cap This turned into an on-site meeting discussing existing conditions that were encountered during the roof cap removal. The AOR was on site for this discussion. No inspection was performed due to unforseen conditions. |
| 2025/07/14 | Building/Structural | Wall/Ceiling | Passed | Kody Boswell | South Entrance Curtain Glass Wall panel replacements. |

BCA Project #: 23-03563- Sandels Building Envelope Repair
| Inspection Date | Discipline | Type | Result | Inspector | Comments |
| Building/Structural | Final Building | Passed | Rocky Wilde | final partial, 100 suite. Rooms in 100 suite are cleared to occupy. | |
| Building/Structural | Other | Cancelled | Kody Boswell |

BCA Project #: 23-03545- Ringling Ca'D'Zan HVAC
| Inspection Date | Discipline | Type | Result | Inspector | Comments |
| 2025/10/02 | Mechanical | Duct Rough-in | Passed | Rocky Wilde | completed by facetime |

BCA Project #: 23-03541- Diffenbaugh Steep Slope Roof Repairs
| Inspection Date | Discipline | Type | Result | Inspector | Comments |
| 2025/04/30 | Building/Structural | Roofing | Passed | Kody Boswell | In-progress inspection of standing seam metal roof panels. |
| 2025/04/04 | Building/Structural | Roofing | Passed | Kody Boswell | In-progress inspection of waterproofing underlayment on steep slope roof areas |

BCA Project #: 23-03540- Howser Baseball Dugout Frame & Door
| Inspection Date | Discipline | Type | Result | Inspector | Comments |
| Building/Structural | Framing | Kody Boswell |

BCA Project #: 23-03539- NCF Pritzker Marine Building Exterior Improvements
| Inspection Date | Discipline | Type | Result | Inspector | Comments |
| 2025/09/22 | Electrical | Final Electrical | Passed | Rocky Wilde | |
| 2025/09/09 | Electrical | Final Electrical | Passed | Rocky Wilde | |
| 2025/06/27 | Roofing | In progress | Conditional | Hank Fulmer | dry in for the sloped sections of the roof were inspected. Installation of the peal and stick was installed per manufactures specifications. The original drip edge and flashing is remaining . This is a partial approval. |
| 2025/06/06 | Roofing | In progress | Conditional | Joan Lima | PARTIAL DRYIN IN PROGRESS SOUTH SIDE |
| 2025/04/22 | Plumbing | Final Plumbing | Passed | Hank Fulmer | |
| 2025/04/22 | Electrical | Final Electrical | Passed | Hank Fulmer | |
| 2024/11/18 | Plumbing | Rough-in | Passed | Hank Fulmer | |
| 2024/11/18 | Electrical | Wall Rough-in | Conditional | Steve Bell | |
| 2024/11/18 | Plumbing | Rough-in | Conditional | Steve Bell | |
| 2024/11/18 | Electrical | Wall Rough-in | Passed | Hank Fulmer | |
| 2024/11/05 | Building/Structural | Structural | Passed | Joseph Agriesti | |
| 2024/10/30 | Building/Structural | Slab | Passed | Steve Bell | |
| 2024/10/28 | Building/Structural | Slab | Failed | Steve Bell | FBC2023 SECTION 107 SUBMITTAL DOCUMENTS No construction documents on site. Please provide approved plans. 1 hr inspection time |
| 2024/10/25 | Building/Structural | Slab | Passed | Nicholas Ninos | |
| 2024/10/25 | Building/Structural | Slab | Failed | Steve Bell | |
| 2024/10/25 | Electrical | Floor Rough-in | Failed | Steve Bell | |
| 2024/10/25 | Electrical | Floor Rough-in | Passed | Nicholas Ninos | |
| 2024/10/25 | Electrical | Wall Rough-in | Failed | Nicholas Ninos | PVC conduit was installed above dirt on plastic sheeting. Installation method is NEC compliant. No discrepancies noted. |
| 2024/10/16 | Building/Structural | Structural | Passed | Hank Fulmer | Partial inspection passed. This is for te south wall, north stairs, and first two column walls. All steel was properly sized and palced. The depths and widths were correctly sized per plans. |
| 2024/09/20 | Building/Structural | Structural | Passed | Joseph Agriesti | |
| 2024/09/06 | Building/Structural | Footing | Passed | Joseph Agriesti | |
| 2024/08/29 | Building/Structural | Structural | Passed | Hank Fulmer | |
| 2024/08/21 | Building/Structural | Structural | Passed | Hank Fulmer | |
| 2024/08/21 | Plumbing | Gas Piping & Test | Passed | Joseph Agriesti | |
| 2024/08/19 | Plumbing | Gas Piping & Test | Passed | Joseph Agriesti | |
| 2024/08/09 | Building/Structural | Footing | Passed | Hank Fulmer |

BCA Project #: 23-03534- Law Research Center-Library AC Install
| Inspection Date | Discipline | Type | Result | Inspector | Comments |
| 2024/05/17 | Mechanical | Equipment | Passed | Dwayne Mahony | |
| 2024/05/17 | Electrical | Appliance/Equipment | Passed | Dwayne Mahony |

BCA Project #: 23-03524- Mag Lab Kitchen Micro Mart
| Inspection Date | Discipline | Type | Result | Inspector | Comments |
| 2024/08/08 | Electrical | Final Electrical | Passed | Alex Masterton | No comments. |

BCA Project #: 23-03508-A Tucker Center Chiller Replacement
| Inspection Date | Discipline | Type | Result | Inspector | Comments |
| 2025/01/31 | Electrical | Appliance/Equipment | Passed | Rocky Wilde | No visit required. This was already looked at by Rocky Wilde this morning at 10am |
| 2025/01/31 | Electrical | Panel/Feeder | Passed | Rocky Wilde | No visit required. This was already looked at by Rocky Wilde this morning at 10am |
| 2025/01/30 | Mechanical | Cond. Piping & Test | Passed | Paul Nitz | Please call me when on the way |
| 2025/01/30 | Mechanical | CHW Piping & Test | Passed | Paul Nitz | Please call me when on the way |
| Mechanical | Final Mechanical | Paul Nitz | final boiler inspection | ||
| Plumbing | Final Plumbing | Paul Nitz | final boiler inspection | ||
| Mechanical | Final Mechanical | Postponed | James Melvin | Please complete final inspection for permit closeout. | |
| Electrical | Final Electrical | Postponed | James Melvin | Please complete final inspection for permit closeout. |

BCA Project #: 23-03474- Turnbull Conference Center Renovations
| Inspection Date | Discipline | Type | Result | Inspector | Comments |
| 2026/01/22 | Fire Safety | Final Fire Safety | Conditional | Curtis Rogers | This will be for a temporary C O for the kitchen. This is due to the elevator not being complete. |
| 2026/01/22 | Mechanical | Final Mechanical | Passed | Paul Nitz | This will be for a temporary C O for the kitchen. This is due to the elevator not being complete. |
| 2026/01/22 | Plumbing | Final Plumbing | Passed | Paul Nitz | This will be for a temporary C O for the kitchen. This is due to the elevator not being complete. |
| 2026/01/22 | Electrical | Final Electrical | Partial | Rocky Wilde | This will be for a temporary C O for the kitchen. This is due to the elevator not being complete. |
| 2026/01/22 | Building/Structural | Final Building | Paul Nitz | This will be for a temporary C O for the kitchen. This is due to the elevator not being complete. | |
| 2026/01/14 | Mechanical | Wall & Ceiling | Passed | Paul Nitz | Need room 209 on the second floor inspected. Paul, I will send pictures. Need the plumbing pipes for the oil interceptor. Paul inspected on 01/13/2026. |
| 2026/01/14 | Mechanical | Duct Rough-in | Passed | Paul Nitz | Need room 209 on the second floor inspected. Paul, I will send pictures. Need the plumbing pipes for the oil interceptor. Paul inspected on 01/13/2026. |
| 2026/01/14 | Plumbing | Equipment | Passed | Paul Nitz | Need room 209 on the second floor inspected. Paul, I will send pictures. Need the plumbing pipes for the oil interceptor. Paul inspected on 01/13/2026. |
| 2026/01/14 | Plumbing | Rough-in | Passed | Paul Nitz | Need room 209 on the second floor inspected. Paul, I will send pictures. Need the plumbing pipes for the oil interceptor. Paul inspected on 01/13/2026. |
| 2026/01/09 | Electrical | Final Electrical | Passed | Rocky Wilde | We need rooms 108, 113,113V, 124, 124B, 125 and 126 inspected for a temporary C O. Curtis, we need to do the fire alarm test and a life safety inspection. Any Questions please call 850-384-7269, Thank you. |
| 2026/01/09 | Fire Safety | Final Fire Safety | Passed | Curtis Rogers | We need rooms 108, 113,113V, 124, 124B, 125 and 126 inspected for a temporary C O. Curtis, we need to do the fire alarm test and a life safety inspection. Any Questions please call 850-384-7269, Thank you. |
| 2026/01/09 | Plumbing | Final Plumbing | Conditional | Paul Nitz | We need rooms 108, 113,113V, 124, 124B, 125 and 126 inspected for a temporary C O. Curtis, we need to do the fire alarm test and a life safety inspection. Any Questions please call 850-384-7269, Thank you. 1) drains in the bar area need to have drain seals 2) drain lines for the ice machines need to be supported 3) drain lines for the ice machines need to be insulated |
| 2026/01/09 | Mechanical | Final Mechanical | Passed | Paul Nitz | We need rooms 108, 113,113V, 124, 124B, 125 and 126 inspected for a temporary C O. Curtis, we need to do the fire alarm test and a life safety inspection. Any Questions please call 850-384-7269, Thank you. |
| 2026/01/09 | Building/Structural | Final Building | Passed | Rocky Wilde | We need rooms 108, 113,113V, 124, 124B, 125 and 126 inspected for a temporary C O. Curtis, we need to do the fire alarm test and a life safety inspection. Any Questions please call 850-384-7269, Thank you.Listed rooms only |
| 2026/01/06 | Fire Safety | Final Fire Safety | Cancelled | Curtis Rogers | We need a final inspection on the following areas, if possible; Rooms 108, 115, 113V, 124, 124B, 125, 113 and 126. This inspection is to be able to get a Temporary CO for these rooms. |
| 2026/01/05 | Mechanical | Re-Inspection | Cancelled | Paul Nitz | Above Ceiling Re-inspection |
| 2025/12/18 | Mechanical | Re-Inspection | Conditional | Paul Nitz | Kody, we need the CFRP and FRP structural for the slab inspected. Paul/Rocky, we need to reinspect above the ceiling in the kitchen area. The engineer of record has given the ok for the flex ducts in these areas. 1) I need to verify that the duct supports for the flex ducting are a minimum 1 ½ “ in width 2) letter from the engineer stating that the length of duct is ok 3) ceiling grid wire is touching the reverse osmosis copper line |
| 2025/12/18 | Mechanical | Wall & Ceiling | Conditional | Paul Nitz | Kody, we need the CFRP and FRP structural for the slab inspected. Paul/Rocky, we need to reinspect above the ceiling in the kitchen area. The engineer of record has given the ok for the flex ducts in these areas. 1) I need to verify that the duct supports for the flex ducting are a minimum 1 ½ “ in width 2) letter from the engineer stating that the length of duct is ok 3) ceiling grid wire is touching the reverse osmosis copper line |
| 2025/12/18 | Electrical | Ceiling Rough-in | Failed | Rocky Wilde | Kody, we need the CFRP and FRP structural for the slab inspected. Paul/Rocky, we need to reinspect above the ceiling in the kitchen area. The engineer of record has given the ok for the flex ducts in these areas. |
| 2025/12/18 | Electrical | Re-Inspection | Failed | Rocky Wilde | Kody, we need the CFRP and FRP structural for the slab inspected. Paul/Rocky, we need to reinspect above the ceiling in the kitchen area. The engineer of record has given the ok for the flex ducts in these areas. |
| 2025/12/18 | Mechanical | Duct Rough-in | Conditional | Paul Nitz | Kody, we need the CFRP and FRP structural for the slab inspected. Paul/Rocky, we need to reinspect above the ceiling in the kitchen area. The engineer of record has given the ok for the flex ducts in these areas. 1) I need to verify that the duct supports for the flex ducting are a minimum 1 ½ “ in width 2) A letter from the engineer stating that the length of the flex duct is ok 3) ceiling grid wire is touching the reverse osmosis copper line |
| 2025/12/18 | Building/Structural | Slab | Conditional | Paul Nitz | Kody, we need the CFRP and FRP structural for the slab inspected. Paul/Rocky, we need to reinspect above the ceiling in the kitchen area. The engineer of record has given the ok for the flex ducts in these areas. |
| 2025/12/18 | Building/Structural | Structural | Failed | Paul Nitz | Kody, we need the CFRP and FRP structural for the slab inspected. Paul/Rocky, we need to reinspect above the ceiling in the kitchen area. The engineer of record has given the ok for the flex ducts in these areas. 1) upper wall in the kitchen needs to be repaired where the duct guys cut out the stud |
| 2025/12/11 | Fire Safety | Fire Water Above Ground | Passed | Curtis Rogers | Above ceiling inspection for kitchen area. sprinklers, hvac, and electrical. |
| 2025/12/10 | Electrical | Ceiling Rough-in | Partial | Rocky Wilde | Above ceiling inspection for kitchen area. sprinklers, hvac, and electrical. Smoke detector over hood needs to be relocated for access |
| 2025/12/10 | Mechanical | Wall & Ceiling | Failed | Paul Nitz | Above ceiling inspection for kitchen area. sprinklers, hvac, and electrical. 1) wall frame that is cut needs to be repaired 2) flex duct needs to be supported smacna 3.7 s3.34 3) flex duct radius exceeds smacna 3.5 s3.24 4) flex duct length needs to be identified with the plans 5) access doors for the grease ducts need to be checked to verify they are able to open without removing the insulation 6) saddles are missing on the chill water lines 7) verify what the duct is going to in the ceiling in the last picture |
| 2025/12/08 | Mechanical | Duct Rough-in | Passed | Paul Nitz | Need the area in front of the food service area where the grid is inspected to be able to close up. |
| 2025/12/08 | Electrical | Ceiling Rough-in | Passed | Rocky Wilde | Need the area in front of the food service area where the grid is inspected to be able to close up. |
| 2025/12/08 | Mechanical | Wall & Ceiling | Passed | Paul Nitz | Need the area in front of the food service area where the grid is inspected to be able to close up. |
| 2025/11/25 | Mechanical | Wall & Ceiling | Partial | Rocky Wilde | Above ceiling inspection in Kitchen and Dining Room. |
| 2025/11/25 | Electrical | Ceiling Rough-in | Partial | Rocky Wilde | Above ceiling inspection in Kitchen and Dining Room. |
| 2025/11/17 | Mechanical | Duct Rough-in | Passed | Paul Nitz | Need to redo the light test on the hood ducts. |
| 2025/11/17 | Mechanical | Re-Inspection | Passed | Paul Nitz | Need to redo the light test on the hood ducts. |
| 2025/11/14 | Fire Safety | Fire Water Above Ground | Conditional | Curtis Rogers | Need an above ceiling inspection for mechanical, electrical and sprinklers. Curtis, we need to inspect the areas that we added sprinklers in and two more sections. |
| 2025/11/14 | Electrical | Ceiling Rough-in | Conditional | Rocky Wilde | Need an above ceiling inspection for mechanical, electrical and sprinklers. Curtis, we need to inspect the areas that we added sprinklers in and two more sections. |
| 2025/11/14 | Mechanical | Wall & Ceiling | Passed | Paul Nitz | Need an above ceiling inspection for mechanical, electrical and sprinklers. Curtis, we need to inspect the areas that we added sprinklers in and two more sections. 1) grand room not included |
| 2025/11/14 | Mechanical | Duct Rough-in | Passed | Paul Nitz | Need an above ceiling inspection for mechanical, electrical and sprinklers. Curtis, we need to inspect the areas that we added sprinklers in and two more sections. 1) Grand room not included |
| 2025/11/12 | Mechanical | Duct Pressure Test | Failed | Paul Nitz | Need a light test on the remaining welded hood ducts. |
| 2025/11/07 | Building/Structural | Framing | Passed | Kody Boswell | Reviewed LG framing and 1 layer of sheathing for the west wall for the new elevator shaft |
| 2025/11/07 | Building/Structural | Wall/Ceiling | Passed | Kody Boswell | Reviewed LG framing and 1 layer of sheathing for the west wall for the new elevator shaft |
| 2025/11/07 | Building/Structural | Sheetrock | Passed | Kody Boswell | Reviewed LG framing and 1 layer of sheathing for the west wall for the new elevator shaft |
| 2025/10/30 | Mechanical | Duct Rough-in | Passed | Paul Nitz | Need duct work and transfer fan inspected on the first floor lobby area. |
| 2025/10/30 | Building/Structural | Re-Inspection | Passed | Kody Boswell | Reviewed reinforcing steel for new concrete beams in elevator shaft. The 2 items listed for the prior failed inspection have been corrected. |
| 2025/10/30 | Building/Structural | Structural | Passed | Kody Boswell | Reviewed reinforcing steel for new concrete beams in elevator shaft. The 2 items listed for the prior failed inspection have been corrected. |
| 2025/10/30 | Mechanical | Wall & Ceiling | Passed | Paul Nitz | Need duct work and transfer fan inspected on the first floor lobby area. |
| 2025/10/30 | Mechanical | Insulation | Passed | Paul Nitz | Need duct work and transfer fan inspected on the first floor lobby area. |
| 2025/10/24 | Building/Structural | Sheetrock | Conditional | Kody Boswell | Reviewed LG framing, insulation, and exterior side sheathing attachment to LG framing for the elevator machine room in the basement. Result is condtional pending AOR approval of use of GP sheathing versus Securock sheathing (as specified in wall type T on sheet G106). |
| 2025/10/24 | Building/Structural | Structural | Failed | Kody Boswell | Reviewed reinforcing steel for new concrete beams in elevator shaft. The following needs to be corrected or clarified: 1) There are missing epoxied hook bars in both beams. Missing bars must be epoxied. 2) Embeds don't have the correct size studs as called out in detail B2.2. on sheet S303. Embed plate called out in the detail is 1/2"x8x8 PL w/ (4) 3/4" dia. X 6" W.S. Embed plate installed in the field has 1/2" dia. X 5" W.S. Either the embeds need to be switched out or the EOR must approve the embeds actually used in the field. Once the above items are addressed, Contractor to call for re-inspection. |
| 2025/10/21 | Electrical | Ceiling Rough-in | Passed | Rocky Wilde | Need structural steel install inspected at elevator. Need above ceiling electrical completed in the dining room area. Need sprinkler inspection completed above the ceiling in the dining room. |
| 2025/10/21 | Building/Structural | Structural | Passed | Kody Boswell | Reviewed structural steel framing for new elevator |
| 2025/10/21 | Fire Safety | Fire Water Above Ground | Partial | Curtis Rogers | Need structural steel install inspected at elevator. Need above ceiling electrical completed in the dining room area. Need sprinkler inspection completed above the ceiling in the dining room. |
| 2025/10/13 | Building/Structural | Wall/Ceiling | Passed | Paul Nitz | Requesting plywood wall screw-off inspection in kitchen cold prep area. Was already inspected by Paul on 10/13 and was passed. |
| 2025/10/13 | Electrical | Ceiling Rough-in | Conditional | Rocky Wilde | Need above ceiling inspection on the first floor.first six bays |
| 2025/10/13 | Building/Structural | Sheetrock | Passed | Paul Nitz | Requesting plywood wall screw-off inspection in kitchen cold prep area. Was already inspected by Paul on 10/13 and was passed. |
| 2025/10/10 | Building/Structural | Structural | Passed | Kody Boswell | Need rebar inspected at the door in the basement elevator room area. |
| 2025/10/10 | Building/Structural | Masonry | Passed | Kody Boswell | Need rebar inspected at the door in the basement elevator room area. |
| 2025/10/10 | Building/Structural | Wall/Ceiling | Passed | Kody Boswell | Need rebar inspected at the door in the basement elevator room area. |
| 2025/10/09 | Building/Structural | Wall/Ceiling | Passed | Paul Nitz | Need framing inspection in the cold prep area window covering. Need electrical wall rough in in the cold prep area window. Need electrical and fire sprinkler inspection above the act ceiling in the big room 108. |
| 2025/10/09 | Building/Structural | Framing | Passed | Paul Nitz | Need framing inspection in the cold prep area window covering. Need electrical wall rough in in the cold prep area window. Need electrical and fire sprinkler inspection above the act ceiling in the big room 108. |
| 2025/10/09 | Electrical | Ceiling Rough-in | Passed | Rocky Wilde | Need framing inspection in the cold prep area window covering. Need electrical wall rough in in the cold prep area window. Need electrical and fire sprinkler inspection above the act ceiling in the big room 108. |
| 2025/10/09 | Electrical | Wall Rough-in | Passed | Rocky Wilde | Need framing inspection in the cold prep area window covering. Need electrical wall rough in in the cold prep area window. Need electrical and fire sprinkler inspection above the act ceiling in the big room 108. |
| 2025/10/08 | Fire Safety | Fire Water Above Ground | Passed | Curtis Rogers | Need framing inspection in the cold prep area window covering. Need electrical wall rough in in the cold prep area window. Need electrical and fire sprinkler inspection above the act ceiling in the big room 108. |
| 2025/10/07 | Plumbing | Gas Piping & Test | Passed | Paul Nitz | Inspection of the gas piping for the Kitchen in Turnbull. |
| 2025/10/07 | Building/Structural | Structural | Passed | Kody Boswell | Reviewed reinforcing steel for new elevator walls from new elevator pit slab to existing first floor. The missing reinforcing steel and steel embed reported on previous inspection has been installed. |
| 2025/10/06 | Building/Structural | Structural | Failed | Kody Boswell | Reviewed reinforcing steel for new elevator walls from new elevator pit slab to existing first floor. Both walls were missing the #5 vertical rebar @12" O.C. per details A.2/S303 and B.2/S303. Also, the embed called out in detail B.2/S303 wasn't installed. This was discussed with the Contractor while on site. Re-inspection required prior to concrete placement. |
| 2025/10/06 | Building/Structural | Slab | NOT READY | Kody Boswell | Need forms inspected at the plaza area for flat work. |
| 2025/10/06 | Building/Structural | Wall/Ceiling | Failed | Kody Boswell | Reviewed reinforcing steel for new elevator walls from new elevator pit slab to existing first floor. Both walls were missing the #5 vertical rebar @12" O.C. per details A.2/S303 and B.2/S303. Also, the embed called out in detail B.2/S303 wasn't installed. This was discussed with the Contractor while on site. Re-inspection required prior to concrete placement. |
| 2025/10/03 | Mechanical | Wall & Ceiling | Passed | Paul Nitz | Need duct inspection in rooms restroom 117, vestibule 124 and 124B, 125, and the A V room |
| 2025/10/03 | Mechanical | Duct Rough-in | Passed | Paul Nitz | Need duct inspection in rooms restroom 117, vestibule 124 and 124B, 125, and the A V room |
| 2025/10/03 | Fire Safety | Final Fire Sprinkler | Passed | Curtis Rogers | Requesting an above ceiling electrical and fire sprinkler inspection in the kitchen area to proceed with hanging drywall on the ceiling. Need the fire sprinklers inspected over the hard ceiling in the kitchen area *Fire Sprinkler looks good in the Kitchen area |
| 2025/10/03 | Electrical | Ceiling Rough-in | Passed | Rocky Wilde | Requesting an above ceiling electrical and fire sprinkler inspection in the kitchen area to proceed with hanging drywall on the ceiling. Need the fire sprinklers inspected over the hard ceiling in the kitchen area |
| 2025/10/02 | Building/Structural | Sheetrock | Passed | Kody Boswell | Reviewed ceiling sheathing attachment on level 1 |
| 2025/09/29 | Building/Structural | Wall/Ceiling | Failed | Paul Nitz | Need inspections of electrical, HVAC and fire sprinklers over the drywall areas 1) not ready |
| 2025/09/29 | Building/Structural | Framing | Failed | Paul Nitz | Need inspections of electrical, HVAC and fire sprinklers over the drywall areas. 1) not ready |
| 2025/09/29 | Fire Safety | Fire Alarm Rough-In | Passed | Curtis Rogers | Need inspections of electrical, HVAC and fire sprinklers over the drywall areas. |
| 2025/09/29 | Mechanical | Wall & Ceiling | Failed | Paul Nitz | Need inspections of electrical, HVAC and fire sprinklers over the drywall areas. 1) not ready |
| 2025/09/29 | Electrical | Ceiling Rough-in | Passed | Rocky Wilde | Need inspections of electrical, HVAC and fire sprinklers over the drywall areas. |
| 2025/09/04 | Building/Structural | Framing | Passed | Rocky Wilde | Rocky inspected the ceiling framing in the foyer area and the electrical disconnect in the dish area on 09/04/2025. Thank you. |
| 2025/09/04 | Building/Structural | Sheetrock | Passed | Paul Nitz | Need screws inspected on drywall in the storage room on the first floor. Need duct work inspected on the first floor to be able to hang some drywall, this is also in the storage room. |
| 2025/09/04 | Building/Structural | Wall/Ceiling | Passed | Rocky Wilde | Rocky inspected the ceiling framing in the foyer area and the electrical disconnect in the dish area on 09/04/2025. Thank you. |
| 2025/09/04 | Mechanical | Duct Rough-in | Passed | Paul Nitz | Need screws inspected on drywall in the storage room on the first floor. Need duct work inspected on the first floor to be able to hang some drywall, this is also in the storage room. |
| 2025/09/04 | Electrical | Wall Rough-in | Passed | Rocky Wilde | Rocky inspected the ceiling framing in the foyer area and the electrical disconnect in the dish area on 09/04/2025. Thank you. |
| 2025/08/27 | Fire Safety | Fire Water Above Ground | Partial | Curtis Rogers | 2nd Floor *Above Ceiling Sprinkler Inspection *Add a few hangers in various spots (Over 2 foot arm overs need hangers) |
| 2025/08/27 | Mechanical | Final Mechanical | Passed | Paul Nitz | Need a above ceiling inspection for the second floor area. Need to reinspect the rough in plumbing in the basement. Need lights inspected on the first floor. 1) labeling was missing for the duct, Ron will send pics when the are on. 2) This mechanical inspection was for the second floor with exception of the mechanical room, it will also need a duct inspection |
| 2025/08/27 | Plumbing | Rough-in | Passed | Paul Nitz | Need the plumbing sanitary and grease piping in the basement area inspected. 1) this was for the sanitary that failed earlier in the week |
| 2025/08/27 | Electrical | Final Electrical | Passed | Rocky Wilde | Need a above ceiling inspection for the second floor area. Need to reinspect the rough in plumbing in the basement. Need lights inspected on the first floor. |
| 2025/08/26 | Building/Structural | Insulation | Passed | Paul Nitz | |
| 2025/08/26 | Building/Structural | Wall/Ceiling | Passed | Paul Nitz | Need plywood on walls inspected to be able to install FRP. Paul inspected this on 8/26/2025. |
| 2025/08/26 | Building/Structural | Sheetrock | Passed | Paul Nitz | |
| 2025/08/25 | Building/Structural | Slab | Passed | Paul Nitz | Re-inspection of the elevator pit floor rebar. |
| 2025/08/25 | Building/Structural | Structural | Passed | Paul Nitz | Re-inspection of the elevator pit floor rebar. |
| 2025/08/25 | Building/Structural | Re-Inspection | Passed | Paul Nitz | Re-inspection of the elevator pit floor rebar. |
| 2025/08/22 | Building/Structural | Slab | Failed | Paul Nitz | Need the rebar inspected in the elevator floor. 1) bars missing |
| 2025/08/22 | Plumbing | Rough-in | Failed | Paul Nitz | Need the plumbing sanitary and grease piping in the basement area inspected. 1) Sanitary line was leaking |
| 2025/08/20 | Electrical | Wall Rough-in | Passed | Rocky Wilde | Storage Room Wall - Electrical Rough-In inspection |
| 2025/08/19 | Building/Structural | Wall/Ceiling | Passed | Kody Boswell | Reviewed LG framing for the storage room wall on level 1 |
| 2025/08/19 | Building/Structural | Framing | Passed | Kody Boswell | Reviewed LG framing for the storage room wall on level 1 |
| 2025/08/19 | Building/Structural | Sheetrock | Passed | Kody Boswell | Reviewed sheathing attachment to interior LG framing for several areas on level 1 |
| 2025/08/15 | Building/Structural | Masonry | Passed | Kody Boswell | Reviewed reinforcing steel for the new elevator walls in the basement. Missing horizontal corner reinforcing bars from previous inspection were installed. |
| 2025/08/15 | Building/Structural | Wall/Ceiling | Passed | Kody Boswell | Reviewed reinforcing steel for the new elevator walls in the basement. Missing horizontal corner reinforcing bars from previous inspection were installed. |
| 2025/08/14 | Building/Structural | Slab | Passed | Kody Boswell | Reviewed reinforcing steel for the elevator equipment room in the basement. |
| 2025/08/14 | Building/Structural | Structural | Failed | Kody Boswell | Reviewed reinforcing steel for the new elevator walls in the basement. There were horizontal corner bars missing at the corners. Contractor to install horizontal corner bars and call for re-inspection |
| 2025/08/08 | Mechanical | Equipment | Passed | Rocky Wilde | Need framing and electrical inspection for walls on the first floor. Need inspection on roof installed hood fans. |
| 2025/08/08 | Electrical | Wall Rough-in | Passed | Rocky Wilde | Need framing and electrical inspection for walls on the first floor. Need inspection on roof installed hood fans. |
| 2025/08/08 | Building/Structural | Framing | Passed | Rocky Wilde | Need framing and electrical inspection for walls on the first floor. Need inspection on roof installed hood fans. |
| 2025/08/06 | Building/Structural | Framing | Passed | Kody Boswell | Reviewed LG framing for partial storage wall on 1st level |
| 2025/08/04 | Building/Structural | Footing | Passed | Kody Boswell | Reviewed reinforcing steel for grade beams for the new elevator machine room. |
| 2025/08/04 | Building/Structural | Structural | Passed | Kody Boswell | Reviewed reinforcing steel for grade beams for the new elevator machine room. |
| 2025/07/28 | Building/Structural | Framing | Passed | Kody Boswell | Reviewed steel framing for new elevator on second floor and reinforcing steel for the elevator lid |
| 2025/07/28 | Building/Structural | Structural | Conditional | Kody Boswell | Reviewed reinforcing steel for elevator grade beams. There was missing vertical reinforcing for the two columns. Result is conditional pending installation of missing reinforcing. FSU BCA will accept photos from the Contractor showing missing reinforcing was installed. Also, clarify with the EOR that lap splices for tip grade beam bars is acceptable. Lap Splice for top and bottom bars was measured 38" in the field. Missing reinforcing was installed and EOR confirmed the 38" lap splice was acceptable as of 8/4/2025 |
| 2025/07/21 | Building/Structural | Framing | Passed | Kody Boswell | Reviewed steel framing that was installed at the elevator area on the mezzanine. |
| 2025/07/21 | Building/Structural | Structural | Passed | Kody Boswell | Reviewed steel framing that was installed at the elevator area on the mezzanine. |
| 2025/07/18 | Mechanical | Insulation | Passed | Paul Nitz | Need hood exhaust duct insulation inspected to be able to close up framing around it. |
| 2025/07/18 | Building/Structural | Structural | Conditional | Kody Boswell | Need to get holes inspected before we epoxy the rebar in. Per phone conversaton with the Contractor, FSU BCA is deferring inspection to the threshold inspector. FSU BCA to confirm via receipt of threshod reports. Threshold report received, filed in job folder (#15) |
| 2025/07/18 | Plumbing | Stack Piping & Test | Passed | Paul Nitz | Need in wall and above ceiling plumbing stack pipes inspected. |
| 2025/07/18 | Building/Structural | Footing | Conditional | Kody Boswell | Need to get holes inspected before we epoxy the rebar in. Per phone conversaton with the Contractor, FSU BCA is deferring inspection to the threshold inspector. FSU BCA to confirm via receipt of threshod reports. Threshold report received, filed in job folder (#15) |
| 2025/07/10 | Building/Structural | Footing | Passed | Kody Boswell | Reviewed helical piles at the elevator equipment room. |
| 2025/07/10 | Building/Structural | Structural | Passed | Kody Boswell | Reviewed helical piles at the elevator equipment room. |
| 2025/07/09 | Mechanical | Duct Rough-in | Conditional | Paul Nitz | Paul and Rocky inspected the flue piping for the boiler on 7/8/2025. 1) contractor agent Ron Mears agreed to install CO2 detectors on each floor of the building where the existing Flew pipe had to be reused until the new one comes in, should be about a week from this date 7/9/2025 |
| 2025/07/08 | Plumbing | Water Piping & Test | Passed | Paul Nitz | Need the water pipes inspected overhead. |
| 2025/07/07 | Mechanical | Duct Rough-in | Passed | Paul Nitz | Need a light test on the welded hood ducts on the second floor. |
| 2025/06/25 | Building/Structural | Slab | Passed | Paul Nitz | Please review rebar in overcut section |
| 2025/06/25 | Building/Structural | Structural | Passed | Paul Nitz | Please review rebar in overcut section |
| 2025/06/23 | Building/Structural | Footing | Passed | Kody Boswell | Reviewed helical pile installation for the new elevator |
| 2025/06/23 | Building/Structural | Structural | Passed | Kody Boswell | Reviewed helical pile installation for the new elevator |
| 2025/06/20 | Plumbing | Stack Piping & Test | Passed | Al Smythe | Need inspection on rebar in slab. Need inspection on stack pipes on the second floor. |
| 2025/06/19 | Building/Structural | Structural | Failed | Kody Boswell | Reviewed reinforcing steel for slab repair located in the area between grids D-E/13-14 on the first floor. There were 16 mechanical rebar couplers that were not installed per manufacturer's standards. Some couplers had torque bolts not fully torqued and some couplers had torque bolts that did not engage rebar. Contractor to replace incorrectly installed rebar couplers and schedule re-inspection. Also, there was one area where bottom reinforcing did not have the required clear cover. Minimum ¾” clearance required. |
| 2025/06/19 | Building/Structural | Slab | Failed | Kody Boswell | Reviewed reinforcing steel for slab repair located in the area between grids D-E/13-14 on the first floor. There were 16 mechanical rebar couplers that were not installed per manufacturer's standards. Some couplers had torque bolts not fully torqued and some couplers had torque bolts that did not engage rebar. Contractor to replace incorrectly installed rebar couplers and schedule re-inspection. Also, there was one area where bottom reinforcing did not have the required clear cover. Minimum ¾” clearance required. |
| 2025/06/09 | Building/Structural | Slab | Passed | Kody Boswell | Reviewed reinforcing steel for loading dock slab replacement at the west end of the building |
| 2025/05/29 | Building/Structural | Structural | NOT READY | Paul Nitz | We need a slab rebar inspection. We need the new grease interceptor plumbing inspected |
| 2025/05/29 | Building/Structural | Slab | NOT READY | Paul Nitz | Need a slab rebar inspection Need inspection on the new grease interceptors plumbing connections |
| 2025/05/29 | Building/Structural | Structural | NOT READY | Paul Nitz | Need a slab rebar inspection Need inspection on the new grease interceptors plumbing connections |
| 2025/05/29 | Plumbing | Rough-in | Passed | Paul Nitz | Need a slab rebar inspection Need inspection on the new grease interceptors plumbing connections |
| 2025/05/29 | Building/Structural | Slab | NOT READY | Paul Nitz | We need a slab rebar inspection. We need the new grease interceptor plumbing inspected |
| 2025/05/29 | Plumbing | Rough-in | Passed | Paul Nitz | We need a slab rebar inspection. We need the new grease interceptor plumbing inspected |
| 2025/05/29 | Plumbing | Equipment | NOT READY | Paul Nitz | Need a slab rebar inspection Need inspection on the new grease interceptors plumbing connections |
| 2025/05/29 | Plumbing | Equipment | Passed | Paul Nitz | We need a slab rebar inspection. We need the new grease interceptor plumbing inspected |
| 2025/05/29 | Plumbing | Underground | Passed | Paul Nitz | We need a slab rebar inspection. We need the new grease interceptor plumbing inspected |
| 2025/05/27 | Building/Structural | Structural | Conditional | Kody Boswell | Reviewed steel framing for Curtain System in the Dining/Auditorium on the first floor. During inspection, it was noted that the angle braces were welded prior to dead load being applied to framing. Per detail 3 on sheet S304, angle braces are to be welded after the dead load is applied. Result is conditional pending direction from EOR if this condition is acceptable. |
| 2025/05/09 | Building/Structural | Framing | Conditional | Kody Boswell | Reviewed LG framing for Service Area on level 1 (wall failed at prior inspection). Additional vertical studs have been added at each side of opening. Result is "passed" Reviewed LG framing for walls in the vending area on level 1. Result is "conditional" pending additional brace installation to structural steel beam above. |
| 2025/05/09 | Building/Structural | Wall/Ceiling | Passed | Kody Boswell | Reviewed screws for interior sheathing installation and insulation installation for several walls on level 1 and level 2. |
| 2025/05/06 | Building/Structural | Insulation | Passed | Kody Boswell | Reviewed insulation installation in several LG framed walls, levels 1 and 2 |
| 2025/05/06 | Building/Structural | Sheetrock | Passed | Kody Boswell | Reviewed sheathing installation for several walls on levels 1 and 2 |
| 2025/05/06 | Building/Structural | Framing | Conditional | Kody Boswell | Reviewed LG framing for several walls located on the first floor. All walls reviewed appeared to be in substantial compliance with the contract documents with exception to the service area (room 125). Service room wall has a large opening. The jamb studs need to be stiffened by adding additonal studs since the opening due to the size of the opening. Contractor may call for re-inspection or have the wall re-reviewed at the next framing inspection. |
| 2025/05/02 | Plumbing | Rough-in | Passed | Paul Nitz | Paul, this is for the plumbing inspection you performed on Monday, 5/28/2025. Thank you. |
| 2025/05/02 | Plumbing | Underground | Passed | Paul Nitz | Paul, this is for the plumbing inspection you performed on Monday, 5/28/2025. Thank you. |
| 2025/05/02 | Building/Structural | Slab | Passed | Kody Boswell | Reviewed reinforcing steel for the rest of the slab on grade infill on level 1 |
| 2025/04/30 | Building/Structural | Slab | Passed | Paul Nitz | Need to get holes inspected for epoxy and rebar |
| 2025/04/29 | Electrical | Wall Rough-in | Passed | Rocky Wilde | Need to have a partial electrical and framing inspections done on the first and second floors. |
| 2025/04/29 | Building/Structural | Framing | Failed | Rocky Wilde | Need to have a partial electrical and framing inspections done on the first and second floors. 2nd floor only but they are OK to sheet rock one side of the walls and we can check the framing at the insulation inispection 1) door framing not complete 2) notch that electricians made in the framing needs to be corrected |
| 2025/04/29 | Electrical | Wall Rough-in | Passed | Rocky Wilde | Need to have a partial electrical and framing inspections done on the first and second floors. |
| 2025/04/29 | Building/Structural | Framing | Passed | Rocky Wilde | Need to have a partial electrical and framing inspections done on the first and second floors. 1st floor |
| 2025/04/28 | Plumbing | Underground | Paul Nitz | ||
| 2025/04/17 | Building/Structural | Slab | Passed | Kody Boswell | Reviewed reinforcing steel for interior slab on grade infill where existing slab was cut and removed to install underground piping. |
| 2025/04/17 | Building/Structural | Structural | Passed | Kody Boswell | Reviewed reinforcing steel for interior slab on grade infill where existing slab was cut and removed to install underground piping. |
| 2025/04/14 | Building/Structural | Slab | Passed | Kody Boswell | hole prep for slab infill at plumbing trenches in slab. |
| 2025/04/09 | Building/Structural | Structural | Passed | Paul Nitz | Need Housekeeping pad rebar, Steel-I Beams and C-Channel in basement inspected. |
| 2025/04/09 | Building/Structural | Slab | Passed | Paul Nitz | Need Housekeeping pad rebar, Steel-I Beams and C-Channel in basement inspected. |
| 2025/03/07 | Building/Structural | Framing | Conditional | Kody Boswell | Reviewed LG framing for vending area walls and ceiling framing in the auditorium (north side) located on level 1. Result is conditional pending additional fasteners added to top track connection for vending area walls and installing missing vertical support stud for ceiling framing. |
| 2025/03/05 | Building/Structural | Masonry | Passed | Paul Nitz | |
| 2025/03/05 | Building/Structural | Structural | Passed | Paul Nitz | |
| 2025/02/25 | Plumbing | Rough-in | Passed | Paul Nitz | |
| 2025/02/06 | Building/Structural | Wall/Ceiling | Passed | Kody Boswell | Drywall inspection for the third phase of the fire ceiling. |
| 2025/02/04 | Building/Structural | Structural | Passed | Kody Boswell | Structural Inspection on the Lower Level for temporary opening in masonry wall located along grid A/11-12. The Contractor, FSU BCA, and Threshold inspector (Penonni) were on site. |
| 2025/02/03 | Building/Structural | Structural | Passed | Kody Boswell | Structural Inspection on the Lower Level for temporary opening in masonry wall located along grid A/11-12. The Contractor, FSU BCA, and Threshold inspector (Penonni) were on site. The reinforcing steel was not yet tied in place. Only dowel holes for new reinforcing were drilled. Penonni checked dowel hole depth and cleanliness. Holes were the corret depth and clean. Contractor to schedule FSU BCA for inspection once reinforcing steel is tied in place, prior to reinforcing being covered up with formwork. |
| 2025/01/30 | Building/Structural | Structural | Postponed | Kody Boswell | Contractor contacted FSU BCA to inspect masonry reinforcing for a temporary opening in the basement. Upon site arrival it was discovered that the structural drawings were modified for the area requested for inspection. FSU BCA and the Thresold Inspector came to the conclusion that the area could not be inspected prior to the modified structural documents being submitted for review and included in the permit documents. Inspection is postponed until modified structural drawings are submitted for BCA review. |
| 2025/01/28 | Building/Structural | Framing | NOT READY | Paul Nitz | Need framing inspection to hang some drywall. 1) plans not on site |
| 2025/01/28 | Building/Structural | Framing | Passed | Paul Nitz | Paul, FSU BCA Inspector, will return today at 1:30 pm to inspect. |
| 2025/01/15 | Building/Structural | Framing | Passed | Kody Boswell | Reviewed LG framing for fire-rated encasement of a structural steel beam |
| Plumbing | Underground | NOT READY | Paul Nitz | Need a slab rebar inspection Need inspection on the new grease interceptors plumbing connections | |
| Mechanical | Final Mechanical | Cancelled | Paul Nitz | We need a final inspection on the following areas, if possible; Rooms 108, 115, 113V, 124, 124B, 125, 113 and 126. This inspection is to be able to get a Temporary CO for these rooms. | |
| Electrical | Final Electrical | Cancelled | Rocky Wilde | We need a final inspection on the following areas, if possible; Rooms 108, 115, 113V, 124, 124B, 125, 113 and 126. This inspection is to be able to get a Temporary CO for these rooms. | |
| Building/Structural | Final Building | Cancelled | Paul Nitz | We need a final inspection on the following areas, if possible; Rooms 108, 115, 113V, 124, 124B, 125, 113 and 126. This inspection is to be able to get a Temporary CO for these rooms. | |
| Building/Structural | Footing | Postponed | Kody Boswell | Need rebar install inspected on the elevator roof and elevator grade beams. Need some framing inspected on the second floor. Contractor contacted FSU BCA prior to site arrival to postpone inspection to a later date | |
| Building/Structural | Framing | Postponed | Kody Boswell | Need rebar install inspected on the elevator roof and elevator grade beams. Need some framing inspected on the second floor. Contractor contacted FSU BCA prior to site arrival to postpone inspection to a later date | |
| Building/Structural | Structural | Postponed | Kody Boswell | Need rebar install inspected on the elevator roof and elevator grade beams. Need some framing inspected on the second floor. Contractor contacted FSU BCA prior to site arrival to postpone inspection to a later date |

BCA Project #: 23-03466- Wm. Johnston - Manikin Chamber Cool Air Upgrade
| Inspection Date | Discipline | Type | Result | Inspector | Comments |
| 2025/08/27 | Electrical | Final Electrical | Failed | Rocky Wilde | 1) electrical panel is not labeled properly |
| 2025/08/22 | Electrical | Final Electrical | Postponed | Rocky Wilde | |
| 2025/08/19 | Mechanical | Final Mechanical | Passed | Paul Nitz | Intent is to verify punch list is complete and close project. |
| 2024/05/14 | Mechanical | Final Mechanical | Failed | Neely Lewis | 1. Need locking caps on regfrigeration access ports FBC-M Sec 1101.10 2. Insulation is to be continuous on refrigeration suction line. FBC-C Section 403.2.10. ( exposed suction pipe will cause condensate to drip and discolor brick on historic building.) 3.Armaflex insulation is to be painted or covered to protect it for degrading from sunlight. FBC-C Sec C403.2.10.1. |
| 2024/05/14 | Electrical | Final Electrical | NOT READY | Dwayne Mahony | No access to room. |
| 2024/02/06 | Building/Structural | Footing | Passed | Dwayne Mahony | Addition to mechanical slab is approved. |
| 2023/12/28 | Building/Structural | Footing | Passed | Dwayne Mahony | Requested inspection is for the concrete pad steel & form and the re-routed storm line per revised drawings. |
| 2023/12/28 | Building/Structural | Slab | Passed | Dwayne Mahony | Requested inspection is for the concrete pad steel & form and the re-routed storm line per revised drawings. |
| 2023/12/28 | Plumbing | Underground | Passed | Dwayne Mahony | Requested inspection is for the concrete pad steel & form and the re-routed storm line per revised drawings. |

BCA Project #: 23-03455-A Doak Campbell - East Stands Improvements Phase II
| Inspection Date | Discipline | Type | Result | Inspector | Comments |
| 2025/12/18 | Fire Safety | Final Fire Alarm | Passed | Curtis Rogers | Scorebaord override |
| 2025/09/04 | Plumbing | Final Plumbing | Conditional | Paul Nitz | 1) ADA stall doors need to be self closing 2) sink carrier needs to be installed in mens ADA bathroom as per plans 3) door handle needs to be replaced as per plans 4) doors in mens bathroom need to be painted as per plans |
| 2025/08/29 | Fire Safety | Final Fire Safety | Passed | Curtis Rogers | Elevator Recall A6 & C5 -PASSED American Signal Test - PASSED Emergency Back Up Power Test on 08.22.25 PASSED Sprinkler Tested on 08.27.25 PASSED Final Fire Alarm Test PASSED *GLOBAL Fire Panel has (4) troubles on Panel (2) Troubles from UCA building (existing troubles) *Scoreboard Trouble Monitor - Waitng for Scoreboard Card to be installed *Existing Troubles on Fire Alarm panel will not affect the Fire Alarm from activating properly |
| 2025/08/29 | Fire Safety | Re-Inspection | Passed | Curtis Rogers | Elevator Recall A#6 Passed |
| 2025/08/28 | Fire Safety | Final Fire Alarm | Partial | Curtis Rogers | Elevator Recall Elevator C#5 PASSED ELEVATOR A#6 NOT READY Elevator A#7 *Out of Scope… Upgrade & Testing Next Year |
| 2025/08/28 | Fire Safety | Final Fire Safety | Partial | Curtis Rogers | Project: 23-03455-A-Doak Campbell - East Stands Improvements Phase II Date: 8/28/2025 By: Curtis Rogers Type: Fire Safety-Final Fire Alarm Results: Partial Notes: Elevator Recall Elevator C#5 PASSED ELEVATOR A#6 NOT READY Elevator A#7 *Out of Scope… Upgrade & Testing Next Year |
| 2025/08/28 | Plumbing | Re-Inspection | Conditional | Paul Nitz | Toilet in room 3212 was loose 1) ADA door in men’s bathroom is in the wrong location as per plans and FBC A604.8.1 2) Door handle in men’s room is not per plans 3) Door closer in men’s room has not been changed as per plans 4) ADA doors in women’s restroom do nor shut properly (self close) 5) Women’s restroom is missing placards on two of the doors |
| 2025/08/28 | Electrical | Final Electrical | Passed | Rocky Wilde | |
| 2025/08/28 | Building/Structural | Final Building | Passed | Kody Boswell | Final building inspection for temporary CO |
| 2025/08/27 | Plumbing | Re-Inspection | Conditional | Paul Nitz | The jobsite superintendent as well as the plumbing contractor assured BCA that the temporary fix for the toilet height will be addressed the week of 9/1/2025 and will be completed by 9/12/2025 before the second home game. The new ADA toilet in the men’s restroom will be fixed and inspected by BCA before 8/29/2025. The cleanout covers that are missing will not be a problem for temporary CO. If you have any questions, please let me know. 1) ADA toilet is set to high MAX height is 19” FBC A604.4 (The Plumbing Contractor Made A Temporary Fix to this problem because of parts not being available before 8/29/2025) and was approved by the building official to be in compliance. 2) Clean-out covers are missing 3) Toilet in men’s new ADA bathroom is not secure and the supply to it is not plumb 4) The drain for the sink in the new men’s bathroom is PVC and needs to be changed out to chrome. |
| 2025/08/27 | Electrical | Final Electrical | Passed | Rocky Wilde | |
| 2025/08/27 | Plumbing | Final Plumbing | Conditional | Paul Nitz | The jobsite superintendent as well as the plumbing contractor assured BCA that the temporary fix for the toilet height will be addressed the week of 9/1/2025 and will be completed by 9/12/2025 before the second home game. The new ADA toilet in the men’s restroom will be fixed and inspected by BCA before 8/29/2025. The cleanout covers that are missing will not be a problem for temporary CO. If you have any questions, please let me know. 1) ADA toilet is set to high MAX height is 19” FBC A604.4 (The Plumbing Contractor Made A Temporary Fix to this problem because of parts not being available before 8/29/2025) and was approved by the building official to be in compliance. 2) Clean-out covers are missing 3) Toilet in men’s new ADA bathroom is not secure and the supply to it is not plumb 4) The drain for the sink in the new men’s bathroom is PVC and needs to be changed out to chrome. |
| 2025/08/26 | Fire Safety | Fire Water Above Ground | Passed | Curtis Rogers | Re inspection - Dry System #1 & 2 Upper Concourse Level East Stands *Trip Test - PASSED *Testing Fire Aalrm Components - PASSED |
| 2025/08/26 | Fire Safety | Final Fire Safety | NOT READY | Curtis Rogers | |
| 2025/08/26 | Building/Structural | Final Building | Failed | Rocky Wilde | 1) labeling missing 2) ADA doors must be self-closing. FBC A604.8.1.2 |
| 2025/08/26 | Fire Safety | Final Fire Alarm | NOT READY | Curtis Rogers | *Need Elevator Up and Running to Complete Fire Alarm Inspections |
| 2025/08/26 | Electrical | Final Electrical | Partial | Rocky Wilde | label electrical covers |
| 2025/08/26 | Mechanical | Final Mechanical | Passed | Paul Nitz | |
| 2025/08/26 | Fire Safety | Final Fire Sprinkler | Conditional | Curtis Rogers | *Need Riser Room Signage on each Riser Room *Add Inspector Test Pipe and Signs at the end of each Dry Sysytem *Add Extra Hanger Bracing for Dry System Riser Upper Concourse Level |
| 2025/08/26 | Plumbing | Final Plumbing | Failed | Paul Nitz | 1) Trap primers are missing in the drains as per plans 2) ADA toilet is set to high MAX height is 19” FBC A604.4 3) Drinking fountain arch needs to be min 4” FBC A602.6 4) Clean-out covers are missing 5) Bathroom stalls need a minimum 15” clearance from partition/ obstacles FBC P405.3.1 6) Toilet in men’s new ADA bathroom is not secure and the supply to it is not plumb 7) The sink in the men’s new ADA bathroom is not hooked up |
| 2025/08/22 | Fire Safety | Final Fire Sprinkler | Failed | Curtis Rogers | Passed*Dry System on Phase 1 LLC East FAILED***(2) Dry Sytems on Phase 2 Upper Concourse Levels- Both Clappers(diapragms) not holding pressure |
| 2025/08/22 | Fire Safety | Final Egress/Emergency Lights | Passed | Curtis Rogers | We are scheduled to shut power down at 6 am to confirm generator switch over Passed *Back Up Power |
| 2025/08/22 | Fire Safety | Fire Water Above Ground | Passed | Curtis Rogers | Visual AboveGround Sprinkler |
| 2025/08/19 | Fire Safety | Hydro-Test | Passed | Curtis Rogers | PASSED*Hydro-Tested 2 Dry Systems East Stands Upper Concourse Level PASSED* Above Ceiling Inpsection |
| 2025/08/14 | Electrical | Panel/Feeder | Passed | Rocky Wilde | |
| 2025/08/11 | Building/Structural | Structural | Conditional | Kody Boswell | Reviewed structural steel, stel deck, and reinforcing steel for the elevated slab infill located on the 4th floor, section 15. Result is conditional pending installation of steel bracing. Contractor is allowed to place concrete prior to brace installation per the EOR. |
| 2025/08/11 | Building/Structural | Slab | Conditional | Kody Boswell | Reviewed structural steel, stel deck, and reinforcing steel for the elevated slab infill located on the 4th floor, section 15. Result is conditional pending installation of steel bracing. Contractor is allowed to place concrete prior to brace installation per the EOR. |
| 2025/08/01 | Building/Structural | Structural | Conditional | Kody Boswell | Re inspection for new slab at section 5- 4th floor Reviewed structural steel framing, steel decking, and elevated slab reinforcing for the slab infill area on the upper concourse in section 5. The following deficiences, originally reported on 7/30/2025, were corrected or in the process of being corrected while on site: - Steel framing along grid G didn't match what was shown in detail 1/S615. The W14x22 beam was placed offset from the existing column and some bracing was missing. - Steel framing along grid G didn't match what was shown in detail 2/S615. The W18x48 columns weren't installed. - Wire mesh slab reinforcing was sitting directly on steel deck. Wire mesh should be chaired over beams. Result is conditional pending receipt of photos from Contractor verifying items discussed on site were completed. |
| 2025/08/01 | Building/Structural | Slab | Conditional | Kody Boswell | Re inspection for new slab at section 5- 4th floor Reviewed structural steel framing, steel decking, and elevated slab reinforcing for the slab infill area on the upper concourse in section 5. The following deficiences, originally reported on 7/30/2025, were corrected or in the process of being corrected while on site: - Steel framing along grid G didn't match what was shown in detail 1/S615. The W14x22 beam was placed offset from the existing column and some bracing was missing. - Steel framing along grid G didn't match what was shown in detail 2/S615. The W18x48 columns weren't installed. - Wire mesh slab reinforcing was sitting directly on steel deck. Wire mesh should be chaired over beams. Result is conditional pending receipt of photos from Contractor verifying items discussed on site were completed. |
| 2025/07/31 | Plumbing | Water Piping & Test | Passed | Rocky Wilde | Water supply under new bathrooms on 4th floor section 7 and 13 |
| 2025/07/31 | Fire Safety | Fire Alarm Rough-In | Conditional | Curtis Rogers | Fire alarm device test for the east side *Notification devices (Speaker Strobes) *Gate M - Outside Pump Room- Lower Speaker Strobe to the correct height - 84 inches to center *Gate E - Mens Restroom- Install Speaker Strobes Inside and Outside for proper coverage |
| 2025/07/30 | Building/Structural | Slab | Failed | Kody Boswell | Reviewed structural steel framing, steel decking, and elevated slab reinforcing for the slab infill area on the upper concourse in section 5. The following deficiences were observed: - Steel framing along grid G didn't match what was shown in detail 1/S615. The W14x22 beam was placed offset from the existing column and some bracing was missing. - Steel framing along grid G didn't match what was shown in detail 2/S615. The W18x48 columns weren't installed. - Wire mesh slab reinforcing was sitting directly on steel deck. Wire mesh should be chaired over beams. |
| 2025/07/02 | Building/Structural | Slab | Passed | Kody Boswell | Reviewed reinforcing steel and and new steel deck attachment to existing structural steel framing for slab repair on ramp at column line 6n-7n vertical line K-L . North side of gate K |
| 2025/07/02 | Building/Structural | Structural | Passed | Kody Boswell | Reviewed reinforcing steel and and new steel deck attachment to existing structural steel framing for slab repair on ramp at column line 6n-7n vertical line K-L . North side of gate K |
| 2025/06/30 | Building/Structural | Sheetrock | Passed | Paul Nitz | Screw inspection new 4th floor bathrooms section 7 and 13 |
| 2025/06/27 | Building/Structural | Structural | Passed | Kody Boswell | Reviewed steel framing and steel deck attachmnet for mid level gate K ramp |
| 2025/06/27 | Building/Structural | Insulation | Passed | Kody Boswell | New bathrooms 4th floor section 7 and 13 ceiling insulation, upper concourse |
| 2025/06/27 | Building/Structural | Slab | Passed | Kody Boswell | Reviewed reinforcing steel for mid level gate K ramp replacement |
| 2025/06/26 | Building/Structural | Masonry | Passed | Paul Nitz | Final lift steel prior to grout 4th floor section 7 and 13. Passing Verified by Paul |
| 2025/06/26 | Building/Structural | Structural | Postponed | Kody Boswell | Mid Level ramp repairs gate K Contractor contacted FSU BCA prior to site arrival to postpone inspection to a later date. |
| 2025/06/26 | Building/Structural | Slab | Postponed | Kody Boswell | Mid Level ramp repairs gate K Contractor contacted FSU BCA prior to site arrival to postpone inspection to a later date. |
| 2025/06/25 | Building/Structural | Masonry | Failed | Paul Nitz | Final lift rebar prior to grout 4th floor section 7 and 13 1) vertical bars not in contact with the grade beam |
| 2025/06/24 | Electrical | Ceiling Rough-in | Passed | Rocky Wilde | New 4th floor bathrooms |
| 2025/06/24 | Building/Structural | Masonry | Passed | Kody Boswell | Reviewed reinforcing steel for 1st lift of CMU walls for new fire suppression rooms attached to new bathrooms 4th floor section 7 and 13 |
| 2025/06/13 | Building/Structural | Slab | Passed | Rocky Wilde | Re-Inspection for 4th floor slab repair column line 2north- 1 east at top of k gate ramp |
| 2025/06/13 | Building/Structural | Structural | Passed | Rocky Wilde | Re-Inspection for 4th floor slab repair column line 2north- 1 east at top of k gate ramp |
| 2025/06/12 | Electrical | Ceiling Rough-in | Failed | Al Smythe | New bathrooms 4th floor section 7 and section 13 and miscellaneous 1) Panel not labeled or identified |
| 2025/06/12 | Building/Structural | Structural | Passed | Kody Boswell | 4 areas of slab repair on 4th floor |
| 2025/06/12 | Building/Structural | Slab | Passed | Kody Boswell | 4 areas of slab repair on 4th floor |
| 2025/05/19 | Building/Structural | Framing | Passed | Kody Boswell | Reviewed roof deck attachment to roof members for new storage room, main concourse, section 9 |
| 2025/05/09 | Building/Structural | Framing | Passed | Kody Boswell | Reviewed roof framing for 1st floor storage room section 9 |
| 2025/05/01 | Plumbing | Re-Inspection | Passed | Paul Nitz | Water supply insulation new 4th floor bathrooms |
| 2025/04/24 | Plumbing | Rough-in | Cancelled | Paul Nitz | Water supply insulation new bathrooms 4th floor section 7 and 13 this inspection was entered twice |
| 2025/04/22 | Plumbing | Stack Piping & Test | Passed | Paul Nitz | New 4th floor bathroom section 13 sanitary and water supply. Also heat trace section 13 and section 7 bathroom |
| 2025/04/22 | Plumbing | Water Piping & Test | Passed | Paul Nitz | New 4th floor bathroom section 13 sanitary and water supply. Also heat trace section 13 and section 7 bathroom |
| 2025/04/21 | Building/Structural | Framing | Passed | Kody Boswell | Reviewed roof framing and roof deck attachment to structure for new bathroom 4th floor section 13 |
| 2025/04/10 | Building/Structural | Framing | Passed | Paul Nitz | Screw down inspection for decking bathroom section 7 on the 4th floor |
| 2025/04/03 | Building/Structural | Framing | Passed | Kody Boswell | Reviewed roof framing for the new north bathroom, section 7, upper concourse. Items noted in failed inspection on 4/1/2025 have been corrected and/or addressed. |
| 2025/04/03 | Plumbing | Rough-in | Passed | Paul Nitz | Re Inspection new bathroom north side 4 th floor section 7 |
| 2025/04/03 | Plumbing | Water Piping & Test | Passed | Paul Nitz | Re Inspection new bathroom north side 4 th floor section 7 |
| 2025/04/03 | Plumbing | Stack Piping & Test | Passed | Paul Nitz | Re Inspection new bathroom north side 4 th floor section 7 |
| 2025/04/02 | Plumbing | Rough-in | Failed | Paul Nitz | North new bathroom 4th floor section 7 1) not holding water |
| 2025/04/02 | Plumbing | Water Piping & Test | Failed | Paul Nitz | North new bathroom 4th floor section 7 1) Vent not supported |
| 2025/04/02 | Plumbing | Stack Piping & Test | Failed | Paul Nitz | North new bathroom 4th floor section 7 1) not holding water and vent not supported |
| 2025/04/01 | Building/Structural | Framing | Failed | Kody Boswell | Reviewed framing new north bathroom 4th floor section 7. The following items need to be addressed/corrected: 1) Simpson clips were not used as shown in detail 5/S7.01. Contractor to verify steel angles area acceptable connections in lieu of Simpson clips with EOR or install Simpson clips. 2) Holes in angle connections along the front wall (detail 6/S7.01) and back wall appeared oversized for the screws being used for connection of angle to LG roof joists. Washers must be installed. 3) Blocking between the end joists and exterior CMU walls was not installed. Blocking must be installed. Items above were discussed with the Contractor prior to FSU BCA leaving the site. Once items are addressed, a re-inspection may be scheduled. Item 1 was addressed by the EOR with acceptance via email. Email filed in Transmittals-correspondence folder. Items 2 and 3 were resolved via re-inspection on 4/2/2025 |
| 2025/03/27 | Building/Structural | Masonry | Passed | Kody Boswell | Reviewed reinforcing steel for masonry walls for ne bathroom 4th floor section 13, final lift |
| 2025/03/24 | Building/Structural | Masonry | Passed | Kody Boswell | Reviewed reinnforcing steel for 4th floor section 13 new bathroom rebar prior to grout installation, 2nd lift |
| 2025/03/17 | Building/Structural | Masonry | Conditional | Kody Boswell | New bathroom section 13 on 4th floor 1st lift grout rebar. FSU BCA arrived on site and the Subcontractor had grouted most of the walls, so FSU BCA was not able to review. Contractor stated the Threshold Inspector (TI) had reviewed and passed the reinforcing. Result is conditional pending verification of the TI's approval. FSU BCA contacted TI via email and is awaiting a response. |
| 2025/03/13 | Building/Structural | Slab | Passed | Kody Boswell | Reviewed reinforcing steel for the elevated slab infill on 4th level, section 13 |
| 2025/03/04 | Building/Structural | Masonry | Passed | Kody Boswell | Reviewed reinforcing steel for the top put lift of new bathroom 4th floor section 7 |
| 2025/02/27 | Building/Structural | Masonry | Passed | Kody Boswell | Re inspection for header rebar for new bathroom section 7 |
| 2025/02/26 | Building/Structural | Masonry | Conditional | Kody Boswell | Reviewed reinforcing steel for the 2nd lift of the new bathroom walls, 4th floor, section 7. Reinforcing steel was in compliance with the structural drawings except for the east wall. The horizontal reinforcing header for the door opening on the east wall did not have proper bearing over jamb reinforcing. This was discussed with the contractor while on site and must be corrected and called in for re-inspection. Contractor may proceed with grouting the north, south, and west walls. |
| 2025/01/29 | Plumbing | Final Plumbing | Passed | Paul Nitz | |
| 2025/01/16 | Plumbing | Storm Piping & Test | Failed | Paul Nitz | Smoke test 1) smoke test was good, missing multiple horizontal and vertical hangers |
| 2024/11/19 | Plumbing | Storm Piping & Test | Conditional | Paul Nitz | Discuss testing options 1) smoke detection will be allowed for the storm drain only |
| 2024/11/13 | Plumbing | Underground | Conditional | Paul Nitz | Storm line tie in by gate L 1st floor 1) Pressure test required before final inspection |
| 2024/11/13 | Plumbing | Storm Piping & Test | Conditional | Paul Nitz | Storm line tie in by gate L 1st floor 1) pressure test required before final inspection |
| 2024/10/17 | Building/Structural | Slab | Conditional | Kody Boswell | Reviewed reinforcing steel and steel decking for 2 concrete repair areas noted on sheet S2.03B (ASI-09): (1) Between grids K-L/2N-3N (2) Between grids K-L/2S-3S Result is conditional pending the WWR mesh is tied down to epoxied bars prior to concrete placement. Threshold inspector to verify. |
| 2024/08/30 | Building/Structural | Final Building | Conditional | Kody Boswell | FSU BCA walked the site to review compliance with the contract documents in order to issue a Conditional Certificate of Occupancy for the upcoming football season. The following need to be addressed prior to the issuance of the Conditional Certificate of Occupancy: 1) Steps at 7 lower vomitories need yellow paint stripes to indicate a change in height. 2) Stair stringer connection to header channel for stairs between grids 11S-12S needs to be corrected. 3) Change in elevation exceeding 1/2" where new field slab and existing field slab at grids A/16S needs to be addressed. Contractor to install flat plate to remedy trip hazard. Per conversation with the Contractor, David Zigler, items stated above would be complete over the weekend prior to the first football game on Monday (9/2/2024) and would provide photos to FSU BCA FSU BCA received pictures addressing the items above on Saturday (8/31) |
| 2024/08/30 | Fire Safety | Final Egress/Emergency Lights | Passed | Mary Creason | Conditional certification of occupancy for the 2024 football season - Fire extinguishers to be provided by FSU, and mounts provided by MCJV to be placed in ‘back of house’ areas adjacent to the temp concession stands. - Temporary illuminated Exit Signs to be placed in locations per the design documents. 12’ AFF. To be installed today and tomorrow. - Egress Lighting Completion - We observed the battery-power operation of the high-bay fixtures in the event of a power outage. No issues were observed. A temporary CCO is approved by Fire for the 2024 season Per Sam Sever and Jason Greisel TFD and Todd Pierce State Fire Marshal office |
| 2024/08/29 | Fire Safety | Final Egress/Emergency Lights | Passed | Sam Sevor | Generator transfer switch was tested and Emergency lights with State Fire Marshal, Todd --- Test Passed |
| 2024/08/19 | Electrical | Ceiling Rough-in | Passed | James Melvin | 1st floor commissary building section 9 |
| 2024/08/19 | Building/Structural | Masonry | Passed | Kody Boswell | Reviewed reinforcing steel for the 2nd lift of the bosster storage walls. Reviewed reinforcing steel for the 2nd lift of masonry walls for the booster storage room in the area between grids C-E/3N-5N. Reinforcing over door openings was corrected from prior failed inspection. |
| 2024/08/15 | Electrical | Ceiling Rough-in | Passed | James Melvin | Commissary building 1st floor section 10 |
| 2024/08/15 | Building/Structural | Masonry | Failed | Kody Boswell | Reviewed reinforcing steel for the 2nd lift of masonry walls for the booster storage room in the area between grids C-E/3N-5N. Reinforcing over door openings was not installed per detail 14 on sheet S5.21. This was discussed with the Contractor and threshold inspector. Re-inspection required after reinforcing is installed. |
| 2024/08/12 | Building/Structural | Masonry | Passed | Kody Boswell | Reviewed reinforcing steel for the first lift of masonry walls for the booster storage room in the area between grids C-E/3N-5N. |
| 2024/08/08 | Fire Safety | Hydro-Test | Passed | Mary Creason | hydro test for 2 hours Start 9:01am at 222psi and End at 11:21am 224psi Passed Visual on pipe/heads inside vistors locker room/maintenance shop/equipment shop/breakroom |
| 2024/08/08 | Fire Safety | Fire Water Above Ground | Passed | Mary Creason | hydro test for 2 hours Start 9:01am at 222psi and End at 11:21am 224psi Passed Visual on pipe/heads inside vistors locker room/maintenance shop/equipment shop/breakroom |
| 2024/07/25 | Building/Structural | Slab | Passed | Kody Boswell | Reviewed structural steel framing for new stairs and reinforcing steel for new landings between column line 8s-18s |
| 2024/07/24 | Plumbing | Storm Piping & Test | Passed | Paul Nitz | Section 4 floor drains x 4 |
| 2024/07/24 | Building/Structural | Slab | Postponed | Kody Boswell | Stairs and landings section 12-16. Contractor contacted FSU prior to arrival on site to postpone the inspection to a later date. |
| 2024/07/24 | Building/Structural | Framing | Postponed | Kody Boswell | Stairs in section 16-12. Contractor contacted FSU prior to arrival on site to postpone the inspection to a later date. |
| 2024/07/19 | Electrical | Ground | Passed | James Melvin | notes*Building ground inspection by Gate C . Gate D was inspected a week ago *notes* |
| 2024/07/12 | Building/Structural | Slab | Passed | Kody Boswell | Reviewed reinforcing steel for elevated slabs on the upper concourse between grids 2N-9N |
| 2024/07/11 | Building/Structural | Slab | Passed | Kody Boswell | Reviewed reinforcing steel for the following areas of elevated slab on the upper concourse: 1) In the area between grids F-J/5S-6S 2) In the area between grids F-J/2S-3S Missing reinforcing from 7/10/2024 inspection was installed and deck was cleaned off. |
| 2024/07/11 | Building/Structural | Re-Inspection | Passed | Kody Boswell | Reviewed reinforcing steel for the following areas of elevated slab on the upper concourse: 1) In the area between grids F-J/5S-6S 2) In the area between grids F-J/2S-3S Missing reinforcing from 7/10/2024 inspection was installed and deck was cleaned off. |
| 2024/07/10 | Building/Structural | Slab | Failed | Kody Boswell | Reviewed reinforcing steel for the following areas of elevated slab on the upper concourse: 1) In the area between grids F-J/5S-6S 2) In the area between grids F-J/2S-3S There was some reinforcing that was not installed per detail 7/S6.13 and there was excessive debris in some areas. Contractor to install reinforcing steel and clean off deck. |
| 2024/07/09 | Building/Structural | Slab | Postponed | Kody Boswell | Contractor contacted FSU prior to arrival on site to cancel inspection and postpone to a later date. |
| 2024/06/27 | Building/Structural | Slab | Passed | Kody Boswell | Reviewed reinforcing steel for the elevated slab at the upper concourse level located in the area between grids F-G/7S-19S |
| 2024/06/26 | Fire Safety | Final Fire Safety | Passed | Mary Creason | Gate K fire line underground = EAST SIDE: Hydro, visual and Flush HYDRO Start at 8:10am 225psi Finished 10:25am 226psi Visual DR18 pipe Flush - passed |
| 2024/06/26 | Fire Safety | Fire Water Underground | Passed | Mary Creason | Section 11 fire line underground = new fire riser line : flush conducted |
| 2024/06/26 | Building/Structural | ADA | Passed | Kody Boswell | Reviewed 1st floor ramps for compliance with FBC. Ramp slopes were within standards set by FBC. Connor Ross was present during the walk through. |
| 2024/06/26 | Building/Structural | Slab | Postponed | Kody Boswell | 4th floor deck columns 7 south- 19s Contractor contacted FSU BCA prior to arriving on site to cancel and postpone inspection. Contractor will reschedule for another date. |
| 2024/06/26 | Fire Safety | Fire Water Underground | Passed | Mary Creason | Gate K, J, L and section 11: completed today - HYDRO, Visual and Flush Paperwork completed |
| 2024/06/26 | Fire Safety | Fire Water Underground | Passed | Mary Creason | Gate K fire line underground = Hydro, visual and flush for west side HYDRO Start: 8am at 224psi Finish 10:20am at 225psi Visual DR18 Flush - passed |
| 2024/06/21 | Plumbing | Rough-in | Passed | Dwayne Mahony | |
| 2024/06/17 | Plumbing | Rough-in | Passed | Paul Nitz | sections 14-13 and 16-15 only |
| 2024/06/12 | Building/Structural | Slab | Passed | Paul Nitz | N side 4th floor elevated slab |
| 2024/06/12 | Plumbing | Rough-in | Failed | Paul Nitz | min slope not met on storm drain fbc p1106.2 |
| 2024/06/10 | Plumbing | Rough-in | NOT READY | Paul Nitz | |
| 2024/06/05 | Building/Structural | Masonry | Passed | Kody Boswell | Reviewed reinforcing steel for new masonry walls located B-C/1E-2S |
| 2024/06/05 | Plumbing | Rough-in | Passed | Paul Nitz | |
| 2024/06/03 | Building/Structural | Slab | Passed | Kody Boswell | Reviewed reinforcing steel for the ramp and stair footer in the area between grids B-E/8S-9S |
| 2024/05/31 | Building/Structural | Slab | Passed | Kody Boswell | Reviewed reinforcing steel for the slab on grade ramp located between grids A-C/5S-6S |
| 2024/05/29 | Building/Structural | Slab | Passed | Kody Boswell | Reviewed reinforcing steel for several ramps (slab on grade) |
| 2024/05/28 | Plumbing | Underground | Passed | Paul Nitz | Section 12/13 |
| 2024/05/24 | Building/Structural | Slab | Passed | Kody Boswell | Reinforcing steel for ramp slab on grade. Inspection deferred to threshold inspector. See correspondence folder for photos from Contractor. |
| 2024/05/23 | Plumbing | Rough-in | Passed | Neely Lewis | 1 floor inlet in lower level ramp |
| 2024/05/23 | Building/Structural | Slab | Passed | Kody Boswell | |
| 2024/05/22 | Building/Structural | Framing | Kody Boswell | Meeting held by the Contractor of procedures for weld inspections. FSU BCA met the Contractor, Testing Agency and Threshold Inspector in the field to discuss welding inspections. | |
| 2024/05/22 | Plumbing | Rough-in | Passed | Paul Nitz | |
| 2024/05/21 | Building/Structural | Slab | Passed | Kody Boswell | Reviewed reinforcing steel for the following slab on grade ramps: 1) Between grids A-C/2N-3N 2) Between grids A-C/8N-9N 3) Between grids A-C/11N-12N |
| 2024/05/17 | Fire Safety | Fire Water Underground | Passed | Mary Creason | Visual passed, hydro passed and flush passed |
| 2024/05/17 | Fire Safety | Hydro-Test | Passed | Mary Creason | test started at 7:45am at 215psi and stopped at 10:10am at 215psi. Passed test. |
| 2024/05/16 | Building/Structural | Slab | Passed | Kody Boswell | Reviewed reinforcing steel and steel deck attachment for a portion of the slab on deck located in the area between grids A-B/7S-16S. |
| 2024/05/15 | Plumbing | Underground | Passed | Paul Nitz | check slope on ramp 9/10 at next inspection |
| 2024/05/15 | Plumbing | Rough-in | Passed | Paul Nitz | check slope on ramp 9/10 at next inspection |
| 2024/05/13 | Plumbing | Underground | NOT READY | Neely Lewis | |
| 2024/05/13 | Building/Structural | Slab | Passed | Kody Boswell | Reviewed reinforcing steel for the following slab on grade ramps: 1) In the area between grids A-C/5N-6N 2) In the area between grids A-C/8N-9N |
| 2024/05/13 | Plumbing | Rough-in | NOT READY | Neely Lewis | |
| 2024/05/09 | Building/Structural | Slab | Passed | Kody Boswell | Reviewed reinforcing steel and steel deck attachment for a portion of the slab on deck located in the area between grids A-B/7N-7S. |
| 2024/05/06 | Building/Structural | Slab | Passed | Dwayne Mahony | Excess foam plastic is to be removed, T.I. will verify. |
| 2024/05/03 | Plumbing | Rough-in | Passed | Dwayne Mahony | Approved south end of grandstand lowest level, 7 area drains, and two lower vomitory ramps. |
| 2024/05/01 | Plumbing | Rough-in | Passed | Neely Lewis | partial only. |
| 2024/04/30 | Building/Structural | Slab | Passed | Kody Boswell | Reviewed reinforcing steel for 2 slab on grade areas that were removed to install underground pipe. Reinforcing consisted of steel doweled into existing concrete at 2'-0" spacing along with WWR. |
| 2024/04/30 | Building/Structural | Footing | Passed | Kody Boswell | Reviewed reinforcing steel for a stair footing located in the area between grids B-C/17S-18S |
| 2024/04/25 | Plumbing | Storm Piping & Test | Passed | Neely Lewis | |
| 2024/04/10 | Building/Structural | Footing | Passed | Kody Boswell | Reviewed reinforcing steel for a wall footing for the north wall at the visitor's locker room |
| 2024/04/02 | Building/Structural | Wall/Ceiling | Passed | Kody Boswell | Reviewed reinforcing steel for walls located along grids 14S, 15S and 16S |
| 2024/03/28 | Building/Structural | Wall/Ceiling | Passed | Kody Boswell | Reviewed reinforcing steel for walls along grids 10S, 11S, 12S and 13S. |
| 2024/03/26 | Building/Structural | Footing | Passed | Kody Boswell | Reviewed reinforcing steel for the following: - Grade beam along grid 16N - Walls along grids 8S, 9S, 14N and 15N |
| 2024/03/21 | Building/Structural | Wall/Ceiling | Passed | Kody Boswell | Reviewed reinforcing steel for walls along grids 2S, 3S, 4S, 5S, 6S and 7S |
| 2024/03/18 | Building/Structural | Wall/Ceiling | Passed | Kody Boswell | Reviewed reinforcing steel for walls along grids 2N and 1E. |
| 2024/03/15 | Building/Structural | Footing | Passed | Kody Boswell | Reviewed reinforcing steel for the following grade beams (GB) and walls: - GBs along grids 11S, 12S, 13S, 14S, 15S and 16S - Walls along grids 3N, 4N, 5N and 6N |
| 2024/03/13 | Building/Structural | Footing | Passed | Kody Boswell | Reviewed reinforcing steel for grade beams along grids 2S thru 10S. |
| 2024/03/11 | Building/Structural | Footing | Passed | Dwayne Mahony | |
| 2024/03/07 | Building/Structural | Footing | Postponed | Kody Boswell | Contractor contacted FSU to postpone the inspection to a later date. |
| 2024/03/06 | Building/Structural | Cast in Place Wall | Passed | Kody Boswell | Reviewed reinforcing steel for walls on top of grade beams located along grids 7N, 8N, 9N ,10N, 11N, 12N, 13N, 14N, 15N and the wall in the area between grids A-B/7N-16N. The deficiencies noted on 3/4/24 inspection were corrected. |
| 2024/03/05 | Building/Structural | Cast in Place Wall | Postponed | Kody Boswell | Contractor contacted FSU to postpone the inspection to a later date due to weather. |
| 2024/03/04 | Building/Structural | Cast in Place Wall | Failed | Kody Boswell | Reviewed reinforcing steel for walls on top of grade beams located along grids 7N, 8N, 9N ,10N, 11N, 12N, 13N, 14N, 15N and the wall in the area between grids A-B/7N-16N. There were several missing embeds at expansion joint locations and there was insufficient development length for #7 bars at multiple locations. Contractor to reschedule inspection after corrections are made. |
| 2024/03/01 | Building/Structural | Footing | Passed | Kody Boswell | Reviewed reinforcing steel for grade beams along grids 1E, 2N, 3N, 4N, and 5N. The deficiencies noted on the 2/29/24 inspection were corrected. |
| 2024/02/29 | Building/Structural | Footing | Failed | Kody Boswell | Reviewed reinforcing steel for grade beams along grids 2N, 3N, 4N, and 5N. Each of these grade beams were stepped and were supposed to be reinforced per detail 4/S5.01. Additional reinforcement called out in the detail going from top steel of top portion of grade beam to bottom steel of bottom portion of grade beam was not placed correctly. Also, the last stirrup located closest to the step did not encase the top steel of the bottom portion of grade beam. |
| 2024/02/27 | Building/Structural | Wall/Ceiling | Passed | Dwayne Mahony | |
| 2024/02/27 | Building/Structural | Footing | Passed | Dwayne Mahony | |
| 2024/02/23 | Building/Structural | Footing | Passed | Dwayne Mahony | |
| 2024/02/22 | Building/Structural | Footing | Failed | Kody Boswell | Reviewed reinforcing steel for grade beams located along grids 6N, 7N, 8N, 9N and 10N. Reinforcing steel at the field side was not in place per detail 7/S5.01. This was discussed with the Contractor. Contractor to contact EOR for direction due to unforeseen conditions. An RFI will be generated. |
| 2024/02/15 | Building/Structural | Footing | Postponed | Kody Boswell | Contractor contacted FSU to postpone grade beam reinforcing steel inspection to a later date. (KB) |
| 2024/02/14 | Building/Structural | Footing | Conditional | Kody Boswell | Reviewed reinforcing steel for grade beams at the lower concourse located between gridlines 15N, 14N, 13N and 12N. Where new grade beams tied to existing concrete columns there was insufficient longitudinal steel length and spacing between existing concrete face and new reinforcing ties. Per the EOR the first new reinforcing tie should be 2" to 3" off of existing concrete. This was not the case for each side of the 4 grade beams reviewed. Contractor to fix reinforcing steel prior to concrete placement. BNI (threshold) to verify reinforcing is corrected prior to concrete placement. (KB) |
| 2024/02/09 | Building/Structural | Footing | Postponed | Kody Boswell | Contractor contacted FSU to cancel today's inspection and postpone to a later date. Inspection request was for grade beam reincorcing steel. (KB) |
| 2024/02/08 | Building/Structural | Footing | Postponed | Kody Boswell | Contractor contacted FSU to cancel today's inspection and postpone to a later date. Inspection request was for grade beam reincorcing steel. (KB) |
| Plumbing | Specialty Piping | Postponed | Paul Nitz | Cold water hot tie in for new bathrooms at section 7 and 13 One side to occur at 9 and the other one at 10 | |
| Building/Structural | Slab | Cancelled | Kody Boswell | Structual slab 4th section 13 column 10s line k. Contactor contacted FSU BCA on 3/7/25 to cancel inspection. | |
| Plumbing | Water Piping & Test | Postponed | Paul Nitz | Water supply new bathrooms section 7 and 13 4th floor | |
| Building/Structural | Masonry | Passed | Rocky Wilde | New north bathroom 4th floor 1st lift of grout | |
| Electrical | Wall Rough-in | Passed | Rocky Wilde | New north bathroom 4th floor 1st lift of grout 4 in wall boxes |

BCA Project #: 23-03455- Doak Campbell - East Stands Improvements Phase I
| Inspection Date | Discipline | Type | Result | Inspector | Comments |
| 2025/07/28 | Building/Structural | Framing | Passed | Kody Boswell | Reviewed LG framing for new ceilings for elevator machine rooms at gate A and M |
| 2025/07/28 | Building/Structural | Insulation | Passed | Kody Boswell | Reviewed insulation for ceilings for elevator machine rooms at gate A and M |
| 2025/04/24 | Plumbing | Specialty Piping | Failed | Paul Nitz | I would like to reschedule the insulation inspection to 2;30 for the new 4th floor bathrooms 1) plans call for 1'' elastomeric insulation on all supply lines 2) trap primers are bot installed |
| 2025/03/27 | Building/Structural | Masonry | NOT READY | Paul Nitz | Final lift new s bathroom 4th floor section 13 |
| 2025/03/11 | Building/Structural | Slab | NOT READY | Kody Boswell | FSU BCA arrived on site and was informed by the Subcontractor that the elevated slab reinforcing steel was not ready for inspection. FSU BCA then left the site. |
| 2025/01/15 | Plumbing | Storm Piping & Test | Failed | Paul Nitz | Smoke test |
| 2025/01/07 | Plumbing | Storm Piping & Test | NOT READY | Paul Nitz | Smoke test |
| 2024/12/16 | Building/Structural | Slab | Passed | Kody Boswell | New Plumbing drains section 5 on the 4th floor rebar |
| 2024/08/30 | Fire Safety | Final Fire Safety | Passed | Mary Creason | Temporary CCO is approved for the 2024 season by Fire. Sam Sever, Fire Manaager FSU, Jason Griisel TFD, and Todd Perce, State Fire Marshal office conducted a walk thru on 8/27/2024 and conditions were good. |
| 2024/08/27 | Building/Structural | Other | Conditional | Paul Nitz | Compliance for football game 1) edge protection required on ramps fbc a405.9 2) protruding objects need to be protected fbc a307.0 |
| 2024/08/27 | Electrical | Ceiling Rough-in | Passed | James Melvin | Visitors locker room |
| 2024/08/23 | Building/Structural | ADA | Failed | Paul Nitz | Preliminary inspection for compliance in preparation for football game 1) ADA 303.2 vertical change on third floor 2)deburring hand rails 2) ADA 405.9 Edge protection on ground leve |
| 2024/08/23 | Failed | Paul Nitz | Preliminary inspection for compliance in preparation for football game 1) ADA 303.2 vertical change on third floor 2)deburring hand rails 2) ADA 405.9 Edge protection on ground level | ||
| 2024/08/22 | Electrical | Ceiling Rough-in | Passed | James Melvin | Commissary building 1st floor section 9 |
| 2024/08/21 | Building/Structural | Sheetrock | Passed | Paul Nitz | Screw inspection visitors locker room |
| 2024/08/21 | Building/Structural | Roofing | Passed | Paul Nitz | Commisary building 1st floor section 9 |
| 2024/08/21 | Building/Structural | Insulation | Passed | Paul Nitz | Commisary building 1st floor section 9 |
| 2024/08/20 | Building/Structural | Wall/Ceiling | Passed | Paul Nitz | Locker room bulkhead framing |
| 2024/08/20 | Plumbing | Underground | Passed | Paul Nitz | Storm line tie in by gate J |
| 2024/08/02 | Building/Structural | Slab | Passed | Paul Nitz | Plumbing repair at existing ramp at section 4 (column 19n- 16n) 1st floor |
| 2024/08/02 | Plumbing | Rough-in | Passed | Paul Nitz | Plumbing repair at existing ramp at section 4 (column 19n- 16n) 1st floor |
| 2024/08/02 | Building/Structural | Framing | Passed | Paul Nitz | Drywall framing in visitors locker room section 13/14 |
| 2024/07/11 | Electrical | Ground | Passed | James Melvin | Ground rods for building steel 1) Al Smythe performed the inspection, it was from gate D to the first elevatoer shaft |
| 2024/04/29 | Fire Safety | System Flush | Passed | Mary Creason | UG near gate J - flushed - approved |
| 2024/04/29 | Fire Safety | Fire Water Underground | Passed | Mary Creason | Hydro and visual of piping, tracer line, bulimous paint and restraints on line into sprinkler riser room. Hydro start 810am 220psi and finished at 1020am at 220psi. Passed |
| 2024/04/25 | Fire Safety | Fire Water Underground | Passed | Mary Creason | Visual and hydro on UG piping at gate J. Hydro start at 8:10am at 205psi and end 10:10am at 2:05psi (See shop drawings for exact location) |
| 2024/04/25 | Fire Safety | Hydro-Test | Passed | Mary Creason | Visual and hydro of pipe passed. Hydro start 8:10am and ended 10:10am 205 psi Pipe is located right next to J gate. (see shop drawings for exact location) |
| 2024/04/25 | Electrical | Panel/Feeder | Passed | Dwayne Mahony | |
| 2024/01/24 | Electrical | Ceiling Rough-in | Conditional | Dwayne Mahony | Panel 94 deadfront piece is missing. Replacement of this piece is mandatory since new load is being added to this panel, per Existing Building code section 808.2. |
| 2024/01/22 | Electrical | Ceiling Rough-in | Passed | Dwayne Mahony | Inspected new lights and wiring on lower ramps. |
| Electrical | Underground | Alex Masterton | Gate D , Small section of 15kva duct bank encasement Revise project to West Stands | ||
| Fire Safety | Hydro-Test | Postponed | Curtis Rogers | 4th floor fire suppression |

BCA Project #: 23-03453- Fine Arts Bldg. - Reroof
| Inspection Date | Discipline | Type | Result | Inspector | Comments |
| 2025/05/20 | Building/Structural | Final Building | Conditional | Kody Boswell | Final Inspection Result is conditional pending installation of 3 missing drain baskets and receipt of lightning protection recertification certificate. |
| 2025/05/20 | Building/Structural | Re-Inspection | Conditional | Kody Boswell | Final Inspection Result is conditional pending installation of 3 missing drain baskets and receipt of lightning protection recertification certificate. |
| 2023/12/28 | Building/Structural | Roofing | Passed | Dwayne Mahony | In-Progress Inspection |
| 2023/12/28 | Building/Structural | Roofing | Passed | Dwayne Mahony | In-Progress Inspection |
| 2023/12/21 | Building/Structural | Roofing | Postponed | Tom Deckert | In-Progress Inspection - Cap Sheet |
| 2023/12/06 | Building/Structural | Roofing | Passed | Kody Boswell | In-Progress Inspection Reviewed installation of cap sheet on one low roof and the cleaning of existing material where cap sheet was to be installed (KB) |
| Building/Structural | Roofing | Postponed | Kody Boswell | Final Roofing/Building Inspection - Had to Reschedule due to weather Contractor contacted FSU BCA prior to site arrival to cancel/postpone inspection to a later date. | |
| Building/Structural | Final Building | Postponed | Kody Boswell | Final Roofing/Building Inspection - Had to Reschedule due to weather Contractor contacted FSU BCA prior to site arrival to cancel/postpone inspection to a later date. | |
| Building/Structural | Roofing | Postponed | Kody Boswell | Final Roofing/Building Inspection Inspection has been postponed to a later date due to incoming weather | |
| Building/Structural | Final Building | Postponed | Kody Boswell | Final Roofing/Building Inspection Inspection has been postponed to a later date due to incoming weather |

BCA Project #: 23-03450- Ringling Ca'D'Zan - Roof Replacement
| Inspection Date | Discipline | Type | Result | Inspector | Comments |
| 2025/09/05 | Building/Structural | Roofing | Passed | Rocky Wilde | inprogress inspection |
| 2025/06/06 | Roofing | In progress | Conditional | Joan Lima | Partial dry-in in progress south sides. |
| Building/Structural | Roofing | Hank Fulmer | roof in progress inspection |

BCA Project #: 23-03433- Soccer Sideline Canopy Improvement
| Inspection Date | Discipline | Type | Result | Inspector | Comments |
| 2024/01/12 | Building/Structural | Roofing | Conditional | Kody Boswell | Reviewed new aluminum supports for new roof panel installation and reviewed new roof panel attachment. Aluminum supports were in substantial compliance with the contract documents. Screw attachment of panels to structure were in substantial compliance with the contract documents and FL Product Approval. Screw attachment at panel sidelaps had not been installed yet. FSU to verify installation during next inspection. (KB) |

BCA Project #: 23-03430- Parking Garages 1-6 CCTV Upgrade
| Inspection Date | Discipline | Type | Result | Inspector | Comments |
| 2023/12/05 | Electrical | Final Electrical | Conditional | Dwayne Mahony | Contact Todd Jones for specific site inspection time. 850-544-4424 Approved garage 5 final inspection in full. |

BCA Project #: 22-03400- New College of Florida College Hall Welcome Center Electrical Improvements
| Inspection Date | Discipline | Type | Result | Inspector | Comments |
| 2023/11/09 | Electrical | Wall Rough-in | Passed | Hank Fulmer | The electrical wall rough is approved. Wires were ran for 2 new floor outlets and several wall lights. The floor outlets were ran through the crawl space in the floor and are correctly protected and sized for the circuit. The wall lights also were ran to NEC code. |

BCA Project #: 22-03364- President's House Camera Installation
| Inspection Date | Discipline | Type | Result | Inspector | Comments |
| 2024/05/15 | Electrical | Final Electrical | Failed | Dwayne Mahony | Outdoor electrical receptacles shall be GFCI protected as required by NEC 210.8. |

BCA Project #: 21-03205- Critchfield Hall - Classroom Improvements
| Inspection Date | Discipline | Type | Result | Inspector | Comments |
| 2025/02/27 | Fire Safety | Final Fire Safety | Conditional | Mary Creason | Need Fire alarm and sprinkler ROC. All other violations completed. NOTE: Address on building is the responsibility of FSU not Southern standard. I inform Phil from Critchfield building maintenance that Numbers are required on building or a sign at front of property) |
| 2023/12/08 | Fire Safety | Final Fire Safety | Conditional | Mary Creason | Final The following items are still outstanding: 1. Need Fire alarm and sprinkler final paperwork 2. Em. Light not working near water fountain/kitchen 3. EXIT sign over the front entrance door not working 4. Em. Light over main door discharge did not work when tested. NEW item : need address on building and Sign stating where sprinkler risers located on outside door to riser room. |
| 2023/12/08 | Electrical | Final Electrical | Failed | Dwayne Mahony | Items from previous inspection have not been corrected. New breaker for feeder to new panel H1A is not a new breaker, rather a used old breaker that the AIC rating is inadequate for the panel has been installed. Install adjustable trip breaker as per plans. |
| 2023/12/08 | Building/Structural | Final Building | Failed | Dwayne Mahony | Grab bar in one of the accessible toilet rooms is missing. |
| 2023/11/15 | Fire Safety | Final Fire Sprinkler | Conditional | Mary Creason | Need to provide the Contractor’s Material and Test certificate for Aboveground piping. NFPA 13: 25.1(3) edition 2016 |
| 2023/11/15 | Fire Safety | Final Fire Safety | Conditional | Mary Creason | 1. Need final paperwork from Fire alarm and sprinkler contractors 2. Emergency light did not work near kitchen area. 3. Exterior em. Light at front exit door was not installed as required on plans. |
| 2023/11/15 | Fire Safety | Final Fire Alarm | Conditional | Mary Creason | Fire Alarm final paperwork is required. Devices worked when tested |
| 2023/11/07 | Electrical | Final Electrical | Conditional | Dwayne Mahony | This building has two separate electrical services. These have long ago been installed in violation of basic NEC requirements, and must be corrected: 1. The 200 amp service is not grounded. This is a fundamental life safety hazard, and must be corrected by installing a lug in the fuse box, and running a #4 minimum conductor the grounding electrode (water pipe) at panel MDP. 2. NEC 230.2(E) requires each service to be identified (in this case Service 1 of 2, Service 2 of 2, with system voltages listed (in this case service 1 is 120/208 volts, three phase, and service two is 120/240 volts, single phase). Identifying multiple services is important for emergency personnel trying to de-energize a building. Identifying voltages and phases is important to electrical service technicians. 3. Identify where the circuit breaker is that feeds new panel H1A. No 200 amp breaker located. |
| 2023/11/07 | Building/Structural | Final Building | Conditional | Dwayne Mahony | Install the accessible parking sign as noted on the plans. Install signage for the toilet rooms. |
| 2023/11/07 | Mechanical | Final Mechanical | Conditional | Dwayne Mahony | Provide test and balance report. Of specific interest will be control and operation of the toilet room (s) exhaust fan. This fan was not running at time of inspection. The plans call for toilet room doors to have 1 1/2" undercut, for "return air", which may have been intended to be for exhaust make-up air. The doors have some undercut; the architect is to determine if this is satisfactory. |
| 2023/09/28 | Fire Safety | Final Fire Safety | NOT READY | Mary Creason | Need to call in sprinkler and fire alarm finals Also trade finals. |
| 2023/06/15 | Building/Structural | Framing | Passed | Dwayne Mahony | Approved the soffit framing over the main entry bar/counter. |
| 2023/02/23 | Building/Structural | Masonry | Passed | Tom Deckert | Rebar for 8' bond beam- RI steel in place per CD's. All cells clean for grout placement. |
| 2023/02/08 | Building/Structural | Masonry | Passed | Andy Howard | Andy Howard met with Travis Sullivan for this inspection. The first lift of vertical masonry passed inspection. |
| 2023/02/06 | Building/Structural | Slab | Passed | Andy Howard | FaceTime call with Andy. This inspection was performed using video telephone between Andy Howard and Travis Sullivan on 02/06/2023. |
| 2023/01/20 | Building/Structural | Footing | Passed | Andy Howard | Andy Howard met with Travis Sullivan and Mike Walker/Gulf Coast Masonry for this inspection. Footer width, depth, and steel sizes and placement were as per plans. Inspection passed. |
| 2023/01/11 | Electrical | Ceiling Rough-in | Passed | Andy Howard | Andy Howard/FSU BCA, Travis Sullivan/Southern, and Shannon Stephens/L&L Electric met for this inspection. The second floor junction boxes and conduits were inspected for above ceiling installation. This inspection was done at 11:15 A.M. est. |
| 2022/11/21 | Building/Structural | Sheetrock | Passed | Tom Deckert | Wall Patches secured OK to finish |
| 2022/11/15 | Building/Structural | Framing | Passed | Andy Howard | Andy Hoard, Neely Lewis, Travis Sullivan, and Shannon Stephens were present for the stud wall framing and electrical wall rough inspections. Both inspections passed. |
| 2022/11/15 | Electrical | Wall Rough-in | Passed | Andy Howard | Andy Hoard, Neely Lewis, Travis Sullivan, and Shannon Stephens were present for the stud wall framing and electrical wall rough inspections. Both inspections passed. |
| Mechanical | Final Mechanical | Neely Lewis | Final |

BCA Project #: 20-03138- Keen Building Re-Roofing
| Inspection Date | Discipline | Type | Result | Inspector | Comments |
| 2023/02/07 | Electrical | Final Electrical | Conditional | Andy Howard | Final Electrical: Andy Howard, Neely Lewis, Sean Mitchell, Travis Marchant, Kent Malik, Matt Ganskop, Mark Poindexter, and Kurt Koetz were present for this joint inspection. The panel on the roof requires a permanent placard identifying the panel, the feed from panel, and the circuit breaker associated with the new exhaust fan. 2017 NEC 408.4 field identification of new equipment. |
| 2023/02/07 | Building/Structural | Roof Final | Conditional | Andy Howard | Roof Final Building Inspection: Andy Howard, Neely Lewis, Sean Mitchell, Travis Marchant, Kent Malik, Matt Ganskop, Mark Poindexter, and Kurt Koetz were present for this joint inspection. The final building inspection is dependent on the final mechanical deficiencies and the final electrical deficiencies to be corrected. Once Final Mechanical and Final Electrical pass, the Final Building can be passed. See the final mechanical and final electrical results for dificiencies. |
| 2023/02/07 | Mechanical | Final Mechanical | Failed | Neely Lewis | 1. Roof drains appear to not be installed according to manufacturers instructions, including the interfacing of the roof membrane with the roof drain. The hole cut into the membrane is smaller than the bowl below it. See Zurn product literature rd-cvr-21. 2. Condensate lines from the package a/c units need to be secured to the roof. FBC2020-M Section 301.15. |
| 2023/01/10 | Building/Structural | Roofing | Passed | Andy Howard | Andy Howard/FSU BCA met with Matt Ganskop and Nick Polovich of OWC at the walk way concrete roof covering the sidewalk between Keen and Collins. This inspection was for the MDC Product Approved Siplast Liquid Applied Roof Coating. This stage of the work included approximately 70% of the roof area with the first stage of the installation which includes a coating directly on the existing coating, a textile membrane, and a coating on top of the membrane. This is stage one of a multilayer installation - see the MDCPA for the exact steps. This is an inprogress inspection. A final inspection is required. |
| 2022/09/06 | Building/Structural | Roofing | Passed | Andy Howard | Andy Howard, Sean Mitchell, Kent Malik, and John Travis Marchant of FSU and Jacob Winters of OWC met for a cap sheet inprogress inspection. The cap inprogress passed, however, the FSU Design team and Project Manager discussed multiple quality control tems to be reworked. John Travis Marchant will be producing a report on the items that were discussed. |
| 2022/08/18 | Building/Structural | Roofing | Conditional | Tom Deckert | This work was concealed without BCA inspection. AOR and Manufacturers inspections will be reviewed for records and acceptance. Contractor needs to verify roof drains / capacities and wall flashing detail. Note- Contractor ceased torching activities until 2 charged extinguishers were on site. |